Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
22059 - GSK - Approved Revised EMP 9.2.2020
22059 GlaxoSmithKline - Full Public Notice Package
22059 GSK - approval to construct ph I buildings without VIMS
22059_GlaxoSmithKline (Monsanto) _TKC-3029 Holdings_LURU21
22059_GlaxoSmithKline LLC_Recorded Brownfields Plats_7-24-2020
22059_GlaxoSmithKline LLC_Recorded Notice of Brownfields Property_7-24-2020
22059_GlaxoSmithKline_ARE_LURU 22
22059_GlaxoSmithKline_DM_06.10.2020
22059_GlaxoSmithKline_DPR RTP Genesis_LURU 22
22059_GlaxoSmithKline_Transmittal Ltr
22059_GSK_LVI_20200429
22059_MONSANTI_Property Map_1
22059_Monsanto Co_Affidavit
22059_Monsanto Co_BPA_20181003
22059_Monsanto Co_Internal Notice
22059_Monsanto Co_RN Fee Conset Form - Nov 8 2018
22059_MONSANTO_11 DCE SAFETY DATA SHEET
22059_MONSANTO_2003 Oct North Complex USTs LSA Report
22059_MONSANTO_2014 dec 3 signed SQG 8700-12
22059_MONSANTO_2015 dec 2_ltr to emerg resp plus SDS atts
22059_MONSANTO_2015 feb 12 North USTs additional assessment rept
22059_MONSANTO_2015-mar-5 NFA Nth Bldg USTs
22059_MONSANTO_2016 april DEQ Acceptance Construction Completion Report
22059_MONSANTO_2017 5-31 Golder Report of Duke Transformer Removal
22059_MONSANTO_2018 april 18_RCRA financial assurance
22059_MONSANTO_A-1 November 9 2012 Email to NCDENR
22059_MONSANTO_A-2 Revised Drawings Add 2 January 14 2013 Email
22059_MONSANTO_ACOE jurisd determ 9-17-09
22059_Monsanto_APP G GW Sampling Logs
22059_MONSANTO_cis 1 dEC SDS
22059_MONSANTO_Closure Report of GSK North Bldg
22059_MONSANTO_CSA N Site Energy Center Law 1995
22059_MONSANTO_Deeds
22059_MONSANTO_DEMOLITION DETAILS
22059_MONSANTO_Easementstest
22059_MONSANTO_Emergency Response Facility Layout
22059_MONSANTO_EXCAVATION EXHIBIT
22059_MONSANTO_Figure of Current Site Overview
22059_Monsanto_FINAL 3RD ANNUAL ASSESSMENT REPORT
22059_Monsanto_FINAL 4TH ANNUAL ASSESSMENT REPORT
22059_Monsanto_FINAL First Annual Report 2015 5-13-15
22059_MONSANTO_Final GSK Excavation RPT 4-03 North Bldg AST Installation
22059_MONSANTO_GSK North Complex RJD (final)
22059_Monsanto_GW Monitoring_JULY 2017_App F Lab Repts
22059_MONSANTO_Interim Measures Soil Excavation Report July 2006
22059_MONSANTO_Law CAP N Site Energy Ctr UST 1995
22059_Monsanto_LOE_20181119
22059_MONSANTO_NCDOT Right-of-Way Plans
22059_MONSANTO_NEC UST-SWMU 15-closure ltr
22059_MONSANTO_North Complex USTs Closure Report
22059_MONSANTO_North Phase I Report_5.6.11
22059_MONSANTO_Nth Bldg UST closure DENR ltr 1-9-06
22059_MONSANTO_PARTIAL SITE TOPO PLAN-NORTH COMPEX
22059_MONSANTO_PCB Report Cover Letter 9-18-15
22059_MONSANTO_Phase 1 Limited Site Assessment Oct. 24, 2003
22059_Monsanto_Revised BPA
22059_Monsanto_Second Annual Report 2016_FINAL
22059_MONSANTO_Stormwater Repair near former waste storage area 2008
22059_MONSANTO_TANK SUPPORT SYSTEM
22059_MONSANTO_TCE SDS DEC 1
22059_MONSANTO_UST Removal Discussion Letter July 12 2013
22059_MONSANTO_vinyl chloride SDS
22059_MONSANTO_Waste Minimization Program July 2017
22059_MONSANTO_Zoning
22059_Mosanto_RN Fee Receipt - 18a
Construction Completion Report - September 2015
Monsanto Approved EMP (BPN 22059-18-032)_20190531
Sept 25 2023 NonCompliance letters 231
Sept 25 2023 NonCompliance letters 232
September 22 NonCompliance Letters 226