Current folder
All folders
Advanced
My WebLink
More
Help
About
Sign Out
No entry selected.
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
01 Note: Folder also contains GW Extraction-Treatment and BW related documents not specifically requested in the COA.
2021.09.14_CCOA.p3b_DEQ 60% Barrier Wall Comment Response Table
2021.09.14_CCOA.p3b_DEQ Comments on Pre-Design Investigation Summary
2021.09.15_CCOA.p.3b_DEQResponse60%DesignSubmittalBarrierWall
2022.01.11_CCOAp3p_BW CQA Plan_post60%design
2022.01.11_CCOAp3p_Chemours Groundwater_PMP_post60%design
2022.02.15 CCOA.p3b_DEQ Questions from SiteVisit_20211216
2022.02.15_CCOA.p3b_DEQ resp_PMP_CQAsubm_after60p_subm
2022.03.14_CCOA.p3b_DEQ-InitialQuestionsModeler
2022.03.17_CCOAp3b_Chemours Response PMP_CQA_Comment
2022.03.18 CCOAp3b_Chemours_PFM Tracer Memo_not require permit
2022.03.24 CCOAp3b_DEQ Email M. Rogers to Garon_UIC Permitnot reqd_PFM
2022.03.25_CCOA.p3b_90 Percent Design Report
2022.03.25_CCOA.p3b_90% Design Report Cover Letter
2022.03.25_CCOA.p3b_Appd A - GW Model Rpt_90pDesign
2022.03.25_CCOA.p3b_ChemoursResp_GWModelComm_20220215_20220314
2022.03.25_EMAIL_[External] Chemours - Barrier Wall and Groundwater Extraction System 90% Design Report
2022.03.25_EMAIL_RE_ [External] Chemours - Barrier Wall and Groundwater Extraction System 90% Design Report
2022.06.03_CCOA.p3b_DEQ_Model-subm7_questions
2022.07.14 CCOA.p3b. ChemResp_DEQcomments-model_20220603
2022.08.31_CCOA.p3b_Barrier Wall_Revised Plan_Profile
2022.09.15 CCOA.p3b_DEQ Response_BW and Ext System 90% Design_Comments_Cond Approval
2022.09.15 CCOA.p3b_DEQ Response_BW and Ext System 90% Design_Letter_Cond Approval
2022.10.13_CCOA.P3b_Barrier Wall CQA Plan
2022.10.25_CCOA.p3b_Chemours resp DEQ 90p Letter_20220915
2022.10.26_CCOA.p3b_DEQapproval_BW and ExtSystem 90p design_FINAL
2022.11.17_CCOA.p3b_Request_WC_AltLocs_PMP_ObsWells
2022.12.12_CCOA.p3b_GW EX Well Depth Table_As Built
2022.12.14_CCOA.p3b_DEQ_partialapproval_WC-AltWellLocs
2023.01.18_CCOA.p3b_ChemoursEmail_TestingResults_TestPanels
2023.03.01_CCOA.p3b_Chemours_BW Sch Letter to DEQ
2023.03.02_CCOA.p3b_DEQresponse_ChemLetter 20230301
2023.03.15_CCOA.p3b_Chemours_FINAL LEAF test report
2023.04.21_CCOA.p3b_Email-Const-QAtesting-updApril202023
2023.05.30_CCOA.p3b_Email-Const-HydroTurf-QATesting-updMay252023
2023.06,20_CCOAp3b_GEOS TM Package Review Letter 48+30 to 49+10
2023.06.12_CCOAp3b_Email-Const-BWlengthconstructed_06112023
2023.06.20_CCOA.p3b_eMailTransKG_Chemours BW Project Update
2023.06.22_CCOAp3b_GEOS TM Package Rev Letter 48+30 to 49+10rev1_Sealed
2023.06.23_CCOAp3b_ProfileNotes-BW_InstallProgress
2023.06.28_CCOA.p.3b_DEQ Final Comments_LEAFreport-rev2
2023.07.13_CCOAp3b_Email_withCompleted_CQA Testing Table
2023.08.01_CCOA.p3b_Excess BW Roadbed Material testing results and plans-additonal testing
2023.08.16_CCOA.p3b_DEQ approval_TransferAdmixture_Info-whygravelroad
2023.10.06_CCOA.p3b_Memo_AreaB6_BWAdmixture_SPLPresults_20231006
2023.10.10_CCOA.p3b_Transm Oct-10MemoDoc_Email_RoadBedAlignment_20231010
2023.10.12_CCOA.p3b_Hydraulic Barrier Wall Quality Certification_GEOS
2023.10.19_CCOA.p3b_Emails Re N align road const_quest 1006 memo
2023.11.30_CCOA.p3b_Email Trans-SoilTesting Report_LEAFupdate
2023.11.30_CCOA.p3b_SPLP_Report_BW Material
2023-03_CCOA.p3b-NPDES NC0090042-Plant 004 System Optimization Rpt 1_Rev 0
2023-04_CCOA.p3b-NPDES NC0090042-Plant 004 System Optimization Rpt 2 Rev 0
2023-05_CCOA.p3b-NPDES NC0090042-Plant 004 Sysem Optimization Rpt 3
2023-06-26_CCOA.p3b-NPDES NC0090042-Plant 004 System Optimization 4
2023-07-26_CCOA.p3b-NPDES NC0090042-Plant 004 System Optimization 5
2023-08-30_CCOA.p3b-NPDES NC0090042-Plant 004 System Opt Rpt 6_Final