Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
01 Note: Folder also contains GW Extraction-Treatment and BW related documents not specifically requested in the COA.
2021.09.14_CCOA.p3b_DEQ 60% Barrier Wall Comment Response Table
2021.09.14_CCOA.p3b_DEQ Comments on Pre-Design Investigation Summary
2021.09.15_CCOA.p.3b_DEQResponse60%DesignSubmittalBarrierWall
2022.01.11_CCOAp3p_BW CQA Plan_post60%design
2022.01.11_CCOAp3p_Chemours Groundwater_PMP_post60%design
2022.02.15 CCOA.p3b_DEQ Questions from SiteVisit_20211216
2022.02.15_CCOA.p3b_DEQ resp_PMP_CQAsubm_after60p_subm
2022.03.14_CCOA.p3b_DEQ-InitialQuestionsModeler
2022.03.17_CCOAp3b_Chemours Response PMP_CQA_Comment
2022.03.18 CCOAp3b_Chemours_PFM Tracer Memo_not require permit
2022.03.24 CCOAp3b_DEQ Email M. Rogers to Garon_UIC Permitnot reqd_PFM
2022.03.25_CCOA.p3b_90 Percent Design Report
2022.03.25_CCOA.p3b_90% Design Report Cover Letter
2022.03.25_CCOA.p3b_Appd A - GW Model Rpt_90pDesign
2022.03.25_CCOA.p3b_ChemoursResp_GWModelComm_20220215_20220314
2022.03.25_EMAIL_[External] Chemours - Barrier Wall and Groundwater Extraction System 90% Design Report
2022.03.25_EMAIL_RE_ [External] Chemours - Barrier Wall and Groundwater Extraction System 90% Design Report
2022.06.03_CCOA.p3b_DEQ_Model-subm7_questions
2022.07.14 CCOA.p3b. ChemResp_DEQcomments-model_20220603
2022.08.31_CCOA.p3b_Barrier Wall_Revised Plan_Profile
2022.09.15 CCOA.p3b_DEQ Response_BW and Ext System 90% Design_Comments_Cond Approval
2022.09.15 CCOA.p3b_DEQ Response_BW and Ext System 90% Design_Letter_Cond Approval
2022.10.13_CCOA.P3b_Barrier Wall CQA Plan
2022.10.25_CCOA.p3b_Chemours resp DEQ 90p Letter_20220915
2022.10.26_CCOA.p3b_DEQapproval_BW and ExtSystem 90p design_FINAL
2022.11.17_CCOA.p3b_Request_WC_AltLocs_PMP_ObsWells
2022.12.12_CCOA.p3b_GW EX Well Depth Table_As Built
2022.12.14_CCOA.p3b_DEQ_partialapproval_WC-AltWellLocs
2023.01.18_CCOA.p3b_ChemoursEmail_TestingResults_TestPanels
2023.03.01_CCOA.p3b_Chemours_BW Sch Letter to DEQ
2023.03.02_CCOA.p3b_DEQresponse_ChemLetter 20230301
2023.03.15_CCOA.p3b_Chemours_FINAL LEAF test report
2023.04.21_CCOA.p3b_Email-Const-QAtesting-updApril202023
2023.05.30_CCOA.p3b_Email-Const-HydroTurf-QATesting-updMay252023
2023.06,20_CCOAp3b_GEOS TM Package Review Letter 48+30 to 49+10
2023.06.12_CCOAp3b_Email-Const-BWlengthconstructed_06112023
2023.06.20_CCOA.p3b_eMailTransKG_Chemours BW Project Update
2023.06.22_CCOAp3b_GEOS TM Package Rev Letter 48+30 to 49+10rev1_Sealed
2023.06.23_CCOAp3b_ProfileNotes-BW_InstallProgress
2023.06.28_CCOA.p.3b_DEQ Final Comments_LEAFreport-rev2
2023.07.13_CCOAp3b_Email_withCompleted_CQA Testing Table
2023.08.01_CCOA.p3b_Excess BW Roadbed Material testing results and plans-additonal testing
2023.08.16_CCOA.p3b_DEQ approval_TransferAdmixture_Info-whygravelroad
2023.10.06_CCOA.p3b_Memo_AreaB6_BWAdmixture_SPLPresults_20231006
2023.10.10_CCOA.p3b_Transm Oct-10MemoDoc_Email_RoadBedAlignment_20231010
2023.10.12_CCOA.p3b_Hydraulic Barrier Wall Quality Certification_GEOS
2023.10.19_CCOA.p3b_Emails Re N align road const_quest 1006 memo
2023.11.30_CCOA.p3b_Email Trans-SoilTesting Report_LEAFupdate
2023.11.30_CCOA.p3b_SPLP_Report_BW Material
2023-03_CCOA.p3b-NPDES NC0090042-Plant 004 System Optimization Rpt 1_Rev 0
2023-04_CCOA.p3b-NPDES NC0090042-Plant 004 System Optimization Rpt 2 Rev 0
2023-05_CCOA.p3b-NPDES NC0090042-Plant 004 Sysem Optimization Rpt 3
2023-06-26_CCOA.p3b-NPDES NC0090042-Plant 004 System Optimization 4
2023-07-26_CCOA.p3b-NPDES NC0090042-Plant 004 System Optimization 5
2023-08-30_CCOA.p3b-NPDES NC0090042-Plant 004 System Opt Rpt 6_Final