Loading...
HomeSearchMy WebLinkAbout0803 Historical Files0803 E. Carolina Reg. MSWLF, Volume 2of2, Permit App.-Erosion and Sedimentation-Part B, 3-16-93 -Rev. March 30th & 6-2-93_199306020803 E. CarolinaReg.MSWLF_Final Leachate Recirculation Program Report-April 2003_Final Approval Letter issued 200305280803 E. CarolinaReg.MSWLF_Vol. 1of2, Permit App., Part B, 3-16-93, Revised 3-30th, 6-2nd, 7-28th & 7-29-93_199307290803 E. CarolinaReg.MSWLF_Vol. 1of2, Permit App., Part B, Draft 3-16-93, Revised 3-30th, 6-2th & 7-28-93_199307280803 Phase 6-Cell15A Ops Approval FID17114630803_Action Plan_June 18-20210803_Addendum to Report of Geotechnical Exploration, etc._199307210803_Addendum to Report of Geotechnical Exploration_199307210803_Approval to receive waste in Cell 3, Subcell 4_199312140803_Approval to receive waste in Cell 4 of Phase I_199407070803_Bertie County Regional Landfill_Submittal in Response to Completeness Review by the NCSWMD Geological and Hydrogeological Site Assesment_199304280803_Bertie Regional Landfill Expansion_Submittal of Additional Soil Test Boring and Piezometer Data_Design Hydrogeologic Report- Cells 3,4,5 and 6_199307210803_Bertie_EastCarolinaMSWLandfill_ModApproval_FID1657814_202203290803_Bertie_EastCarolinaMSWLandfill_ModRequest_FID1657812_202202240803_BertieRegionalLF_ Lateral Stability of Subsurface Soils_199307230803_BertieRegionalLF_ Permit Application_199301010803_BertieRegionalLF_A Cultural Resource Assessment of the Spruill Farms Tract_199212010803_BertieRegionalLF_Report of Geotechnical Exploration Slope Stability and Settlement_199305180803_BertieRegionalLF_Volume 1 of 2_PermitApplication_Part B_19930316_Revised-_199303300803_BertieRegionalLF_Volume 2 of 2_PermitApp._Erosion and Sedimentation_Part B_March 16th, 1993_Revised March 30th-_199306020803_Compilation of Geotechnical Submittals_199607190803_Construction Quality Assurance Report_200109010803_Contours represent bottom of clay_199406150803_Data Submittal of Additional Soil Test Borings and Piezometer Installation_199303310803_Design Hydrogeologic Report_Phase 2_Cells 7 and 8_199611050803_DRAWINGS-Design Hydrogeologic Report_Phase 2_Cells 7 and 8_199611050803_East Carolina 2023_FACostEst0803_East Carolina Regional MSWLF_Report of Groundwater Statistical Analysis and Ground and Surface Water Quality Results_First SemiAnnual Sampling Event_199404070803_East Carolina Regional MSWLF_Report of Groundwater Statistical Analysis and Ground and Surface Water Quality Results_First SemiAnnual Sampling Event_199604240803_East Carolina Regional MSWLF_Report of Groundwater Statistical Analysis and Ground and Surface Water Quality Results_Second SemiAnnual Sampling Event_199410070803_EastCarolina_19930811_RecordedPTC_DIN166640803_EastCarolina_19940408_TransitionPlan_DINxxxx0803_EastCarolina_19941205_ResponseToComments_DIN143860803_EastCarolina_19951009_Correspondence_DIN143850803_EastCarolina_19961105_PTCPhase2_FID13782870803_EastCarolina_19990418_PTOPhase1and2_FID13782880803_EastCarolina_20000210_GeologicObservationCell9_DIN55210803_EastCarolina_20000327_PTCPhase3Cell9_FID13782980803_EastCarolina_20001031_FranAgreeSupplements_DIN263280803_EastCarolina_20001108_PTOPhase3_FID13782970803_EastCarolina_20010424_ArticlesOfMerger_FID13783