HomeMy WebLinkAbout7407_INSP_20180124FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
MSWLF LCID
T&P YW Transfer Compost SLAS COUNTY: Pitt
Closed
MSWLF HHW White
goods X Incin T&P FIRM PERMIT NO.: 7407-CDLF-2009
CDLF X Tire T&P /
Collection X Tire
Monofill Industrial
Landfill DEMO SDTF FILE TYPE: COMPLIANCE
Date of Inspection: 24 January 2018 Date of Last Inspection: 8 May 2017
FACILITY NAME AND ADDRESS:
C&D Landfill, Inc
802 Recycling Lane
Greenville, North Carolina 27834
GPS COORDINATES: N: 35.6160944 E: -077.1865917
FACILITY CONTACT NAME AND PHONE NUMBER:
Wayne Bell; General Manager
252.752.8274
FACILITY CONTACT ADDRESS:
EJE Recycling and Disposal, Inc
802 Recycling Lane
Greenville, North Carolina 27834
E-mail: wayne@ejerecycle.com
Attn: Wayne Bell
PARTICIPANTS:
Wayne Bell; EJE Recycling and Disposal, Inc
Ray Williams; NCDEQ-Solid Waste
STATUS OF PERMIT:
Expired; Permit to Operate (PTO) issued 21 July 2009, expired 21 July 2014. Pursuant to 15A NCAC 13B .0201(c)
and .0206(a) a complete permit review request including updated Facility, Operations, and Waste Screening Plans was
due on or before 21 March 2014.
PURPOSE OF SITE VISIT:
Partial Facility Compliance Inspection without records review
STATUS OF PAST NOTED VIOLATIONS:
1) 15A NCAC 13B .0542 (a) states “The owner or operator of a C&DLF unit must maintain and operate
the facility in accordance with the operation plan prepared in accordance with this Rule.”
-C&D LANDFILL, INC. CONSTRUCTION AND DEMOLITION DEBRIS (C&D) LANDFILL
PERMIT NO. 74-07-CDLF-2009 ATTACHMENT 1 PART IV: GENERAL CONDITIONS (6) states
“Construction and operation of this solid waste management facility must be in accordance with the Solid
Waste Management Rules, 15A NCAC 13B, Article 9 of Chapter 130A of the North Carolina General
Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit; and the approved plan.”
-C&D LANDFILL, INC. CONSTRUCTION AND DEMOLITION DEBRIS (C&D) LANDFILL
PERMIT NO. 74-07-CDLF-2009 ATTACHMENT 2 PART I: FACILITY SPECIFIC CONDITIONS
(18) states “All required sedimentation and erosion control measures must be installed and operable to
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
7407_INSP_20180124
Page 2 of 5
mitigate excessive on-site erosion and to prevent silt from leaving the area of the landfill unit during the
service life of the facility.”
-C&D LANDFILL, INC. CONSTRUCTION AND DEMOLITION DEBRIS (C&D) LANDFILL
PERMIT NO. 74-07-CDLF-2009 ATTACHMENT 3 PART I: OPERATING CONDITIONS (13) states
“The use of alternative periodic cover requires approval, prior to implementation, by the Section.”
Unresolved. The Facility operator has repaired the landfill cap system by compacting, covering, and grading
all Facility sideslopes at a slope not greater than 3:1. However, a groundcover suitable to prevent erosion of
the landfill cap system has not yet been established.
2) 15A NCAC 13B .0542 (f)(2) states “…areas which will not have additional wastes placed on them for three
months or more, but where final termination of disposal operations has not occurred, must be covered and
stabilized with vegetative ground cover or other stabilizing material.” Unresolved. All inactive areas of the
landfill have been compacted, covered, and graded at a slope not greater than 3:1. However, a groundcover
suitable to prevent erosion of the landfill cap system has not yet been established.
3) 15A NCAC 13B .0542 (k)(1) states “Adequate sediment control measures consisting of vegetative cover,
materials, structures or devices must be utilized to prevent sediment from leaving the C&DLF facility.”
Unresolved. A groundcover suitable to prevent erosion of the landfill cap system has not yet been
established.
4) 15A NCAC 13B .0542 (k)(3) states “Provisions for a vegetative ground cover sufficient to restrain erosion
must be accomplished as directed by appropriate state or local agency upon completion of any phase of
C&DLF development consistent with Rule .0543(c)(5) of this Section.” Unresolved. A groundcover suitable
to prevent erosion of the landfill cap system has not yet been established.
ADDITIONAL COMMENTS:
1) This Facility is a Construction and Demolition Landfill, White Goods Collection, and Scrap Tire Collection
facility.
