Loading...
HomeMy WebLinkAboutCumberland Contractor Yard - ACP NC Cumberland (CY 10-A) Drainage Calcs_06072018ATLANTIC COAST PIPELINE PROJECT ATLANTIC COAST PIPELINE, LLC AND DOMINION ENERGY TRANSMISSION, INC. NORTH CAROLINA CONTRACTOR/PIPE YARDS EROSION AND SEDIMENT CONTROL PLAN HYDRAULICS CALCULATIONS FOR CONTRACTOR YARD (CY SPR 10-A) IN CUMBERLAND COUNTY, NORTH CAROLINA Atlantic Coast Pipeline Project NC Contractor & Pipe Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 i I.Introduction ....................................................................................................................... 1 II.CUMBERLAND CONTRACTOR YARD (CY SPR 10-A) ................................................... 4 A.Project and Site Descriptions .............................................................................................. 4 B.Existing Site Conditions ...................................................................................................... 4 C.Soils .............................................................................................................................. 4 D.Adjacent Areas ................................................................................................................... 5 E.Off-site Areas ...................................................................................................................... 5 F.Critical Areas ...................................................................................................................... 6 G.Erosion and Sediment Control Measures ........................................................................... 6 H.Stormwater Runoff Considerations ..................................................................................... 6 Atlantic Coast Pipeline Project NC Contractor & Pipe Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 ii Appendices Appendix A – Contractor Yard - CY SPR 10-A A1 Soils Report A2 Drainage Area Maps A3 Calculations A3.1 A3.2 A3.3 A3.4 Hydrologic and Hydraulics Calculations – HydroCAD A3.1.1 Watershed Composite Curve Number Calculations Sediment Basin Calculations Infiltration Basin Calculations Sand Filter CalculationsA3.5 Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 Page 1 I. Introduction As part of the Atlantic Coast Pipeline (ACP) project in North Carolina, Dominion Energy Transmission, Inc. (DETI) will construct contractor yards and pipe yard for construction staging. Each site, sized between 30 to 45 acres, will consist of a gravel road, gravel parking area, topsoil blending pile, and maintained turf land for equipment over the current parcels. Sediment basins, sediment traps, perimeter sediment barriers, and diversions will be constructed to control runoff volume, rate, and velocity before drainage discharges from the site. Additional erosion and sediment control (ESC) measures are detailed in the plans and narrative for the project. As such, this report summarizes erosion and sediment control measures, hydraulic analyses, and calculations that form the basis for the contractor yard erosion and sediment control design. As part of the construction process of installing large diameter gas pipelines, these yards are utilized for the purposes of daily parking for pipe liners, welding of pipe, storing of fuel, providing offices via temporary trailers, and minor material storage. These yards are temporary and are anticipated to be utilized for approximately two years beginning in 2018. After the construction activities, temporary soil stockpiles, rock staging areas and equipment areas shall be removed, regraded, and stabilized to pre-existing conditions per the landowner agreements. The erosion and sediment control plan contained herein has been developed in accordance with applicable provisions of the latest editions of the North Carolina Erosion and Sediment Control Planning and Design Manual by the North Carolina Department of Environmental Quality (DEQ), and the latest editions of the North Carolina Department of Environmental Quality Stormwater Design Manual. As such, the plan includes provisions for erosion and sediment control for the contractor yard and pipe yard sites. These measures are capable of minimizing or eliminating, where possible, potentially adverse effects of the development. These measures are intended to provide adequate protection for the environment, the project site, and to downstream properties, which could be affected by sedimentation and changes in runoff related to construction of the contractor yards. Perimeter controls and sediment trapping facilities shall be constructed as a first step in land-disturbing activities. Additionally, stabilization of earthen structures is required immediately after installation. The proposed site disturbance area for each of the sites is greater than 1 acre. The proposed sites will incorporate BMPs and stormwater management facilities designed to meet the requirements enacted under North Carolina Stormwater regulations with respect to Minimum Design Criteria (MDC) for all Stormwater Control Measures (SCMs). The sites will be restored to their pre-development conditions to the extent feasible upon the completion of the estimated two-year service life. The proposed SCMs that will be implemented on the site, such as perimeter barriers, sediment basins, infiltration devices, and diversions to provide essential stormwater quality improvements. Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 Page 2 For the purposes of this document, the following definitions apply: ●Limits of Disturbance (LOD): The boundary within which ground disturbance occurs (or may occur) as a result of construction-related activities. DETI and/or the construction activity operator must design, install, implement and maintain pollution prevention measures to: Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters; Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on-site to precipitation and to stormwater; Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures; Prohibit the discharge of wastewater from the washout of concrete; Prohibit the discharge of wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; and Prohibit the discharge of fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance. Note that DETI is formally requesting the following deviations from the NCDEQ Standard Sediment and Erosion control measures: ●Use of Belted Silt Retention Fence (BSRF) in lieu of Silt Fence (SF). ●Use of Compost Filter Sock (CSF) in lieu of Silt Fence (SF). Drainage node numbering utilized in the drainage calculations and on the drainage area maps has been set up to be consistent for each contractor yard site and is as follows: 100S series numbers – Pre-Development for the site. 200S series numbers - (Post) ESC-Development for the site. The modeling software utilized for the hydrologic and hydraulic analyses included: The Time of Concentration (Tc) for both the Pre and (Post) ESC Developed condition of all drainage areas was calculated. GIS was utilized to obtain drainage areas, flow paths, and land use information based on readily available County GIS data. This information was used in the HydroCAD software. Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 Page 3 HydroCAD was the primary hydraulic software used to calculate flow rates for Q1, Q2, and Q10, design storms to size and analyze hydraulic structures such as culverts, sediment traps, and sediment basins, and to conduct hydraulic analysis of stream channel erosion, channel volume capacity, and overall site hydrology. FHWA HY8 was utilized for culvert analysis and design for the Q10 design storm and to calculate the outlet velocity for riprap outlet protection design. Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 Page 4 II. CUMBERLAND CONTRACTOR YARD (CY SPR 10-A) A. Project and Site Descriptions As part of the Atlantic Coast Pipeline (ACP) project, Dominion Energy Transmission Inc. is proposing to construct a contractor staging area approximately 3.3 miles southeast of Fayetteville, North Carolina on U.S. Highway 24. The site is located at 35°02'45.76"N and 78°49 25.94"W, and is bounded by Highway 24 on the northeast, Downing Road on the north, Accord Rd on the west, and an agricultural parcel to the south. The proposed yard limits will cross two parcels identified as: Parcel ID 0457-51-1976. The parcel (property) owner for this site is Martha L Hair & Kathy Nell Hair Radcliff with a parcel area of 51.7 acres. Parcel ID 0457-40-6622. The parcel (property) owner for this site is John S. Hair Jr with a parcel area of 99.8 acres. Table II.A-1 – Project Area Summary Parcel Parcel (acres) Limits of Disturbance (acres) A 51.7 14.4 B 99.8 26.2 Total 151.5 40.6 B. Existing Site Conditions The site topography generally slopes toward the south. The grade varies from approximately one quarter to two percent (0.25-2%) sloped towards the existing wetland near the southern edge of Parcel B. Currently the sites are agricultural fields, with an isolated strip of woody vegetation on the southern corner of Parcel B and between the access roads along the east side. (Appendix A2- Drainage Area Maps). Soils on the site are predominantly sandy loam. C. Soils Based on the USDA NRCS Web Soil Survey (Appendix A1), the breakdown of the soils present within the project limits are hydrologic soil groups B, C with some A. The project site consists mostly of Map Unit WmB and AaA soils with additional small portions of Map Unit TaB and Ro soils. Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 Page 5 Table II.C-1 – Project Area Underlying Soil Unit Symbol Unit Name HSG Drainage Class Wmb Wickham fine sandy loam B Well Drained AaA Altavista fine sandy loam C Moderately well drained TaB Tarboro loamy A Somewhat excessively drained Ro Roanoke and Warne C/D Poorly Drained The analysis incorporated this soils information by assigning various land use and corresponding curve numbers per NRCS TR-55 Urban Hydrology for Small Watersheds. The proposed gravel lots will be considered as impervious. D. Adjacent Areas The subject project area parcel is bounded by roadways on the north and west sides and agricultural fields and residential homes on the eastern and southern side. Adjacent parcel ownerships are summarized in the Table II.D-1. Table II.D-1 – Adjacent Parcel Summary Direction Adjacent Parcel Owner Land Use Description North Highway 24 West Accord Rd South Mary J. Clark Young Agricultural Land South John S Hair, Jr. Agricultural Land East Mary J. Clark Young Agricultural Land E. Off-site Areas Any construction activities for the project that are performed outside the limits of disturbance depicted on the plans will be considered off-site. At this time, there are no off-site areas that have been identified. However, if additional area for fill material is needed, or if additional sites are needed for disposal of excess material, these sites will require an approved Erosion and Sediment Control Plan from the Plan Approving Authority prior to soil transport to or from the off-site area. The Erosion and Sediment Control permits must be posted at the waste/borrow area before the site is utilized. The proper erosion and sediment control procedures will be implemented by the Contractor for any off-site areas required for the project. The permit holder shall be responsible for final stabilization and maintenance of all off-site areas. Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 Page 6 F. Critical Areas The critical area of the project, with respect to sediment impacts, is the existing wetland on the southern edge of the project area. Site specific practices to protect these areas are compost filter sock, belted silt retention fence, and a sediment basin. DETI intends to utilize diversions to reduce the existing overland slope length and direct the flow to sediment basins for downstream protection. The erosion and sediment control practices are illustrated on the plans (Sheet 3 of 7) and described herein. This area should be considered a critical area throughout construction and additional protection should be provided, as needed, to ensure adequate protection of these areas. G. Erosion and Sediment Control Measures The erosion and sediment control measures for the CY10A site are indicated on the plans and include, but are not limited to, the use of rock construction entrances; compost filter sock or belted silt retention fence; dewatering devices; rock check dam; outlet protection; riprap; culvert; sediment barrier; stormwater conveyance channel; sediment basin, riser, barrel, emergency spillway; and diversions. Additionally, dewatering devices may be utilized for sediment basin cleanout during operation of the contractor yards and during site restoration when the contractor yards are no longer needed. Unless otherwise noted, all vegetative and structural erosion and sediment control practices are to be constructed and maintained according to the NCDEQ standards. The Minimum Standards are to be adhered to unless otherwise waived or approved by a variance by authorities having jurisdiction. Drainage Area Maps are provided in Appendix A2 and ESC measures can be found on Plan Sheet 3 of 9. H. Stormwater Runoff Considerations Under the post-condition and within the LOC, runoff from the northwest portion of the site (area 222S) and northeast portion of the site (area 223S) will discharge west to an existing swale along an access road off of Downing Road. A large portion of the site located to the south of the 222S and 223S will drain south to an 18” culvert under the existing access road, then to a twin 18” culvert under a gravel lot access road, then into the Sediment Basin 221. Drainage areas from the east and west property lines combine with the flows from the twin 18” culvert. This flow then travels into the sediment basin and discharges out of the basin into the natural wetland drainage area in a southerly direction to the Unnamed Tributary to Locks Creek (refer to Appendix A2 for Drainage Map Post-Condition). The southeast corner of the site (area 224S) will discharge southeast to an existing swale which ultimately combines with runoff from the discharge from 221S. Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 Page 7 Water Quantity Hydraulic calculations were evaluated using HydroCAD for the 1-, 2-, and 10-year storms. Calculations can be found for the pre-development conditions and post-development conditions in Appendix A3.1.1. The results are summarized in Table II.H-1. Table II.H-1 – Outfall Summary Pre Drainage Area Pre‐ Q1 (CFS) Pre‐ Q2 (CFS) Pre‐ Q10 (CFS) Post Drainage Area Post‐ Q1 (CFS) Post‐ Q2 (CFS) Post‐ Q10 (CFS) 121S 24.59 20.4 30.8 64.5 221S 24.59 1.5 5.5 59.1 122S 5.33 6.8 10.4 22.1 222S 9.02 0.00 0.00 0.69 123S 3.71 2.5 3.9 8.6 Included w/222S N/A N/A N/A 124S 3.19 4.1 6.2 13.2 224S 3.19 0.00 0.08 1.74 As demonstrated in the outfall summary above, the overall post development flows for the required 1-year 24 hour runoff do not exceed the pre-development flows for each of the basins. In addition to the 1-year storm, we have provided information in the table showing the release rates for each of the basins for both the 2- and 10-year storms. For the post-developed condition, Basins 122S and 123S are combined in Basin 222. The total combined pre-developed flows for Basins 122S and 123S are: 1-Year: 9.3 cfs 2-Year: 14.3 cfs 10-Year: 30.7 cfs Post-developed flows for the 1-Year, 2-Year and 10-Year are 0.0 cfs, 0.0 cfs, and 0.69 cfs respectively as shown on Table II.H-1 for Basin 222. No Post-Development flows are applicable for watershed 223 and noted as N/A as these flows are diverted to Basin 222. The site under the post-development condition will contribute less overall development discharge than the pre-development condition. Water Quality To provide required water quality, basins 221 and 223 will be converted to infiltration basins and basin 224 will be converted to a sand filter once the site is stabilized. Calculations were performed using the design equation in the State Design Manual to size the surface area for each facility. The calculations are summarized in Appendix A3.3 and A3.4. Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 APPENDICES Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 APPENDIX A (CUMBERLAND CY SPR 10-A) A1 Soils Report A2 Drainage Area Maps A3 Calculations Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 APPENDIX A1: SOILS REPORT Geosyntec Consultants of NC, PC March 30, 2018 Attn: Mr. Beau Hodge, P.G. (NC) Principal S&EC Project # 13479.S1 2501 Blue Ridge Road, Suite 430 Raleigh, NC 27607 Re: Soil Evaluation and In-Situ Conductivity Measurements – Contractor Yard Site, Cumberland County, NC. Dear Mr. Hodge: Soil & Environmental Consultants, PA (S&EC) S&EC was contacted to help assess the soil conditions within the vicinity of the potential storm water BMP sites on the project mentioned above. The purpose of this evaluation was to provide soil data for the proper design of the potential storm water BMP, including the depth to the seasonal high water table (SHWT) and the in-situ testing of the unsaturated soil horizons at the contractor yard site in Cumberland County, NC. This report discusses S&EC’s methods and testing results and was completed as per our scope of work dated March 25, 2018. Soil/Site Evaluation Methodology The site evaluation was performed by advancing a hand auger to complete the soil borings to a depth of 4 feet within the proposed storm water BMP areas (see attached Figure 1 Map). The soil boring locations were determined by the client prior to S&EC’s field evaluation. Soil morphological conditions using standard techniques outlined in the “Field Book for Describing and Sampling Soils, Version 3” published by the Natural Resources Conservation Service (NRCS, 2012). A detailed soil profile description from each of the soil boring locations (Site 1 thru Site 4) are included in Attachment 1 to this report. Soil/Site Conditions This site is located in the middle coastal plain region of Cumberland County, NC. The sites shown on the attached map are in an open agricultural field. These soils range from somewhat poorly drained to poorly drained soils with moderate to slow permeable infiltration rates. Within the in-situ testing phase of this evaluation (described below), S&EC was able to test the conductivity rate at the targeted depth of 12 inches below land surface at two locations, at 6 inches at one location and due to saturated soil conditions, one site was unable to be tested. At the first area evaluated (Site 1), S&EC did observed a seasonal high water table within 13 inches below top of ground. The apparent water table (free water in the borehole) was noted at 44 inches below the top of ground. At this location, the upper 10 inches was a sandy loam soil and the lower portion was sandy clay loam. See the soil profile description (Site 1) in Attachment 1 below. Within the second BMP area (Site 2), S&EC observed a seasonal high water table within 23 inches below top of ground. There was not an apparent water table observe within 48 inches below the top of ground. At this location, the upper 23 inches was a sandy loam soil and the lower portion was sandy clay loam. See the soil profile description (Site 2) in Attachment 1 below. Within the third BMP area (Site 3), S&EC did observed a seasonal high water table at the land surface as this soil is identified as poorly drained. The apparent water table (free water in the borehole) was observed at 20 inches below the top of ground and the soil was noted as saturated at field capacity. Also in areas near the boring site, the land surface was noted as being saturated. At this location, the upper 11 inches was a clay loam soil and the lower portion was clay. See the soil profile description (Site 3) in Attachment 1 below. Due to these conditions, we were unable to conduct an in-situ measurement at this location. At the fourth area evaluated (Site 4), S&EC did observed a seasonal high water table within 5 inches below top of ground. The apparent water table (free water in the borehole) was not observed within 36 inches below the top of ground. At this location, the upper 5 inches was a sandy loam soil and the lower portion was clay loam to sandy clay loam. See the soil profile description (Site 4) in Attachment 1 below. Given the soil moisture conditions and depth to the seasonal high water table, we conducted an in-situ test measurement at 6 inches below top of ground at this location. Given the site topography and sloping conditions within the agricultural field, the seasonal high water table could vary across the BMP areas and the soil boring descriptions (noted below) were a single targeted point within the BMP’s. If needed, S&EC can conduct additional soil borings and testing in the area. In-Situ Hydraulic Conductivity Analysis: In-situ saturated hydraulic conductivity (Ksat) measurements were conducted in the unsaturated soil horizons at three sites within the target BMP areas by the constant head well permeameter technique (also known as shallow well pump-in technique and bore hole permeameter method). These sites are shown on the attached map (Site 1, Site 2 & Site 4). The initial target depth to run this in-situ analysis was 12 inches below land surface at each location, however as mentioned above Site 4 was ran at 6 inches below top of land surface. This in-situ Ksat procedure is described in Methods of Soil Analysis, Part 1., Chapter 29 – Hydraulic Conductivity of Saturated Soils: Field Methods, 29 – 3.2 Shallow Well Pump In Method, pp. 758-763 and in the Soil Science Society of America Journal, Vol. 53, no. 5, Sept. – Oct. 1989, “A Constant-head Permeameter for Measuring Saturated Hydraulic Conductivity of the Vadose Zone” and “Comparison of the Glover Solution with the Simultaneous – Equations Approach for Measuring Hydraulic Conductivity.” In essence, a volume of water was applied and measured with time until a steady state of water flow was achieved. This volume/time with steady state was used to calculate the saturated hydraulic conductivity of the