850803_EastCarolina_20011024_Invoice0803_EastCarolina_20011111_TechnicalSpecsADC_FID13783800803_EastCarolina_20020128_PTCPhase3_FID13783310803_EastCarolina_20020501_PTOPetroleumSoils_FID13783320803_EastCarolina_20021130_ResponseToFA_DIN177900803_EastCarolina_20030326_WasteSolidProcess_FID13784070803_EastCarolina_20030603_PTOSludge_FID13783330803_EastCarolina_20030923_PTOPhase3Cell10_FID13783340803_EastCarolina_20031119_NotificationOfSiteSuitability_FID13783350803_EastCarolina_20040219_PTO_FID13783360803_EastCarolina_20050101_PermitFile_DIN207520803_EastCarolina_20050617_RecordedPTO_DIN208310803_EastCarolina_20050714_PTCPhase4_FID13783380803_EastCarolina_20060328_PTO_DIN2090803_EastCarolina_20060524_Capacity_DIN28050803_EastCarolina_20060525_CQACertification_DIN2440803_EastCarolina_20060606_MonResults_DIN48400803_EastCarolina_20060615_PTO_DIN2410803_EastCarolina_20060615_PTOCoverLetter_DIN2420803_EastCarolina_20060719_ADCDemoRequest_DIN30840803_EastCarolina_20070124_BackgroundSamplingReport_DIN9180803_EastCarolina_20070316_GWMonReport_DIN22390803_EastCarolina_20070629_MethaneMon_DIN30350803_EastCarolina_20070904_GWSampling_DIN29980803_EastCarolina_20070919_ConstructionSpecifications_DIN53160803_EastCarolina_20070930_MethaneReport_DIN39370803_EastCarolina_20071011_Cell12Redesign_DIN33650803_EastCarolina_20071105_Correspondence_DIN33360803_EastCarolina_20071108_ResponseToComments_DIN33890803_EastCarolina_20071108_ResponseToComments_DIN54750803_EastCarolina_20071115_ResponcetoComments_DIN33830803_EastCarolina_20071115_VarianceBoring_DIN33910803_EastCarolina_20071205_ResponseToCommentsPhase5_DIN45830803_EastCarolina_20080114_GWSampling_DIN216350803_EastCarolina_20080131_Closure_DIN39380803_EastCarolina_20080303_GWSampling_DIN42440803_EastCarolina_20080402_Phase5PTCApp_DIN66590803_EastCarolina_20080501_CQACell12_DIN53140803_EastCarolina_20080513_HydroApproval_DIN44830803_EastCarolina_20080514_HydroComments_DIN45040803_EastCarolina_20080514_PTCAppDesignHydroPhase5_DIN60320803_EastCarolina_20080602_ResponseToComments_DIN53150803_EastCarolina_20080617_PTO_DIN48860803_EastCarolina_20080618_PTOCoverLetter_DIN48870803_EastCarolina_20080722_MethaneMon_DIN55530803_EastCarolina_20080905_GWMonReport_DIN125540803_EastCarolina_20080930_MethanMon_DIN220320803_EastCarolina_20081024_CompletnessLetter_DIN59620803_EastCarolina_20081108_RequestAddInfo_DIN33560803_EastCarolina_20081111_PTCAppPhase5Part1_DIN59610803_EastCarolina_20081201_MethaneMon_DIN220300803_EastCarolina_20090115_FacilityDrawings_66290803_EastCarolina_20090209_PTC_DIN66280803_EastCarolina_20090225_MethaneMon_DIN219970803_EastCarolina_20090310_GWSampling_DIN73140803_EastCarolina_20090819_GWMonReport_DIN177640803_EastCarolina_20090914_GWMonReport_DIN156490803_EastCarolina_20091116_PiezometerAbandomentReport_DIN89470803_EastCarolina_20091228_GWMonWellMethaneInstallReport_DIN91020803_EastCarolina_20100122_CapacityRequest_DIN93700803_EastCarolina_20100308_GWMonReport_DIN85050803_EastCarolina_20100311_FacilityMap_DIN120480803_EastCarolina_20100319_GWMonReport_DIN102460803_EastCarolina_20110121_PTORequest_DIN127840803_EastCarolina_20110225_GWMonReport_DIN133050803_EastCarolina_20110307_LFG_DIN140040803_EastCarolina_20110604_CompletenessLetter_DIN135400803_EastCarolina