Loading...
HomeSearchMy WebLinkAbout01 Note: Folder also contains GW Extraction-Treatment and BW related documents not specifically requested in the COA.2021.09.14_CCOA.p3b_DEQ 60% Barrier Wall Comment Response Table2021.09.14_CCOA.p3b_DEQ Comments on Pre-Design Investigation Summary2021.09.15_CCOA.p.3b_DEQResponse60%DesignSubmittalBarrierWall2022.01.11_CCOAp3p_BW CQA Plan_post60%design2022.01.11_CCOAp3p_Chemours Groundwater_PMP_post60%design2022.02.15 CCOA.p3b_DEQ Questions from SiteVisit_202112162022.02.15_CCOA.p3b_DEQ resp_PMP_CQAsubm_after60p_subm2022.03.14_CCOA.p3b_DEQ-InitialQuestionsModeler2022.03.17_CCOAp3b_Chemours Response PMP_CQA_Comment2022.03.18 CCOAp3b_Chemours_PFM Tracer Memo_not require permit2022.03.24 CCOAp3b_DEQ Email M. Rogers to Garon_UIC Permitnot reqd_PFM2022.03.25_CCOA.p3b_90 Percent Design Report2022.03.25_CCOA.p3b_90% Design Report Cover Letter2022.03.25_CCOA.p3b_Appd A - GW Model Rpt_90pDesign2022.03.25_CCOA.p3b_ChemoursResp_GWModelComm_20220215_202203142022.03.25_EMAIL_[External] Chemours - Barrier Wall and Groundwater Extraction System 90% Design Report2022.03.25_EMAIL_RE_ [External] Chemours - Barrier Wall and Groundwater Extraction System 90% Design Report2022.06.03_CCOA.p3b_DEQ_Model-subm7_questions2022.07.14 CCOA.p3b. ChemResp_DEQcomments-model_202206032022.08.31_CCOA.p3b_Barrier Wall_Revised Plan_Profile2022.09.15 CCOA.p3b_DEQ Response_BW and Ext System 90% Design_Comments_Cond Approval2022.09.15 CCOA.p3b_DEQ Response_BW and Ext System 90% Design_Letter_Cond Approval2022.10.13_CCOA.P3b_Barrier Wall CQA Plan2022.10.25_CCOA.p3b_Chemours resp DEQ 90p Letter_202209152022.10.26_CCOA.p3b_DEQapproval_BW and ExtSystem 90p design_FINAL2022.11.17_CCOA.p3b_Request_WC_AltLocs_PMP_ObsWells2022.12.12_CCOA.p3b_GW EX Well Depth Table_As Built2022.12.14_CCOA.p3b_DEQ_partialapproval_WC-AltWellLocs2023.01.18_CCOA.p3b_ChemoursEmail_TestingResults_TestPanels2023.03.01_CCOA.p3b_Chemours_BW Sch Letter to DEQ2023.03.02_CCOA.p3b_DEQresponse_ChemLetter 202303012023.03.15_CCOA.p3b_Chemours_FINAL LEAF test report2023.04.21_CCOA.p3b_Email-Const-QAtesting-updApril2020232023.05.30_CCOA.p3b_Email-Const-HydroTurf-QATesting-updMay2520232023.06,20_CCOAp3b_GEOS TM Package Review Letter 48+30 to 49+102023.06.12_CCOAp3b_Email-Const-BWlengthconstructed_061120232023.06.20_CCOA.p3b_eMailTransKG_Chemours BW Project Update2023.06.22_CCOAp3b_GEOS TM Package Rev Letter 48+30 to 49+10rev1_Sealed2023.06.23_CCOAp3b_ProfileNotes-BW_InstallProgress2023.06.28_CCOA.p.3b_DEQ Final Comments_LEAFreport-rev22023.07.13_CCOAp3b_Email_withCompleted_CQA Testing Table2023.08.01_CCOA.p3b_Excess BW Roadbed Material testing results and plans-additonal testing2023.08.16_CCOA.p3b_DEQ approval_TransferAdmixture_Info-whygravelroad2023.10.06_CCOA.p3b_Memo_AreaB6_BWAdmixture_SPLPresults_202310062023.10.10_CCOA.p3b_Transm Oct-10MemoDoc_Email_RoadBedAlignment_202310102023.10.12_CCOA.p3b_Hydraulic Barrier Wall Quality Certification_GEOS2023.10.19_CCOA.p3b_Emails Re N align road const_quest 1006 memo2023.11.30_CCOA.p3b_Email Trans-SoilTesting Report_LEAFupdate2023.11.30_CCOA.p3b_SPLP_Report_BW Material