subsoil by the Glover equation. The Ksat value for each site is summarized below. Ksat data calculations are provided in Attachment 2 of this report. Ksat Location Horizon, Soil Texture & Testing Depth Ksat Values (in/hr) Site 1 A & Upper Bt, Sandy Loam & Sandy Clay Loam, 12 inches 0.10 Site 2 A, Sandy Loam, 12 inches 0.32 Site 4 A & Upper Bt, Sandy Loam & Clay loam, 6 inches 0.11 These measurements were made in the unsaturated soil zone and are not intended to provide values of the saturated zone, possible mounding or the rate of water movement off site. The hydraulic conductivity of soil varies based on the soil texture and conditions. The test results noted above should be used as a general guide in the decision of the final construction and permitting of the storm water device, however any soil variations or site impacts within the BMP could affect the results. Attachment 1. Soil Boring Profile Descriptions SITE-1 Horizon & Depth Texture, & Structure Munsell Color Notes A 0 – 4 in Sandy Loam, Granular 10 YR 2/2 BE 4 – 10 in Sandy Loam, Granular 10 YR 6/4 Not Sticky, Not Plastic Bt1 10 – 13 in Sandy Clay Loam, Medium, Subangular Blocky 10 YR 5/3 Slightly Sticky, Slightly Plastic Bt2 13 – 22 in Sandy Clay Loam, Massive, Medium, Subangular Blocky 10 YR 5/3 7.5 YR 5/3 Sticky, Plastic Bt3 22 – 32 in Sandy Clay Loam, Massive, Medium, Subangular Blocky 10 YR 6/2 7.5 YR 5/6 Dual Matrix Colors, Sticky, Plastic C 32 – 48 in Sandy Loam/Sandy Clay Loam 10 YR 6/1 7.5 YR 5/6 Patches of gley clay Seasonal High Water Table Indicators observed within 13 inches below land surface Apparent Water Table Observed within 44 inches of land surface SITE-2 Horizon & Depth Texture, & Structure Munsell Color Notes A 0 – 5 in Sandy Loam, Weak, Medium, Granular 10 YR 3/2 E 5 – 13 in Sandy Loam, Weak, Medium, Granular 2.5 Y 4/4 BE 13 – 23 in Sandy Loam, Weak, Medium, Subangular Blocky 10 YR 6/1 Bt1 23 – 32 in Sandy Clay Loam, Weak, Medium, Subangular Blocky 10 YR 6/8 7.5 YR 5/8 10 YR 6/1 Mottled, Slightly Sticky, Slightly Plastic Bt2 35 – 41 in Sandy Clay Loam, Moderate, Medium, Subangular Blocky 10 YR 6/1 7.5 YR 5/6 Sticky, Plastic Btg 41 – 48 in Sandy Clay Loam, Moderate, Medium, Subangular Blocky 10 YR 6/1 7.5 YR 5/6 Sticky, Plastic Seasonal High Water Table Indicators observed within 23 inches below land surface No Apparent Water Table Observed within 4 feet of land surface SITE-3 Horizon & Depth Texture, & Structure Munsell Color Notes A/B 0 – 11 in Clay Loam, Weak, Medium, Subangular Blocky 10 YR 3/1 7.5 YR 5/2 10 YR 4/6 Slightly Sticky, Slightly Plastic Bt 11 – 20 in Clay, Moderate, Medium, Subangular Blocky 10 YR 4/2 7.5 YR 5/2 10 YR 4/1 Sticky, Plastic Btg1 20 – 29 in Clay, Moderate to Strong, Medium, Subangular Blocky 10 YR 5/2 7.5 YR 5/2 10 YR 4/1 Sticky, Plastic Btg2 29 – 36 in Clay, Strong, Medium, Subangular Blocky 10 YR 5/1 7.5 YR 5/2 10 YR 4/1 Very Sticky, Very Plastic Seasonal High Water Table Indicators observed at surface, standing water observed near site Apparent Water Table observed within 20 inches of land surface SITE-4 Horizon & Depth Texture, & Structure Munsell Color Notes Ap 0 – 5 in Sandy Loam, Weak, Medium, Subangular Blocky 10 YR 3/2 Not Sticky, Not Plastic Bt1 5 – 16 in Clay Loam, Medium, Moderate, Subangular Blocky 7.5 YR 5/6 7.5 YR 5/2 Slightly Sticky, Slightly Plastic Bt2 16 – 26 in Clay, Moderate, Medium, Subangular Blocky 7.5 YR 5/6 7.5 YR 5/2 7.5 YR 5/1 Sticky, Plastic BCg 26 – 34 in Sandy Clay Loam, Strong, Medium, Subangular Blocky 7.5 YR 6/1 7.5 YR 6/6 Sticky, Plastic Cg 34+ in Sandy Loam, Structureless 7.5 YR 6/1 7.5 YR 6.6 Very Friable, Not Sticky, Not Plastic Seasonal High Water Table Indicators observed at 5 inches No Apparent Water Table observed within 36 inches Attachment 2 In-Situ Ksat Worksheets Calculating Saturated Hydraulic Conductiviy, Ksat, by the Glover model INFORMATION Date 3/29/2018 Measurement Conducted By Don Wells Job Name Cumberland Yard BMP's Job Number 13479.S1 Weather Cond., Temp.sunny, 72 Ksat Location Site # 1 Soil Ag Field Horizon A & Bt, SL & SCL Source of Water tap Required Data Value Units Radius of Hole 2.5 cm Depth of Hole 30.48 cm Initial Depth of Water in Hole (H)22.86 cm Final Depth of Water in Hole (H)22.86 cm Start Saturation Time 12:13 Hour:Min Start of Steady-State Condition Time 13:01 Hour:Min No. of Reservoirs Used at Steady-State 2 Ratio H/r 9.1440 A factor in Equation [2] of Manual 0.000613 Clock Water Time Change Flow Flow Flow Time Level Interval in Water Volume Rate Rate Reading Level Q Q Ksat Ksat Hr.Min cm Minute cm cm3 cm3/min cm3/hour cm/hour cm/day cm/hour in/hour gpd/sf 12.13 19.5 0.26 0.10 1.54 12.16 13.3 3.00 6.2 651 217.00 13020.0 7.98 191.54 12.31 12.4 15.00 0.9 94.5 6.30 378.0 0.23 5.56 13.01 10.2 30.00 2.2 231 7.70 462.0 0.28 6.80 13.31 8 30.00 2.2 231 7.70 462.0 0.28 6.80 14.01 6.1 30.00 1.9 199.5 6.65 399.0 0.24 5.87 14.31 4 30.00 2.1 220.5 7.35 441.0 0.27 6.49 14.46 3 15.00 1 105 7.00 420.0 0.26 6.18 15.01 2 15.00 1 105 7.00 420.0 0.26 6.18 inch cm 15.16 1 15.00 1 105 7.00 420.0 0.26 6.18 Hole Depth:12 30.48 Hi:9 22.86 Hf:9 22.86 Graph Data Time Ksat 12.31 0.23 13.01 0.28 13.31 0.28 14.01 0.24 14.31 0.27 14.46 0.26 15.01 0.26 15.16 0.26 AVERAGE: 0.00 0.05 0.10 0.15 0.20 0.25 0.30 0.35 10.00 11.00 12.00 13.00 14.00 15.00 16.00 Series1 Calculating Saturated Hydraulic Conductiviy, Ksat, by the Glover model INFORMATION Date 3/29/2018 Measurement Conducted By Don Wells Job Name Cumberland Yard BMP's Job Number 13479.S1 Weather Cond., Temp.sunny, 70 Ksat Location Site # 2 Soil Ag Field Horizon A, Sandy loam Source of Water tap Required Data Value Units Radius of Hole 2.5 cm Depth of Hole 30.48 cm Initial Depth of Water in Hole (H)15.24 cm Final Depth of Water in Hole (H)15.24 cm Start Saturation Time 12:06 Hour:Min Start of Steady-State Condition Time 12:36 Hour:Min No. of Reservoirs Used at Steady-State 2 Ratio H/r 6.0960 A factor in Equation [2] of Manual 0.001136 Clock Water Time Change Flow Flow Flow Time Level Interval in Water Volume Rate Rate Reading Level Q Q Ksat Ksat Hr.Min cm Minute cm cm3 cm3/min cm3/hour cm/hour cm/day 12.06 26 12.21 20.8 15.00 5.2 546 36.40 2184.0 2.48 59.56 12.36 19.2 15.00 1.6 168 11.20 672.0 0.76 18.33 13.06 16.1 30.00 3.1 325.5 10.85 651.0 0.74 17.75 cm/hour in/hour gpd/sf 13.36 13 30.00 3.1 325.5 10.85 651.0 0.74 17.75 0.81 0.32 4.80 14.06 9.6 30.00 3.4 357 11.90 714.0 0.81 19.47 14.36 6.4 30.00 3.2 336 11.20 672.0 0.76 18.33 15.06 2.6 30.00 3.8 399 13.30 798.0 0.91 21.76 15.21 1 15.00 1.6 168 11.20 672.0 0.76 18.33 inch cm Hole Depth:12 30.48 Hi:6 15.24 Hf:6 15.24 Graph Data Time Ksat 12.36 0.76 13.06 0.74 13.36 0.74 14.06 0.81 14.36 0.76 15.06 0.91 15.21 0.76 AVERAGE: 0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 Series1 Calculating Saturated Hydraulic Conductiviy, Ksat, by the Glover model INFORMATION Date 3/29/2018 Measurement Conducted By Don Wells Job Name Cumberland Yard BMP's Job Number 13479.S1 Weather Cond., Temp.sunny, 72 Ksat Location Site #4 Soil Ag Field Horizon A & Bt; SL & CL Source of Water tap Required Data Value Units Radius of Hole 2.5 cm Depth of Hole 15.24 cm Initial Depth of Water in Hole (H)15.24 cm Final Depth of Water in Hole (H)15.24 cm Start Saturation Time 11:48 Hour:Min Start of Steady-State Condition Time 12:20 Hour:Min No. of Reservoirs Used at Steady-State 2 Ratio H/r 6.0960 A factor in Equation [2] of Manual 0.001136 Clock Water Time Change Flow Flow Flow Time Level Interval in Water Volume Rate Rate Reading Level Q Q Ksat Ksat Hr.Min cm Minute cm cm3 cm3/min cm3/hour cm/hour cm/day cm/hour in/hour gpd/sf 0.27 0.11 1.62 11.48 11.8 11.50 9.2 2.00 2.6 273 136.50 8190.0 9.31 223.34 12.20 7.1 30.00 2.1 220.5 7.35 441.0 0.50 12.03 12.50 5.6 30.00 1.5 157.5 5.25 315.0 0.36 8.59 13.20 4.1 30.00 1.5 157.5 5.25 315.0 0.36 8.59 13.50 3 30.00 1.1 115.5 3.85 231.0 0.26 6.30 14.20 2 30.00 1 105 3.50 210.0 0.24 5.73 inch cm 14.50 1 30.00 1 105 3.50 210.0 0.24 5.73 Hole Depth:6 15.24 Hi:6 15.24 Hf:6 15.24 Graph Data Time Ksat 12.20 0.50 12.50 0.36 13.20 0.36 13.50 0.26 14.20 0.24 14.50 0.24 AVERAGE: 0.00 0.10 0.20 0.30 0.40 0.50 0.60 12.00 12.50 13.00 13.50 14.00 14.50 15.00 Series1 @? @? @? @?-78.822244, 35.042356 -78.824596, 35.045426 -78.823073, 35.046019 -78.820309, 35.042148 NC HWY 24 DOWNING RD ACCORD RDNC Center for Geographic Information & Anaylsis Project Number: DWProject Manager: 1" = 300'Scale: 03/29/18Date: Map Title: Source: Ksat & Soil Boring Map North Carolina ACP Contractor Yard Cumberland County, NC Cumberland Co GIS, 2017 aerial from NCOneMap.com 13479.S1 ­Figure 1 0 150 300 450 600Feet Legend @?Ksat & Soil Boring Locations Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 APPENDIX A2: DRAINAGE AREA MAPS GAGA GA GA E E E E E TS GP G 281 G G LM PIEDMONT LM PIEDMONT 90410045701 LAT:35°02'38.27" LON:78°49'20.7146" APPROX. LOCATION APPROX. LOCATION wcuc 051e 90 LM PIEDMONT S09° 33' 45.90"E1326.907S82° 48' 15.42"W 1195.159N08° 35' 40.83"W789.151N12° 47' 30.74"W671.599N66° 28' 1 7 . 5 5 " E 445.385 S75° 03' 0 7 . 7 6 " E 541.71 8 JOHN S HAIR PARCEL 0457-40-6622 (52.4 ACRES) MARY J YOUNG PARCEL 0457-20-1369 (41.2 ACRES) HOWARD H R & RICHARD KING PARCEL 0457-21-1811 (6.7 ACRES) JEANNE BRYAN DAVIS PARCEL 0457-20-4762 (0.45 ACRES) ELLA J CLARK PARCEL 0456-39-9627 (60.4 ACRES) MARTHA L HAIR & KATHY RADCLIFF PARCEL 0457-51-1976 (1.7 ACRES) GATE POSTS 92 949494949494949292 92949290929494 96 9 6 94 96949294 929496OVERHEAD ELECTRIC LINEE UNDERGROUND GAS LINEG FENCE xCONTOUR STREAM DITCH CONTOUR1000 WETLANDwcuc 051e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hite Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC ERM 15720 Brixham Hill Ave, Suite 120 License #F-1223 ERM NC, INC. Charlotte, NC 28277 (704) 541-8345 AS NOTED 05/22/2018WTS 05/22/2018NJB 4-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 --ISSUED FOR REVIEWWTS08/04/171 --ISSUED FOR REVIEWNJB02/12/20182 --ISSUED FOR REVIEWNJB04/30/20183 --ISSUED FOR REVIEWWTS05/22/20184 1 OF 2 LIMITS OF DISTURBANCE LIMITS OF CONSTRUCTION NC S T A T E H I G H W A Y 2 4 DOWN I N G R O A D ACCORD ROADFLOW ARROW DRAINAGE AREA NODE NUMBER >Tc SHEET FLOW >Tc SHALLOW CONCENTRATED FLOW >Tc CHANNEL FLOW DRAINAGE AREA BOUNDARY SHEET FLOW LENGTH = 166 LF >Tc PIPE FLOW SHEET FLOW LENGTH = 209 LF SHEET FLOW LENGTH = 165 LF SHEET FLOW LENGTH = 136 LF SHALLOW CONCENTRATED LENGTH = 105 LF SHALLOW CONCENTRATED LENGTH = 385 LF SHALLOW CONCENTRATED LENGTH = 118 LF SHALLOW CONCENTRATED LENGTH = 285 LF SHALLOW CONCENTRATED LENGTH = 157 LF SHALLOW CONCENTRATED LENGTH = 147 LF CHANNEL FLOW LENGTH = 149 LF CHANNEL FLOW LENGTH = 480 LF PIPE FLOW LENGTH = 24 LF PIPE FLOW LENGTH = 32 LF GAGA GA GA E E E E E TS GP G 281 G G LM PIEDMONT LM PIEDMONT 90410045701 APPROX. LOCATION APPROX. LOCATION wcuc 051e 90 E Q U I P M E N T LM PIEDMONT S09° 33' 45.90"E1326.907S82° 48' 15.42"W 1195.159N08° 35' 40.83"W789.151N12° 47' 30.74"W671.599N66° 28' 1 7 . 5 5 " E 445.385 S75° 03' 0 7 . 7 6 " E 541.71 8 JOHN S HAIR PARCEL 0457-40-6622 (52.4 ACRES) MARY J YOUNG PARCEL 0457-20-1369 (41.2 ACRES) HOWARD H R & RICHARD KING PARCEL 0457-21-1811 (6.7 ACRES) JEANNE BRYAN DAVIS PARCEL 0457-20-4762 (0.45 ACRES) ELLA J CLARK PARCEL 0456-39-9627 (60.4 ACRES) MARTHA L HAIR & KATHY RADCLIFF PARCEL 0457-51-1976 (1.7 ACRES) GATE POSTS 92 949494949494949292 92949290929494 96 9 6 94 96949294 929496100' 25' 132' 26' 76' 105' 30' 20' 50' 30' 1' DEEP, VARIED DIMENSION INFILTRATION TRENCH OVERHEAD ELECTRIC LINEE UNDERGROUND GAS LINEG FENCE xSTREAM DITCH PRIVACY FENCE UTILITY POLE GP GUY POLE GUY ANCHORGA UTILITY VALVE POST LM LINE MARKER TS TEST STAND TBM TEMPORARY BENCH MARK GRAVEL AREA. TOP SOIL SEGREGATION AREA WETLANDwcuc 051e FUEL TANK AREA (25' x 250') TRAILER (24' x 60') STORAGE UNITS 1000 100 0 50 100 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED. CUMBERLAND CUMBERLAND CY PROPOSED DRAINAGE AREA MAP UNNAMED TRI B U T A R Y TO LOCKS CRE E K GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC ERM 15720 Brixham Hill Ave, Suite 120 License #F-1223 ERM NC, INC. Charlotte, NC 28277 (704) 541-8345 AS NOTED 05/22/2018WTS 05/22/2018NJB 4-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 --ISSUED FOR REVIEWWTS08/04/171 --ISSUED FOR REVIEWNJB02/12/20182 --ISSUED FOR REVIEWNJB04/30/20183 --ISSUED FOR REVIEWWTS05/22/20184 2 OF 2 LIMITS OF DISTURBANCE LIMITS OF CONSTRUCTION PROPOSED COMPOST FILTER SOCK OR SILT FENCE NC S T A T E H I G H W A Y 2 4 DOWN I N G R O A D ACCORD ROADFLOW ARROW ROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) OUTLET PROTECTION PROPOSED CULVERT PROPOSED DIVERSION SWALE DRAINAGE AREA NODE NUMBER POND NODE NUMBER SHEET FLOW LENGTH = 166 LF SLOPE = SHEET FLOW LENGTH = 209 LF SHEET FLOW LENGTH = 165 LF SHEET FLOW LENGTH = 136 LF SHALLOW CONCENTRATED LENGTH = 105 LF SHALLOW CONCENTRATED LENGTH = 385 LF SHALLOW CONCENTRATED LENGTH = 118 LF SHALLOW CONCENTRATED LENGTH = 285 LF SHALLOW CONCENTRATED LENGTH = 157 LF SHALLOW CONCENTRATED LENGTH = 147 LF CHANNEL FLOW LENGTH = 149 LF CHANNEL FLOW LENGTH = 480 LF PIPE FLOW LENGTH = 24 LF PIPE FLOW LENGTH = 32 LF >Tc SHEET FLOW >Tc SHALLOW CONCENTRATED FLOW >Tc CHANNEL FLOW DRAINAGE AREA BOUNDARY >Tc PIPE FLOW PROPOSED CONTOUR125 EXISTING CONTOUR Service Layer Credits: Source: Esri,DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID,IGN, and the GIS User Community OP24 OP24 OP24 OP24 ST1006 D o w n in g R o a d Accord RoadDowning RoadClintonRoad B D D C D A B This information is for environmental review purposes only. 0 15 0 30 0 Fe et 1:1,800 Existing Drainage Basin Site Boundary HSG Soil Group Public Road (OSM) FILE: M:\Clients\D-F\DOM\SRPP\_ArcGIS\2017\09\06_Water_Quality_Figures\Figures\C Y\Rev1v3\_DOM_SRP_NC_DEQ_Pre_CY.mxd | REVISED: 02/10/2018 | SCALE: 1:1,800 when printed at 36 x 24 | REVISED: 02/10/2018 CY Spr 10-AWater Quan tity AnalysisPre-Dev elop me nt L andcover and HSG DRAWN BY: TG NC °E RM 1 inch = 1 50 feet NLCD Landcover Classes 13 - Surveyed Waterbody 21 - Developed, Open Space 22 - Developed, Low Intensity 42 - Evergreen Forest 52 - Shrub/Scrub 71 - Grass land/Herbaceous 81 - Pasture/Hay 82 - Cultivated Crops 90 - Woody Wetlands 91 - Surveyed PEM W etland 99 - Gravel Service Layer Credits: Source: Esri,DigitalGlobe, GeoEye, Earthstar Geographics,CNES/Airbus DS, USDA, USGS, AeroGRID,IGN, and the GIS User Community OP24 OP24 OP24 OP24 ST1006 D o w n in g R o a d Accord RoadDowning RoadClintonRoad B D D C D A B This information is for environmental review purposes only. 0 15 0 30 0 Fe et 1:1,800 Proposed Drainage Basin Site Boundary HSG Soil Group Public Road (OSM) FILE: M:\Clients\D-F\DOM\SRPP\_ArcGIS\2017\09\06_Water_Quality_Figures\Figures\C Y\Rev1v3\_DOM_SRP_NC_DEQ_Post_CY.mxd | REVISED: 02/10/2018 | SCALE: 1:1,800 when printed at 36 x 24 | REVISED: 02/10/2018 CY Spr 10-AWater Quan tity AnalysisPost-Deve lopmen t Landcov er and HSG DRAWN BY: TG NC °E RM 1 inch = 1 50 feet NLCD Landcover Classes 11 - Open Water 13 - Surveyed Waterbody 21 - Developed, Open Space 22 - Developed, Low Intensity 42 - Evergreen Forest 52 - Shrub/Scrub 61 - Topsoil 71 - Grass land/Herbaceous 81 - Pasture/Hay 82 - Cultivated Crops 90 - Woody Wetlands 91 - Surveyed PEM W etland 99 - Gravel Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 APPENDIX A3: CALCULATIONS A3.1 Hydrologic and Hydraulics Calculations – HydroCAD A3.1.1 Watershed A3.2 Composite Curve Number Calculations A3.3 Sediment Basin Calculations A3.4 Infiltration Basin Calculations Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 A3.1 Hydrologic and Hydraulics Calculations – HydroCAD A3.1.1 Watershed 121S Pre Dev't 122S Pre Dev't 123S Pre Dev't 124S Pre Dev't 221S Post CY (s) 222S Post CY (nw) 223S Post CY (ne) 224S Post CY (se) 226R (new Reach) 221P 221 222P SF 224P 224 Routing Diagram for Site Contractor COMBINED 222 and 223 Prepared by AECOM, Printed 5/23/2018 HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Subcat Reach Pond Link Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 2HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Area Listing (all nodes) Area (acres) CN Description (subcatchment-numbers) 24.590 75 (121S) 12.230 73 (122S, 123S, 124S) 24.590 87 (221S) 5.330 85 (222S) 3.710 89 (223S) 3.190 69 (224S) 73.640 80 TOTAL AREA Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 3HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Soil Listing (all nodes) Area (acres) Soil Group Subcatchment Numbers 0.000 HSG A 0.000 HSG B 0.000 HSG C 0.000 HSG D 73.640 Other 121S, 122S, 123S, 124S, 221S, 222S, 223S, 224S 73.640 TOTAL AREA Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 4HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Ground Covers (all nodes) HSG-A (acres) HSG-B (acres) HSG-C (acres) HSG-D (acres) Other (acres) Total (acres) Ground Cover Subcatchment Numbers 0.000 0.000 0.000 0.000 73.640 73.640 121S, 122S, 123S, 124S, 221S, 222S, 223S, 224S 0.000 0.000 0.000 0.000 73.640 73.640 TOTAL AREA Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 5HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pipe Listing (all nodes) Line# Node Number In-Invert (feet) Out-Invert (feet) Length (feet) Slope (ft/ft) n Diam/Width (inches) Height (inches) Inside-Fill (inches) 1 121S 0.00 0.00 24.0 0.0083 0.030 36.0 0.0 0.0 2 121S 0.00 0.00 32.0 0.0063 0.030 3.0 0.0 0.0 3 221S 0.00 0.00 24.0 0.0083 0.030 3.0 0.0 0.0 4 221S 0.00 0.00 32.0 0.0063 0.030 3.0 0.0 0.0 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 6HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.03 hrs, 801 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=24.590 ac 0.00% Impervious Runoff Depth>0.96"Subcatchment 121S: Pre Dev't Flow Length=1,245' Tc=27.6 min CN=75 Runoff=20.44 cfs 1.977 af Runoff Area=5.330 ac 0.00% Impervious Runoff Depth>0.87"Subcatchment 122S: Pre Dev't Tc=10.0 min CN=73 Runoff=6.84 cfs 0.385 af Runoff Area=3.710 ac 0.00% Impervious Runoff Depth>0.86"Subcatchment 123S: Pre Dev't Tc=30.0 min CN=73 Runoff=2.52 cfs 0.266 af Runoff Area=3.190 ac 0.00% Impervious Runoff Depth>0.87"Subcatchment 124S: Pre Dev't Tc=10.0 min CN=73 Runoff=4.09 cfs 0.230 af Runoff Area=24.590 ac 0.00% Impervious Runoff Depth>1.75"Subcatchment 221S: Post CY (s) Flow Length=979' Tc=14.1 min CN=87 Runoff=57.39 cfs 3.587 af Runoff Area=5.330 ac 0.00% Impervious Runoff Depth>1.60"Subcatchment 222S: Post CY (nw) Tc=5.0 min CN=85 Runoff=15.67 cfs 0.712 af Runoff Area=3.710 ac 0.00% Impervious Runoff Depth>1.92"Subcatchment 223S: Post CY (ne) Tc=5.0 min CN=89 Runoff=12.76 cfs 0.592 af Runoff Area=3.190 ac 0.00% Impervious Runoff Depth>0.68"Subcatchment 224S: Post CY (se) Tc=5.0 min CN=69 Runoff=3.79 cfs 0.181 af Avg. Flow Depth=0.36' Max Vel=3.87 fps Inflow=7.86 cfs 0.651 afReach 226R: (new Reach) n=0.035 L=10.0' S=0.0400 '/' Capacity=181.21 cfs Outflow=7.85 cfs 0.651 af Peak Elev=93.05' Storage=122,218 cf Inflow=57.39 cfs 3.587 afPond 221P: 221 Outflow=1.53 cfs 0.825 af Peak Elev=93.45' Storage=56,804 cf Inflow=28.43 cfs 1.305 afPond 222P: SF Outflow=0.00 cfs 0.000 af Peak Elev=92.68' Storage=7,863 cf Inflow=3.79 cfs 0.181 afPond 224P: 224 Outflow=0.00 cfs 0.000 af Total Runoff Area = 73.640 ac Runoff Volume = 7.931 af Average Runoff Depth = 1.29" 100.00% Pervious = 73.640 ac 0.00% Impervious = 0.000 ac Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 7HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 121S: Pre Dev't Runoff = 20.44 cfs @ 12.24 hrs, Volume= 1.977 af, Depth> 0.96" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1 yr Rainfall=3.02" Area (ac) CN Description * 24.590 75 24.590 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.7 165 0.0212 0.41 Sheet Flow, Cultivated: Residue<=20% n= 0.060 P2= 3.36" 1.8 106 0.0038 0.99 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 150 0.0220 5.84 70.07 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.040 0.1 24 0.0083 3.73 26.33 Pipe Channel, 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.030 Corrugated metal 9.9 384 0.0016 0.64 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.9 32 0.0063 0.62 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 Corrugated metal 7.8 384 0.0026 0.82 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.6 1,245 Total Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 8HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Subcatchment 121S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 1 yr Rainfall=3.02" Runoff Area=24.590 ac Runoff Volume=1.977 af Runoff Depth>0.96" Flow Length=1,245' Tc=27.6 min CN=75 20.44 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 9HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 121S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.50 0.05 0.00 0.00 1.80 0.06 0.00 0.00 2.10 0.07 0.00 0.00 2.40 0.08 0.00 0.00 2.70 0.09 0.00 0.00 3.00 0.10 0.00 0.00 3.30 0.12 0.00 0.00 3.60 0.13 0.00 0.00 3.90 0.14 0.00 0.00 4.20 0.15 0.00 0.00 4.50 0.17 0.00 0.00 4.80 0.18 0.00 0.00 5.10 0.20 0.00 0.00 5.40 0.21 0.00 0.00 5.70 0.23 0.00 0.00 6.00 0.24 0.00 0.00 6.30 0.26 0.00 0.00 6.60 0.28 0.00 0.00 6.90 0.29 0.00 0.00 7.20 0.31 0.00 0.00 7.50 0.33 0.00 0.00 7.80 0.35 0.00 0.00 8.10 0.37 0.00 0.00 8.40 0.39 0.00 0.00 8.70 0.42 0.00 0.00 9.00 0.44 0.00 0.00 9.30 0.47 0.00 0.00 9.60 0.50 0.00 0.00 9.90 0.53 0.00 0.00 10.20 0.57 0.00 0.00 10.50 0.62 0.00 0.00 10.80 0.67 0.00 0.00 11.10 0.73 0.00 0.02 11.40 0.82 0.01 0.16 11.70 1.07 0.04 0.64 12.00 2.00 0.38 7.83 12.30 2.15 0.46 19.39 12.60 2.25 0.51 8.78 12.90 2.31 0.54 4.65 13.20 2.37 0.57 3.21 13.50 2.41 0.60 2.53 13.80 2.45 0.62 2.16 14.10 2.49 0.64 1.88 14.40 2.52 0.66 1.66 14.70 2.55 0.68 1.55 15.00 2.58 0.70 1.46 15.30 2.60 0.71 1.37 15.60 2.63 0.73 1.29 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 2.65 0.74 1.20 16.20 2.67 0.75 1.12 16.50 2.69 0.77 1.05 16.80 2.71 0.78 1.01 17.10 2.73 0.79 0.98 17.40 2.75 0.80 0.95 17.70 2.76 0.81 0.92 18.00 2.78 0.82 0.89 18.30 2.80 0.83 0.86 18.60 2.81 0.84 0.82 18.90 2.83 0.85 0.79 19.20 2.84 0.86 0.76 19.50 2.85 0.87 0.73 19.80 2.87 0.87 0.69 20.10 2.88 0.88 0.66 20.40 2.89 0.89 0.63 20.70 2.90 0.90 0.62 21.00 2.91 0.90 0.61 21.30 2.92 0.91 0.60 21.60 2.94 0.92 0.60 21.90 2.95 0.93 0.59 22.20 2.96 0.93 0.59 22.50 2.97 0.94 0.58 22.80 2.98 0.95 0.57 23.10 2.99 0.95 0.57 23.40 3.00 0.96 0.56 23.70 3.01 0.97 0.56 24.00 3.02 0.97 0.55 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 10HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 122S: Pre Dev't Runoff = 6.84 cfs @ 12.03 hrs, Volume= 0.385 af, Depth> 0.