_20110614_RevisedOpsPlan_DIN141460803_EastCarolina_20110615_GWMPlanApproval_DIN141470803_EastCarolina_20110616_ADCDemoApproval_DIN141510803_EastCarolina_20110616_PTO_DIN135920803_EastCarolina_20110817_AFR10-110803_EastCarolina_20110822_GWMonReport_DIN151450803_EastCarolina_20120314_GWMonReport_DIN163950803_EastCarolina_20120326_ExtensionRequest_DINxxxxx0803_EastCarolina_20120418_LeachateEvapoDemo_DIN164570803_EastCarolina_20120419_AckLetter_DIN164580803_EastCarolina_20120612_Cell13DemoProject_DIN178470803_EastCarolina_20120905_AFR11-120803_EastCarolina_20121002_ProtectiveCoverRequest_DIN164570803_EastCarolina_20121009_GWMonReport_DIN175570803_EastCarolina_201220326_AltCoverDemo0803_EastCarolina_20130128_CoverDemoRequest_DIN182920803_EastCarolina_20130213_GeoReportCell13_DIN184930803_EastCarolina_20130215_CorrespondenceSubgradeInsp_DIN184920803_EastCarolina_20130220_PTCMod_DIN178490803_EastCarolina_20130221_PTCModLetter_DIN185300803_EastCarolina_20130301_GWMonReport_DIN187690803_EastCarolina_20130701_CQACell13_DIN192910803_EastCarolina_20130715_Invoice0803_EastCarolina_20130729_AFR12-130803_EastCarolina_20130809_NSPSTempVariance_DIN196820803_EastCarolina_20130823_PTO_DIN194500803_EastCarolina_20130908_GWMonReport_DIN201520803_EastCarolina_20131204_Invoice0803_EastCarolina_20140204_OpsPlan_DIN205600803_EastCarolina_20140204_PTCRenewalRequest_DIN207180803_EastCarolina_20140331_GWMonReport_DIN221800803_EastCarolina_20140421_PTOPTC_DIN207170803_EastCarolina_20140502_CompletenessLetter_DIN205590803_EastCarolina_20140813_WellAbandInstallReport_DIN218230803_EastCarolina_20141003_BackgroundSampling_DIN221810803_EastCarolina_20141003_BackgroundSampling_DIN22181 (2)0803_EastCarolina_20141026_AFR13-140803_EastCarolina_20150330_GWMonReport_DIN245270803_EastCarolina_20150730_AFR14-150803_EastCarolina_20151019_CQABaseLiner_DIN251870803_EastCarolina_20151019_CQABaseLiner_DIN25187 (2)0803_EastCarolina_20160127_GWMonReport_DIN272140803_EastCarolina_20160211_Approval_AerosolizationImplementation_DIN284210803_EastCarolina_20160727_GWMonReport_DIN272190803_EastCarolina_20160801_AFR15-160803_EastCarolina_20170509_GWMonReport_DINxxxxx0803_EastCarolina_20170613_Cell14CQAPlan_FID13771950803_EastCarolina_20170726_GWMonReport_FID12010640803_EastCarolina_20170801_AFR16-170803_EastCarolina_20170818_LetterRescindingLeachateEvaporationDemo_FID7322680803_EastCarolina_20170818_LettertoDEQRescindEvapDemo_FID7322690803_EastCarolina_20170907_Cell14Plans_FID13771960803_EastCarolina_20180226_MWInstallCell14_FID10879240803_EastCarolina_20180307_PreconSigninSheet0803_EastCarolina_20180413_GWMonReport_FID11335000803_EastCarolina_20180423_techreviewDHRandEMPPhase6and7_FID11332830803_EastCarolina_20180517_ResponseToComments_FID12130370803_EastCarolina_20180524_NCSWSapprovedrevisionstoDHRandEMP_FID12130280803_EastCarolina_20180529_finalapprovedDHRPhases6and7_FID12133220803_EastCarolina_20180529_finalapprovedWQMPandLFGMP_FID12133230803_EastCarolina_20180531_FinalapprovalDHRandEMP_FID12133210803_EastCarolina_20180702_FacilityresponsetoSWSletter_FID12156200803_EastCarolina_20180706_SWSemailtofacilityreAppIIwells_FID12366100803_EastCarolina_20180714_Statistical