2) This Facility is permitted to receive Construction and Demolition (C&D) waste as defined in 15 NCAC 13B
.0532(8); Inert Debris as defined in GS 130A-290 (a)(14); Land-clearing waste as defined in GS 130A-290
(a)(15); Asphalt in accordance with GS 130-294 (m); and regulated-asbestos containing material in
accordance with 40 CFR 61 and 15 NCAC 13B .0542 (c).
3) This Facility is permitted to receive the aforementioned wastes generated within a 100-mile radius of the
Facility. Counties included in the permitted area are Beaufort, Bertie, Bladen, Camden, Carteret, Chatham,
Chowan, Craven, Cumberland, Currituck, Dare, Duplin, Durham, Edgecombe, Franklin, Gates, Granville,
Greene, Halifax, Harnett, Hertford, Hyde, Johnston, Jones, Lenoir, Martin, Nash, New Hanover,
Northampton, Onslow, Pamlico, Pasquotank, Pender, Perquimans, Pitt, Sampson, Tyrrell, Vance, Wake,
Warren, Washington, Wayne, and Wilson Counties.
4) This Facility is currently operating in Phase II.
5) Proper signage including the Facility permit number, accepted waste types, banned or excluded items, hours
of operation, and the emergency contact number is posted at the Facility entrance.
6) The hours of operation are Monday through Friday 7:00 AM to 5:00 PM.
7) The Facility is secured by means of a locked gate at the Facility entrance.
8) The entrance to the Facility is well maintained and no windblown debris was noted along the roadway
approaching the site.
9) The Facility access road is of all-weather construction and is being maintained in overall good condition.
10) Permanent Edge of Waste Markers are in place around the footprint of the landfill and are being maintained
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
7407_INSP_20180124
Page 3 of 5
as required.
11) Groundwater monitoring wells were observed during this Facility Compliance Inspection. All reviewed wells
were readily accessible, properly labeled, and secured with functional locks.
12) Ground vegetative material is being stockpiled in an area adjacent to the northern end of Phase II for use in
weekly cover and erosion repair. The stockpile is being maintained with a buffer of 50 feet from all surface
water ditches. This ground vegetative material is mixed with soil at a 50/50 ratio and used as cover.
13) The soil cover mix is being properly applied, compacted, and sloped at a slope not greater than 3:1. Weekly
cover operations are being conducted as required.
14) The active working area is being maintained in a compact and manageable size. The working area is being
covered weekly or when it reaches ½ acre in size.
15) Windblown debris is being well managed. No windblown materials were observed outside of the active
working area.
16) The waste type was reviewed; only Construction & Demolition waste was observed and no unpermitted waste
streams were noted in the active disposal area during this Facility Compliance Inspection.
17) All outside slopes of Phase II have recently been covered, compacted, and graded at a slope not greater than
3:1. Plans are underway for the seeding and mulching of all repaired/newly graded areas. *As per our
conversation, these areas need to be seeded and mulched as soon as possible to establish a groundcover
suitable to prevent erosion of your landfill cap system.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
7407_INSP_20180124
Page 4 of 5
18) An area of erosion was observed on the southwest sideslope of Phase II just below the old access road to the
top lift (please see the aerial photograph below). *This area should be filled, compacted, and graded at a slope
not greater than 3:1 and then seeded and mulched to establish a groundcover suitable to prevent erosion of
your landfill cap system.
Approximate area of
erosion on Phase II
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
7407_INSP_20180124
Page 5 of 5
19) Cover and grading repair on the outside slopes of Phase I are underway. As per our conversation, it is
recommended that tracked equipment work vertically on the final cover of the outside slopes to help prevent
the channelization of surface waters which leads to erosion of your landfill cap.*Please continue working to
cover and grade all outside slopes of Phase I. Once completed, all repaired areas should be seeded and
mulched to establish a groundcover suitable to prevent erosion of your landfill cap system.
20) *Continued corrective measures are required as a result of this Facility Compliance Inspection.
Please contact me if you have any questions or concerns regarding this Facility Compliance Inspection Report.
Ray Williams; Environmental Senior Specialist Phone: 252.948.3955 E-mail: ray.williams@ncdenr.gov
Regional Representative
Delivered on: 26 January 2018 by X Electronic delivery US Mail Certified No. [ _]
cc: Andrew Hammonds; Eastern District Supervisor/SWS: andrew.hammonds@ncdenr.gov
John Demary; Director/Pitt County Solid Waste & Recycling: john.demary@pittcountync.gov
C: \2018\Pitt\Facilities\74-07\Inspections\7407_INSP_20180124
NCDEQ DWM Laserfiche Online Document Management System: http://edocs.deq.nc.gov/WasteManagement/Welcome.aspx
Go Green! Thank you for helping NCDEQ be environmentally responsible.