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1 yr Rainfall=3.02" Area (ac) CN Description * 5.330 73 5.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Direct Subcatchment 122S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)7 6 5 4 3 2 1 0 Type II 24-hr 1 yr Rainfall=3.02" Runoff Area=5.330 ac Runoff Volume=0.385 af Runoff Depth>0.87" Tc=10.0 min CN=73 6.84 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 11HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 122S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.50 0.05 0.00 0.00 1.80 0.06 0.00 0.00 2.10 0.07 0.00 0.00 2.40 0.08 0.00 0.00 2.70 0.09 0.00 0.00 3.00 0.10 0.00 0.00 3.30 0.12 0.00 0.00 3.60 0.13 0.00 0.00 3.90 0.14 0.00 0.00 4.20 0.15 0.00 0.00 4.50 0.17 0.00 0.00 4.80 0.18 0.00 0.00 5.10 0.20 0.00 0.00 5.40 0.21 0.00 0.00 5.70 0.23 0.00 0.00 6.00 0.24 0.00 0.00 6.30 0.26 0.00 0.00 6.60 0.28 0.00 0.00 6.90 0.29 0.00 0.00 7.20 0.31 0.00 0.00 7.50 0.33 0.00 0.00 7.80 0.35 0.00 0.00 8.10 0.37 0.00 0.00 8.40 0.39 0.00 0.00 8.70 0.42 0.00 0.00 9.00 0.44 0.00 0.00 9.30 0.47 0.00 0.00 9.60 0.50 0.00 0.00 9.90 0.53 0.00 0.00 10.20 0.57 0.00 0.00 10.50 0.62 0.00 0.00 10.80 0.67 0.00 0.00 11.10 0.73 0.00 0.00 11.40 0.82 0.00 0.03 11.70 1.07 0.03 0.37 12.00 2.00 0.32 6.51 12.30 2.15 0.39 1.45 12.60 2.25 0.44 0.79 12.90 2.31 0.47 0.60 13.20 2.37 0.50 0.50 13.50 2.41 0.52 0.43 13.80 2.45 0.54 0.38 14.10 2.49 0.56 0.33 14.40 2.52 0.58 0.31 14.70 2.55 0.59 0.29 15.00 2.58 0.61 0.28 15.30 2.60 0.62 0.26 15.60 2.63 0.64 0.24 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 2.65 0.65 0.23 16.20 2.67 0.66 0.21 16.50 2.69 0.67 0.20 16.80 2.71 0.69 0.20 17.10 2.73 0.70 0.19 17.40 2.75 0.71 0.19 17.70 2.76 0.72 0.18 18.00 2.78 0.73 0.17 18.30 2.80 0.74 0.17 18.60 2.81 0.74 0.16 18.90 2.83 0.75 0.15 19.20 2.84 0.76 0.15 19.50 2.85 0.77 0.14 19.80 2.87 0.78 0.13 20.10 2.88 0.78 0.13 20.40 2.89 0.79 0.13 20.70 2.90 0.80 0.12 21.00 2.91 0.80 0.12 21.30 2.92 0.81 0.12 21.60 2.94 0.82 0.12 21.90 2.95 0.82 0.12 22.20 2.96 0.83 0.12 22.50 2.97 0.84 0.12 22.80 2.98 0.84 0.12 23.10 2.99 0.85 0.11 23.40 3.00 0.86 0.11 23.70 3.01 0.86 0.11 24.00 3.02 0.87 0.11 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 12HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 123S: Pre Dev't Runoff = 2.52 cfs @ 12.27 hrs, Volume= 0.266 af, Depth> 0.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1 yr Rainfall=3.02" Area (ac) CN Description * 3.710 73 3.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Subcatchment 123S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)2 1 0 Type II 24-hr 1 yr Rainfall=3.02" Runoff Area=3.710 ac Runoff Volume=0.266 af Runoff Depth>0.86" Tc=30.0 min CN=73 2.52 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 13HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 123S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.50 0.05 0.00 0.00 1.80 0.06 0.00 0.00 2.10 0.07 0.00 0.00 2.40 0.08 0.00 0.00 2.70 0.09 0.00 0.00 3.00 0.10 0.00 0.00 3.30 0.12 0.00 0.00 3.60 0.13 0.00 0.00 3.90 0.14 0.00 0.00 4.20 0.15 0.00 0.00 4.50 0.17 0.00 0.00 4.80 0.18 0.00 0.00 5.10 0.20 0.00 0.00 5.40 0.21 0.00 0.00 5.70 0.23 0.00 0.00 6.00 0.24 0.00 0.00 6.30 0.26 0.00 0.00 6.60 0.28 0.00 0.00 6.90 0.29 0.00 0.00 7.20 0.31 0.00 0.00 7.50 0.33 0.00 0.00 7.80 0.35 0.00 0.00 8.10 0.37 0.00 0.00 8.40 0.39 0.00 0.00 8.70 0.42 0.00 0.00 9.00 0.44 0.00 0.00 9.30 0.47 0.00 0.00 9.60 0.50 0.00 0.00 9.90 0.53 0.00 0.00 10.20 0.57 0.00 0.00 10.50 0.62 0.00 0.00 10.80 0.67 0.00 0.00 11.10 0.73 0.00 0.00 11.40 0.82 0.00 0.00 11.70 1.07 0.03 0.04 12.00 2.00 0.32 0.78 12.30 2.15 0.39 2.50 12.60 2.25 0.44 1.29 12.90 2.31 0.47 0.69 13.20 2.37 0.50 0.47 13.50 2.41 0.52 0.36 13.80 2.45 0.54 0.31 14.10 2.49 0.56 0.27 14.40 2.52 0.58 0.24 14.70 2.55 0.59 0.22 15.00 2.58 0.61 0.21 15.30 2.60 0.62 0.19 15.60 2.63 0.64 0.18 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 2.65 0.65 0.17 16.20 2.67 0.66 0.16 16.50 2.69 0.67 0.15 16.80 2.71 0.69 0.14 17.10 2.73 0.70 0.14 17.40 2.75 0.71 0.13 17.70 2.76 0.72 0.13 18.00 2.78 0.73 0.13 18.30 2.80 0.74 0.12 18.60 2.81 0.74 0.12 18.90 2.83 0.75 0.11 19.20 2.84 0.76 0.11 19.50 2.85 0.77 0.10 19.80 2.87 0.78 0.10 20.10 2.88 0.78 0.09 20.40 2.89 0.79 0.09 20.70 2.90 0.80 0.09 21.00 2.91 0.80 0.09 21.30 2.92 0.81 0.09 21.60 2.94 0.82 0.08 21.90 2.95 0.82 0.08 22.20 2.96 0.83 0.08 22.50 2.97 0.84 0.08 22.80 2.98 0.84 0.08 23.10 2.99 0.85 0.08 23.40 3.00 0.86 0.08 23.70 3.01 0.86 0.08 24.00 3.02 0.87 0.08 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 14HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 124S: Pre Dev't Runoff = 4.09 cfs @ 12.03 hrs, Volume= 0.230 af, Depth> 0.87" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1 yr Rainfall=3.02" Area (ac) CN Description * 3.190 73 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 124S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)4 3 2 1 0 Type II 24-hr 1 yr Rainfall=3.02" Runoff Area=3.190 ac Runoff Volume=0.230 af Runoff Depth>0.87" Tc=10.0 min CN=73 4.09 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 15HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 124S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.50 0.05 0.00 0.00 1.80 0.06 0.00 0.00 2.10 0.07 0.00 0.00 2.40 0.08 0.00 0.00 2.70 0.09 0.00 0.00 3.00 0.10 0.00 0.00 3.30 0.12 0.00 0.00 3.60 0.13 0.00 0.00 3.90 0.14 0.00 0.00 4.20 0.15 0.00 0.00 4.50 0.17 0.00 0.00 4.80 0.18 0.00 0.00 5.10 0.20 0.00 0.00 5.40 0.21 0.00 0.00 5.70 0.23 0.00 0.00 6.00 0.24 0.00 0.00 6.30 0.26 0.00 0.00 6.60 0.28 0.00 0.00 6.90 0.29 0.00 0.00 7.20 0.31 0.00 0.00 7.50 0.33 0.00 0.00 7.80 0.35 0.00 0.00 8.10 0.37 0.00 0.00 8.40 0.39 0.00 0.00 8.70 0.42 0.00 0.00 9.00 0.44 0.00 0.00 9.30 0.47 0.00 0.00 9.60 0.50 0.00 0.00 9.90 0.53 0.00 0.00 10.20 0.57 0.00 0.00 10.50 0.62 0.00 0.00 10.80 0.67 0.00 0.00 11.10 0.73 0.00 0.00 11.40 0.82 0.00 0.02 11.70 1.07 0.03 0.22 12.00 2.00 0.32 3.90 12.30 2.15 0.39 0.87 12.60 2.25 0.44 0.47 12.90 2.31 0.47 0.36 13.20 2.37 0.50 0.30 13.50 2.41 0.52 0.26 13.80 2.45 0.54 0.23 14.10 2.49 0.56 0.20 14.40 2.52 0.58 0.19 14.70 2.55 0.59 0.18 15.00 2.58 0.61 0.17 15.30 2.60 0.62 0.16 15.60 2.63 0.64 0.15 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 2.65 0.65 0.14 16.20 2.67 0.66 0.13 16.50 2.69 0.67 0.12 16.80 2.71 0.69 0.12 17.10 2.73 0.70 0.12 17.40 2.75 0.71 0.11 17.70 2.76 0.72 0.11 18.00 2.78 0.73 0.10 18.30 2.80 0.74 0.10 18.60 2.81 0.74 0.10 18.90 2.83 0.75 0.09 19.20 2.84 0.76 0.09 19.50 2.85 0.77 0.08 19.80 2.87 0.78 0.08 20.10 2.88 0.78 0.08 20.40 2.89 0.79 0.07 20.70 2.90 0.80 0.07 21.00 2.91 0.80 0.07 21.30 2.92 0.81 0.07 21.60 2.94 0.82 0.07 21.90 2.95 0.82 0.07 22.20 2.96 0.83 0.07 22.50 2.97 0.84 0.07 22.80 2.98 0.84 0.07 23.10 2.99 0.85 0.07 23.40 3.00 0.86 0.07 23.70 3.01 0.86 0.07 24.00 3.02 0.87 0.07 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 16HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 221S: Post CY (s) Runoff = 57.39 cfs @ 12.06 hrs, Volume= 3.587 af, Depth> 1.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1 yr Rainfall=3.02" Area (ac) CN Description * 24.590 87 24.590 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 165 0.0212 1.59 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.36" 1.4 106 0.0038 1.25 Shallow Concentrated Flow, Paved Kv= 20.3 fps 0.4 150 0.0220 6.67 80.08 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.035 0.6 24 0.0083 0.71 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 Corrugated metal 7.9 384 0.0016 0.81 Shallow Concentrated Flow, Paved Kv= 20.3 fps 0.9 32 0.0063 0.62 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 1.2 118 0.0110 1.69 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 14.1 979 Total Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 17HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Subcatchment 221S: Post CY (s) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)60 55 50 45 40 35 30 25 20 15 10 5 0 Type II 24-hr 1 yr Rainfall=3.02" Runoff Area=24.590 ac Runoff Volume=3.587 af Runoff Depth>1.75" Flow Length=979' Tc=14.1 min CN=87 57.39 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 18HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 221S: Post CY (s) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.50 0.05 0.00 0.00 1.80 0.06 0.00 0.00 2.10 0.07 0.00 0.00 2.40 0.08 0.00 0.00 2.70 0.09 0.00 0.00 3.00 0.10 0.00 0.00 3.30 0.12 0.00 0.00 3.60 0.13 0.00 0.00 3.90 0.14 0.00 0.00 4.20 0.15 0.00 0.00 4.50 0.17 0.00 0.00 4.80 0.18 0.00 0.00 5.10 0.20 0.00 0.00 5.40 0.21 0.00 0.00 5.70 0.23 0.00 0.00 6.00 0.24 0.00 0.00 6.30 0.26 0.00 0.00 6.60 0.28 0.00 0.00 6.90 0.29 0.00 0.00 7.20 0.31 0.00 0.00 7.50 0.33 0.00 0.04 7.80 0.35 0.00 0.07 8.10 0.37 0.00 0.12 8.40 0.39 0.01 0.17 8.70 0.42 0.01 0.24 9.00 0.44 0.01 0.33 9.30 0.47 0.02 0.42 9.60 0.50 0.02 0.49 9.90 0.53 0.03 0.61 10.20 0.57 0.04 0.79 10.50 0.62 0.06 1.03 10.80 0.67 0.07 1.37 11.10 0.73 0.10 1.87 11.40 0.82 0.13 2.79 11.70 1.07 0.26 6.71 12.00 2.00 0.91 49.89 12.30 2.15 1.03 17.57 12.60 2.25 1.10 7.15 12.90 2.31 1.16 4.78 13.20 2.37 1.20 3.85 13.50 2.41 1.24 3.28 13.80 2.45 1.27 2.83 14.10 2.49 1.30 2.46 14.40 2.52 1.33 2.24 14.70 2.55 1.35 2.11 15.00 2.58 1.38 1.99 15.30 2.60 1.40 1.86 15.60 2.63 1.42 1.73 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 2.65 1.44 1.60 16.20 2.67 1.46 1.48 16.50 2.69 1.47 1.42 16.80 2.71 1.49 1.38 17.10 2.73 1.51 1.33 17.40 2.75 1.52 1.28 17.70 2.76 1.54 1.24 18.00 2.78 1.55 1.19 18.30 2.80 1.56 1.14 18.60 2.81 1.58 1.10 18.90 2.83 1.59 1.05 19.20 2.84 1.60 1.00 19.50 2.85 1.61 0.96 19.80 2.87 1.62 0.91 20.10 2.88 1.63 0.86 20.40 2.89 1.64 0.84 20.70 2.90 1.65 0.83 21.00 2.91 1.66 0.82 21.30 2.92 1.67 0.81 21.60 2.94 1.68 0.80 21.90 2.95 1.69 0.79 22.20 2.96 1.70 0.78 22.50 2.97 1.71 0.77 22.80 2.98 1.72 0.76 23.10 2.99 1.73 0.75 23.40 3.00 1.74 0.75 23.70 3.01 1.75 0.74 24.00 3.02 1.76 0.73 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 19HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 222S: Post CY (nw) Runoff = 15.67 cfs @ 11.96 hrs, Volume= 0.712 af, Depth> 1.60" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1 yr Rainfall=3.02" Area (ac) CN Description * 5.330 85 5.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 222S: Post CY (nw) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)16 14 12 10 8 6 4 2 0 Type II 24-hr 1 yr Rainfall=3.02" Runoff Area=5.330 ac Runoff Volume=0.712 af Runoff Depth>1.60" Tc=5.0 min CN=85 15.67 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 20HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 222S: Post CY (nw) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.50 0.05 0.00 0.00 1.80 0.06 0.00 0.00 2.10 0.07 0.00 0.00 2.40 0.08 0.00 0.00 2.70 0.09 0.00 0.00 3.00 0.10 0.00 0.00 3.30 0.12 0.00 0.00 3.60 0.13 0.00 0.00 3.90 0.14 0.00 0.00 4.20 0.15 0.00 0.00 4.50 0.17 0.00 0.00 4.80 0.18 0.00 0.00 5.10 0.20 0.00 0.00 5.40 0.21 0.00 0.00 5.70 0.23 0.00 0.00 6.00 0.24 0.00 0.00 6.30 0.26 0.00 0.00 6.60 0.28 0.00 0.00 6.90 0.29 0.00 0.00 7.20 0.31 0.00 0.00 7.50 0.33 0.00 0.00 7.80 0.35 0.00 0.00 8.10 0.37 0.00 0.00 8.40 0.39 0.00 0.01 8.70 0.42 0.00 0.03 9.00 0.44 0.00 0.04 9.30 0.47 0.01 0.06 9.60 0.50 0.01 0.08 9.90 0.53 0.02 0.10 10.20 0.57 0.02 0.14 10.50 0.62 0.03 0.19 10.80 0.67 0.05 0.27 11.10 0.73 0.07 0.38 11.40 0.82 0.10 0.60 11.70 1.07 0.21 3.00 12.00 2.00 0.80 13.51 12.30 2.15 0.91 1.83 12.60 2.25 0.98 1.08 12.90 2.31 1.03 0.88 13.20 2.37 1.07 0.73 13.50 2.41 1.11 0.63 13.80 2.45 1.14 0.55 14.10 2.49 1.17 0.48 14.40 2.52 1.19 0.45 14.70 2.55 1.22 0.42 15.00 2.58 1.24 0.40 15.30 2.60 1.26 0.37 15.60 2.63 1.28 0.35 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 2.65 1.30 0.32 16.20 2.67 1.32 0.30 16.50 2.69 1.33 0.29 16.80 2.71 1.35 0.28 17.10 2.73 1.36 0.27 17.40 2.75 1.38 0.26 17.70 2.76 1.39 0.25 18.00 2.78 1.41 0.24 18.30 2.80 1.42 0.23 18.60 2.81 1.43 0.22 18.90 2.83 1.44 0.21 19.20 2.84 1.46 0.20 19.50 2.85 1.47 0.19 19.80 2.87 1.48 0.18 20.10 2.88 1.49 0.18 20.40 2.89 1.50 0.17 20.70 2.90 1.51 0.17 21.00 2.91 1.52 0.17 21.30 2.92 1.53 0.17 21.60 2.94 1.53 0.17 21.90 2.95 1.54 0.16 22.20 2.96 1.55 0.16 22.50 2.97 1.56 0.16 22.80 2.98 1.57 0.16 23.10 2.99 1.58 0.16 23.40 3.00 1.59 0.15 23.70 3.01 1.60 0.15 24.00 3.02 1.61 0.15 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 21HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 223S: Post CY (ne) Runoff = 12.76 cfs @ 11.96 hrs, Volume= 0.592 af, Depth> 1.92" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1 yr Rainfall=3.02" Area (ac) CN Description * 3.710 89 3.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 223S: Post CY (ne) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)14 12 10 8 6 4 2 0 Type II 24-hr 1 yr Rainfall=3.02" Runoff Area=3.710 ac Runoff Volume=0.592 af Runoff Depth>1.92" Tc=5.0 min CN=89 12.76 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 22HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 223S: Post CY (ne) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.50 0.05 0.00 0.00 1.80 0.06 0.00 0.00 2.10 0.07 0.00 0.00 2.40 0.08 0.00 0.00 2.70 0.09 0.00 0.00 3.00 0.10 0.00 0.00 3.30 0.12 0.00 0.00 3.60 0.13 0.00 0.00 3.90 0.14 0.00 0.00 4.20 0.15 0.00 0.00 4.50 0.17 0.00 0.00 4.80 0.18 0.00 0.00 5.10 0.20 0.00 0.00 5.40 0.21 0.00 0.00 5.70 0.23 0.00 0.00 6.00 0.24 0.00 0.00 6.30 0.26 0.00 0.00 6.60 0.28 0.00 0.01 6.90 0.29 0.00 0.01 7.20 0.31 0.00 0.02 7.50 0.33 0.01 0.03 7.80 0.35 0.01 0.03 8.10 0.37 0.01 0.04 8.40 0.39 0.02 0.05 8.70 0.42 0.02 0.07 9.00 0.44 0.03 0.09 9.30 0.47 0.03 0.10 9.60 0.50 0.04 0.11 9.90 0.53 0.05 0.14 10.20 0.57 0.07 0.18 10.50 0.62 0.08 0.23 10.80 0.67 0.11 0.30 11.10 0.73 0.14 0.40 11.40 0.82 0.18 0.61 11.70 1.07 0.33 2.79 12.00 2.00 1.03 10.85 12.30 2.15 1.16 1.43 12.60 2.25 1.23 0.84 12.90 2.31 1.29 0.68 13.20 2.37 1.34 0.56 13.50 2.41 1.38 0.48 13.80 2.45 1.41 0.42 14.10 2.49 1.44 0.36 14.40 2.52 1.47 0.34 14.70 2.55 1.50 0.32 15.00 2.58 1.52 0.30 15.30 2.60 1.55 0.28 15.60 2.63 1.57 0.26 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 2.65 1.59 0.24 16.20 2.67 1.61 0.23 16.50 2.69 1.62 0.22 16.80 2.71 1.64 0.21 17.10 2.73 1.66 0.21 17.40 2.75 1.67 0.20 17.70 2.76 1.69 0.19 18.00 2.78 1.70 0.18 18.30 2.80 1.72 0.18 18.60 2.81 1.73 0.17 18.90 2.83 1.74 0.16 19.20 2.84 1.76 0.15 19.50 2.85 1.77 0.15 19.80 2.87 1.78 0.14 20.10 2.88 1.79 0.13 20.40 2.89 1.80 0.13 20.70 2.90 1.81 0.13 21.00 2.91 1.82 0.13 21.30 2.92 1.83 0.13 21.60 2.94 1.84 0.12 21.90 2.95 1.85 0.12 22.20 2.96 1.86 0.12 22.50 2.97 1.87 0.12 22.80 2.98 1.88 0.12 23.10 2.99 1.89 0.12 23.40 3.00 1.90 0.12 23.70 3.01 1.91 0.11 24.00 3.02 1.92 0.11 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 23HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 224S: Post CY (se) Runoff = 3.79 cfs @ 11.97 hrs, Volume= 0.181 af, Depth> 0.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1 yr Rainfall=3.02" Area (ac) CN Description * 3.190 69 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 224S: Post CY (se) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)4 3 2 1 0 Type II 24-hr 1 yr Rainfall=3.02" Runoff Area=3.190 ac Runoff Volume=0.181 af Runoff Depth>0.68" Tc=5.0 min CN=69 3.79 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 24HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 224S: Post CY (se) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.04 0.00 0.00 1.50 0.05 0.00 0.00 1.80 0.06 0.00 0.00 2.10 0.07 0.00 0.00 2.40 0.08 0.00 0.00 2.70 0.09 0.00 0.00 3.00 0.10 0.00 0.00 3.30 0.12 0.00 0.00 3.60 0.13 0.00 0.00 3.90 0.14 0.00 0.00 4.20 0.15 0.00 0.00 4.50 0.17 0.00 0.00 4.80 0.18 0.00 0.00 5.10 0.20 0.00 0.00 5.40 0.21 0.00 0.00 5.70 0.23 0.00 0.00 6.00 0.24 0.00 0.00 6.30 0.26 0.00 0.00 6.60 0.28 0.00 0.00 6.90 0.29 0.00 0.00 7.20 0.31 0.00 0.00 7.50 0.33 0.00 0.00 7.80 0.35 0.00 0.00 8.10 0.37 0.00 0.00 8.40 0.39 0.00 0.00 8.70 0.42 0.00 0.00 9.00 0.44 0.00 0.00 9.30 0.47 0.00 0.00 9.60 0.50 0.00 0.00 9.90 0.53 0.00 0.00 10.20 0.57 0.00 0.00 10.50 0.62 0.00 0.00 10.80 0.67 0.00 0.00 11.10 0.73 0.00 0.00 11.40 0.82 0.00 0.00 11.70 1.07 0.01 0.12 12.00 2.00 0.22 3.49 12.30 2.15 0.27 0.56 12.60 2.25 0.31 0.34 12.90 2.31 0.34 0.29 13.20 2.37 0.36 0.24 13.50 2.41 0.38 0.21 13.80 2.45 0.40 0.18 14.10 2.49 0.42 0.16 14.40 2.52 0.43 0.15 14.70 2.55 0.44 0.15 15.00 2.58 0.46 0.14 15.30 2.60 0.47 0.13 15.60 2.63 0.48 0.12 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 2.65 0.49 0.11 16.20 2.67 0.50 0.11 16.50 2.69 0.51 0.10 16.80 2.71 0.52 0.10 17.10 2.73 0.53 0.10 17.40 2.75 0.54 0.10 17.70 2.76 0.55 0.09 18.00 2.78 0.56 0.09 18.30 2.80 0.56 0.09 18.60 2.81 0.57 0.08 18.90 2.83 0.58 0.08 19.20 2.84 0.59 0.08 19.50 2.85 0.59 0.07 19.80 2.87 0.60 0.07 20.10 2.88 0.61 0.07 20.40 2.89 0.61 0.06 20.70 2.90 0.62 0.06 21.00 2.91 0.62 0.06 21.30 2.92 0.63 0.06 21.60 2.94 0.64 0.06 21.90 2.95 0.64 0.06 22.20 2.96 0.65 0.06 22.50 2.97 0.65 0.06 22.80 2.98 0.66 0.06 23.10 2.99 0.66 0.06 23.40 3.00 0.67 0.06 23.70 3.01 0.68 0.06 24.00 3.02 0.68 0.06 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 25HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Reach 226R: (new Reach) Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth > 0.86" for 1 yr event Inflow = 7.86 cfs @ 12.04 hrs, Volume= 0.651 af Outflow = 7.85 cfs @ 12.04 hrs, Volume= 0.651 af, Atten= 0%, Lag= 0.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Max. Velocity= 3.87 fps, Min. Travel Time= 0.0 min Avg. Velocity = 1.32 fps, Avg. Travel Time= 0.1 min Peak Storage= 20 cf @ 12.04 hrs Average Depth at Peak Storage= 0.36' Bank-Full Depth= 2.00' Flow Area= 18.0 sf, Capacity= 181.21 cfs 5.00' x 2.00' deep channel, n= 0.035 Side Slope Z-value= 2.0 '/' Top Width= 13.00' Length= 10.0' Slope= 0.0400 '/' Inlet Invert= 94.00', Outlet Invert= 93.60' Reach 226R: (new Reach) Inflow Outflow Hydrograph Time (hours) 242220181614121086420Flow (cfs)8 7 6 5 4 3 2 1 0 Inflow Area=9.040 ac Avg. Flow Depth=0.36' Max Vel=3.87 fps n=0.035 L=10.0' S=0.0400 '/' Capacity=181.21 cfs 7.86 cfs7.85 cfs Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 26HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Reach 226R: (new Reach) Primary Stage-Discharge Discharge (cfs) 150100500Depth (feet)2 1 0 Reach 226R: (new Reach) Storage Stage-Storage Storage (cubic-feet) 180160140120100806040200Depth (feet)2 1 0 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 27HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Reach 226R: (new Reach) Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) 0.00 0.00 0 94.00 0.00 0.60 0.00 0 94.00 0.00 1.20 0.00 0 94.00 0.00 1.80 0.00 0 94.00 0.00 2.40 0.00 0 94.00 0.00 3.00 0.00 0 94.00 0.00 3.60 0.00 0 94.00 0.00 4.20 0.00 0 94.00 0.00 4.80 0.00 0 94.00 0.00 5.40 0.00 0 94.00 0.00 6.00 0.00 0 94.00 0.00 6.60 0.00 0 94.00 0.00 7.20 0.00 0 94.00 0.00 7.80 0.00 0 94.00 0.00 8.40 0.00 0 94.00 0.00 9.00 0.00 0 94.00 0.00 9.60 0.00 0 94.00 0.00 10.20 0.00 0 94.00 0.00 10.80 0.00 0 94.00 0.00 11.40 0.03 0 94.01 0.03 12.00 7.29 19 94.34 7.25 12.60 2.08 9 94.16 2.09 13.20 0.97 5 94.10 0.97 13.80 0.69 4 94.08 0.69 14.40 0.55 4 94.07 0.55 15.00 0.48 3 94.07 0.48 15.60 0.43 3 94.06 0.43 16.20 0.37 3 94.06 0.37 16.80 0.34 3 94.05 0.34 17.40 0.32 3 94.05 0.32 18.00 0.30 3 94.05 0.30 18.60 0.28 2 94.05 0.28 19.20 0.26 2 94.05 0.26 19.80 0.23 2 94.04 0.23 20.40 0.21 2 94.04 0.21 21.00 0.21 2 94.04 0.21 21.60 0.21 2 94.04 0.21 22.20 0.20 2 94.04 0.20 22.80 0.20 2 94.04 0.20 23.40 0.19 2 94.04 0.19 24.00 0.19 2 94.04 0.19 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 28HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Reach 226R: (new Reach) Elevation (feet) Velocity (ft/sec) Discharge (cfs) 94.00 0.00 0.00 94.02 0.62 0.06 94.04 0.98 0.20 94.06 1.28 0.39 94.08 1.54 0.63 94.10 1.77 0.92 94.12 1.99 1.25 94.14 2.19 1.62 94.16 2.39 2.03 94.18 2.57 2.48 94.20 2.74 2.96 94.22 2.90 3.48 94.24 3.06 4.03 94.26 3.21 4.61 94.28 3.36 5.23 94.30 3.50 5.88 94.32 3.64 6.57 94.34 3.77 7.29 94.36 3.90 8.04 94.38 4.03 8.82 94.40 4.15 9.63 94.42 4.27 10.47 94.44 4.39 11.35 94.46 4.50 12.26 94.48 4.61 13.19 94.50 4.72 14.16 94.52 4.83 15.16 94.54 4.93 16.20 94.56 5.04 17.26 94.58 5.14 18.35 94.60 5.24 19.48 94.62 5.33 20.63 94.64 5.43 21.82 94.66 5.52 23.04 94.68 5.62 24.29 94.70 5.71 25.57 94.72 5.80 26.88 94.74 5.89 28.22 94.76 5.97 29.60 94.78 6.06 31.01 94.80 6.14 32.44 94.82 6.23 33.91 94.84 6.31 35.41 94.86 6.39 36.95 94.88 6.47 38.51 94.90 6.55 40.11 94.92 6.63 41.74 94.94 6.71 43.40 94.96 6.79 45.10 94.98 6.87 46.83 95.00 6.94 48.59 95.02 7.02 50.38 95.04 7.09 52.20 Elevation (feet) Velocity (ft/sec) Discharge (cfs) 95.06 7.16 54.06 95.08 7.24 55.96 95.10 7.31 57.88 95.12 7.38 59.84 95.14 7.45 61.83 95.16 7.52 63.86 95.18 7.59 65.92 95.20 7.66 68.01 95.22 7.73 70.14 95.24 7.80 72.30 95.26 7.86 74.50 95.28 7.93 76.73 95.30 8.00 78.99 95.32 8.06 81.29 95.34 8.13 83.63 95.36 8.19 86.00 95.38 8.26 88.40 95.40 8.32 90.84 95.42 8.38 93.32 95.44 8.45 95.83 95.46 8.51 98.38 95.48 8.57 100.96 95.50 8.63 103.58 95.52 8.69 106.24 95.54 8.75 108.93 95.56 8.81 111.66 95.58 8.88 114.42 95.60 8.93 117.23 95.62 8.99 120.06 95.64 9.05 122.94 95.66 9.11 125.85 95.68 9.17 128.80 95.70 9.23 131.79 95.72 9.29 134.82 95.74 9.34 137.88 95.76 9.40 140.98 95.78 9.46 144.12 95.80 9.52 147.30 95.82 9.57 150.51 95.84 9.63 153.77 95.86 9.68 157.06 95.88 9.74 160.39 95.90 9.79 163.76 95.92 9.85 167.17 95.94 9.90 170.62 95.96 9.96 174.11 95.98 10.01 177.64 96.00 10.07 181.21 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 29HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Reach 226R: (new Reach) Elevation (feet) End-Area (sq-ft) Storage (cubic-feet) 94.00 0.0 0 94.02 0.1 1 94.04 0.2 2 94.06 0.3 3 94.08 0.4 4 94.10 0.5 5 94.12 0.6 6 94.14 0.7 7 94.16 0.9 9 94.18 1.0 10 94.20 1.1 11 94.22 1.2 12 94.24 1.3 13 94.26 1.4 14 94.28 1.6 16 94.30 1.7 17 94.32 1.8 18 94.34 1.9 19 94.36 2.1 21 94.38 2.2 22 94.40 2.3 23 94.42 2.5 25 94.44 2.6 26 94.46 2.7 27 94.48 2.9 29 94.50 3.0 30 94.52 3.1 31 94.54 3.3 33 94.56 3.4 34 94.58 3.6 36 94.60 3.7 37 94.62 3.9 39 94.64 4.0 40 94.66 4.2 42 94.68 4.3 43 94.70 4.5 45 94.72 4.6 46 94.74 4.8 48 94.76 5.0 50 94.78 5.1 51 94.80 5.3 53 94.82 5.4 54 94.84 5.6 56 94.86 5.8 58 94.88 5.9 59 94.90 6.1 61 94.92 6.3 63 94.94 6.5 65 94.96 6.6 66 94.98 6.8 68 95.00 7.0 70 95.02 7.2 72 95.04 7.4 74 Elevation (feet) End-Area (sq-ft) Storage (cubic-feet) 95.06 7.5 75 95.08 7.7 77 95.10 7.9 79 95.12 8.1 81 95.14 8.3 83 95.16 8.5 85 95.18 8.7 87 95.20 8.9 89 95.22 9.1 91 95.24 9.3 93 95.26 9.5 95 95.28 9.7 97 95.30 9.9 99 95.32 10.1 101 95.34 10.3 103 95.36 10.5 105 95.38 10.7 107 95.40 10.9 109 95.42 11.1 111 95.44 11.3 113 95.46 11.6 116 95.48 11.8 118 95.50 12.0 120 95.52 12.2 122 95.54 12.4 124 95.56 12.7 127 95.58 12.9 129 95.60 13.1 131 95.62 13.3 133 95.64 13.6 136 95.66 13.8 138 95.68 14.0 140 95.70 14.3 143 95.72 14.5 145 95.74 14.8 148 95.76 15.0 150 95.78 15.2 152 95.80 15.5 155 95.82 15.7 157 95.84 16.0 160 95.86 16.2 162 95.88 16.5 165 95.90 16.7 167 95.92 17.0 170 95.94 17.2 172 95.96 17.5 175 95.98 17.7 177 96.00 18.0 180 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 30HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 221P: 221 Inflow Area = 24.590 ac, 0.00% Impervious, Inflow Depth > 1.75" for 1 yr event Inflow = 57.39 cfs @ 12.06 hrs, Volume= 3.587 af Outflow = 1.53 cfs @ 16.06 hrs, Volume= 0.825 af, Atten= 97%, Lag= 239.8 min Primary = 1.53 cfs @ 16.06 hrs, Volume= 0.825 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 93.05' @ 16.06 hrs Surf.Area= 89,118 sf Storage= 122,218 cf Plug-Flow detention time= 443.4 min calculated for 0.824 af (23% of inflow) Center-of-Mass det. time= 307.9 min ( 1,131.5 - 823.6 ) Volume Invert Avail.Storage Storage Description #1 91.00' 308,000 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 91.00 49,357 0 0 91.50 52,297 25,414 25,414 92.00 55,253 26,888 52,301 92.50 58,224 28,369 80,670 93.00 88,767 36,748 117,418 94.00 95,276 92,022 209,440 94.10 95,930 9,560 219,000 95.00 101,848 89,000 308,000 Device Routing Invert Outlet Devices #1 Primary 93.