procedure_FID12609060803_EastCarolina_20180725_GWMonReport_FID12378510803_EastCarolina_20180801_AFR17-180803_EastCarolina_20180817_AppIIDetections_FID12372910803_EastCarolina_20180919_assessmentletter_FID12546570803_EastCarolina_20180921_ReportofGeologocObservationCell14_FID12609800803_EastCarolina_20181011_requestforGW7replacement_FID12566750803_EastCarolina_20181019_FranchiseAgreement_FID12608330803_EastCarolina_20190116_GW7Rwellinstallationreport_FID1280502_201901160803_EastCarolina_20190123_Jan2019GWMR_FID13209240803_EastCarolina_20190206_PTCPhase6and7AppPart1_FID12852260803_EastCarolina_20190206_PTCPhase6and7AppPart2_FID12852280803_EastCarolina_20190304_NotificationofAppIIdetects_FID12857400803_EastCarolina_20190304_PARFInvoice0803_EastCarolina_20190409_PTOExtensionLetter_FID13189150803_EastCarolina_20190506_ADCDemoProject_FID13203730803_EastCarolina_20190517_ReviewResponseJan2019GWMR_FID13209250803_EastCarolina_20190606_SoilMulchAlternativeCoverNotification_FID13393330803_EastCarolina_20190721_FireOccurrenceReport0803_EastCarolina_20191107_CQAReportCell14_FID13768840803_EastCarolina_20191210_PTOPTC_FID13792160803_EastCarolina_HydroMemo_200304290803_EastCarolina_PermitFiles_200001010803_EastCarolina_TempChangetoOperationalHours_FID1638265_202108060803_EastCarolinaLF, Report of Piezometer Abandonment_Cell 8_199710140803_EastCarolinaLF_199804020803_EastCarolinaLF_199807290803_EastCarolinaLF_Cell 9_Phase 3 Expansion_200006130803_EastCarolinaLF_ConstructionQualityAssuranceManual_Feb.1993_Revised-19930601_199307280803_EastCarolinaLF_DesignHydrogeologicReport_Permit to Construct_Phase 4_Cells 11-12_Revised-20050603_Approved-200507140803_EastCarolinaLF_DesignHydrogeologicReport_Phase 3_Cells 9-10_20000125_Approved-200003270803_EastCarolinaLF_Erosion Control Plan Submittal_199307010803_EastCarolinaLF_Expansion_Permit to Construct_April 2004_Approved-_200506170803_EastCarolinaLF_Expansion_Site Application and Facility Plan_Permit to Construct_June 2003_200506170803_EastCarolinaLF_PermitFile_199301010803_EastCarolinaLF_PermitFile_199401010803_EastCarolinaLF_PermitFile_199501010803_EastCarolinaLF_permitfile1996_199601010803_EastCarolinaLF_PermitFiles_199701010803_EastCarolinaLF_Water Monitoring Procedures_199307010803_EastCarolinaReg.MSWLF_Report of Groundwater Statistical Analysis and Ground and Surface Water Quality Results_199311040803_EastCarolinaReg.MSWLF_Report Of Piezometer Abandonment_Cell 6_199508140803_EastCarolinaReg.MSWLF_SiteHydrogeologicReport_PermitToConstruct_200506170803_EastCarolinaReg.MSWLF_Volume 1 of 2_Permit Application_Part B_March 16th, 1993_Revised-19930330_199306020803_EastCarolinaReg.MSWLF_Volume 1 of 2_Permit Application_Phase 4_ConstructionPermit_May 2005_Approved-_200507140803_EastCarolinaReg.MSWLF_Volume 1 of 2_Permit Application_Phase 5_ConstructionPermit_200804030803_EastCarolinaReg.MSWLF_Volume 1 of 2_Site Application and Facility Plan_July 1998_19980724)0803_EastCarolinaReg.MSWLF_Volume 2 of 2_Permit Application, Part B_March 16th, 1993_Revised March 30th and June 2nd_199307280803_EastCarolinaReg.MSWLF_Volume 2 of 2_PermitApplication_Phase 4_Construction Permit_May 2005_Approved-200507140803_EastCarolinaReg.MSWLF_Volume 2 of 2_PermitApplication_Phase 5_ConstructionPermit_April 2008_200804030803_EastCarolinaReg.MSWLF_Volume 2 of 2_Site Application and Facility