HomeMy WebLinkAboutNCC191775_NOI Application_20190910Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 9/6/2019 1:38:10 PM (NCG01 NOI Submission)
Approve by Farkas, Jim J 9/9/2019 11:40:50 AM (Review- Construction NOI 15640)
• The task was assigned to Farkas, Jim J by round robin distribution 9/6/2019 1:38 PM
The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 10, 2019 5:00
PM 9/6/2019 1:38 PM
Submit by McCoy, Suzanne 9/10/2019 11:52:36 AM (Payment Verification for NCC191775)
* Jason Rivenbark.
• McCoy, Suzanne assigned the task to McCoy, Suzanne 9/10/2019 11:51 AM
• The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 9, 2019 5:00 PM
9/9/2019 11:41 AM
1re) frIT7i)Mfi1i(-_ToIa1010
NORTH CAROLINA
Ernvlronmentol qualily
A. Project Information
Part A.
Project Location and Waterbody Inforrration
1. Project Name * RIDGEMOOR (formerly COUNTRY WALK S/D PHASE 1)
2. County* Wake
3. Highway or Street ACKERMAN RD AND HEBRON CHURCH RD
Address * Street name only is acceptable if no address nurrtrer assigned yet
4. City or Township* GARNER
5. State * NC
6. Zip Code* 27529
7. Latitude * Enter the latitude in decirral degrees
35.6699
8. Longitude * Enter the longitude in decirral degrees (MJSTbe negative)
-78.5813
If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of
North Carolina. Look for the coordinates in the bottom left corner.
9. Date to Begin*
05/17/2019
Estimated Construction Project Start Date
10. Date to End*
01 /01 /2020
Estimated Construction Project End Date
11. SIC (Primary)*
Residential, Other
than SFE (1522)
Standard Industrial Gassification for Development
12. Acres to be
39.00
disturbed*
(including off -site borrow and waste areas)
13. Total site area 93.00
(acres)*
14. Post- 20.34
construction (Estimated)
impervious area
(acres) *
NCC Project NCC-WAKE-2019-RIDGEMOOR (formerly COUNTRY WALK S/D
Tracking ID PHASE 1)
Assigned autorratically
Below you must enter waterbody information for surface waters affected by this project. Please consult
DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. You may
enter up to 3 waterbodies.
15a. Receiving MAHLERS CREEK
Wate rbody* Narre of waterbody into which storrrwater runoff will discharge
15b. Waterbody 27-43-9
Index No. * NC Waterbody Index Ninber
Stormwater PF No
discharges will flow r Yes
to additional
wate rs *
16a. Is this project F Yes
subject to the NC r No, not subject to NC SPCA
Sediment Pollution
Control Act?*
B. Permittee Information
Part B.
P rrrittee Information - Legally Responsible Entity and Individual
.....................................................................................................................................................................
h
Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application
form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same
organization. That person must be a responsible corporate officer who owns or operates the construction activity, such
as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
1. Organization LENNAR CAROLINAS, LLC
Name *
2. First Name* TROY
ff Corporation, enter Registered Agent First l\brre
3. Last Name * GEORGE
ff Corporation, enter Registered Agent Last Barre
3b. Title Division President
4. Permitee E-mail TROY.GEORGE@LENNAR.COM
Address*
5. Permittee 919-465-5935
Telephone No.*
6. Permittee Mailing Street Address
Address* 1100 Perimeter Park Drive
Address Line 2
SUITE 112
City
Morrisville
Postal / Zip Code
27560
Check box if the
street address the
same as mailing
address
7. Permittee Street
Address*
fJ Yes
Street Address
1100 Perimeter Park Drive
Address Line 2
SUITE 112
City
Morrisville
Postal / Zip Code
27560
State / Province / Region
NC
Country
US
State / Province / Region
NC
Country
US
C. Site Contact Information
Part C.
Proiect Site Contact Information
1. Type of Non -Government
Ownership*
2. Primary Site STEVEN
Contact - First
Name *
3. Primary Site MALLORY
Contact - Last
Name *
4. Title DIVISION ENVIRONMENTAL MANAGER
5. Site Contact E- STEVEN.MALLORY@LENNAR.COM
mail Address*
6. Site Contact 919-624-4629
Telephone No.*
7. Organization
LENNAR CAROLINAS, LLC
Name
8. Site Contact
Street Address
Mailing Address*
1100 Perimeter Park Drive
Address Line 2
SUITE 112
City
Morrisville
Fbstal / Zip Code
27560
9. Consultant Name (Optional)
First and Last nave
10. Consultant E- This person will be copied on all correspondence.
mail
11. Consultant
Telephone No.
State / Province / Pegion
NC
Country
US
D. E&SC Plan
Part D.
Erosion & Sediment Control (E&SC) Ran Approval Information
.......................................................................................................................................................................................................................................
1. Date E&SC Plan 01/29/2019
Approved *
2. E&SC Plan Project SEC-008798-2018
Number/ID* Assigned by agency or local program
3. E&SC Plan f State DEQ Office
Approved by r Local Program
4. Local Program* Wake County
Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a
complete application.
5. E&SC Plan 2019-01-29 Wake County ES Phase I ES Approval
Approval 275.68KB
Letter.pdf
letter/documentation
Mist be RJF format
6. NOI Certification CountryWalk_NOICertForm.pdf 443.25KB
Form Mist be RJFformat
This is an Express r No
Review Project* r Yes
E. Certification
North Carolina General Statute 143-215.6B (1) provides that:
Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other
documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement
of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders
inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the
Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand
dollars ($10,000).
Under penalty of law, I certify that:
rJ I am the person responsible for the construction activities of this project, for
satisfying the requirements of this permit, and for any civil or criminal penalties
incurred due to violations of this permit.
* V The information submitted in this NOI is, to the best of my knowledge and belief,
true, accurate, and complete based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the
information.
* I7 I will abide by all conditions of the NCG010000 General Permit and the
approved Erosion and Sediment Control Plan.
* V If the Erosion and Sediment Control Plan approved by the delegated program is
not compliant with Part II (Stormwater Pollution Prevention Plan) of the
NCG010000 General Permit, I will nonetheless ensure that all conditions of Part
II of the permit are met on the project at all times.
* I7 I hereby request coverage under the NCG010000 General Permit and
understand that coverage under this permit will constitute the permit
requirements for the discharge(s) and is enforceable in the same manner as an
individual permit.
Specify if you are:* r The Responsible Person named on this Notice of Intent
r Authorized Responsible Person*
Important: The person who signs this Certification above and signs the NOI Certification Form should be the same
person (or authorized responsible person within the same organization) as listed in Section B (Permittee Information)
of this form. *An authorized individual is a responsible corporate officer who owns or operates the construction activity,
such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,
Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part
IV, Section B, Item (6) of that permit.
Signature
Y
Type Name* Troy George
Title Division President
Organization Lennar Carolinas, LLC
Date * 09/06/2019
F. Tracking and COC Info
NOI Tracking No. 15640
NC Reference No. NCG01-2019-1775
Uses 'count _nunber'variable (increrrented by SP)
Certificate of NCC191775
Coverage (COC) Uses'count_nunber'variable (incremented by SF)
No. *
Count Number 1775
Sequential nunber for subrrittal that is increrrented by Stored Procedure
COC Year 2019
Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)