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=1.47 cfs @ 16.06 hrs HW=93.05' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 1.47 cfs @ 0.54 fps) Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 31HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 221P: 221 Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)60 50 40 30 20 10 0 Inflow Area=24.590 ac Peak Elev=93.05' Storage=122,218 cf 57.39 cfs 1.53 cfs Pond 221P: 221 Primary Stage-Discharge Discharge (cfs) 350300250200150100500Elevation (feet)95 94 93 92 91 Broad-Crested Rectangular Weir Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 32HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 221P: 221 Surface Storage Stage-Area-Storage Storage (cubic-feet) 300,000200,000100,0000 Surface/Horizontal/Wetted Area (sq-ft) 100,00080,00060,00040,00020,0000 Elevation (feet)95 94 93 92 91 Custom Stage Data Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 33HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 221P: 221 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 91.00 0.00 0.60 0.00 0 91.00 0.00 1.20 0.00 0 91.00 0.00 1.80 0.00 0 91.00 0.00 2.40 0.00 0 91.00 0.00 3.00 0.00 0 91.00 0.00 3.60 0.00 0 91.00 0.00 4.20 0.00 0 91.00 0.00 4.80 0.00 0 91.00 0.00 5.40 0.00 0 91.00 0.00 6.00 0.00 0 91.00 0.00 6.60 0.00 0 91.00 0.00 7.20 0.00 1 91.00 0.00 7.80 0.07 80 91.00 0.00 8.40 0.17 334 91.01 0.00 9.00 0.33 864 91.02 0.00 9.60 0.49 1,769 91.04 0.00 10.20 0.79 3,108 91.06 0.00 10.80 1.37 5,371 91.11 0.00 11.40 2.79 9,566 91.19 0.00 12.00 49.89 38,002 91.74 0.00 12.60 7.15 93,542 92.70 0.00 13.20 3.85 104,264 92.84 0.00 13.80 2.83 111,385 92.93 0.00 14.40 2.24 116,753 92.99 0.00 15.00 1.99 120,487 93.03 0.81 15.60 1.73 122,004 93.05 1.43 16.20 1.48 122,206 93.05 1.53 16.80 1.38 122,054 93.05 1.45 17.40 1.28 121,876 93.05 1.37 18.00 1.19 121,689 93.05 1.28 18.60 1.10 121,498 93.05 1.19 19.20 1.00 121,303 93.04 1.09 19.80 0.91 121,107 93.04 1.00 20.40 0.84 120,914 93.04 0.92 21.00 0.82 120,761 93.04 0.88 21.60 0.80 120,644 93.04 0.85 22.20 0.78 120,547 93.04 0.82 22.80 0.76 120,463 93.03 0.80 23.40 0.75 120,384 93.03 0.78 24.00 0.73 120,310 93.03 0.76 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 34HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 221P: 221 Elevation (feet) Primary (cfs) 91.00 0.00 91.02 0.00 91.04 0.00 91.06 0.00 91.08 0.00 91.10 0.00 91.12 0.00 91.14 0.00 91.16 0.00 91.18 0.00 91.20 0.00 91.22 0.00 91.24 0.00 91.26 0.00 91.28 0.00 91.30 0.00 91.32 0.00 91.34 0.00 91.36 0.00 91.38 0.00 91.40 0.00 91.42 0.00 91.44 0.00 91.46 0.00 91.48 0.00 91.50 0.00 91.52 0.00 91.54 0.00 91.56 0.00 91.58 0.00 91.60 0.00 91.62 0.00 91.64 0.00 91.66 0.00 91.68 0.00 91.70 0.00 91.72 0.00 91.74 0.00 91.76 0.00 91.78 0.00 91.80 0.00 91.82 0.00 91.84 0.00 91.86 0.00 91.88 0.00 91.90 0.00 91.92 0.00 91.94 0.00 91.96 0.00 91.98 0.00 92.00 0.00 92.02 0.00 92.04 0.00 Elevation (feet) Primary (cfs) 92.06 0.00 92.08 0.00 92.10 0.00 92.12 0.00 92.14 0.00 92.16 0.00 92.18 0.00 92.20 0.00 92.22 0.00 92.24 0.00 92.26 0.00 92.28 0.00 92.30 0.00 92.32 0.00 92.34 0.00 92.36 0.00 92.38 0.00 92.40 0.00 92.42 0.00 92.44 0.00 92.46 0.00 92.48 0.00 92.50 0.00 92.52 0.00 92.54 0.00 92.56 0.00 92.58 0.00 92.60 0.00 92.62 0.00 92.64 0.00 92.66 0.00 92.68 0.00 92.70 0.00 92.72 0.00 92.74 0.00 92.76 0.00 92.78 0.00 92.80 0.00 92.82 0.00 92.84 0.00 92.86 0.00 92.88 0.00 92.90 0.00 92.92 0.00 92.94 0.00 92.96 0.00 92.98 0.00 93.00 0.00 93.02 0.33 93.04 0.94 93.06 1.72 93.08 2.65 93.10 3.70 Elevation (feet) Primary (cfs) 93.12 4.86 93.14 6.13 93.16 7.49 93.18 8.94 93.20 10.46 93.22 12.16 93.24 13.94 93.26 15.83 93.28 17.81 93.30 19.88 93.32 22.05 93.34 24.31 93.36 26.65 93.38 29.09 93.40 31.62 93.42 34.30 93.44 37.07 93.46 39.93 93.48 42.90 93.50 45.96 93.52 49.12 93.54 52.38 93.56 55.74 93.58 59.19 93.60 62.74 93.62 65.86 93.64 69.02 93.66 72.22 93.68 75.48 93.70 78.77 93.72 82.11 93.74 85.49 93.76 88.91 93.78 92.38 93.80 95.88 93.82 99.50 93.84 103.16 93.86 106.87 93.88 110.62 93.90 114.41 93.92 118.25 93.94 122.12 93.96 126.04 93.98 130.00 94.00 134.00 94.02 137.94 94.04 141.91 94.06 145.91 94.08 149.95 94.10 154.02 94.12 158.12 94.14 162.25 94.16 166.41 Elevation (feet) Primary (cfs) 94.18 170.61 94.20 174.83 94.22 179.15 94.24 183.51 94.26 187.90 94.28 192.31 94.30 196.77 94.32 201.25 94.34 205.76 94.36 210.31 94.38 214.88 94.40 219.49 94.42 224.21 94.44 228.96 94.46 233.75 94.48 238.57 94.50 243.42 94.52 248.30 94.54 253.22 94.56 258.17 94.58 263.15 94.60 268.16 94.62 273.20 94.64 278.28 94.66 283.39 94.68 288.52 94.70 293.69 94.72 298.89 94.74 304.12 94.76 309.37 94.78 314.66 94.80 319.98 94.82 325.33 94.84 330.71 94.86 336.11 94.88 341.55 94.90 347.01 94.92 352.51 94.94 358.03 94.96 363.58 94.98 369.16 95.00 374.77 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 35HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 221P: 221 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 91.00 49,357 0 91.05 49,651 2,475 91.10 49,945 4,965 91.15 50,239 7,470 91.20 50,533 9,989 91.25 50,827 12,523 91.30 51,121 15,072 91.35 51,415 17,635 91.40 51,709 20,213 91.45 52,003 22,806 91.50 52,297 25,414 91.55 52,593 28,036 91.60 52,888 30,673 91.65 53,184 33,325 91.70 53,479 35,991 91.75 53,775 38,673 91.80 54,071 41,369 91.85 54,366 44,080 91.90 54,662 46,805 91.95 54,957 49,546 92.00 55,253 52,301 92.05 55,550 55,071 92.10 55,847 57,856 92.15 56,144 60,656 92.20 56,441 63,470 92.25 56,739 66,300 92.30 57,036 69,144 92.35 57,333 72,003 92.40 57,630 74,878 92.45 57,927 77,766 92.50 58,224 80,670 92.55 61,278 83,658 92.60 64,333 86,798 92.65 67,387 90,091 92.70 70,441 93,537 92.75 73,496 97,135 92.80 76,550 100,886 92.85 79,604 104,790 92.90 82,658 108,847 92.95 85,713 113,056 93.00 88,767 117,418 93.05 89,092 121,864 93.10 89,418 126,327 93.15 89,743 130,806 93.20 90,069 135,302 93.25 90,394 139,813 93.30 90,720 144,341 93.35 91,045 148,885 93.40 91,371 153,446 93.45 91,696 158,022 93.50 92,022 162,615 93.55 92,347 167,224 93.60 92,672 171,850 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 93.65 92,998 176,492 93.70 93,323 181,150 93.75 93,649 185,824 93.80 93,974 190,514 93.85 94,300 195,221 93.90 94,625 199,944 93.95 94,951 204,684 94.00 95,276 209,440 94.05 95,603 214,211 94.10 95,930 219,000 94.15 96,259 223,805 94.20 96,588 228,626 94.25 96,916 233,463 94.30 97,245 238,317 94.35 97,574 243,188 94.40 97,903 248,075 94.45 98,231 252,978 94.50 98,560 257,898 94.55 98,889 262,834 94.60 99,218 267,787 94.65 99,547 272,756 94.70 99,875 277,741 94.75 100,204 282,743 94.80 100,533 287,762 94.85 100,862 292,797 94.90 101,190 297,848 94.95 101,519 302,916 95.00 101,848 308,000 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 36HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 222P: SF Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth > 1.73" for 1 yr event Inflow = 28.43 cfs @ 11.96 hrs, Volume= 1.305 af Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 93.45' @ 24.00 hrs Surf.Area= 81,614 sf Storage= 56,804 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 92.00' 182,259 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 92.00 11,830 0 0 93.00 44,530 28,180 28,180 94.00 126,241 85,386 113,566 94.40 217,225 68,693 182,259 Device Routing Invert Outlet Devices #1 Primary 94.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=92.00' (Free Discharge) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 37HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 222P: SF Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)30 25 20 15 10 5 0 Inflow Area=9.040 ac Peak Elev=93.45' Storage=56,804 cf 28.43 cfs 0.00 cfs Pond 222P: SF Primary Stage-Discharge Discharge (cfs) 302520151050Elevation (feet)94 93 92 Broad-Crested Rectangular Weir Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 38HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 222P: SF Surface Storage Stage-Area-Storage Storage (cubic-feet) 150,000100,00050,0000 Surface/Horizontal/Wetted Area (sq-ft) 200,000150,000100,00050,0000 Elevation (feet)94 93 92 Custom Stage Data Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 39HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 222P: SF Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 92.00 0.00 0.60 0.00 0 92.00 0.00 1.20 0.00 0 92.00 0.00 1.80 0.00 0 92.00 0.00 2.40 0.00 0 92.00 0.00 3.00 0.00 0 92.00 0.00 3.60 0.00 0 92.00 0.00 4.20 0.00 0 92.00 0.00 4.80 0.00 0 92.00 0.00 5.40 0.00 0 92.00 0.00 6.00 0.00 0 92.00 0.00 6.60 0.01 6 92.00 0.00 7.20 0.02 37 92.00 0.00 7.80 0.03 95 92.01 0.00 8.40 0.07 199 92.02 0.00 9.00 0.13 412 92.03 0.00 9.60 0.19 759 92.06 0.00 10.20 0.32 1,290 92.10 0.00 10.80 0.57 2,208 92.15 0.00 11.40 1.21 3,983 92.25 0.00 12.00 24.36 24,331 92.91 0.00 12.60 1.92 35,047 93.14 0.00 13.20 1.29 38,438 93.20 0.00 13.80 0.96 40,848 93.23 0.00 14.40 0.79 42,700 93.26 0.00 15.00 0.70 44,315 93.29 0.00 15.60 0.61 45,731 93.31 0.00 16.20 0.53 46,946 93.32 0.00 16.80 0.49 48,047 93.34 0.00 17.40 0.46 49,077 93.35 0.00 18.00 0.43 50,035 93.37 0.00 18.60 0.39 50,919 93.38 0.00 19.20 0.36 51,729 93.39 0.00 19.80 0.32 52,464 93.40 0.00 20.40 0.30 53,134 93.41 0.00 21.00 0.30 53,782 93.42 0.00 21.60 0.29 54,417 93.42 0.00 22.20 0.28 55,037 93.43 0.00 22.80 0.28 55,642 93.44 0.00 23.40 0.27 56,234 93.45 0.00 24.00 0.26 56,810 93.45 0.00 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 40HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 222P: SF Elevation (feet) Primary (cfs) 92.00 0.00 92.02 0.00 92.04 0.00 92.06 0.00 92.08 0.00 92.10 0.00 92.12 0.00 92.14 0.00 92.16 0.00 92.18 0.00 92.20 0.00 92.22 0.00 92.24 0.00 92.26 0.00 92.28 0.00 92.30 0.00 92.32 0.00 92.34 0.00 92.36 0.00 92.38 0.00 92.40 0.00 92.42 0.00 92.44 0.00 92.46 0.00 92.48 0.00 92.50 0.00 92.52 0.00 92.54 0.00 92.56 0.00 92.58 0.00 92.60 0.00 92.62 0.00 92.64 0.00 92.66 0.00 92.68 0.00 92.70 0.00 92.72 0.00 92.74 0.00 92.76 0.00 92.78 0.00 92.80 0.00 92.82 0.00 92.84 0.00 92.86 0.00 92.88 0.00 92.90 0.00 92.92 0.00 92.94 0.00 92.96 0.00 92.98 0.00 93.00 0.00 93.02 0.00 93.04 0.00 Elevation (feet) Primary (cfs) 93.06 0.00 93.08 0.00 93.10 0.00 93.12 0.00 93.14 0.00 93.16 0.00 93.18 0.00 93.20 0.00 93.22 0.00 93.24 0.00 93.26 0.00 93.28 0.00 93.30 0.00 93.32 0.00 93.34 0.00 93.36 0.00 93.38 0.00 93.40 0.00 93.42 0.00 93.44 0.00 93.46 0.00 93.48 0.00 93.50 0.00 93.52 0.00 93.54 0.00 93.56 0.00 93.58 0.00 93.60 0.00 93.62 0.00 93.64 0.00 93.66 0.00 93.68 0.00 93.70 0.00 93.72 0.00 93.74 0.00 93.76 0.00 93.78 0.00 93.80 0.00 93.82 0.00 93.84 0.00 93.86 0.00 93.88 0.00 93.90 0.00 93.92 0.00 93.94 0.00 93.96 0.00 93.98 0.00 94.00 0.00 94.02 0.33 94.04 0.94 94.06 1.72 94.08 2.65 94.10 3.70 Elevation (feet) Primary (cfs) 94.12 4.86 94.14 6.13 94.16 7.49 94.18 8.94 94.20 10.46 94.22 12.16 94.24 13.94 94.26 15.83 94.28 17.81 94.30 19.88 94.32 22.05 94.34 24.31 94.36 26.65 94.38 29.09 94.40 31.62 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 41HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 222P: SF Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 92.00 11,830 0 92.05 13,465 632 92.10 15,100 1,346 92.15 16,735 2,142 92.20 18,370 3,020 92.25 20,005 3,979 92.30 21,640 5,020 92.35 23,275 6,143 92.40 24,910 7,348 92.45 26,545 8,634 92.50 28,180 10,003 92.55 29,815 11,452 92.60 31,450 12,984 92.65 33,085 14,597 92.70 34,720 16,293 92.75 36,355 18,069 92.80 37,990 19,928 92.85 39,625 21,868 92.90 41,260 23,891 92.95 42,895 25,994 93.00 44,530 28,180 93.05 48,616 30,509 93.10 52,701 33,042 93.15 56,787 35,779 93.20 60,872 38,720 93.25 64,958 41,866 93.30 69,043 45,216 93.35 73,129 48,770 93.40 77,214 52,529 93.45 81,300 56,492 93.50 85,386 60,659 93.55 89,471 65,030 93.60 93,557 69,606 93.65 97,642 74,386 93.70 101,728 79,370 93.75 105,813 84,559 93.80 109,899 89,952 93.85 113,984 95,549 93.90 118,070 101,350 93.95 122,155 107,356 94.00 126,241 113,566 94.05 137,614 120,162 94.10 148,987 127,327 94.15 160,360 135,061 94.20 171,733 143,363 94.25 183,106 152,234 94.30 194,479 161,673 94.35 205,852 171,682 94.40 217,225 182,259 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 42HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 224P: 224 Inflow Area = 3.190 ac, 0.00% Impervious, Inflow Depth > 0.68" for 1 yr event Inflow = 3.79 cfs @ 11.97 hrs, Volume= 0.181 af Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 92.68' @ 24.00 hrs Surf.Area= 12,311 sf Storage= 7,863 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 92.00' 25,759 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 92.00 10,786 0 0 92.50 11,926 5,678 5,678 93.00 12,993 6,230 11,908 93.50 13,844 6,709 18,617 94.00 14,722 7,142 25,759 Device Routing Invert Outlet Devices #1 Primary 93.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=92.00' (Free Discharge) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 43HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 224P: 224 Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)4 3 2 1 0 Inflow Area=3.190 ac Peak Elev=92.68' Storage=7,863 cf 3.79 cfs 0.00 cfs Pond 224P: 224 Primary Stage-Discharge Discharge (cfs) 1301201101009080706050403020100Elevation (feet)94 93 92 Broad-Crested Rectangular Weir Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 44HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 224P: 224 Surface Storage Stage-Area-Storage Storage (cubic-feet) 25,00020,00015,00010,0005,0000 Surface/Horizontal/Wetted Area (sq-ft) 14,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)94 93 92 Custom Stage Data Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 45HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 224P: 224 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 92.00 0.00 0.60 0.00 0 92.00 0.00 1.20 0.00 0 92.00 0.00 1.80 0.00 0 92.00 0.00 2.40 0.00 0 92.00 0.00 3.00 0.00 0 92.00 0.00 3.60 0.00 0 92.00 0.00 4.20 0.00 0 92.00 0.00 4.80 0.00 0 92.00 0.00 5.40 0.00 0 92.00 0.00 6.00 0.00 0 92.00 0.00 6.60 0.00 0 92.00 0.00 7.20 0.00 0 92.00 0.00 7.80 0.00 0 92.00 0.00 8.40 0.00 0 92.00 0.00 9.00 0.00 0 92.00 0.00 9.60 0.00 0 92.00 0.00 10.20 0.00 0 92.00 0.00 10.80 0.00 0 92.00 0.00 11.40 0.00 0 92.00 0.00 12.00 3.49 1,783 92.16 0.00 12.60 0.34 3,503 92.31 0.00 13.20 0.24 4,121 92.37 0.00 13.80 0.18 4,575 92.41 0.00 14.40 0.15 4,933 92.44 0.00 15.00 0.14 5,251 92.46 0.00 15.60 0.12 5,533 92.49 0.00 16.20 0.11 5,779 92.51 0.00 16.80 0.10 6,003 92.53 0.00 17.40 0.10 6,216 92.54 0.00 18.00 0.09 6,414 92.56 0.00 18.60 0.08 6,599 92.58 0.00 19.20 0.08 6,770 92.59 0.00 19.80 0.07 6,926 92.60 0.00 20.40 0.06 7,068 92.62 0.00 21.00 0.06 7,207 92.63 0.00 21.60 0.06 7,343 92.64 0.00 22.20 0.06 7,477 92.65 0.00 22.80 0.06 7,608 92.66 0.00 23.40 0.06 7,737 92.67 0.00 24.00 0.06 7,863 92.68 0.00 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 46HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 224P: 224 Elevation (feet) Primary (cfs) 92.00 0.00 92.01 0.00 92.02 0.00 92.03 0.00 92.04 0.00 92.05 0.00 92.06 0.00 92.07 0.00 92.08 0.00 92.09 0.00 92.10 0.00 92.11 0.00 92.12 0.00 92.13 0.00 92.14 0.00 92.15 0.00 92.16 0.00 92.17 0.00 92.18 0.00 92.19 0.00 92.20 0.00 92.21 0.00 92.22 0.00 92.23 0.00 92.24 0.00 92.25 0.00 92.26 0.00 92.27 0.00 92.28 0.00 92.29 0.00 92.30 0.00 92.31 0.00 92.32 0.00 92.33 0.00 92.34 0.00 92.35 0.00 92.36 0.00 92.37 0.00 92.38 0.00 92.39 0.00 92.40 0.00 92.41 0.00 92.42 0.00 92.43 0.00 92.44 0.00 92.45 0.00 92.46 0.00 92.47 0.00 92.48 0.00 92.49 0.00 92.50 0.00 92.51 0.00 92.52 0.00 Elevation (feet) Primary (cfs) 92.53 0.00 92.54 0.00 92.55 0.00 92.56 0.00 92.57 0.00 92.58 0.00 92.59 0.00 92.60 0.00 92.61 0.00 92.62 0.00 92.63 0.00 92.64 0.00 92.65 0.00 92.66 0.00 92.67 0.00 92.68 0.00 92.69 0.00 92.70 0.00 92.71 0.00 92.72 0.00 92.73 0.00 92.74 0.00 92.75 0.00 92.76 0.00 92.77 0.00 92.78 0.00 92.79 0.00 92.80 0.00 92.81 0.00 92.82 0.00 92.83 0.00 92.84 0.00 92.85 0.00 92.86 0.00 92.87 0.00 92.88 0.00 92.89 0.00 92.90 0.00 92.91 0.00 92.92 0.00 92.93 0.00 92.94 0.00 92.95 0.00 92.96 0.00 92.97 0.00 92.98 0.00 92.99 0.00 93.00 0.00 93.01 0.12 93.02 0.33 93.03 0.61 93.04 0.94 93.05 1.31 Elevation (feet) Primary (cfs) 93.06 1.72 93.07 2.17 93.08 2.65 93.09 3.16 93.10 3.70 93.11 4.27 93.12 4.86 93.13 5.48 93.14 6.13 93.15 6.80 93.16 7.49 93.17 8.20 93.18 8.94 93.19 9.69 93.20 10.46 93.21 11.30 93.22 12.16 93.23 13.04 93.24 13.94 93.25 14.88 93.26 15.83 93.27 16.81 93.28 17.81 93.29 18.83 93.30 19.88 93.31 20.95 93.32 22.05 93.33 23.17 93.34 24.31 93.35 25.47 93.36 26.65 93.37 27.86 93.38 29.09 93.39 30.35 93.40 31.62 93.41 32.95 93.42 34.30 93.43 35.67 93.44 37.07 93.45 38.49 93.46 39.93 93.47 41.40 93.48 42.90 93.49 44.42 93.50 45.96 93.51 47.53 93.52 49.12 93.53 50.74 93.54 52.38 93.55 54.05 93.56 55.74 93.57 57.45 93.58 59.19 Elevation (feet) Primary (cfs) 93.59 60.95 93.60 62.74 93.61 64.29 93.62 65.86 93.63 67.43 93.64 69.02 93.65 70.62 93.66 72.22 93.67 73.84 93.68 75.48 93.69 77.12 93.70 78.77 93.71 80.44 93.72 82.11 93.73 83.80 93.74 85.49 93.75 87.20 93.76 88.91 93.77 90.64 93.78 92.38 93.79 94.13 93.80 95.88 93.81 97.69 93.82 99.50 93.83 101.33 93.84 103.16 93.85 105.01 93.86 106.87 93.87 108.74 93.88 110.62 93.89 112.51 93.90 114.41 93.91 116.32 93.92 118.25 93.93 120.18 93.94 122.12 93.95 124.08 93.96 126.04 93.97 128.02 93.98 130.00 93.99 132.00 94.00 134.00 Type II 24-hr 1 yr Rainfall=3.02"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 47HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 224P: 224 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 92.00 10,786 0 92.02 10,832 216 92.04 10,877 433 92.06 10,923 651 92.08 10,968 870 92.10 11,014 1,090 92.12 11,060 1,311 92.14 11,105 1,532 92.16 11,151 1,755 92.18 11,196 1,978 92.20 11,242 2,203 92.22 11,288 2,428 92.24 11,333 2,654 92.26 11,379 2,881 92.28 11,424 3,109 92.30 11,470 3,338 92.32 11,516 3,568 92.34 11,561 3,799 92.36 11,607 4,031 92.38 11,652 4,263 92.40 11,698 4,497 92.42 11,744 4,731 92.44 11,789 4,967 92.46 11,835 5,203 92.48 11,880 5,440 92.50 11,926 5,678 92.52 11,969 5,917 92.54 12,011 6,157 92.56 12,054 6,397 92.58 12,097 6,639 92.60 12,139 6,881 92.62 12,182 7,124 92.64 12,225 7,369 92.66 12,267 7,613 92.68 12,310 7,859 92.70 12,353 8,106 92.72 12,395 8,353 92.74 12,438 8,602 92.76 12,481 8,851 92.78 12,524 9,101 92.80 12,566 9,352 92.82 12,609 9,604 92.84 12,652 9,856 92.86 12,694 10,110 92.88 12,737 10,364 92.90 12,780 10,619 92.92 12,822 10,875 92.94 12,865 11,132 92.96 12,908 11,390 92.98 12,950 11,648 93.00 12,993 11,908 93.02 13,027 12,168 93.04 13,061 12,429 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 93.06 13,095 12,690 93.08 13,129 12,953 93.10 13,163 13,216 93.12 13,197 13,479 93.14 13,231 13,743 93.16 13,265 14,008 93.18 13,299 14,274 93.20 13,333 14,540 93.22 13,367 14,807 93.24 13,401 15,075 93.26 13,436 15,343 93.28 13,470 15,613 93.30 13,504 15,882 93.32 13,538 16,153 93.34 13,572 16,424 93.36 13,606 16,696 93.38 13,640 16,968 93.40 13,674 17,241 93.42 13,708 17,515 93.44 13,742 17,789 93.46 13,776 18,065 93.48 13,810 18,340 93.50 13,844 18,617 93.52 13,879 18,894 93.54 13,914 19,172 93.56 13,949 19,451 93.58 13,984 19,730 93.60 14,020 20,010 93.62 14,055 20,291 93.64 14,090 20,572 93.66 14,125 20,855 93.68 14,160 21,137 93.70 14,195 21,421 93.72 14,230 21,705 93.74 14,265 21,990 93.76 14,301 22,276 93.78 14,336 22,562 93.80 14,371 22,849 93.82 14,406 23,137 93.84 14,441 23,425 93.86 14,476 23,715 93.88 14,511 24,005 93.90 14,546 24,295 93.92 14,582 24,586 93.94 14,617 24,878 93.96 14,652 25,171 93.98 14,687 25,464 94.00 14,722 25,759 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 48HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.03 hrs, 801 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=24.590 ac 0.00% Impervious Runoff Depth>1.40"Subcatchment 121S: Pre Dev't Flow Length=1,245' Tc=27.6 min CN=75 Runoff=30.78 cfs 2.877 af Runoff Area=5.330 ac 0.00% Impervious Runoff Depth>1.28"Subcatchment 122S: Pre Dev't Tc=10.0 min CN=73 Runoff=10.40 cfs 0.571 af Runoff Area=3.710 ac 0.00% Impervious Runoff Depth>1.28"Subcatchment 123S: Pre Dev't Tc=30.0 min CN=73 Runoff=3.92 cfs 0.394 af Runoff Area=3.190 ac 0.00% Impervious Runoff Depth>1.28"Subcatchment 124S: Pre Dev't Tc=10.0 min CN=73 Runoff=6.22 cfs 0.341 af Runoff Area=24.590 ac 0.00% Impervious Runoff