Plan_July 1998_199807240803_FAX_DRAFT-Preliminary Plans_Water Monitoring Procedures_199307280803_FAX-Contact Address for the East Carolina Landfill_199401110803_FAX-Contact and Address for subject landfill_199401110803_Final Petroleum Contaminated Soil Alternative Daily Cover Progress Report_200304280803_Final Water Quality Monitoring Plan_199309300803_FireOccurrenceReport_201809020803_FireOccurrenceReport-ECLF_202206160803_FireOccurrenceReport-ECLF_6_30_20230803_INSP_200611030803_INSP_200706180803_INSP_200908270803_INSP_201105050803_INSP_201111150803_INSP_201302050803_INSP_201307100803_INSP_201408140803_INSP_201608110803_INSP_201706020803_INSP_201805160803_INSP_201809250803_INSP_201903270803_INSP_201910040803_INSP_201911210803_INSP_202004170803_INSP_202005110803_INSP_202008190803_INSP_202102220803_INSP_202103240803_INSP_202106290803_INSP_202107290803_INSP_202109300803_INSP_202111100803_INSP_202201070803_INSP_202203070803_INSP_202206080803_INSP_202209270803_INSP_202301240803_INSP_202303300803_INSP_202305310803_INSP_202407220803_Installation of Phase 1 of the Landfill Gas Collection System_200109240803_Letter Notice -Work will begin on Cell 5 within a few weeks_199406220803_Letter Notice work will begin on Cell 5 within next few weeks_199406220803_Letter-Notice that the East Carolina Env., Inc. will begin work on Cell No. 5 in a few weeks_199406220803_Notebook Contents_19931230-Revised0803_Notebook Contents-Revised_19931230-Revised0803_NOV Resolution Letter_202206100803_NOV_202107120803_Operation Plan_200205010803_Permit Application_199211230803_Permit Renewal Application, Phase 2, Volume 2 of 2. May 14th, 1996_19960820-Revised_19961105-Approved0803_Permit to Const. Renewal_201402040803_Permit to Construct Renewal_201402040803_Permit to Construct_19930806_199307260803_POA_ Inspection Issues on 04-17-20200803_Reference-Approval to receive waste in Cell 3_Subcell 4_199312140803_Reference-Approval to receive waste in Cell 4 of Phase 1_199406160803_Reference-Approval to receive waste in Cell 4 of Phase 1_199406200803_Reference-Approval to receive waste in Cell 4 of Phase I_199406160803_Reference-Approval to receive waste in Cell 4 of Phase I_199406200803_Reference-Approval to receive waste in Cell 4 of Phase I_199407070803_Reference-General Condition & Specific Design Requirements_199307260803_Reference-Work on project completed_199312070803_RepublicServices__EastCarolina_2022CostEstimate_202208190803_Revised Cross Section of Soils on the Subject Project Request_199307150803_Revised Cross Sections of Soils on the subject project_199307150803_Sixty Day Leachate Recirculation Progress Report_200211110803_Specifications and Contract Documents for Construction of Cell Number 9_200002240803_Submittal of all the CQA documentation for Cell 3_199312160803_Technical Specification_199307270803_The work of the Subject Project was completed_199312070803+EastCarolinaLF_PermitFiles_199901010803Annual Aerial Survey Letter dated 19950803Com0803-East Carolina MSWLF_Approval Ops Cell 15B_FID1821269_202311150803-East Carolina MSWLF-1993_CQAReportCell15B Review_FID1819294_202310230803-East Carolina MSWLF-1993_CQAReportCell15B_FID1818111_202309230803-East Carolina MSWLF-1993_PTO_FID1820019_202312200803-East Carolina MSWLF-1993_Revised