Depth>2.32"Subcatchment 221S: Post CY (s) Flow Length=979' Tc=14.1 min CN=87 Runoff=75.53 cfs 4.753 af Runoff Area=5.330 ac 0.00% Impervious Runoff Depth>2.15"Subcatchment 222S: Post CY (nw) Tc=5.0 min CN=85 Runoff=20.84 cfs 0.957 af Runoff Area=3.710 ac 0.00% Impervious Runoff Depth>2.50"Subcatchment 223S: Post CY (ne) Tc=5.0 min CN=89 Runoff=16.43 cfs 0.774 af Runoff Area=3.190 ac 0.00% Impervious Runoff Depth>1.05"Subcatchment 224S: Post CY (se) Tc=5.0 min CN=69 Runoff=6.08 cfs 0.279 af Avg. Flow Depth=0.46' Max Vel=4.49 fps Inflow=12.15 cfs 0.965 afReach 226R: (new Reach) n=0.035 L=10.0' S=0.0400 '/' Capacity=181.21 cfs Outflow=12.14 cfs 0.965 af Peak Elev=93.13' Storage=128,973 cf Inflow=75.53 cfs 4.753 afPond 221P: 221 Outflow=5.49 cfs 1.976 af Peak Elev=93.66' Storage=75,368 cf Inflow=37.27 cfs 1.731 afPond 222P: SF Outflow=0.00 cfs 0.000 af Peak Elev=93.00' Storage=11,970 cf Inflow=6.08 cfs 0.279 afPond 224P: 224 Outflow=0.08 cfs 0.004 af Total Runoff Area = 73.640 ac Runoff Volume = 10.946 af Average Runoff Depth = 1.78" 100.00% Pervious = 73.640 ac 0.00% Impervious = 0.000 ac Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 49HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 121S: Pre Dev't Runoff = 30.78 cfs @ 12.23 hrs, Volume= 2.877 af, Depth> 1.40" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr Rainfall=3.66" Area (ac) CN Description * 24.590 75 24.590 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.7 165 0.0212 0.41 Sheet Flow, Cultivated: Residue<=20% n= 0.060 P2= 3.36" 1.8 106 0.0038 0.99 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 150 0.0220 5.84 70.07 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.040 0.1 24 0.0083 3.73 26.33 Pipe Channel, 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.030 Corrugated metal 9.9 384 0.0016 0.64 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.9 32 0.0063 0.62 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 Corrugated metal 7.8 384 0.0026 0.82 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.6 1,245 Total Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 50HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Subcatchment 121S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)30 25 20 15 10 5 0 Type II 24-hr 2 yr Rainfall=3.66" Runoff Area=24.590 ac Runoff Volume=2.877 af Runoff Depth>1.40" Flow Length=1,245' Tc=27.6 min CN=75 30.78 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 51HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 121S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.80 0.07 0.00 0.00 2.10 0.08 0.00 0.00 2.40 0.10 0.00 0.00 2.70 0.11 0.00 0.00 3.00 0.13 0.00 0.00 3.30 0.14 0.00 0.00 3.60 0.16 0.00 0.00 3.90 0.17 0.00 0.00 4.20 0.19 0.00 0.00 4.50 0.20 0.00 0.00 4.80 0.22 0.00 0.00 5.10 0.24 0.00 0.00 5.40 0.25 0.00 0.00 5.70 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.30 0.31 0.00 0.00 6.60 0.33 0.00 0.00 6.90 0.36 0.00 0.00 7.20 0.38 0.00 0.00 7.50 0.40 0.00 0.00 7.80 0.42 0.00 0.00 8.10 0.45 0.00 0.00 8.40 0.47 0.00 0.00 8.70 0.50 0.00 0.00 9.00 0.54 0.00 0.00 9.30 0.57 0.00 0.00 9.60 0.61 0.00 0.00 9.90 0.65 0.00 0.00 10.20 0.69 0.00 0.00 10.50 0.75 0.00 0.04 10.80 0.81 0.01 0.16 11.10 0.89 0.01 0.38 11.40 0.99 0.03 0.74 11.70 1.30 0.10 1.60 12.00 2.43 0.61 13.08 12.30 2.61 0.72 28.87 12.60 2.72 0.78 12.65 12.90 2.80 0.83 6.56 13.20 2.87 0.88 4.45 13.50 2.92 0.91 3.48 13.80 2.97 0.94 2.96 14.10 3.01 0.97 2.57 14.40 3.05 1.00 2.28 14.70 3.09 1.02 2.11 15.00 3.12 1.04 1.99 15.30 3.16 1.06 1.87 15.60 3.19 1.08 1.75 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 3.21 1.10 1.63 16.20 3.24 1.12 1.51 16.50 3.26 1.14 1.42 16.80 3.29 1.15 1.37 17.10 3.31 1.17 1.33 17.40 3.33 1.18 1.28 17.70 3.35 1.20 1.24 18.00 3.37 1.21 1.20 18.30 3.39 1.22 1.15 18.60 3.41 1.24 1.11 18.90 3.43 1.25 1.07 19.20 3.44 1.26 1.02 19.50 3.46 1.27 0.97 19.80 3.47 1.28 0.93 20.10 3.49 1.29 0.88 20.40 3.50 1.30 0.85 20.70 3.52 1.31 0.83 21.00 3.53 1.32 0.82 21.30 3.54 1.33 0.81 21.60 3.56 1.34 0.80 21.90 3.57 1.35 0.79 22.20 3.58 1.36 0.78 22.50 3.60 1.37 0.78 22.80 3.61 1.38 0.77 23.10 3.62 1.39 0.76 23.40 3.64 1.40 0.75 23.70 3.65 1.41 0.74 24.00 3.66 1.42 0.73 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 52HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 122S: Pre Dev't Runoff = 10.40 cfs @ 12.02 hrs, Volume= 0.571 af, Depth> 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr Rainfall=3.66" Area (ac) CN Description * 5.330 73 5.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Direct Subcatchment 122S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)11 10 9 8 7 6 5 4 3 2 1 0 Type II 24-hr 2 yr Rainfall=3.66" Runoff Area=5.330 ac Runoff Volume=0.571 af Runoff Depth>1.28" Tc=10.0 min CN=73 10.40 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 53HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 122S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.80 0.07 0.00 0.00 2.10 0.08 0.00 0.00 2.40 0.10 0.00 0.00 2.70 0.11 0.00 0.00 3.00 0.13 0.00 0.00 3.30 0.14 0.00 0.00 3.60 0.16 0.00 0.00 3.90 0.17 0.00 0.00 4.20 0.19 0.00 0.00 4.50 0.20 0.00 0.00 4.80 0.22 0.00 0.00 5.10 0.24 0.00 0.00 5.40 0.25 0.00 0.00 5.70 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.30 0.31 0.00 0.00 6.60 0.33 0.00 0.00 6.90 0.36 0.00 0.00 7.20 0.38 0.00 0.00 7.50 0.40 0.00 0.00 7.80 0.42 0.00 0.00 8.10 0.45 0.00 0.00 8.40 0.47 0.00 0.00 8.70 0.50 0.00 0.00 9.00 0.54 0.00 0.00 9.30 0.57 0.00 0.00 9.60 0.61 0.00 0.00 9.90 0.65 0.00 0.00 10.20 0.69 0.00 0.00 10.50 0.75 0.00 0.00 10.80 0.81 0.00 0.02 11.10 0.89 0.01 0.08 11.40 0.99 0.02 0.19 11.70 1.30 0.07 0.88 12.00 2.43 0.53 10.04 12.30 2.61 0.63 2.09 12.60 2.72 0.69 1.12 12.90 2.80 0.74 0.85 13.20 2.87 0.78 0.70 13.50 2.92 0.81 0.61 13.80 2.97 0.84 0.53 14.10 3.01 0.87 0.46 14.40 3.05 0.89 0.43 14.70 3.09 0.91 0.41 15.00 3.12 0.93 0.38 15.30 3.16 0.95 0.36 15.60 3.19 0.97 0.34 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 3.21 0.99 0.31 16.20 3.24 1.01 0.29 16.50 3.26 1.02 0.28 16.80 3.29 1.04 0.27 17.10 3.31 1.05 0.26 17.40 3.33 1.07 0.26 17.70 3.35 1.08 0.25 18.00 3.37 1.09 0.24 18.30 3.39 1.11 0.23 18.60 3.41 1.12 0.22 18.90 3.43 1.13 0.21 19.20 3.44 1.14 0.20 19.50 3.46 1.15 0.19 19.80 3.47 1.16 0.18 20.10 3.49 1.17 0.17 20.40 3.50 1.18 0.17 20.70 3.52 1.19 0.17 21.00 3.53 1.20 0.17 21.30 3.54 1.21 0.17 21.60 3.56 1.22 0.16 21.90 3.57 1.23 0.16 22.20 3.58 1.24 0.16 22.50 3.60 1.25 0.16 22.80 3.61 1.25 0.16 23.10 3.62 1.26 0.15 23.40 3.64 1.27 0.15 23.70 3.65 1.28 0.15 24.00 3.66 1.29 0.15 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 54HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 123S: Pre Dev't Runoff = 3.92 cfs @ 12.26 hrs, Volume= 0.394 af, Depth> 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr Rainfall=3.66" Area (ac) CN Description * 3.710 73 3.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Subcatchment 123S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)4 3 2 1 0 Type II 24-hr 2 yr Rainfall=3.66" Runoff Area=3.710 ac Runoff Volume=0.394 af Runoff Depth>1.28" Tc=30.0 min CN=73 3.92 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 55HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 123S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.80 0.07 0.00 0.00 2.10 0.08 0.00 0.00 2.40 0.10 0.00 0.00 2.70 0.11 0.00 0.00 3.00 0.13 0.00 0.00 3.30 0.14 0.00 0.00 3.60 0.16 0.00 0.00 3.90 0.17 0.00 0.00 4.20 0.19 0.00 0.00 4.50 0.20 0.00 0.00 4.80 0.22 0.00 0.00 5.10 0.24 0.00 0.00 5.40 0.25 0.00 0.00 5.70 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.30 0.31 0.00 0.00 6.60 0.33 0.00 0.00 6.90 0.36 0.00 0.00 7.20 0.38 0.00 0.00 7.50 0.40 0.00 0.00 7.80 0.42 0.00 0.00 8.10 0.45 0.00 0.00 8.40 0.47 0.00 0.00 8.70 0.50 0.00 0.00 9.00 0.54 0.00 0.00 9.30 0.57 0.00 0.00 9.60 0.61 0.00 0.00 9.90 0.65 0.00 0.00 10.20 0.69 0.00 0.00 10.50 0.75 0.00 0.00 10.80 0.81 0.00 0.00 11.10 0.89 0.01 0.02 11.40 0.99 0.02 0.06 11.70 1.30 0.07 0.16 12.00 2.43 0.53 1.41 12.30 2.61 0.63 3.87 12.60 2.72 0.69 1.91 12.90 2.80 0.74 1.00 13.20 2.87 0.78 0.66 13.50 2.92 0.81 0.51 13.80 2.97 0.84 0.43 14.10 3.01 0.87 0.37 14.40 3.05 0.89 0.33 14.70 3.09 0.91 0.30 15.00 3.12 0.93 0.28 15.30 3.16 0.95 0.27 15.60 3.19 0.97 0.25 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 3.21 0.99 0.23 16.20 3.24 1.01 0.22 16.50 3.26 1.02 0.20 16.80 3.29 1.04 0.20 17.10 3.31 1.05 0.19 17.40 3.33 1.07 0.18 17.70 3.35 1.08 0.18 18.00 3.37 1.09 0.17 18.30 3.39 1.11 0.17 18.60 3.41 1.12 0.16 18.90 3.43 1.13 0.15 19.20 3.44 1.14 0.15 19.50 3.46 1.15 0.14 19.80 3.47 1.16 0.13 20.10 3.49 1.17 0.13 20.40 3.50 1.18 0.12 20.70 3.52 1.19 0.12 21.00 3.53 1.20 0.12 21.30 3.54 1.21 0.12 21.60 3.56 1.22 0.11 21.90 3.57 1.23 0.11 22.20 3.58 1.24 0.11 22.50 3.60 1.25 0.11 22.80 3.61 1.25 0.11 23.10 3.62 1.26 0.11 23.40 3.64 1.27 0.11 23.70 3.65 1.28 0.11 24.00 3.66 1.29 0.11 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 56HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 124S: Pre Dev't Runoff = 6.22 cfs @ 12.02 hrs, Volume= 0.341 af, Depth> 1.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr Rainfall=3.66" Area (ac) CN Description * 3.190 73 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 124S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)6 5 4 3 2 1 0 Type II 24-hr 2 yr Rainfall=3.66" Runoff Area=3.190 ac Runoff Volume=0.341 af Runoff Depth>1.28" Tc=10.0 min CN=73 6.22 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 57HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 124S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.80 0.07 0.00 0.00 2.10 0.08 0.00 0.00 2.40 0.10 0.00 0.00 2.70 0.11 0.00 0.00 3.00 0.13 0.00 0.00 3.30 0.14 0.00 0.00 3.60 0.16 0.00 0.00 3.90 0.17 0.00 0.00 4.20 0.19 0.00 0.00 4.50 0.20 0.00 0.00 4.80 0.22 0.00 0.00 5.10 0.24 0.00 0.00 5.40 0.25 0.00 0.00 5.70 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.30 0.31 0.00 0.00 6.60 0.33 0.00 0.00 6.90 0.36 0.00 0.00 7.20 0.38 0.00 0.00 7.50 0.40 0.00 0.00 7.80 0.42 0.00 0.00 8.10 0.45 0.00 0.00 8.40 0.47 0.00 0.00 8.70 0.50 0.00 0.00 9.00 0.54 0.00 0.00 9.30 0.57 0.00 0.00 9.60 0.61 0.00 0.00 9.90 0.65 0.00 0.00 10.20 0.69 0.00 0.00 10.50 0.75 0.00 0.00 10.80 0.81 0.00 0.01 11.10 0.89 0.01 0.05 11.40 0.99 0.02 0.11 11.70 1.30 0.07 0.53 12.00 2.43 0.53 6.01 12.30 2.61 0.63 1.25 12.60 2.72 0.69 0.67 12.90 2.80 0.74 0.51 13.20 2.87 0.78 0.42 13.50 2.92 0.81 0.36 13.80 2.97 0.84 0.32 14.10 3.01 0.87 0.28 14.40 3.05 0.89 0.26 14.70 3.09 0.91 0.24 15.00 3.12 0.93 0.23 15.30 3.16 0.95 0.22 15.60 3.19 0.97 0.20 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 3.21 0.99 0.19 16.20 3.24 1.01 0.17 16.50 3.26 1.02 0.17 16.80 3.29 1.04 0.16 17.10 3.31 1.05 0.16 17.40 3.33 1.07 0.15 17.70 3.35 1.08 0.15 18.00 3.37 1.09 0.14 18.30 3.39 1.11 0.14 18.60 3.41 1.12 0.13 18.90 3.43 1.13 0.13 19.20 3.44 1.14 0.12 19.50 3.46 1.15 0.11 19.80 3.47 1.16 0.11 20.10 3.49 1.17 0.10 20.40 3.50 1.18 0.10 20.70 3.52 1.19 0.10 21.00 3.53 1.20 0.10 21.30 3.54 1.21 0.10 21.60 3.56 1.22 0.10 21.90 3.57 1.23 0.10 22.20 3.58 1.24 0.10 22.50 3.60 1.25 0.09 22.80 3.61 1.25 0.09 23.10 3.62 1.26 0.09 23.40 3.64 1.27 0.09 23.70 3.65 1.28 0.09 24.00 3.66 1.29 0.09 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 58HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 221S: Post CY (s) Runoff = 75.53 cfs @ 12.06 hrs, Volume= 4.753 af, Depth> 2.32" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr Rainfall=3.66" Area (ac) CN Description * 24.590 87 24.590 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 165 0.0212 1.59 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.36" 1.4 106 0.0038 1.25 Shallow Concentrated Flow, Paved Kv= 20.3 fps 0.4 150 0.0220 6.67 80.08 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.035 0.6 24 0.0083 0.71 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 Corrugated metal 7.9 384 0.0016 0.81 Shallow Concentrated Flow, Paved Kv= 20.3 fps 0.9 32 0.0063 0.62 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 1.2 118 0.0110 1.69 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 14.1 979 Total Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 59HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Subcatchment 221S: Post CY (s) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)80 70 60 50 40 30 20 10 0 Type II 24-hr 2 yr Rainfall=3.66" Runoff Area=24.590 ac Runoff Volume=4.753 af Runoff Depth>2.32" Flow Length=979' Tc=14.1 min CN=87 75.53 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 60HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 221S: Post CY (s) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.80 0.07 0.00 0.00 2.10 0.08 0.00 0.00 2.40 0.10 0.00 0.00 2.70 0.11 0.00 0.00 3.00 0.13 0.00 0.00 3.30 0.14 0.00 0.00 3.60 0.16 0.00 0.00 3.90 0.17 0.00 0.00 4.20 0.19 0.00 0.00 4.50 0.20 0.00 0.00 4.80 0.22 0.00 0.00 5.10 0.24 0.00 0.00 5.40 0.25 0.00 0.00 5.70 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.30 0.31 0.00 0.01 6.60 0.33 0.00 0.04 6.90 0.36 0.00 0.09 7.20 0.38 0.00 0.14 7.50 0.40 0.01 0.19 7.80 0.42 0.01 0.25 8.10 0.45 0.01 0.31 8.40 0.47 0.02 0.39 8.70 0.50 0.02 0.50 9.00 0.54 0.03 0.64 9.30 0.57 0.04 0.77 9.60 0.61 0.05 0.85 9.90 0.65 0.07 1.02 10.20 0.69 0.08 1.28 10.50 0.75 0.10 1.63 10.80 0.81 0.13 2.11 11.10 0.89 0.17 2.79 11.40 0.99 0.22 4.08 11.70 1.30 0.40 9.51 12.00 2.43 1.25 66.32 12.30 2.61 1.40 22.76 12.60 2.72 1.50 9.15 12.90 2.80 1.57 6.10 13.20 2.87 1.62 4.90 13.50 2.92 1.67 4.18 13.80 2.97 1.72 3.59 14.10 3.01 1.75 3.12 14.40 3.05 1.79 2.84 14.70 3.09 1.82 2.68 15.00 3.12 1.85 2.51 15.30 3.16 1.88 2.35 15.60 3.19 1.90 2.19 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 3.21 1.93 2.02 16.20 3.24 1.95 1.87 16.50 3.26 1.97 1.79 16.80 3.29 1.99 1.74 17.10 3.31 2.01 1.68 17.40 3.33 2.03 1.62 17.70 3.35 2.05 1.56 18.00 3.37 2.07 1.50 18.30 3.39 2.08 1.44 18.60 3.41 2.10 1.38 18.90 3.43 2.12 1.32 19.20 3.44 2.13 1.26 19.50 3.46 2.15 1.20 19.80 3.47 2.16 1.14 20.10 3.49 2.17 1.08 20.40 3.50 2.19 1.05 20.70 3.52 2.20 1.04 21.00 3.53 2.21 1.03 21.30 3.54 2.22 1.02 21.60 3.56 2.23 1.01 21.90 3.57 2.25 0.99 22.20 3.58 2.26 0.98 22.50 3.60 2.27 0.97 22.80 3.61 2.28 0.96 23.10 3.62 2.29 0.95 23.40 3.64 2.30 0.94 23.70 3.65 2.32 0.92 24.00 3.66 2.33 0.91 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 61HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 222S: Post CY (nw) Runoff = 20.84 cfs @ 11.96 hrs, Volume= 0.957 af, Depth> 2.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr Rainfall=3.66" Area (ac) CN Description * 5.330 85 5.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 222S: Post CY (nw) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 2 yr Rainfall=3.66" Runoff Area=5.330 ac Runoff Volume=0.957 af Runoff Depth>2.15" Tc=5.0 min CN=85 20.84 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 62HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 222S: Post CY (nw) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.80 0.07 0.00 0.00 2.10 0.08 0.00 0.00 2.40 0.10 0.00 0.00 2.70 0.11 0.00 0.00 3.00 0.13 0.00 0.00 3.30 0.14 0.00 0.00 3.60 0.16 0.00 0.00 3.90 0.17 0.00 0.00 4.20 0.19 0.00 0.00 4.50 0.20 0.00 0.00 4.80 0.22 0.00 0.00 5.10 0.24 0.00 0.00 5.40 0.25 0.00 0.00 5.70 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.30 0.31 0.00 0.00 6.60 0.33 0.00 0.00 6.90 0.36 0.00 0.00 7.20 0.38 0.00 0.01 7.50 0.40 0.00 0.02 7.80 0.42 0.00 0.03 8.10 0.45 0.00 0.04 8.40 0.47 0.01 0.06 8.70 0.50 0.01 0.08 9.00 0.54 0.02 0.11 9.30 0.57 0.02 0.13 9.60 0.61 0.03 0.15 9.90 0.65 0.04 0.19 10.20 0.69 0.06 0.24 10.50 0.75 0.07 0.32 10.80 0.81 0.09 0.43 11.10 0.89 0.12 0.59 11.40 0.99 0.17 0.91 11.70 1.30 0.33 4.31 12.00 2.43 1.12 17.82 12.30 2.61 1.27 2.37 12.60 2.72 1.36 1.40 12.90 2.80 1.42 1.14 13.20 2.87 1.48 0.94 13.50 2.92 1.52 0.81 13.80 2.97 1.57 0.70 14.10 3.01 1.60 0.61 14.40 3.05 1.63 0.58 14.70 3.09 1.66 0.54 15.00 3.12 1.69 0.51 15.30 3.16 1.72 0.48 15.60 3.19 1.74 0.44 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 3.21 1.77 0.41 16.20 3.24 1.79 0.38 16.50 3.26 1.81 0.37 16.80 3.29 1.83 0.36 17.10 3.31 1.85 0.35 17.40 3.33 1.87 0.33 17.70 3.35 1.89 0.32 18.00 3.37 1.90 0.31 18.30 3.39 1.92 0.30 18.60 3.41 1.94 0.28 18.90 3.43 1.95 0.27 19.20 3.44 1.97 0.26 19.50 3.46 1.98 0.25 19.80 3.47 1.99 0.23 20.10 3.49 2.01 0.22 20.40 3.50 2.02 0.22 20.70 3.52 2.03 0.22 21.00 3.53 2.04 0.22 21.30 3.54 2.06 0.21 21.60 3.56 2.07 0.21 21.90 3.57 2.08 0.21 22.20 3.58 2.09 0.21 22.50 3.60 2.10 0.20 22.80 3.61 2.11 0.20 23.10 3.62 2.12 0.20 23.40 3.64 2.13 0.20 23.70 3.65 2.15 0.19 24.00 3.66 2.16 0.19 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 63HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 223S: Post CY (ne) Runoff = 16.43 cfs @ 11.96 hrs, Volume= 0.774 af, Depth> 2.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr Rainfall=3.66" Area (ac) CN Description * 3.710 89 3.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 223S: Post CY (ne) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)18 16 14 12 10 8 6 4 2 0 Type II 24-hr 2 yr Rainfall=3.66" Runoff Area=3.710 ac Runoff Volume=0.774 af Runoff Depth>2.50" Tc=5.0 min CN=89 16.43 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 64HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 223S: Post CY (ne) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.80 0.07 0.00 0.00 2.10 0.08 0.00 0.00 2.40 0.10 0.00 0.00 2.70 0.11 0.00 0.00 3.00 0.13 0.00 0.00 3.30 0.14 0.00 0.00 3.60 0.16 0.00 0.00 3.90 0.17 0.00 0.00 4.20 0.19 0.00 0.00 4.50 0.20 0.00 0.00 4.80 0.22 0.00 0.00 5.10 0.24 0.00 0.00 5.40 0.25 0.00 0.00 5.70 0.27 0.00 0.01 6.00 0.29 0.00 0.02 6.30 0.31 0.00 0.02 6.60 0.33 0.01 0.03 6.90 0.36 0.01 0.04 7.20 0.38 0.01 0.05 7.50 0.40 0.02 0.06 7.80 0.42 0.02 0.07 8.10 0.45 0.03 0.08 8.40 0.47 0.04 0.10 8.70 0.50 0.04 0.12 9.00 0.54 0.06 0.14 9.30 0.57 0.07 0.16 9.60 0.61 0.08 0.18 9.90 0.65 0.10 0.21 10.20 0.69 0.12 0.27 10.50 0.75 0.14 0.33 10.80 0.81 0.18 0.43 11.10 0.89 0.22 0.57 11.40 0.99 0.28 0.85 11.70 1.30 0.48 3.79 12.00 2.43 1.39 13.90 12.30 2.61 1.55 1.81 12.60 2.72 1.65 1.06 12.90 2.80 1.72 0.86 13.20 2.87 1.78 0.71 13.50 2.92 1.83 0.61 13.80 2.97 1.88 0.53 14.10 3.01 1.91 0.46 14.40 3.05 1.95 0.43 14.70 3.09 1.98 0.41 15.00 3.12 2.01 0.38 15.30 3.16 2.04 0.35 15.60 3.19 2.07 0.33 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 3.21 2.09 0.30 16.20 3.24 2.12 0.28 16.50 3.26 2.14 0.27 16.80 3.29 2.16 0.27 17.10 3.31 2.18 0.26 17.40 3.33 2.20 0.25 17.70 3.35 2.22 0.24 18.00 3.37 2.24 0.23 18.30 3.39 2.26 0.22 18.60 3.41 2.27 0.21 18.90 3.43 2.29 0.20 19.20 3.44 2.30 0.19 19.50 3.46 2.32 0.18 19.80 3.47 2.33 0.17 20.10 3.49 2.35 0.16 20.40 3.50 2.36 0.16 20.70 3.52 2.37 0.16 21.00 3.53 2.39 0.16 21.30 3.54 2.40 0.16 21.60 3.56 2.41 0.16 21.90 3.57 2.42 0.15 22.20 3.58 2.44 0.15 22.50 3.60 2.45 0.15 22.80 3.61 2.46 0.15 23.10 3.62 2.47 0.15 23.40 3.64 2.48 0.14 23.70 3.65 2.49 0.14 24.00 3.66 2.51 0.14 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 65HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 224S: Post CY (se) Runoff = 6.08 cfs @ 11.97 hrs, Volume= 0.279 af, Depth> 1.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 2 yr Rainfall=3.66" Area (ac) CN Description * 3.190 69 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 224S: Post CY (se) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)6 5 4 3 2 1 0 Type II 24-hr 2 yr Rainfall=3.66" Runoff Area=3.190 ac Runoff Volume=0.279 af Runoff Depth>1.05" Tc=5.0 min CN=69 6.08 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 66HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 224S: Post CY (se) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.01 0.00 0.00 0.60 0.02 0.00 0.00 0.90 0.03 0.00 0.00 1.20 0.05 0.00 0.00 1.50 0.06 0.00 0.00 1.80 0.07 0.00 0.00 2.10 0.08 0.00 0.00 2.40 0.10 0.00 0.00 2.70 0.11 0.00 0.00 3.00 0.13 0.00 0.00 3.30 0.14 0.00 0.00 3.60 0.16 0.00 0.00 3.90 0.17 0.00 0.00 4.20 0.19 0.00 0.00 4.50 0.20 0.00 0.00 4.80 0.22 0.00 0.00 5.10 0.24 0.00 0.00 5.40 0.25 0.00 0.00 5.70 0.27 0.00 0.00 6.00 0.29 0.00 0.00 6.30 0.31 0.00 0.00 6.60 0.33 0.00 0.00 6.90 0.36 0.00 0.00 7.20 0.38 0.00 0.00 7.50 0.40 0.00 0.00 7.80 0.42 0.00 0.00 8.10 0.45 0.00 0.00 8.40 0.47 0.00 0.00 8.70 0.50 0.00 0.00 9.00 0.54 0.00 0.00 9.30 0.57 0.00 0.00 9.60 0.61 0.00 0.00 9.90 0.65 0.00 0.00 10.20 0.69 0.00 0.00 10.50 0.75 0.00 0.00 10.80 0.81 0.00 0.00 11.10 0.89 0.00 0.00 11.40 0.99 0.00 0.03 11.70 1.30 0.03 0.54 12.00 2.43 0.39 5.48 12.30 2.61 0.47 0.83 12.60 2.72 0.53 0.50 12.90 2.80 0.57 0.42 13.20 2.87 0.60 0.35 13.50 2.92 0.63 0.30 13.80 2.97 0.66 0.27 14.10 3.01 0.68 0.23 14.40 3.05 0.70 0.22 14.70 3.09 0.72 0.21 15.00 3.12 0.74 0.20 15.30 3.16 0.75 0.19 15.60 3.19 0.77 0.17 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 3.21 0.79 0.16 16.20 3.24 0.80 0.15 16.50 3.26 0.81 0.15 16.80 3.29 0.83 0.14 17.10 3.31 0.84 0.14 17.40 3.33 0.85 0.13 17.70 3.35 0.87 0.13 18.00 3.37 0.88 0.12 18.30 3.39 0.89 0.12 18.60 3.41 0.90 0.12 18.90 3.43 0.91 0.11 19.20 3.44 0.92 0.11 19.50 3.46 0.93 0.10 19.80 3.47 0.94 0.10 20.10 3.49 0.95 0.09 20.40 3.50 0.96 0.09 20.70 3.52 0.96 0.09 21.00 3.53 0.97 0.09 21.30 3.54 0.98 0.09 21.60 3.56 0.99 0.09 21.90 3.57 1.00 0.09 22.20 3.58 1.01 0.09 22.50 3.60 1.01 0.08 22.80 3.61 1.02 0.08 23.10 3.62 1.03 0.08 23.40 3.64 1.04 0.08 23.70 3.65 1.04 0.08 24.00 3.66 1.05 0.08 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 67HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Reach 226R: (new Reach) Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth > 1.28" for 2 yr event Inflow = 12.15 cfs @ 12.03 hrs, Volume= 0.965 af Outflow = 12.14 cfs @ 12.03 hrs, Volume= 0.965 af, Atten= 0%, Lag= 0.1 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Max. Velocity= 4.49 fps, Min. Travel Time= 0.0 min Avg. Velocity = 1.47 fps, Avg. Travel Time= 0.1 min Peak Storage= 27 cf @ 12.03 hrs Average Depth at Peak Storage= 0.46' Bank-Full Depth= 2.00' Flow Area= 18.0 sf, Capacity= 181.21 cfs 5.00' x 2.00' deep channel, n= 0.035 Side Slope Z-value= 2.0 '/' Top Width= 13.00' Length= 10.0' Slope= 0.0400 '/' Inlet Invert= 94.00', Outlet Invert= 93.60' Reach 226R: (new Reach) Inflow Outflow Hydrograph Time (hours) 242220181614121086420Flow (cfs)12 10 8 6 4 2 0 Inflow Area=9.040 ac Avg. Flow Depth=0.46' Max Vel=4.49 fps n=0.035 L=10.0' S=0.0400 '/' Capacity=181.21 cfs 12.15 cfs12.14 cfs Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 68HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Reach 226R: (new Reach) Primary Stage-Discharge Discharge (cfs) 150100500Depth (feet)2 1 0 Reach 226R: (new Reach) Storage Stage-Storage Storage (cubic-feet) 180160140120100806040200Depth (feet)2 1 0 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 69HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Reach 226R: (new Reach) Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) 0.00 0.00 0 94.00 0.00 0.60 0.00 0 94.00 0.00 1.20 0.00 0 94.00 0.00 1.80 0.00 0 94.00 0.00 2.40 0.00 0 94.00 0.00 3.00 0.00 0 94.00 0.00 3.60 0.00 0 94.00 0.00 4.20 0.00 0 94.00 0.00 4.80 0.00 0 94.00 0.00 5.40 0.00 0 94.00 0.00 6.00 0.00 0 94.00 0.00 6.60 0.00 0 94.00 0.00 7.20 0.00 0 94.00 0.00 7.80 0.00 0 94.00 0.00 8.40 0.00 0 94.00 0.00 9.00 0.00 0 94.00 0.00 9.60 0.00 0 94.00 0.00 10.20 0.00 0 94.00 0.00 10.80 0.02 0 94.01 0.02 11.40 0.25 2 94.04 0.24 12.00 11.45 26 94.44 11.40 12.60 3.03 11 94.20 3.04 13.20 1.36 7 94.13 1.37 13.80 0.96 5 94.10 0.96 14.40 0.76 5 94.09 0.76 15.00 0.67 4 94.08 0.67 15.60 0.59 4 94.08 0.59 16.20 0.51 4 94.07 0.51 16.80 0.47 3 94.07 0.47 17.40 0.44 3 94.06 0.44 18.00 0.41 3 94.06 0.41 18.60 0.38 3 94.06 0.38 19.20 0.35 3 94.06 0.35 19.80 0.32 3 94.05 0.32 20.40 0.29 3 94.05 0.29 21.00 0.28 2 94.05 0.28 21.60 0.28 2 94.05 0.28 22.20 0.27 2 94.05 0.27 22.80 0.27 2 94.05 0.27 23.40 0.26 2 94.05 0.26 24.00 0.26 2 94.05 0.26 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 70HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Reach 226R: (new Reach) Elevation (feet) Velocity (ft/sec) Discharge (cfs) 94.00 0.00 0.00 94.02 0.62 0.06 94.04 0.98 0.20 94.06 1.28 0.39 94.08 1.54 0.63 94.10 1.77 0.92 94.12 1.99 1.25 94.14 2.19 1.62 94.16 2.39 2.03 94.18 2.57 2.48 94.20 2.74 2.96 94.22 2.90 3.48 94.24 3.06 4.03 94.26 3.21 4.61 94.28 3.36 5.23 94.30 3.50 5.88 94.32 3.64 6.57 94.34 3.77 7.29 94.36 3.90 8.04 94.38 4.03 8.82 94.40 4.15 9.63 94.42 4.27 10.47 94.44 4.39 11.35 94.46 4.50 12.26 94.48 4.61 13.19 94.50 4.72 14.16 94.52 4.83 15.16 94.54 4.93 16.20 94.56 5.04 17.26 94.58 5.14 18.35 94.60 5.24 19.48 94.62 5.33 20.63 94.64 5.43 21.82 94.66 5.52 23.04 94.68 5.62 24.29 94.70 5.71 25.57 94.72 5.80 26.88 94.74 5.89 28.22 94.76 5.97 29.60 94.78 6.06 31.01 94.80 6.14 32.44 94.82 6.23 33.91 94.84 6.31 35.41 94.86 6.39 36.95 94.88 6.47 38.51 94.90 6.55 40.11 94.92 6.63 41.74 94.94 6.71 43.40 94.96 6.79 45.10 94.98 6.87 46.83 95.00 6.94 48.59 95.02 7.02 50.38 95.04 7.09 52.20 Elevation (feet) Velocity (ft/sec) Discharge (cfs) 95.06 7.16 54.06 95.08 7.24 55.96 95.10 7.31 57.88 95.12 7.38 59.84 95.14 7.45 61.83 95.16 7.52 63.86 95.18 7.59 65.92 95.20 7.66 68.01 95.22 7.73 70.14 95.24 7.80 72.30 95.26 7.86 74.50 95.28 7.93 76.73 95.30 8.00 78.99 95.32 8.06 81.29 95.34 8.13 83.63 95.36 8.19 86.00 95.38 8.26 88.40 95.40 8.32 90.84 95.42 8.38 93.32 95.44 8.45 95.83 95.46 8.51 98.38 95.48 8.57 100.96 95.50 8.63 103.58 95.52 8.69 106.24 95.54 8.75 108.93 95.56 8.81 111.66 95.58 8.88 114.42 95.60 8.93 117.23 95.62 8.99 120.06 95.64 9.05 122.94 95.66 9.11 125.85 95.68 9.17 128.80 95.70 9.23 131.79 95.72 9.29 134.82 95.74 9.34 137.88 95.76 9.40 140.98 95.78 9.46 144.12 95.80 9.52 147.30 95.82 9.57 150.51 95.84 9.63 153.77 95.86 9.68 157.06 95.88 9.74 160.39 95.90 9.79 163.76 95.92 9.85 167.17 95.94 9.90 170.62 95.96 9.96 174.11 95.98 10.01 177.64 96.00 10.07 181.21 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 71HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Reach 226R: (new Reach) Elevation (feet) End-Area (sq-ft) Storage (cubic-feet) 94.00 0.0 0 94.02 0.1 1 94.04 0.2 2 94.06 0.3 3 94.08 0.4 4 94.10 0.5 5 94.12 0.6 6 94.14 0.7 7 94.16 0.9 9 94.18 1.0 10 94.20 1.1 11 94.22 1.2 12 94.24 1.3 13 94.26 1.4 14 94.28 1.6 16 94.30 1.7 17 94.32 1.8 18 94.34 1.9 19 94.36 2.1 21 94.38 2.2 22 94.40 2.3 23 94.42 2.5 25 94.44 2.6 26 94.46 2.7 27 94.48 2.9 29 94.50 3.0 30 94.52 3.1 31 94.54 3.3 33 94.56 3.4 34 94.58 3.6 36 94.60 3.7 37 94.62 3.9 39 94.64 4.0 40 94.66 4.2 42 94.68 4.3 43 94.70 4.5 45 94.72 4.6 46 94.74 4.8 48 94.76 5.0 50 94.78 5.1 51 94.80 5.3 53 94.82 5.4 54 94.84 5.6 56 94.86 5.8 58 94.88 5.9 59 94.90 6.1 61 94.92 6.3 63 94.94 6.5 65 94.96 6.6 66 94.98 6.8 68 95.00 7.0 70 95.02 7.2 72 95.04 7.4 74 Elevation (feet) End-Area (sq-ft) Storage (cubic-feet) 95.06 7.5 75 95.08 7.7 77 95.10 7.9 79 95.12 8.1 81 95.14 8.3 83 95.16 8.5 85 95.18 8.7 87 95.20 8.9 89 95.22 9.1 91 95.24 9.3 93 95.26 9.5 95 95.28 9.7 97 95.30 9.9 99 95.32 10.1 101 95.34 10.3 103 95.36 10.5 105 95.38 10.7 107 95.40 10.9 109 95.42 11.1 111 95.44 11.3 113 95.46 11.6 116 95.48 11.8 118 95.50 12.0 120 95.52 12.2 122 95.54 12.4 124 95.56 12.7 127 95.58 12.9 129 95.60 13.1 131 95.62 13.3 133 95.64 13.6 136 95.66 13.8 138 95.68 14.0 140 95.70 14.3 143 95.72 14.5 145 95.74 14.8 148 95.76 15.0 150 95.78 15.2 152 95.80 15.5 155 95.82 15.7 157 95.84 16.0 160 95.86 16.2 162 95.88 16.5 165 95.90 16.7 167 95.92 17.0 170 95.94 17.2 172 95.96 17.5 175 95.98 17.7 177 96.00 18.0 180 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 72HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 221P: 221 Inflow Area = 24.590 ac, 0.00% Impervious, Inflow Depth > 2.32" for 2 yr event Inflow = 75.53 cfs @ 12.06 hrs, Volume= 4.753 af Outflow = 5.49 cfs @ 13.04 hrs, Volume= 1.976 af, Atten= 93%, Lag= 58.9 min Primary = 5.49 cfs @ 13.04 hrs, Volume= 1.976 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 93.13' @ 13.04 hrs Surf.Area= 89,610 sf Storage= 128,973 cf Plug-Flow detention time= 287.7 min calculated for 1.973 af (42% of inflow) Center-of-Mass det. time= 169.6 min ( 985.3 - 815.7 ) Volume Invert Avail.Storage Storage Description #1 91.00' 308,000 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 91.00 49,357 0 0 91.50 52,297 25,414 25,414 92.00 55,253 26,888 52,301 92.50 58,224 28,369 80,670 93.00 88,767 36,748 117,418 94.00 95,276 92,022 209,440 94.10 95,930 9,560 219,000 95.00 101,848 89,000 308,000 Device Routing Invert Outlet Devices #1 Primary 93.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=5.45 cfs @ 13.04 hrs HW=93.13' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 5.45 cfs @ 0.84 fps) Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 73HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 221P: 221 Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)80 70 60 50 40 30 20 10 0 Inflow Area=24.590 ac Peak Elev=93.13' Storage=128,973 cf 75.53 cfs 5.49 cfs Pond 221P: 221 Primary Stage-Discharge Discharge (cfs) 350300250200150100500Elevation (feet)95 94 93 92 91 Broad-Crested Rectangular Weir Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 74HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 221P: 221 Surface Storage Stage-Area-Storage Storage (cubic-feet) 300,000200,000100,0000 Surface/Horizontal/Wetted Area (sq-ft) 100,00080,00060,00040,00020,0000 Elevation (feet)95 94 93 92 91 Custom Stage Data Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 75HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 221P: 221 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 91.00 0.00 0.60 0.00 0 91.00 0.00 1.20 0.00 0 91.00 0.00 1.80 0.00 0 91.00 0.00 2.40 0.00 0 91.00 0.00 3.00 0.00 0 91.00 0.00 3.60 0.00 0 91.00 0.00 4.20 0.00 0 91.00 0.00 4.80 0.00 0 91.00 0.00 5.40 0.00 0 91.00 0.00 6.00 0.00 0 91.00 0.00 6.60 0.04 26 91.00 0.00 7.20 0.14 225 91.00 0.00 7.80 0.25 646 91.01 0.00 8.40 0.39 1,317 91.03 0.00 9.00 0.64 2,413 91.05 0.00 9.60 0.85 4,052 91.08 0.00 10.20 1.28 6,288 91.13 0.00 10.80 2.11 9,849 91.20 0.00 11.40 4.08 16,114 91.32 0.00 12.00 66.32 55,151 92.05 0.00 12.60 9.15 126,132 93.10 3.63 13.20 4.90 128,818 93.13 5.38 13.80 3.59 127,319 93.11 4.37 14.40 2.84 125,773 93.09 3.41 15.00 2.51 124,856 93.08 2.84 15.60 2.19 124,208 93.08 2.49 16.20 1.87 123,547 93.07 2.17 16.80 1.74 123,030 93.06 1.92 17.40 1.62 122,687 93.06 1.76 18.00 1.50 122,408 93.06 1.62 18.60 1.38 122,150 93.05 1.50 19.20 1.26 121,898 93.05 1.38 19.80 1.14 121,648 93.05 1.26 20.40 1.05 121,408 93.04 1.14 21.00 1.03 121,266 93.04 1.08 21.60 1.01 121,185 93.04 1.04 22.20 0.98 121,125 93.04 1.01 22.80 0.96 121,072 93.04 0.98 23.40 0.94 121,022 93.04 0.96 24.00 0.91 120,972 93.04 0.94 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 76HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 221P: 221 Elevation (feet) Primary (cfs) 91.00 0.00 91.02 0.00 91.04 0.00 91.06 0.00 91.08 0.00 91.10 0.00 91.12 0.00 91.14 0.00 91.16 0.00 91.18 0.00 91.20 0.00 91.22 0.00 91.24 0.00 91.26 0.00 91.28 0.00 91.30 0.00 91.32 0.00 91.34 0.00 91.36 0.00 91.38 0.00 91.40 0.00 91.42 0.00 91.44 0.00 91.46 0.00 91.48 0.00 91.50 0.00 91.52 0.00 91.54 0.00 91.56 0.00 91.58 0.00 91.60 0.00 91.62 0.00 91.64 0.00 91.66 0.00 91.68 0.00 91.70 0.00 91.72 0.00 91.74 0.00 91.76 0.00 91.78 0.00 91.80 0.00 91.82 0.00 91.84 0.00 91.86 0.00 91.88 0.00 91.90 0.00 91.92 0.00 91.94 0.00 91.96 0.00 91.98 0.00 92.00 0.00 92.02 0.00 92.04 0.00 Elevation (feet) Primary (cfs) 92.06 0.00 92.08 0.00 92.10 0.00 92.12 0.00 92.14 0.00 92.16 0.00 92.18 0.00 92.20 0.00 92.22 0.00 92.24 0.00 92.26 0.00 92.28 0.00 92.30 0.00 92.32 0.00 92.34 0.00 92.36 0.00 92.38 0.00 92.40 0.00 92.42 0.00 92.44 0.00 92.46 0.00 92.48 0.00 92.50 0.00 92.52 0.00 92.54 0.00 92.56 0.00 92.58 0.00 92.60 0.00 92.62 0.00 92.64 0.00 92.66 0.00 92.68 0.00 92.70 0.00 92.72 0.00 92.74 0.00 92.76 0.00 92.78 0.00 92.80 0.00 92.82 0.00 92.84 0.00 92.86 0.00 92.88 0.00 92.90 0.00 92.92 0.00 92.94 0.00 92.96 0.00 92.98 0.00 93.00 0.00 93.02 0.33 93.04 0.94 93.06 1.72 93.08 2.65 93.10 3.70 Elevation (feet) Primary (cfs) 93.12 4.86 93.14 6.13 93.16 7.49 93.18 8.94 93.20 10.46 93.22 12.16 93.24 13.94 93.26 15.83 93.28 17.81 93.30 19.88 93.32 22.05 93.34 24.31 93.36 26.65 93.38 29.09 93.40 31.62 93.42 34.30 93.44 37.07 93.46 39.93 93.48 42.90 93.50 45.96 93.52 49.12 93.54 52.38 93.56 55.74 93.58 59.19 93.60 62.74 93.62 65.86 93.64 69.02 93.66 72.22 93.68 75.48 93.70 78.77 93.72 82.11 93.74 85.49 93.76 88.91 93.78 92.38 93.80 95.88 93.82 99.50 93.84 103.16 93.86 106.87 93.88 110.62 93.90 114.41 93.92 118.25 93.94 122.12 93.96 126.04 93.98 130.00 94.00 134.00 94.02 137.94 94.04 141.91 94.06 145.91 94.08 149.95 94.10 154.02 94.12 158.12 94.14 162.25 94.16 166.41 Elevation (feet) Primary (cfs) 94.18 170.61 94.20 174.83 94.22 179.15 94.24 183.51 94.26 187.90 94.28 192.31 94.30 196.77 94.32 201.25 94.34 205.76 94.36 210.31 94.38 214.88 94.40 219.49 94.42 224.21 94.44 228.96 94.46 233.75 94.48 238.57 94.50 243.42 94.52 248.30 94.54 253.22 94.56 258.17 94.58 263.15 94.60 268.16 94.62 273.20 94.64 278.28 94.66 283.39 94.68 288.52 94.70 293.69 94.72 298.89 94.74 304.12 94.76 309.37 94.78 314.66 94.80 319.98 94.82 325.33 94.84 330.71 94.86 336.11 94.88 341.55 94.90 347.01 94.92 352.51 94.94 358.03 94.96 363.58 94.98 369.16 95.00 374.77 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 77HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 221P: 221 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 91.00 49,357 0 91.05 49,651 2,475 91.10 49,945 4,965 91.15 50,239 7,470 91.20 50,533 9,989 91.25 50,827 12,523 91.30 51,121 15,072 91.35 51,415 17,635 91.40 51,709 20,213 91.45 52,003 22,806 91.50 52,297 25,414 91.55 52,593 28,036 91.60 52,888 30,673 91.65 53,184 33,325 91.70 53,479 35,991 91.75 53,775 38,673 91.80 54,071 41,369 91.85 54,366 44,080 91.90 54,662 46,805 91.95 54,957 49,546 92.00 55,253 52,301 92.05 55,550 55,071 92.10 55,847 57,856 92.15 56,144 60,656 92.20 56,441 63,470 92.25 56,739 66,300 92.30 57,036 69,144 92.35 57,333 72,003 92.40 57,630 74,878 92.45 57,927 77,766 92.50 58,224 80,670 92.55 61,278 83,658 92.60 64,333 86,798 92.65 67,387 90,091 92.70 70,441 93,537 92.75 73,496 97,135 92.80 76,550 100,886 92.85 79,604 104,790 92.90 82,658 108,847 92.95 85,713 113,056 93.00 88,767 117,418 93.05 89,092 121,864 93.10 89,418 126,327 93.15 89,743 130,806 93.20 90,069 135,302 93.25 90,394 139,813 93.30 90,720 144,341 93.35 91,045 148,885 93.40 91,371 153,446 93.45 91,696 158,022 93.50 92,022 162,615 93.55 92,347 167,224 93.60 92,672 171,850 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 93.65 92,998 176,492 93.70 93,323 181,150 93.75 93,649 185,824 93.80 93,974 190,514 93.85 94,300 195,221 93.90 94,625 199,944 93.95 94,951 204,684 94.00 95,276 209,440 94.05 95,603 214,211 94.10 95,930 219,000 94.15 96,259 223,805 94.20 96,588 228,626 94.25 96,916 233,463 94.30 97,245 238,317 94.35 97,574 243,188 94.40 97,903 248,075 94.45 98,231 252,978 94.50 98,560 257,898 94.55 98,889 262,834 94.60 99,218 267,787 94.65 99,547 272,756 94.70 99,875 277,741 94.75 100,204 282,743 94.80 100,533 287,762 94.85 100,862 292,797 94.90 101,190 297,848 94.95 101,519 302,916 95.00 101,848 308,000 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 78HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 222P: SF Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth > 2.30" for 2 yr event Inflow = 37.27 cfs @ 11.96 hrs, Volume= 1.731 af Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 93.66' @ 24.00 hrs Surf.Area= 98,460 sf Storage= 75,368 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 92.00' 182,259 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 92.00 11,830 0 0 93.00 44,530 28,180 28,180 94.00 126,241 85,386 113,566 94.40 217,225 68,693 182,259 Device Routing Invert Outlet Devices #1 Primary 94.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=92.00' (Free Discharge) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 79HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 222P: SF Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)40 35 30 25 20 15 10 5 0 Inflow Area=9.040 ac Peak Elev=93.66' Storage=75,368 cf 37.27 cfs 0.00 cfs Pond 222P: SF Primary Stage-Discharge Discharge (cfs) 302520151050Elevation (feet)94 93 92 Broad-Crested Rectangular Weir Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 80HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 222P: SF Surface Storage Stage-Area-Storage Storage (cubic-feet) 150,000100,00050,0000 Surface/Horizontal/Wetted Area (sq-ft) 200,000150,000100,00050,0000 Elevation (feet)94 93 92 Custom Stage Data Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 81HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 222P: SF Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 92.00 0.00 0.60 0.00 0 92.00 0.00 1.20 0.00 0 92.00 0.00 1.80 0.00 0 92.00 0.00 2.40 0.00 0 92.00 0.00 3.00 0.00 0 92.00 0.00 3.60 0.00 0 92.00 0.00 4.20 0.00 0 92.00 0.00 4.80 0.00 0 92.00 0.00 5.40 0.00 0 92.00 0.00 6.00 0.02 17 92.00 0.00 6.60 0.03 67 92.01 0.00 7.20 0.06 157 92.01 0.00 7.80 0.10 321 92.03 0.00 8.40 0.15 582 92.05 0.00 9.00 0.25 1,015 92.08 0.00 9.60 0.32 1,635 92.12 0.00 10.20 0.51 2,515 92.17 0.00 10.80 0.86 3,949 92.25 0.00 11.40 1.75 6,581 92.37 0.00 12.00 31.72 33,972 93.12 0.00 12.60 2.46 47,802 93.34 0.00 13.20 1.64 52,133 93.39 0.00 13.80 1.23 55,201 93.43 0.00 14.40 1.01 57,554 93.46 0.00 15.00 0.89 59,603 93.49 0.00 15.60 0.77 61,397 93.51 0.00 16.20 0.67 62,935 93.53 0.00 16.80 0.62 64,327 93.54 0.00 17.40 0.58 65,629 93.56 0.00 18.00 0.54 66,837 93.57 0.00 18.60 0.49 67,953 93.58 0.00 19.20 0.45 68,975 93.59 0.00 19.80 0.41 69,902 93.60 0.00 20.40 0.38 70,745 93.61 0.00 21.00 0.37 71,562 93.62 0.00 21.60 0.37 72,361 93.63 0.00 22.20 0.36 73,141 93.64 0.00 22.80 0.35 73,903 93.64 0.00 23.40 0.34 74,646 93.65 0.00 24.00 0.33 75,371 93.66 0.00 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 82HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 222P: SF Elevation (feet) Primary (cfs) 92.00 0.00 92.02 0.00 92.04 0.00 92.06 0.00 92.08 0.00 92.10 0.00 92.12 0.00 92.14 0.00 92.16 0.00 92.18 0.00 92.20 0.00 92.22 0.00 92.24 0.00 92.26 0.00 92.28 0.00 92.30 0.00 92.32 0.00 92.34 0.00 92.36 0.00 92.38 0.00 92.40 0.00 92.42 0.00 92.44 0.00 92.46 0.00 92.48 0.00 92.50 0.00 92.52 0.00 92.54 0.00 92.56 0.00 92.58 0.00 92.60 0.00 92.62 0.00 92.64 0.00 92.66 0.00 92.68 0.00 92.70 0.00 92.72 0.00 92.74 0.00 92.76 0.00 92.78 0.00 92.80 0.00 92.82 0.00 92.84 0.00 92.86 0.00 92.88 0.00 92.90 0.00 92.92 0.00 92.94 0.00 92.96 0.00 92.98 0.00 93.00 0.00 93.02 0.00 93.04 0.00 Elevation (feet) Primary (cfs) 93.06 0.00 93.08 0.00 93.10 0.00 93.12 0.00 93.14 0.00 93.16 0.00 93.18 0.00 93.20 0.00 93.22 0.00 93.24 0.00 93.26 0.00 93.28 0.00 93.30 0.00 93.32 0.00 93.34 0.00 93.36 0.00 93.38 0.00 93.40 0.00 93.42 0.00 93.44 0.00 93.46 0.00 93.48 0.00 93.50 0.00 93.52 0.00 93.54 0.00 93.56 0.00 93.58 0.00 93.60 0.00 93.62 0.00 93.64 0.00 93.66 0.00 93.68 0.00 93.70 0.00 93.72 0.00 93.74 0.00 93.76 0.00 93.78 0.00 93.80 0.00 93.82 0.00 93.84 0.00 93.86 0.00 93.88 0.00 93.90 0.00 93.92 0.00 93.94 0.00 93.96 0.00 93.98 0.00 94.00 0.00 94.02 0.33 94.04 0.94 94.06 1.72 94.08 2.65 94.10 3.70 Elevation (feet) Primary (cfs) 94.12 4.86 94.14 6.13 94.16 7.49 94.18 8.94 94.20 10.46 94.22 12.16 94.24 13.94 94.26 15.83 94.28 17.81 94.30 19.88 94.32 22.05 94.34 24.31 94.36 26.65 94.38 29.09 94.40 31.62 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 83HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 222P: SF Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 92.00 11,830 0 92.05 13,465 632 92.10 15,100 1,346 92.15 16,735 2,142 92.20 18,370 3,020 92.25 20,005 3,979 92.30 21,640 5,020 92.35 23,275 6,143 92.40 24,910 7,348 92.45 26,545 8,634 92.50 28,180 10,003 92.55 29,815 11,452 92.60 31,450 12,984 92.65 33,085 14,597 92.70 34,720 16,293 92.75 36,355 18,069 92.80 37,990 19,928 92.85 39,625 21,868 92.90 41,260 23,891 92.95 42,895 25,994 93.00 44,530 28,180 93.05 48,616 30,509 93.10 52,701 33,042 93.15 56,787 35,779 93.20 60,872 38,720 93.25 64,958 41,866 93.30 69,043 45,216 93.35 73,129 48,770 93.40 77,214 52,529 93.45 81,300 56,492 93.50 85,386 60,659 93.55 89,471 65,030 93.60 93,557 69,606 93.65 97,642 74,386 93.70 101,728 79,370 93.75 105,813 84,559 93.80 109,899 89,952 93.85 113,984 95,549 93.90 118,070 101,350 93.95 122,155 107,356 94.00 126,241 113,566 94.05 137,614 120,162 94.10 148,987 127,327 94.15 160,360 135,061 94.20 171,733 143,363 94.25 183,106 152,234 94.30 194,479 161,673 94.35 205,852 171,682 94.40 217,225 182,259 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 84HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 224P: 224 Inflow Area = 3.190 ac, 0.00% Impervious, Inflow Depth > 1.05" for 2 yr event Inflow = 6.08 cfs @ 11.97 hrs, Volume= 0.279 af Outflow = 0.08 cfs @ 24.00 hrs, Volume= 0.004 af, Atten= 99%, Lag= 721.8 min Primary = 0.08 cfs @ 24.00 hrs, Volume= 0.004 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 93.00' @ 24.00 hrs Surf.Area= 13,001 sf Storage= 11,970 cf Plug-Flow detention time= 723.2 min calculated for 0.004 af (2% of inflow) Center-of-Mass det. time= 555.6 min ( 1,420.0 - 864.4 ) Volume Invert Avail.Storage Storage Description #1 92.00' 25,759 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 92.00 10,786 0 0 92.50 11,926 5,678 5,678 93.00 12,993 6,230 11,908 93.50 13,844 6,709 18,617 94.00 14,722 7,142 25,759 Device Routing Invert Outlet Devices #1 Primary 93.