CQAReportCell15B & Response to comments_FID1819734_202310250803Map19920803Map19930803MAP1993-CONST DESIGN0803MAP1993-ErosionControl0803MAP1993-FacilityMasterPlan0803Map19940803Map1995 Plans0803MAP1995-CONST PLANS0803Map19960803Map1996 MAPS0803MAP1996 PERMIT REN-PH 20803MAP1996-PTC PHASE 20803Map19970803Map19980803MAP1998-AERIAL MAP0803Map19990803Map20000803MAP2000-PH CELL 90803map2000-ptccell90803Map20010803Map20020803Map20030803Map20050803Map20060803-MSWLF-1991_GeologicObservationReport Cell15A_FID1652565_202203090803-MSWLF-1993 East Carolina Regional Landfill SW022-0027 PARF & Invoice 03-09-20220803-MSWLF-1993 East Carolina Environmental Regional Landfill SW021-0046 PARF & Invoice 04-05-20210803-MSWLF-1993 East Carolina Environmental Regional Landfill SW019-0110 PARF & Invoice 11-12-190803-MSWLF-1993:Leachate Survey:June 20240803-MSWLF-1993_Abandonment report for monitoring well and piezometers_FID1792626_202305010803-MSWLF-1993_AppII sampling 1527637_202012230803-MSWLF-1993_April 2023 Piezometer Abandonment_FID1790957_202304130803-MSWLF-1993_EastCarolina_ModificationRequest_FID1575055_202103260803-MSWLF-1993_EastCarolina_PTO_FID1585840_202106100803-MSWLF-1993_FAR-FY2018-190803-MSWLF-1993_FAR-FY2018-19_Fees0803-MSWLF-1993_FAR-FY2019-200803-MSWLF-1993_FAR-FY2019-20_Fees0803-MSWLF-1993_FAR-FY2020-210803-MSWLF-1993_FAR-FY2020-21_Fees0803-MSWLF-1993_FAR-FY2021-220803-MSWLF-1993_FAR-FY2021-22_Fees0803-MSWLF-1993_FAR-FY2022-230803-MSWLF-1993_FAR-FY2023-240803-MSWLF-1993_FAR-FY2023-24_Fees0803-MSWLF-1993_Feb 2023 WQMR_FID1788860_202302070803-MSWLF-1993_Geologic Observation Report Cell No. 15_FID1795713_202305220803-MSWLF-1993_Jan2020GWMR_FID1401500_202001240803-MSWLF-1993_Jan2021GWMR_FID _202101260803-MSWLF-1993_July 2020 GWMR_FID1527636_202007290803-MSWLF-1993_July 2021 WQMR_FID1624847_202107280803-MSWLF-1993_July 2021 WQMR_FID1624847_20210728 (2)0803-MSWLF-1993_July 2022 WQMR_FID1717458_202207280803-MSWLF-1993_July2019WQMR_FID1377137_201907260803-MSWLF-1993_Leachate Release Abatement Report_FID1600683_202108170803-MSWLF-1993_Leachate Release Sampling Plan approval_FID 1592709_202107200803-MSWLF-1993_Leachate Release Soil Excavation & Sampling Plan_FID1592598_202107190803-MSWLF-1993_Leachate Report review_FID1624084_202111080803-MSWLF-1993_LeachateReleaseAbatementReport_FID1618488_202110110803-MSWLF-1993_May 2024 WQMR_FID1897912_202405090803-MSWLF-1993_May2023GeologicObservReportCell15B_FID1815699_202305310803-MSWLF-1993_NCSWS response to Leachate Release Abatement_FID 1600698_202108200803-MSWLF-1993_Notice of App II detections_FID1390246_202002200803-MSWLF-1993_Nov 2023 WQMR_FID1830651_202311290803-MSWLF-1993_Well installation and abandonment report_FID1387662_202001130803-Permit Renewal Application_Volume 1 of 2, Phase 2_19961105-Approved0803Permit19900803Permit19910803Permit19920803Permit19930803Permit19940803Permit19950803Permit19960803Permit19970803Permit19980803Permit19990803Permit20000803Permit20010803Permit20020803Permit20030803Permit20040803Permit20050803Permit20060803Photo19910803Photo19970803Photo19980803Photo20000808-MSWLF-1993_Jan 2022 WQMR_FID1664147_20220128RepublicServices, Inc._2023FAReview_FID1792604_20230508SW_F_0803-MSWLF-1993_20080617_G_Oxxxx_Unknown_20080609_MethaneMonitoring_DIN4893