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=0.04 cfs @ 24.00 hrs HW=93.00' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 0.04 cfs @ 0.16 fps) Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 85HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 224P: 224 Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)6 5 4 3 2 1 0 Inflow Area=3.190 ac Peak Elev=93.00' Storage=11,970 cf 6.08 cfs 0.08 cfs Pond 224P: 224 Primary Stage-Discharge Discharge (cfs) 1301201101009080706050403020100Elevation (feet)94 93 92 Broad-Crested Rectangular Weir Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 86HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 224P: 224 Surface Storage Stage-Area-Storage Storage (cubic-feet) 25,00020,00015,00010,0005,0000 Surface/Horizontal/Wetted Area (sq-ft) 14,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)94 93 92 Custom Stage Data Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 87HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 224P: 224 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 92.00 0.00 0.60 0.00 0 92.00 0.00 1.20 0.00 0 92.00 0.00 1.80 0.00 0 92.00 0.00 2.40 0.00 0 92.00 0.00 3.00 0.00 0 92.00 0.00 3.60 0.00 0 92.00 0.00 4.20 0.00 0 92.00 0.00 4.80 0.00 0 92.00 0.00 5.40 0.00 0 92.00 0.00 6.00 0.00 0 92.00 0.00 6.60 0.00 0 92.00 0.00 7.20 0.00 0 92.00 0.00 7.80 0.00 0 92.00 0.00 8.40 0.00 0 92.00 0.00 9.00 0.00 0 92.00 0.00 9.60 0.00 0 92.00 0.00 10.20 0.00 0 92.00 0.00 10.80 0.00 0 92.00 0.00 11.40 0.03 11 92.00 0.00 12.00 5.48 3,346 92.30 0.00 12.60 0.50 5,953 92.52 0.00 13.20 0.35 6,855 92.60 0.00 13.80 0.27 7,513 92.65 0.00 14.40 0.22 8,027 92.69 0.00 15.00 0.20 8,480 92.73 0.00 15.60 0.17 8,882 92.76 0.00 16.20 0.15 9,230 92.79 0.00 16.80 0.14 9,548 92.82 0.00 17.40 0.13 9,848 92.84 0.00 18.00 0.12 10,127 92.86 0.00 18.60 0.12 10,387 92.88 0.00 19.20 0.11 10,626 92.90 0.00 19.80 0.10 10,844 92.92 0.00 20.40 0.09 11,044 92.93 0.00 21.00 0.09 11,237 92.95 0.00 21.60 0.09 11,427 92.96 0.00 22.20 0.09 11,614 92.98 0.00 22.80 0.08 11,797 92.99 0.00 23.40 0.08 11,950 93.00 0.05 24.00 0.08 11,970 93.00 0.08 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 88HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 224P: 224 Elevation (feet) Primary (cfs) 92.00 0.00 92.01 0.00 92.02 0.00 92.03 0.00 92.04 0.00 92.05 0.00 92.06 0.00 92.07 0.00 92.08 0.00 92.09 0.00 92.10 0.00 92.11 0.00 92.12 0.00 92.13 0.00 92.14 0.00 92.15 0.00 92.16 0.00 92.17 0.00 92.18 0.00 92.19 0.00 92.20 0.00 92.21 0.00 92.22 0.00 92.23 0.00 92.24 0.00 92.25 0.00 92.26 0.00 92.27 0.00 92.28 0.00 92.29 0.00 92.30 0.00 92.31 0.00 92.32 0.00 92.33 0.00 92.34 0.00 92.35 0.00 92.36 0.00 92.37 0.00 92.38 0.00 92.39 0.00 92.40 0.00 92.41 0.00 92.42 0.00 92.43 0.00 92.44 0.00 92.45 0.00 92.46 0.00 92.47 0.00 92.48 0.00 92.49 0.00 92.50 0.00 92.51 0.00 92.52 0.00 Elevation (feet) Primary (cfs) 92.53 0.00 92.54 0.00 92.55 0.00 92.56 0.00 92.57 0.00 92.58 0.00 92.59 0.00 92.60 0.00 92.61 0.00 92.62 0.00 92.63 0.00 92.64 0.00 92.65 0.00 92.66 0.00 92.67 0.00 92.68 0.00 92.69 0.00 92.70 0.00 92.71 0.00 92.72 0.00 92.73 0.00 92.74 0.00 92.75 0.00 92.76 0.00 92.77 0.00 92.78 0.00 92.79 0.00 92.80 0.00 92.81 0.00 92.82 0.00 92.83 0.00 92.84 0.00 92.85 0.00 92.86 0.00 92.87 0.00 92.88 0.00 92.89 0.00 92.90 0.00 92.91 0.00 92.92 0.00 92.93 0.00 92.94 0.00 92.95 0.00 92.96 0.00 92.97 0.00 92.98 0.00 92.99 0.00 93.00 0.00 93.01 0.12 93.02 0.33 93.03 0.61 93.04 0.94 93.05 1.31 Elevation (feet) Primary (cfs) 93.06 1.72 93.07 2.17 93.08 2.65 93.09 3.16 93.10 3.70 93.11 4.27 93.12 4.86 93.13 5.48 93.14 6.13 93.15 6.80 93.16 7.49 93.17 8.20 93.18 8.94 93.19 9.69 93.20 10.46 93.21 11.30 93.22 12.16 93.23 13.04 93.24 13.94 93.25 14.88 93.26 15.83 93.27 16.81 93.28 17.81 93.29 18.83 93.30 19.88 93.31 20.95 93.32 22.05 93.33 23.17 93.34 24.31 93.35 25.47 93.36 26.65 93.37 27.86 93.38 29.09 93.39 30.35 93.40 31.62 93.41 32.95 93.42 34.30 93.43 35.67 93.44 37.07 93.45 38.49 93.46 39.93 93.47 41.40 93.48 42.90 93.49 44.42 93.50 45.96 93.51 47.53 93.52 49.12 93.53 50.74 93.54 52.38 93.55 54.05 93.56 55.74 93.57 57.45 93.58 59.19 Elevation (feet) Primary (cfs) 93.59 60.95 93.60 62.74 93.61 64.29 93.62 65.86 93.63 67.43 93.64 69.02 93.65 70.62 93.66 72.22 93.67 73.84 93.68 75.48 93.69 77.12 93.70 78.77 93.71 80.44 93.72 82.11 93.73 83.80 93.74 85.49 93.75 87.20 93.76 88.91 93.77 90.64 93.78 92.38 93.79 94.13 93.80 95.88 93.81 97.69 93.82 99.50 93.83 101.33 93.84 103.16 93.85 105.01 93.86 106.87 93.87 108.74 93.88 110.62 93.89 112.51 93.90 114.41 93.91 116.32 93.92 118.25 93.93 120.18 93.94 122.12 93.95 124.08 93.96 126.04 93.97 128.02 93.98 130.00 93.99 132.00 94.00 134.00 Type II 24-hr 2 yr Rainfall=3.66"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 89HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 224P: 224 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 92.00 10,786 0 92.02 10,832 216 92.04 10,877 433 92.06 10,923 651 92.08 10,968 870 92.10 11,014 1,090 92.12 11,060 1,311 92.14 11,105 1,532 92.16 11,151 1,755 92.18 11,196 1,978 92.20 11,242 2,203 92.22 11,288 2,428 92.24 11,333 2,654 92.26 11,379 2,881 92.28 11,424 3,109 92.30 11,470 3,338 92.32 11,516 3,568 92.34 11,561 3,799 92.36 11,607 4,031 92.38 11,652 4,263 92.40 11,698 4,497 92.42 11,744 4,731 92.44 11,789 4,967 92.46 11,835 5,203 92.48 11,880 5,440 92.50 11,926 5,678 92.52 11,969 5,917 92.54 12,011 6,157 92.56 12,054 6,397 92.58 12,097 6,639 92.60 12,139 6,881 92.62 12,182 7,124 92.64 12,225 7,369 92.66 12,267 7,613 92.68 12,310 7,859 92.70 12,353 8,106 92.72 12,395 8,353 92.74 12,438 8,602 92.76 12,481 8,851 92.78 12,524 9,101 92.80 12,566 9,352 92.82 12,609 9,604 92.84 12,652 9,856 92.86 12,694 10,110 92.88 12,737 10,364 92.90 12,780 10,619 92.92 12,822 10,875 92.94 12,865 11,132 92.96 12,908 11,390 92.98 12,950 11,648 93.00 12,993 11,908 93.02 13,027 12,168 93.04 13,061 12,429 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 93.06 13,095 12,690 93.08 13,129 12,953 93.10 13,163 13,216 93.12 13,197 13,479 93.14 13,231 13,743 93.16 13,265 14,008 93.18 13,299 14,274 93.20 13,333 14,540 93.22 13,367 14,807 93.24 13,401 15,075 93.26 13,436 15,343 93.28 13,470 15,613 93.30 13,504 15,882 93.32 13,538 16,153 93.34 13,572 16,424 93.36 13,606 16,696 93.38 13,640 16,968 93.40 13,674 17,241 93.42 13,708 17,515 93.44 13,742 17,789 93.46 13,776 18,065 93.48 13,810 18,340 93.50 13,844 18,617 93.52 13,879 18,894 93.54 13,914 19,172 93.56 13,949 19,451 93.58 13,984 19,730 93.60 14,020 20,010 93.62 14,055 20,291 93.64 14,090 20,572 93.66 14,125 20,855 93.68 14,160 21,137 93.70 14,195 21,421 93.72 14,230 21,705 93.74 14,265 21,990 93.76 14,301 22,276 93.78 14,336 22,562 93.80 14,371 22,849 93.82 14,406 23,137 93.84 14,441 23,425 93.86 14,476 23,715 93.88 14,511 24,005 93.90 14,546 24,295 93.92 14,582 24,586 93.94 14,617 24,878 93.96 14,652 25,171 93.98 14,687 25,464 94.00 14,722 25,759 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 90HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Time span=0.00-24.00 hrs, dt=0.03 hrs, 801 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Runoff Area=24.590 ac 0.00% Impervious Runoff Depth>2.86"Subcatchment 121S: Pre Dev't Flow Length=1,245' Tc=27.6 min CN=75 Runoff=64.47 cfs 5.853 af Runoff Area=5.330 ac 0.00% Impervious Runoff Depth>2.69"Subcatchment 122S: Pre Dev't Tc=10.0 min CN=73 Runoff=22.06 cfs 1.194 af Runoff Area=3.710 ac 0.00% Impervious Runoff Depth>2.67"Subcatchment 123S: Pre Dev't Tc=30.0 min CN=73 Runoff=8.61 cfs 0.826 af Runoff Area=3.190 ac 0.00% Impervious Runoff Depth>2.69"Subcatchment 124S: Pre Dev't Tc=10.0 min CN=73 Runoff=13.21 cfs 0.715 af Runoff Area=24.590 ac 0.00% Impervious Runoff Depth>4.05"Subcatchment 221S: Post CY (s) Flow Length=979' Tc=14.1 min CN=87 Runoff=128.95 cfs 8.294 af Runoff Area=5.330 ac 0.00% Impervious Runoff Depth>3.85"Subcatchment 222S: Post CY (nw) Tc=5.0 min CN=85 Runoff=36.13 cfs 1.709 af Runoff Area=3.710 ac 0.00% Impervious Runoff Depth>4.27"Subcatchment 223S: Post CY (ne) Tc=5.0 min CN=89 Runoff=27.08 cfs 1.319 af Runoff Area=3.190 ac 0.00% Impervious Runoff Depth>2.34"Subcatchment 224S: Post CY (se) Tc=5.0 min CN=69 Runoff=13.82 cfs 0.622 af Avg. Flow Depth=0.71' Max Vel=5.76 fps Inflow=26.31 cfs 2.020 afReach 226R: (new Reach) n=0.035 L=10.0' S=0.0400 '/' Capacity=181.21 cfs Outflow=26.29 cfs 2.020 af Peak Elev=93.58' Storage=169,945 cf Inflow=128.95 cfs 8.294 afPond 221P: 221 Outflow=59.14 cfs 5.491 af Peak Elev=94.03' Storage=117,645 cf Inflow=63.22 cfs 3.029 afPond 222P: SF Outflow=0.69 cfs 0.341 af Peak Elev=93.06' Storage=12,695 cf Inflow=13.82 cfs 0.622 afPond 224P: 224 Outflow=1.74 cfs 0.346 af Total Runoff Area = 73.640 ac Runoff Volume = 20.533 af Average Runoff Depth = 3.35" 100.00% Pervious = 73.640 ac 0.00% Impervious = 0.000 ac Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 91HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 121S: Pre Dev't Runoff = 64.47 cfs @ 12.22 hrs, Volume= 5.853 af, Depth> 2.86" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr Rainfall=5.52" Area (ac) CN Description * 24.590 75 24.590 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.7 165 0.0212 0.41 Sheet Flow, Cultivated: Residue<=20% n= 0.060 P2= 3.36" 1.8 106 0.0038 0.99 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 150 0.0220 5.84 70.07 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.040 0.1 24 0.0083 3.73 26.33 Pipe Channel, 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.030 Corrugated metal 9.9 384 0.0016 0.64 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.9 32 0.0063 0.62 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 Corrugated metal 7.8 384 0.0026 0.82 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.6 1,245 Total Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 92HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Subcatchment 121S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)70 60 50 40 30 20 10 0 Type II 24-hr 10 yr Rainfall=5.52" Runoff Area=24.590 ac Runoff Volume=5.853 af Runoff Depth>2.86" Flow Length=1,245' Tc=27.6 min CN=75 64.47 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 93HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 121S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.02 0.00 0.00 0.60 0.03 0.00 0.00 0.90 0.05 0.00 0.00 1.20 0.07 0.00 0.00 1.50 0.09 0.00 0.00 1.80 0.11 0.00 0.00 2.10 0.13 0.00 0.00 2.40 0.15 0.00 0.00 2.70 0.17 0.00 0.00 3.00 0.19 0.00 0.00 3.30 0.21 0.00 0.00 3.60 0.23 0.00 0.00 3.90 0.26 0.00 0.00 4.20 0.28 0.00 0.00 4.50 0.30 0.00 0.00 4.80 0.33 0.00 0.00 5.10 0.36 0.00 0.00 5.40 0.38 0.00 0.00 5.70 0.41 0.00 0.00 6.00 0.44 0.00 0.00 6.30 0.47 0.00 0.00 6.60 0.50 0.00 0.00 6.90 0.54 0.00 0.00 7.20 0.57 0.00 0.00 7.50 0.60 0.00 0.00 7.80 0.64 0.00 0.00 8.10 0.67 0.00 0.00 8.40 0.72 0.00 0.01 8.70 0.76 0.00 0.07 9.00 0.81 0.01 0.17 9.30 0.86 0.01 0.30 9.60 0.92 0.02 0.42 9.90 0.98 0.03 0.56 10.20 1.05 0.04 0.77 10.50 1.13 0.06 1.06 10.80 1.22 0.08 1.46 11.10 1.34 0.11 2.06 11.40 1.50 0.17 3.01 11.70 1.96 0.36 5.22 12.00 3.66 1.42 31.04 12.30 3.94 1.62 59.40 12.60 4.10 1.74 24.85 12.90 4.23 1.84 12.44 13.20 4.33 1.91 8.27 13.50 4.41 1.98 6.39 13.80 4.48 2.04 5.41 14.10 4.55 2.09 4.68 14.40 4.61 2.13 4.12 14.70 4.66 2.18 3.81 15.00 4.71 2.22 3.58 15.30 4.76 2.26 3.36 15.60 4.80 2.29 3.14 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 4.84 2.32 2.92 16.20 4.88 2.35 2.70 16.50 4.92 2.38 2.54 16.80 4.95 2.41 2.44 17.10 4.99 2.44 2.36 17.40 5.02 2.47 2.28 17.70 5.05 2.49 2.20 18.00 5.08 2.52 2.12 18.30 5.11 2.54 2.04 18.60 5.14 2.56 1.96 18.90 5.17 2.59 1.88 19.20 5.19 2.61 1.80 19.50 5.22 2.63 1.72 19.80 5.24 2.65 1.64 20.10 5.26 2.66 1.55 20.40 5.28 2.68 1.49 20.70 5.30 2.70 1.45 21.00 5.33 2.72 1.44 21.30 5.35 2.73 1.42 21.60 5.37 2.75 1.40 21.90 5.39 2.77 1.39 22.20 5.41 2.78 1.37 22.50 5.43 2.80 1.36 22.80 5.45 2.81 1.34 23.10 5.46 2.83 1.33 23.40 5.48 2.85 1.31 23.70 5.50 2.86 1.30 24.00 5.52 2.88 1.28 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 94HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 122S: Pre Dev't Runoff = 22.06 cfs @ 12.02 hrs, Volume= 1.194 af, Depth> 2.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr Rainfall=5.52" Area (ac) CN Description * 5.330 73 5.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Direct Subcatchment 122S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)24 22 20 18 16 14 12 10 8 6 4 2 0 Type II 24-hr 10 yr Rainfall=5.52" Runoff Area=5.330 ac Runoff Volume=1.194 af Runoff Depth>2.69" Tc=10.0 min CN=73 22.06 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 95HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 122S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.02 0.00 0.00 0.60 0.03 0.00 0.00 0.90 0.05 0.00 0.00 1.20 0.07 0.00 0.00 1.50 0.09 0.00 0.00 1.80 0.11 0.00 0.00 2.10 0.13 0.00 0.00 2.40 0.15 0.00 0.00 2.70 0.17 0.00 0.00 3.00 0.19 0.00 0.00 3.30 0.21 0.00 0.00 3.60 0.23 0.00 0.00 3.90 0.26 0.00 0.00 4.20 0.28 0.00 0.00 4.50 0.30 0.00 0.00 4.80 0.33 0.00 0.00 5.10 0.36 0.00 0.00 5.40 0.38 0.00 0.00 5.70 0.41 0.00 0.00 6.00 0.44 0.00 0.00 6.30 0.47 0.00 0.00 6.60 0.50 0.00 0.00 6.90 0.54 0.00 0.00 7.20 0.57 0.00 0.00 7.50 0.60 0.00 0.00 7.80 0.64 0.00 0.00 8.10 0.67 0.00 0.00 8.40 0.72 0.00 0.00 8.70 0.76 0.00 0.00 9.00 0.81 0.00 0.02 9.30 0.86 0.00 0.05 9.60 0.92 0.01 0.07 9.90 0.98 0.01 0.11 10.20 1.05 0.02 0.16 10.50 1.13 0.04 0.23 10.80 1.22 0.06 0.34 11.10 1.34 0.08 0.49 11.40 1.50 0.13 0.81 11.70 1.96 0.30 2.78 12.00 3.66 1.29 21.62 12.30 3.94 1.48 4.11 12.60 4.10 1.60 2.14 12.90 4.23 1.69 1.61 13.20 4.33 1.77 1.32 13.50 4.41 1.83 1.13 13.80 4.48 1.88 0.98 14.10 4.55 1.93 0.85 14.40 4.61 1.98 0.79 14.70 4.66 2.02 0.75 15.00 4.71 2.06 0.71 15.30 4.76 2.09 0.66 15.60 4.80 2.13 0.62 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 4.84 2.16 0.57 16.20 4.88 2.19 0.53 16.50 4.92 2.22 0.51 16.80 4.95 2.25 0.50 17.10 4.99 2.27 0.48 17.40 5.02 2.30 0.46 17.70 5.05 2.32 0.45 18.00 5.08 2.35 0.43 18.30 5.11 2.37 0.41 18.60 5.14 2.39 0.40 18.90 5.17 2.41 0.38 19.20 5.19 2.43 0.36 19.50 5.22 2.45 0.35 19.80 5.24 2.47 0.33 20.10 5.26 2.49 0.31 20.40 5.28 2.50 0.30 20.70 5.30 2.52 0.30 21.00 5.33 2.54 0.30 21.30 5.35 2.55 0.30 21.60 5.37 2.57 0.29 21.90 5.39 2.59 0.29 22.20 5.41 2.60 0.29 22.50 5.43 2.62 0.28 22.80 5.45 2.63 0.28 23.10 5.46 2.65 0.28 23.40 5.48 2.67 0.27 23.70 5.50 2.68 0.27 24.00 5.52 2.70 0.27 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 96HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 123S: Pre Dev't Runoff = 8.61 cfs @ 12.25 hrs, Volume= 0.826 af, Depth> 2.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr Rainfall=5.52" Area (ac) CN Description * 3.710 73 3.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Subcatchment 123S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)9 8 7 6 5 4 3 2 1 0 Type II 24-hr 10 yr Rainfall=5.52" Runoff Area=3.710 ac Runoff Volume=0.826 af Runoff Depth>2.67" Tc=30.0 min CN=73 8.61 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 97HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 123S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.02 0.00 0.00 0.60 0.03 0.00 0.00 0.90 0.05 0.00 0.00 1.20 0.07 0.00 0.00 1.50 0.09 0.00 0.00 1.80 0.11 0.00 0.00 2.10 0.13 0.00 0.00 2.40 0.15 0.00 0.00 2.70 0.17 0.00 0.00 3.00 0.19 0.00 0.00 3.30 0.21 0.00 0.00 3.60 0.23 0.00 0.00 3.90 0.26 0.00 0.00 4.20 0.28 0.00 0.00 4.50 0.30 0.00 0.00 4.80 0.33 0.00 0.00 5.10 0.36 0.00 0.00 5.40 0.38 0.00 0.00 5.70 0.41 0.00 0.00 6.00 0.44 0.00 0.00 6.30 0.47 0.00 0.00 6.60 0.50 0.00 0.00 6.90 0.54 0.00 0.00 7.20 0.57 0.00 0.00 7.50 0.60 0.00 0.00 7.80 0.64 0.00 0.00 8.10 0.67 0.00 0.00 8.40 0.72 0.00 0.00 8.70 0.76 0.00 0.00 9.00 0.81 0.00 0.00 9.30 0.86 0.00 0.02 9.60 0.92 0.01 0.03 9.90 0.98 0.01 0.05 10.20 1.05 0.02 0.08 10.50 1.13 0.04 0.11 10.80 1.22 0.06 0.17 11.10 1.34 0.08 0.24 11.40 1.50 0.13 0.36 11.70 1.96 0.30 0.63 12.00 3.66 1.29 3.65 12.30 3.94 1.48 8.36 12.60 4.10 1.60 3.92 12.90 4.23 1.69 1.97 13.20 4.33 1.77 1.27 13.50 4.41 1.83 0.97 13.80 4.48 1.88 0.80 14.10 4.55 1.93 0.69 14.40 4.61 1.98 0.61 14.70 4.66 2.02 0.56 15.00 4.71 2.06 0.52 15.30 4.76 2.09 0.49 15.60 4.80 2.13 0.46 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 4.84 2.16 0.43 16.20 4.88 2.19 0.40 16.50 4.92 2.22 0.37 16.80 4.95 2.25 0.36 17.10 4.99 2.27 0.35 17.40 5.02 2.30 0.33 17.70 5.05 2.32 0.32 18.00 5.08 2.35 0.31 18.30 5.11 2.37 0.30 18.60 5.14 2.39 0.29 18.90 5.17 2.41 0.28 19.20 5.19 2.43 0.26 19.50 5.22 2.45 0.25 19.80 5.24 2.47 0.24 20.10 5.26 2.49 0.23 20.40 5.28 2.50 0.22 20.70 5.30 2.52 0.21 21.00 5.33 2.54 0.21 21.30 5.35 2.55 0.21 21.60 5.37 2.57 0.21 21.90 5.39 2.59 0.20 22.20 5.41 2.60 0.20 22.50 5.43 2.62 0.20 22.80 5.45 2.63 0.20 23.10 5.46 2.65 0.19 23.40 5.48 2.67 0.19 23.70 5.50 2.68 0.19 24.00 5.52 2.70 0.19 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 98HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 124S: Pre Dev't Runoff = 13.21 cfs @ 12.02 hrs, Volume= 0.715 af, Depth> 2.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr Rainfall=5.52" Area (ac) CN Description * 3.190 73 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Subcatchment 124S: Pre Dev't Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)14 12 10 8 6 4 2 0 Type II 24-hr 10 yr Rainfall=5.52" Runoff Area=3.190 ac Runoff Volume=0.715 af Runoff Depth>2.69" Tc=10.0 min CN=73 13.21 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 99HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 124S: Pre Dev't Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.02 0.00 0.00 0.60 0.03 0.00 0.00 0.90 0.05 0.00 0.00 1.20 0.07 0.00 0.00 1.50 0.09 0.00 0.00 1.80 0.11 0.00 0.00 2.10 0.13 0.00 0.00 2.40 0.15 0.00 0.00 2.70 0.17 0.00 0.00 3.00 0.19 0.00 0.00 3.30 0.21 0.00 0.00 3.60 0.23 0.00 0.00 3.90 0.26 0.00 0.00 4.20 0.28 0.00 0.00 4.50 0.30 0.00 0.00 4.80 0.33 0.00 0.00 5.10 0.36 0.00 0.00 5.40 0.38 0.00 0.00 5.70 0.41 0.00 0.00 6.00 0.44 0.00 0.00 6.30 0.47 0.00 0.00 6.60 0.50 0.00 0.00 6.90 0.54 0.00 0.00 7.20 0.57 0.00 0.00 7.50 0.60 0.00 0.00 7.80 0.64 0.00 0.00 8.10 0.67 0.00 0.00 8.40 0.72 0.00 0.00 8.70 0.76 0.00 0.00 9.00 0.81 0.00 0.01 9.30 0.86 0.00 0.03 9.60 0.92 0.01 0.04 9.90 0.98 0.01 0.07 10.20 1.05 0.02 0.10 10.50 1.13 0.04 0.14 10.80 1.22 0.06 0.20 11.10 1.34 0.08 0.30 11.40 1.50 0.13 0.48 11.70 1.96 0.30 1.66 12.00 3.66 1.29 12.94 12.30 3.94 1.48 2.46 12.60 4.10 1.60 1.28 12.90 4.23 1.69 0.96 13.20 4.33 1.77 0.79 13.50 4.41 1.83 0.68 13.80 4.48 1.88 0.59 14.10 4.55 1.93 0.51 14.40 4.61 1.98 0.48 14.70 4.66 2.02 0.45 15.00 4.71 2.06 0.42 15.30 4.76 2.09 0.40 15.60 4.80 2.13 0.37 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 4.84 2.16 0.34 16.20 4.88 2.19 0.32 16.50 4.92 2.22 0.31 16.80 4.95 2.25 0.30 17.10 4.99 2.27 0.29 17.40 5.02 2.30 0.28 17.70 5.05 2.32 0.27 18.00 5.08 2.35 0.26 18.30 5.11 2.37 0.25 18.60 5.14 2.39 0.24 18.90 5.17 2.41 0.23 19.20 5.19 2.43 0.22 19.50 5.22 2.45 0.21 19.80 5.24 2.47 0.20 20.10 5.26 2.49 0.19 20.40 5.28 2.50 0.18 20.70 5.30 2.52 0.18 21.00 5.33 2.54 0.18 21.30 5.35 2.55 0.18 21.60 5.37 2.57 0.17 21.90 5.39 2.59 0.17 22.20 5.41 2.60 0.17 22.50 5.43 2.62 0.17 22.80 5.45 2.63 0.17 23.10 5.46 2.65 0.17 23.40 5.48 2.67 0.16 23.70 5.50 2.68 0.16 24.00 5.52 2.70 0.16 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 100HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 221S: Post CY (s) Runoff = 128.95 cfs @ 12.06 hrs, Volume= 8.294 af, Depth> 4.05" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr Rainfall=5.52" Area (ac) CN Description * 24.590 87 24.590 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 165 0.0212 1.59 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.36" 1.4 106 0.0038 1.25 Shallow Concentrated Flow, Paved Kv= 20.3 fps 0.4 150 0.0220 6.67 80.08 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.035 0.6 24 0.0083 0.71 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 Corrugated metal 7.9 384 0.0016 0.81 Shallow Concentrated Flow, Paved Kv= 20.3 fps 0.9 32 0.0063 0.62 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 1.2 118 0.0110 1.69 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 14.1 979 Total Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 101HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Subcatchment 221S: Post CY (s) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)140 120 100 80 60 40 20 0 Type II 24-hr 10 yr Rainfall=5.52" Runoff Area=24.590 ac Runoff Volume=8.294 af Runoff Depth>4.05" Flow Length=979' Tc=14.1 min CN=87 128.95 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 102HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 221S: Post CY (s) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.02 0.00 0.00 0.60 0.03 0.00 0.00 0.90 0.05 0.00 0.00 1.20 0.07 0.00 0.00 1.50 0.09 0.00 0.00 1.80 0.11 0.00 0.00 2.10 0.13 0.00 0.00 2.40 0.15 0.00 0.00 2.70 0.17 0.00 0.00 3.00 0.19 0.00 0.00 3.30 0.21 0.00 0.00 3.60 0.23 0.00 0.00 3.90 0.26 0.00 0.00 4.20 0.28 0.00 0.00 4.50 0.30 0.00 0.00 4.80 0.33 0.00 0.04 5.10 0.36 0.00 0.11 5.40 0.38 0.00 0.18 5.70 0.41 0.01 0.26 6.00 0.44 0.01 0.35 6.30 0.47 0.02 0.44 6.60 0.50 0.02 0.53 6.90 0.54 0.03 0.62 7.20 0.57 0.04 0.72 7.50 0.60 0.05 0.82 7.80 0.64 0.06 0.92 8.10 0.67 0.08 1.02 8.40 0.72 0.09 1.21 8.70 0.76 0.11 1.46 9.00 0.81 0.13 1.73 9.30 0.86 0.16 1.98 9.60 0.92 0.18 2.11 9.90 0.98 0.21 2.43 10.20 1.05 0.25 2.93 10.50 1.13 0.29 3.61 10.80 1.22 0.35 4.52 11.10 1.34 0.43 5.79 11.40 1.50 0.53 8.17 11.70 1.96 0.87 18.23 12.00 3.66 2.33 114.94 12.30 3.94 2.58 37.85 12.60 4.10 2.73 14.93 12.90 4.23 2.85 9.90 13.20 4.33 2.94 7.93 13.50 4.41 3.02 6.74 13.80 4.48 3.08 5.79 14.10 4.55 3.14 5.02 14.40 4.61 3.20 4.57 14.70 4.66 3.25 4.30 15.00 4.71 3.30 4.04 15.30 4.76 3.34 3.77 15.60 4.80 3.38 3.51 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 4.84 3.42 3.24 16.20 4.88 3.46 2.99 16.50 4.92 3.49 2.87 16.80 4.95 3.52 2.77 17.10 4.99 3.56 2.68 17.40 5.02 3.59 2.58 17.70 5.05 3.62 2.49 18.00 5.08 3.65 2.39 18.30 5.11 3.67 2.30 18.60 5.14 3.70 2.20 18.90 5.17 3.73 2.11 19.20 5.19 3.75 2.01 19.50 5.22 3.77 1.91 19.80 5.24 3.79 1.82 20.10 5.26 3.81 1.72 20.40 5.28 3.84 1.67 20.70 5.30 3.85 1.65 21.00 5.33 3.87 1.63 21.30 5.35 3.89 1.62 21.60 5.37 3.91 1.60 21.90 5.39 3.93 1.58 22.20 5.41 3.95 1.56 22.50 5.43 3.97 1.54 22.80 5.45 3.99 1.52 23.10 5.46 4.01 1.50 23.40 5.48 4.02 1.48 23.70 5.50 4.04 1.46 24.00 5.52 4.06 1.44 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 103HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 222S: Post CY (nw) Runoff = 36.13 cfs @ 11.96 hrs, Volume= 1.709 af, Depth> 3.85" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr Rainfall=5.52" Area (ac) CN Description * 5.330 85 5.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 222S: Post CY (nw) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)40 35 30 25 20 15 10 5 0 Type II 24-hr 10 yr Rainfall=5.52" Runoff Area=5.330 ac Runoff Volume=1.709 af Runoff Depth>3.85" Tc=5.0 min CN=85 36.13 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 104HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 222S: Post CY (nw) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.02 0.00 0.00 0.60 0.03 0.00 0.00 0.90 0.05 0.00 0.00 1.20 0.07 0.00 0.00 1.50 0.09 0.00 0.00 1.80 0.11 0.00 0.00 2.10 0.13 0.00 0.00 2.40 0.15 0.00 0.00 2.70 0.17 0.00 0.00 3.00 0.19 0.00 0.00 3.30 0.21 0.00 0.00 3.60 0.23 0.00 0.00 3.90 0.26 0.00 0.00 4.20 0.28 0.00 0.00 4.50 0.30 0.00 0.00 4.80 0.33 0.00 0.00 5.10 0.36 0.00 0.00 5.40 0.38 0.00 0.01 5.70 0.41 0.00 0.03 6.00 0.44 0.00 0.05 6.30 0.47 0.01 0.06 6.60 0.50 0.01 0.08 6.90 0.54 0.02 0.10 7.20 0.57 0.02 0.12 7.50 0.60 0.03 0.14 7.80 0.64 0.04 0.16 8.10 0.67 0.05 0.18 8.40 0.72 0.06 0.23 8.70 0.76 0.08 0.28 9.00 0.81 0.09 0.34 9.30 0.86 0.11 0.37 9.60 0.92 0.14 0.40 9.90 0.98 0.16 0.49 10.20 1.05 0.20 0.61 10.50 1.13 0.24 0.76 10.80 1.22 0.29 0.98 11.10 1.34 0.35 1.28 11.40 1.50 0.45 1.90 11.70 1.96 0.76 8.43 12.00 3.66 2.16 30.52 12.30 3.94 2.40 3.96 12.60 4.10 2.55 2.32 12.90 4.23 2.66 1.88 13.20 4.33 2.75 1.54 13.50 4.41 2.83 1.32 13.80 4.48 2.89 1.15 14.10 4.55 2.95 1.00 14.40 4.61 3.00 0.94 14.70 4.66 3.06 0.89 15.00 4.71 3.10 0.83 15.30 4.76 3.15 0.77 15.60 4.80 3.19 0.72 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 4.84 3.22 0.66 16.20 4.88 3.26 0.62 16.50 4.92 3.29 0.60 16.80 4.95 3.33 0.58 17.10 4.99 3.36 0.56 17.40 5.02 3.39 0.54 17.70 5.05 3.42 0.52 18.00 5.08 3.45 0.50 18.30 5.11 3.47 0.48 18.60 5.14 3.50 0.46 18.90 5.17 3.52 0.44 19.20 5.19 3.55 0.42 19.50 5.22 3.57 0.40 19.80 5.24 3.59 0.38 20.10 5.26 3.61 0.36 20.40 5.28 3.63 0.35 20.70 5.30 3.65 0.35 21.00 5.33 3.67 0.35 21.30 5.35 3.69 0.34 21.60 5.37 3.71 0.34 21.90 5.39 3.73 0.33 22.20 5.41 3.75 0.33 22.50 5.43 3.76 0.33 22.80 5.45 3.78 0.32 23.10 5.46 3.80 0.32 23.40 5.48 3.82 0.31 23.70 5.50 3.83 0.31 24.00 5.52 3.85 0.31 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 105HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 223S: Post CY (ne) Runoff = 27.08 cfs @ 11.96 hrs, Volume= 1.319 af, Depth> 4.27" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr Rainfall=5.52" Area (ac) CN Description * 3.710 89 3.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 223S: Post CY (ne) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)30 25 20 15 10 5 0 Type II 24-hr 10 yr Rainfall=5.52" Runoff Area=3.710 ac Runoff Volume=1.319 af Runoff Depth>4.27" Tc=5.0 min CN=89 27.08 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 106HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 223S: Post CY (ne) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.02 0.00 0.00 0.60 0.03 0.00 0.00 0.90 0.05 0.00 0.00 1.20 0.07 0.00 0.00 1.50 0.09 0.00 0.00 1.80 0.11 0.00 0.00 2.10 0.13 0.00 0.00 2.40 0.15 0.00 0.00 2.70 0.17 0.00 0.00 3.00 0.19 0.00 0.00 3.30 0.21 0.00 0.00 3.60 0.23 0.00 0.00 3.90 0.26 0.00 0.00 4.20 0.28 0.00 0.01 4.50 0.30 0.00 0.02 4.80 0.33 0.01 0.04 5.10 0.36 0.01 0.05 5.40 0.38 0.01 0.06 5.70 0.41 0.02 0.08 6.00 0.44 0.03 0.09 6.30 0.47 0.03 0.11 6.60 0.50 0.04 0.12 6.90 0.54 0.05 0.14 7.20 0.57 0.07 0.15 7.50 0.60 0.08 0.17 7.80 0.64 0.09 0.18 8.10 0.67 0.11 0.20 8.40 0.72 0.13 0.24 8.70 0.76 0.15 0.29 9.00 0.81 0.18 0.34 9.30 0.86 0.21 0.36 9.60 0.92 0.24 0.38 9.90 0.98 0.27 0.46 10.20 1.05 0.31 0.55 10.50 1.13 0.37 0.67 10.80 1.22 0.43 0.86 11.10 1.34 0.51 1.09 11.40 1.50 0.63 1.58 11.70 1.96 0.99 6.78 12.00 3.66 2.51 22.70 12.30 3.94 2.76 2.90 12.60 4.10 2.92 1.69 12.90 4.23 3.04 1.37 13.20 4.33 3.13 1.12 13.50 4.41 3.21 0.96 13.80 4.48 3.28 0.83 14.10 4.55 3.34 0.72 14.40 4.61 3.39 0.68 14.70 4.66 3.45 0.64 15.00 4.71 3.50 0.60 15.30 4.76 3.54 0.56 15.60 4.80 3.58 0.52 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 4.84 3.62 0.48 16.20 4.88 3.66 0.45 16.50 4.92 3.69 0.43 16.80 4.95 3.73 0.42 17.10 4.99 3.76 0.40 17.40 5.02 3.79 0.39 17.70 5.05 3.82 0.37 18.00 5.08 3.85 0.36 18.30 5.11 3.88 0.35 18.60 5.14 3.91 0.33 18.90 5.17 3.93 0.32 19.20 5.19 3.96 0.30 19.50 5.22 3.98 0.29 19.80 5.24 4.00 0.27 20.10 5.26 4.02 0.26 20.40 5.28 4.04 0.25 20.70 5.30 4.06 0.25 21.00 5.33 4.08 0.25 21.30 5.35 4.10 0.25 21.60 5.37 4.12 0.24 21.90 5.39 4.14 0.24 22.20 5.41 4.16 0.24 22.50 5.43 4.18 0.23 22.80 5.45 4.20 0.23 23.10 5.46 4.22 0.23 23.40 5.48 4.24 0.23 23.70 5.50 4.25 0.22 24.00 5.52 4.27 0.22 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 107HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Subcatchment 224S: Post CY (se) Runoff = 13.82 cfs @ 11.96 hrs, Volume= 0.622 af, Depth> 2.34" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 10 yr Rainfall=5.52" Area (ac) CN Description * 3.190 69 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Subcatchment 224S: Post CY (se) Runoff Hydrograph Time (hours) 242220181614121086420Flow (cfs)14 12 10 8 6 4 2 0 Type II 24-hr 10 yr Rainfall=5.52" Runoff Area=3.190 ac Runoff Volume=0.622 af Runoff Depth>2.34" Tc=5.0 min CN=69 13.82 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 108HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Subcatchment 224S: Post CY (se) Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 0.00 0.00 0.00 0.00 0.30 0.02 0.00 0.00 0.60 0.03 0.00 0.00 0.90 0.05 0.00 0.00 1.20 0.07 0.00 0.00 1.50 0.09 0.00 0.00 1.80 0.11 0.00 0.00 2.10 0.13 0.00 0.00 2.40 0.15 0.00 0.00 2.70 0.17 0.00 0.00 3.00 0.19 0.00 0.00 3.30 0.21 0.00 0.00 3.60 0.23 0.00 0.00 3.90 0.26 0.00 0.00 4.20 0.28 0.00 0.00 4.50 0.30 0.00 0.00 4.80 0.33 0.00 0.00 5.10 0.36 0.00 0.00 5.40 0.38 0.00 0.00 5.70 0.41 0.00 0.00 6.00 0.44 0.00 0.00 6.30 0.47 0.00 0.00 6.60 0.50 0.00 0.00 6.90 0.54 0.00 0.00 7.20 0.57 0.00 0.00 7.50 0.60 0.00 0.00 7.80 0.64 0.00 0.00 8.10 0.67 0.00 0.00 8.40 0.72 0.00 0.00 8.70 0.76 0.00 0.00 9.00 0.81 0.00 0.00 9.30 0.86 0.00 0.00 9.60 0.92 0.00 0.00 9.90 0.98 0.00 0.02 10.20 1.05 0.00 0.04 10.50 1.13 0.01 0.08 10.80 1.22 0.02 0.13 11.10 1.34 0.04 0.21 11.40 1.50 0.07 0.38 11.70 1.96 0.20 2.17 12.00 3.66 1.05 12.11 12.30 3.94 1.23 1.70 12.60 4.10 1.33 1.01 12.90 4.23 1.42 0.83 13.20 4.33 1.48 0.69 13.50 4.41 1.54 0.60 13.80 4.48 1.59 0.52 14.10 4.55 1.63 0.46 14.40 4.61 1.68 0.43 14.70 4.66 1.71 0.41 15.00 4.71 1.75 0.38 15.30 4.76 1.78 0.36 15.60 4.80 1.82 0.33 Time (hours) Precip. (inches) Excess (inches) Runoff (cfs) 15.90 4.84 1.85 0.31 16.20 4.88 1.87 0.29 16.50 4.92 1.90 0.28 16.80 4.95 1.92 0.27 17.10 4.99 1.95 0.26 17.40 5.02 1.97 0.25 17.70 5.05 2.00 0.25 18.00 5.08 2.02 0.24 18.30 5.11 2.04 0.23 18.60 5.14 2.06 0.22 18.90 5.17 2.08 0.21 19.20 5.19 2.10 0.20 19.50 5.22 2.12 0.19 19.80 5.24 2.13 0.18 20.10 5.26 2.15 0.17 20.40 5.28 2.17 0.17 20.70 5.30 2.18 0.17 21.00 5.33 2.20 0.17 21.30 5.35 2.21 0.16 21.60 5.37 2.23 0.16 21.90 5.39 2.24 0.16 22.20 5.41 2.26 0.16 22.50 5.43 2.27 0.16 22.80 5.45 2.29 0.16 23.10 5.46 2.30 0.15 23.40 5.48 2.32 0.15 23.70 5.50 2.33 0.15 24.00 5.52 2.34 0.15 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 109HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Reach 226R: (new Reach) Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth > 2.68" for 10 yr event Inflow = 26.31 cfs @ 12.03 hrs, Volume= 2.020 af Outflow = 26.29 cfs @ 12.03 hrs, Volume= 2.020 af, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Max. Velocity= 5.76 fps, Min. Travel Time= 0.0 min Avg. Velocity = 1.78 fps, Avg. Travel Time= 0.1 min Peak Storage= 46 cf @ 12.03 hrs Average Depth at Peak Storage= 0.71' Bank-Full Depth= 2.00' Flow Area= 18.0 sf, Capacity= 181.21 cfs 5.00' x 2.00' deep channel, n= 0.035 Side Slope Z-value= 2.0 '/' Top Width= 13.00' Length= 10.0' Slope= 0.0400 '/' Inlet Invert= 94.00', Outlet Invert= 93.60' Reach 226R: (new Reach) Inflow Outflow Hydrograph Time (hours) 242220181614121086420Flow (cfs)25 20 15 10 5 0 Inflow Area=9.040 ac Avg. Flow Depth=0.71' Max Vel=5.76 fps n=0.035 L=10.0' S=0.0400 '/' Capacity=181.21 cfs 26.31 cfs26.29 cfs Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 110HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Reach 226R: (new Reach) Primary Stage-Discharge Discharge (cfs) 150100500Depth (feet)2 1 0 Reach 226R: (new Reach) Storage Stage-Storage Storage (cubic-feet) 180160140120100806040200Depth (feet)2 1 0 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 111HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Reach 226R: (new Reach) Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Outflow (cfs) 0.00 0.00 0 94.00 0.00 0.60 0.00 0 94.00 0.00 1.20 0.00 0 94.00 0.00 1.80 0.00 0 94.00 0.00 2.40 0.00 0 94.00 0.00 3.00 0.00 0 94.00 0.00 3.60 0.00 0 94.00 0.00 4.20 0.00 0 94.00 0.00 4.80 0.00 0 94.00 0.00 5.40 0.00 0 94.00 0.00 6.00 0.00 0 94.00 0.00 6.60 0.00 0 94.00 0.00 7.20 0.00 0 94.00 0.00 7.80 0.00 0 94.00 0.00 8.40 0.00 0 94.00 0.00 9.00 0.03 0 94.01 0.02 9.60 0.11 1 94.03 0.11 10.20 0.24 2 94.04 0.24 10.80 0.51 4 94.07 0.50 11.40 1.17 6 94.11 1.17 12.00 25.27 44 94.69 25.20 12.60 6.06 17 94.31 6.07 13.20 2.59 10 94.18 2.59 13.80 1.78 8 94.15 1.79 14.40 1.40 7 94.13 1.40 15.00 1.23 6 94.12 1.23 15.60 1.08 6 94.11 1.08 16.20 0.93 5 94.10 0.93 16.80 0.85 5 94.10 0.85 17.40 0.80 5 94.09 0.80 18.00 0.74 5 94.09 0.74 18.60 0.68 4 94.08 0.68 19.20 0.63 4 94.08 0.63 19.80 0.57 4 94.07 0.57 20.40 0.52 4 94.07 0.52 21.00 0.51 4 94.07 0.51 21.60 0.50 4 94.07 0.50 22.20 0.49 3 94.07 0.49 22.80 0.48 3 94.07 0.48 23.40 0.46 3 94.07 0.46 24.00 0.45 3 94.07 0.45 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 112HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Reach 226R: (new Reach) Elevation (feet) Velocity (ft/sec) Discharge (cfs) 94.00 0.00 0.00 94.02 0.62 0.06 94.04 0.98 0.20 94.06 1.28 0.39 94.08 1.54 0.63 94.10 1.77 0.92 94.12 1.99 1.25 94.14 2.19 1.62 94.16 2.39 2.03 94.18 2.57 2.48 94.20 2.74 2.96 94.22 2.90 3.48 94.24 3.06 4.03 94.26 3.21 4.61 94.28 3.36 5.23 94.30 3.50 5.88 94.32 3.64 6.57 94.34 3.77 7.29 94.36 3.90 8.04 94.38 4.03 8.82 94.40 4.15 9.63 94.42 4.27 10.47 94.44 4.39 11.35 94.46 4.50 12.26 94.48 4.61 13.19 94.50 4.72 14.16 94.52 4.83 15.16 94.54 4.93 16.20 94.56 5.04 17.26 94.58 5.14 18.35 94.60 5.24 19.48 94.62 5.33 20.63 94.64 5.43 21.82 94.66 5.52 23.04 94.68 5.62 24.29 94.70 5.71 25.57 94.72 5.80 26.88 94.74 5.89 28.22 94.76 5.97 29.60 94.78 6.06 31.01 94.80 6.14 32.44 94.82 6.23 33.91 94.84 6.31 35.41 94.86 6.39 36.95 94.88 6.47 38.51 94.90 6.55 40.11 94.92 6.63 41.74 94.94 6.71 43.40 94.96 6.79 45.10 94.98 6.87 46.83 95.00 6.94 48.59 95.02 7.02 50.38 95.04 7.09 52.20 Elevation (feet) Velocity (ft/sec) Discharge (cfs) 95.06 7.16 54.06 95.08 7.24 55.96 95.10 7.31 57.88 95.12 7.38 59.84 95.14 7.45 61.83 95.16 7.52 63.86 95.18 7.59 65.92 95.20 7.66 68.01 95.22 7.73 70.14 95.24 7.80 72.30 95.26 7.86 74.50 95.28 7.93 76.73 95.30 8.00 78.99 95.32 8.06 81.29 95.34 8.13 83.63 95.36 8.19 86.00 95.38 8.26 88.40 95.40 8.32 90.84 95.42 8.38 93.32 95.44 8.45 95.83 95.46 8.51 98.38 95.48 8.57 100.96 95.50 8.63 103.58 95.52 8.69 106.24 95.54 8.75 108.93 95.56 8.81 111.66 95.58 8.88 114.42 95.60 8.93 117.23 95.62 8.99 120.06 95.64 9.05 122.94 95.66 9.11 125.85 95.68 9.17 128.80 95.70 9.23 131.79 95.72 9.29 134.82 95.74 9.34 137.88 95.76 9.40 140.98 95.78 9.46 144.12 95.80 9.52 147.30 95.82 9.57 150.51 95.84 9.63 153.77 95.86 9.68 157.06 95.88 9.74 160.39 95.90 9.79 163.76 95.92 9.85 167.17 95.94 9.90 170.62 95.96 9.96 174.11 95.98 10.01 177.64 96.00 10.07 181.21 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 113HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Reach 226R: (new Reach) Elevation (feet) End-Area (sq-ft) Storage (cubic-feet) 94.00 0.0 0 94.02 0.1 1 94.04 0.2 2 94.06 0.3 3 94.08 0.4 4 94.10 0.5 5 94.12 0.6 6 94.14 0.7 7 94.16 0.9 9 94.18 1.0 10 94.20 1.1 11 94.22 1.2 12 94.24 1.3 13 94.26 1.4 14 94.28 1.6 16 94.30 1.7 17 94.32 1.8 18 94.34 1.9 19 94.36 2.1 21 94.38 2.2 22 94.40 2.3 23 94.42 2.5 25 94.44 2.6 26 94.46 2.7 27 94.48 2.9 29 94.50 3.0 30 94.52 3.1 31 94.54 3.3 33 94.56 3.4 34 94.58 3.6 36 94.60 3.7 37 94.62 3.9 39 94.64 4.0 40 94.66 4.2 42 94.68 4.3 43 94.70 4.5 45 94.72 4.6 46 94.74 4.8 48 94.76 5.0 50 94.78 5.1 51 94.80 5.3 53 94.82 5.4 54 94.84 5.6 56 94.86 5.8 58 94.88 5.9 59 94.90 6.1 61 94.92 6.3 63 94.94 6.5 65 94.96 6.6 66 94.98 6.8 68 95.00 7.0 70 95.02 7.2 72 95.04 7.4 74 Elevation (feet) End-Area (sq-ft) Storage (cubic-feet) 95.06 7.5 75 95.08 7.7 77 95.10 7.9 79 95.12 8.1 81 95.14 8.3 83 95.16 8.5 85 95.18 8.7 87 95.20 8.9 89 95.22 9.1 91 95.24 9.3 93 95.26 9.5 95 95.28 9.7 97 95.30 9.9 99 95.32 10.1 101 95.34 10.3 103 95.36 10.5 105 95.38 10.7 107 95.40 10.9 109 95.42 11.1 111 95.44 11.3 113 95.46 11.6 116 95.48 11.8 118 95.50 12.0 120 95.52 12.2 122 95.54 12.4 124 95.56 12.7 127 95.58 12.9 129 95.60 13.1 131 95.62 13.3 133 95.64 13.6 136 95.66 13.8 138 95.68 14.0 140 95.70 14.3 143 95.72 14.5 145 95.74 14.8 148 95.76 15.0 150 95.78 15.2 152 95.80 15.5 155 95.82 15.7 157 95.84 16.0 160 95.86 16.2 162 95.88 16.5 165 95.90 16.7 167 95.92 17.0 170 95.94 17.2 172 95.96 17.5 175 95.98 17.7 177 96.00 18.0 180 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 114HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 221P: 221 Inflow Area = 24.590 ac, 0.00% Impervious, Inflow Depth > 4.05" for 10 yr event Inflow = 128.95 cfs @ 12.06 hrs, Volume= 8.294 af Outflow = 59.14 cfs @ 12.22 hrs, Volume= 5.491 af, Atten= 54%, Lag= 10.1 min Primary = 59.14 cfs @ 12.22 hrs, Volume= 5.491 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 93.58' @ 12.22 hrs Surf.Area= 92,539 sf Storage= 169,945 cf Plug-Flow detention time= 180.7 min calculated for 5.491 af (66% of inflow) Center-of-Mass det. time= 81.9 min ( 882.0 - 800.1 ) Volume Invert Avail.Storage Storage Description #1 91.00' 308,000 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 91.00 49,357 0 0 91.50 52,297 25,414 25,414 92.00 55,253 26,888 52,301 92.50 58,224 28,369 80,670 93.00 88,767 36,748 117,418 94.00 95,276 92,022 209,440 94.10 95,930 9,560 219,000 95.00 101,848 89,000 308,000 Device Routing Invert Outlet Devices #1 Primary 93.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=58.73 cfs @ 12.22 hrs HW=93.58' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 58.73 cfs @ 2.03 fps) Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 115HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 221P: 221 Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)140 120 100 80 60 40 20 0 Inflow Area=24.590 ac Peak Elev=93.58' Storage=169,945 cf 128.95 cfs 59.14 cfs Pond 221P: 221 Primary Stage-Discharge Discharge (cfs) 350300250200150100500Elevation (feet)95 94 93 92 91 Broad-Crested Rectangular Weir Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 116HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 221P: 221 Surface Storage Stage-Area-Storage Storage (cubic-feet) 300,000200,000100,0000 Surface/Horizontal/Wetted Area (sq-ft) 100,00080,00060,00040,00020,0000 Elevation (feet)95 94 93 92 91 Custom Stage Data Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 117HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 221P: 221 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 91.00 0.00 0.60 0.00 0 91.00 0.00 1.20 0.00 0 91.00 0.00 1.80 0.00 0 91.00 0.00 2.40 0.00 0 91.00 0.00 3.00 0.00 0 91.00 0.00 3.60 0.00 0 91.00 0.00 4.20 0.00 0 91.00 0.00 4.80 0.04 14 91.00 0.00 5.40 0.18 248 91.01 0.00 6.00 0.35 819 91.02 0.00 6.60 0.53 1,761 91.04 0.00 7.20 0.72 3,102 91.06 0.00 7.80 0.92 4,867 91.10 0.00 8.40 1.21 7,107 91.14 0.00 9.00 1.73 10,262 91.21 0.00 9.60 2.11 14,488 91.29 0.00 10.20 2.93 19,793 91.39 0.00 10.80 4.52 27,665 91.54 0.00 11.40 8.17 40,610 91.79 0.00 12.00 114.94 111,849 92.94 0.00 12.60 14.93 150,093 93.36 27.06 13.20 7.93 135,967 93.21 11.11 13.80 5.79 131,393 93.16 7.26 14.40 4.57 128,855 93.13 5.40 15.00 4.04 127,556 93.11 4.52 15.60 3.51 126,600 93.10 3.92 16.20 2.99 125,719 93.09 3.38 16.80 2.77 125,090 93.09 2.99 17.40 2.58 124,697 93.08 2.74 18.00 2.39 124,356 93.08 2.56 18.60 2.20 123,983 93.07 2.38 19.20 2.01 123,593 93.07 2.19 19.80 1.82 123,197 93.06 2.00 20.40 1.67 122,814 93.06 1.82 21.00 1.63 122,587 93.06 1.71 21.60 1.60 122,456 93.06 1.65 22.20 1.56 122,359 93.06 1.60 22.80 1.52 122,273 93.05 1.56 23.40 1.48 122,192 93.05 1.52 24.00 1.44 122,111 93.05 1.48 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 118HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 221P: 221 Elevation (feet) Primary (cfs) 91.00 0.00 91.02 0.00 91.04 0.00 91.06 0.00 91.08 0.00 91.10 0.00 91.12 0.00 91.14 0.00 91.16 0.00 91.18 0.00 91.20 0.00 91.22 0.00 91.24 0.00 91.26 0.00 91.28 0.00 91.30 0.00 91.32 0.00 91.34 0.00 91.36 0.00 91.38 0.00 91.40 0.00 91.42 0.00 91.44 0.00 91.46 0.00 91.48 0.00 91.50 0.00 91.52 0.00 91.54 0.00 91.56 0.00 91.58 0.00 91.60 0.00 91.62 0.00 91.64 0.00 91.66 0.00 91.68 0.00 91.70 0.00 91.72 0.00 91.74 0.00 91.76 0.00 91.78 0.00 91.80 0.00 91.82 0.00 91.84 0.00 91.86 0.00 91.88 0.00 91.90 0.00 91.92 0.00 91.94 0.00 91.96 0.00 91.98 0.00 92.00 0.00 92.02 0.00 92.04 0.00 Elevation (feet) Primary (cfs) 92.06 0.00 92.08 0.00 92.10 0.00 92.12 0.00 92.14 0.00 92.16 0.00 92.18 0.00 92.20 0.00 92.22 0.00 92.24 0.00 92.26 0.00 92.28 0.00 92.30 0.00 92.32 0.00 92.34 0.00 92.36 0.00 92.38 0.00 92.40 0.00 92.42 0.00 92.44 0.00 92.46 0.00 92.48 0.00 92.50 0.00 92.52 0.00 92.54 0.00 92.56 0.00 92.58 0.00 92.60 0.00 92.62 0.00 92.64 0.00 92.66 0.00 92.68 0.00 92.70 0.00 92.72 0.00 92.74 0.00 92.76 0.00 92.78 0.00 92.80 0.00 92.82 0.00 92.84 0.00 92.86 0.00 92.88 0.00 92.90 0.00 92.92 0.00 92.94 0.00 92.96 0.00 92.98 0.00 93.00 0.00 93.02 0.33 93.04 0.94 93.06 1.72 93.08 2.65 93.10 3.70 Elevation (feet) Primary (cfs) 93.12 4.86 93.14 6.13 93.16 7.49 93.18 8.94 93.20 10.46 93.22 12.16 93.24 13.94 93.26 15.83 93.28 17.81 93.30 19.88 93.32 22.05 93.34 24.31 93.36 26.65 93.38 29.09 93.40 31.62 93.42 34.30 93.44 37.07 93.46 39.93 93.48 42.90 93.50 45.96 93.52 49.12 93.54 52.38 93.56 55.74 93.58 59.19 93.60 62.74 93.62 65.86 93.64 69.02 93.66 72.22 93.68 75.48 93.70 78.77 93.72 82.11 93.74 85.49 93.76 88.91 93.78 92.38 93.80 95.88 93.82 99.50 93.84 103.16 93.86 106.87 93.88 110.62 93.90 114.41 93.92 118.25 93.94 122.12 93.96 126.04 93.98 130.00 94.00 134.00 94.02 137.94 94.04 141.91 94.06 145.91 94.08 149.95 94.10 154.02 94.12 158.12 94.14 162.25 94.16 166.41 Elevation (feet) Primary (cfs) 94.18 170.61 94.20 174.83 94.22 179.15 94.24 183.51 94.26 187.90 94.28 192.31 94.30 196.77 94.32 201.25 94.34 205.76 94.36 210.31 94.38 214.88 94.40 219.49 94.42 224.21 94.44 228.96 94.46 233.75 94.48 238.57 94.50 243.42 94.52 248.30 94.54 253.22 94.56 258.17 94.58 263.15 94.60 268.16 94.62 273.20 94.64 278.28 94.66 283.39 94.68 288.52 94.70 293.69 94.72 298.89 94.74 304.12 94.76 309.37 94.78 314.66 94.80 319.98 94.82 325.33 94.84 330.71 94.86 336.11 94.88 341.55 94.90 347.01 94.92 352.51 94.94 358.03 94.96 363.58 94.98 369.16 95.00 374.77 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 119HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 221P: 221 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 91.00 49,357 0 91.05 49,651 2,475 91.10 49,945 4,965 91.15 50,239 7,470 91.20 50,533 9,989 91.25 50,827 12,523 91.30 51,121 15,072 91.35 51,415 17,635 91.40 51,709 20,213 91.45 52,003 22,806 91.50 52,297 25,414 91.55 52,593 28,036 91.60 52,888 30,673 91.65 53,184 33,325 91.70 53,479 35,991 91.75 53,775 38,673 91.80 54,071 41,369 91.85 54,366 44,080 91.90 54,662 46,805 91.95 54,957 49,546 92.00 55,253 52,301 92.05 55,550 55,071 92.10 55,847 57,856 92.15 56,144 60,656 92.20 56,441 63,470 92.25 56,739 66,300 92.30 57,036 69,144 92.35 57,333 72,003 92.40 57,630 74,878 92.45 57,927 77,766 92.50 58,224 80,670 92.55 61,278 83,658 92.60 64,333 86,798 92.65 67,387 90,091 92.70 70,441 93,537 92.75 73,496 97,135 92.80 76,550 100,886 92.85 79,604 104,790 92.90 82,658 108,847 92.95 85,713 113,056 93.00 88,767 117,418 93.05 89,092 121,864 93.10 89,418 126,327 93.15 89,743 130,806 93.20 90,069 135,302 93.25 90,394 139,813 93.30 90,720 144,341 93.35 91,045 148,885 93.40 91,371 153,446 93.45 91,696 158,022 93.50 92,022 162,615 93.55 92,347 167,224 93.60 92,672 171,850 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 93.65 92,998 176,492 93.70 93,323 181,150 93.75 93,649 185,824 93.80 93,974 190,514 93.85 94,300 195,221 93.90 94,625 199,944 93.95 94,951 204,684 94.00 95,276 209,440 94.05 95,603 214,211 94.10 95,930 219,000 94.15 96,259 223,805 94.20 96,588 228,626 94.25 96,916 233,463 94.30 97,245 238,317 94.35 97,574 243,188 94.40 97,903 248,075 94.45 98,231 252,978 94.50 98,560 257,898 94.55 98,889 262,834 94.60 99,218 267,787 94.65 99,547 272,756 94.70 99,875 277,741 94.75 100,204 282,743 94.80 100,533 287,762 94.85 100,862 292,797 94.90 101,190 297,848 94.95 101,519 302,916 95.00 101,848 308,000 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 120HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 222P: SF Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth > 4.02" for 10 yr event Inflow = 63.22 cfs @ 11.96 hrs, Volume= 3.029 af Outflow = 0.69 cfs @ 19.48 hrs, Volume= 0.341 af, Atten= 99%, Lag= 451.6 min Primary = 0.69 cfs @ 19.48 hrs, Volume= 0.341 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 94.03' @ 19.48 hrs Surf.Area= 133,390 sf Storage= 117,645 cf Plug-Flow detention time= 656.6 min calculated for 0.341 af (11% of inflow) Center-of-Mass det. time= 443.8 min ( 1,237.3 - 793.5 ) Volume Invert Avail.Storage Storage Description #1 92.00' 182,259 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 92.00 11,830 0 0 93.00 44,530 28,180 28,180 94.00 126,241 85,386 113,566 94.40 217,225 68,693 182,259 Device Routing Invert Outlet Devices #1 Primary 94.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=0.65 cfs @ 19.48 hrs HW=94.03' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 0.65 cfs @ 0.41 fps) Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 121HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 222P: SF Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)70 60 50 40 30 20 10 0 Inflow Area=9.040 ac Peak Elev=94.03' Storage=117,645 cf 63.22 cfs 0.69 cfs Pond 222P: SF Primary Stage-Discharge Discharge (cfs) 302520151050Elevation (feet)94 93 92 Broad-Crested Rectangular Weir Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 122HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 222P: SF Surface Storage Stage-Area-Storage Storage (cubic-feet) 150,000100,00050,0000 Surface/Horizontal/Wetted Area (sq-ft) 200,000150,000100,00050,0000 Elevation (feet)94 93 92 Custom Stage Data Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 123HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 222P: SF Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 92.00 0.00 0.60 0.00 0 92.00 0.00 1.20 0.00 0 92.00 0.00 1.80 0.00 0 92.00 0.00 2.40 0.00 0 92.00 0.00 3.00 0.00 0 92.00 0.00 3.60 0.00 0 92.00 0.00 4.20 0.01 8 92.00 0.00 4.80 0.04 60 92.00 0.00 5.40 0.08 172 92.01 0.00 6.00 0.14 399 92.03 0.00 6.60 0.20 763 92.06 0.00 7.20 0.27 1,273 92.10 0.00 7.80 0.34 1,938 92.14 0.00 8.40 0.47 2,794 92.19 0.00 9.00 0.67 4,021 92.25 0.00 9.60 0.79 5,604 92.33 0.00 10.20 1.16 7,674 92.41 0.00 10.80 1.83 10,817 92.53 0.00 11.40 3.48 16,205 92.70 0.00 12.00 53.22 64,715 93.55 0.00 12.60 4.01 87,597 93.78 0.00 13.20 2.67 94,643 93.84 0.00 13.80 1.98 99,612 93.89 0.00 14.40 1.62 103,411 93.92 0.00 15.00 1.43 106,711 93.94 0.00 15.60 1.24 109,593 93.97 0.00 16.20 1.07 112,061 93.99 0.00 16.80 1.00 114,264 94.01 0.08 17.40 0.93 115,942 94.02 0.31 18.00 0.86 116,945 94.03 0.53 18.60 0.79 117,449 94.03 0.64 19.20 0.72 117,642 94.03 0.68 19.80 0.65 117,641 94.03 0.68 20.40 0.61 117,536 94.03 0.66 21.00 0.60 117,437 94.03 0.64 21.60 0.58 117,353 94.03 0.62 22.20 0.57 117,276 94.03 0.60 22.80 0.55 117,204 94.03 0.59 23.40 0.54 117,136 94.03 0.57 24.00 0.53 117,069 94.03 0.56 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 124HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 222P: SF Elevation (feet) Primary (cfs) 92.00 0.00 92.02 0.00 92.04 0.00 92.06 0.00 92.08 0.00 92.10 0.00 92.12 0.00 92.14 0.00 92.16 0.00 92.18 0.00 92.20 0.00 92.22 0.00 92.24 0.00 92.26 0.00 92.28 0.00 92.30 0.00 92.32 0.00 92.34 0.00 92.36 0.00 92.38 0.00 92.40 0.00 92.42 0.00 92.44 0.00 92.46 0.00 92.48 0.00 92.50 0.00 92.52 0.00 92.54 0.00 92.56 0.00 92.58 0.00 92.60 0.00 92.62 0.00 92.64 0.00 92.66 0.00 92.68 0.00 92.70 0.00 92.72 0.00 92.74 0.00 92.76 0.00 92.78 0.00 92.80 0.00 92.82 0.00 92.84 0.00 92.86 0.00 92.88 0.00 92.90 0.00 92.92 0.00 92.94 0.00 92.96 0.00 92.98 0.00 93.00 0.00 93.02 0.00 93.04 0.00 Elevation (feet) Primary (cfs) 93.06 0.00 93.08 0.00 93.10 0.00 93.12 0.00 93.14 0.00 93.16 0.00 93.18 0.00 93.20 0.00 93.22 0.00 93.24 0.00 93.26 0.00 93.28 0.00 93.30 0.00 93.32 0.00 93.34 0.00 93.36 0.00 93.38 0.00 93.40 0.00 93.42 0.00 93.44 0.00 93.46 0.00 93.48 0.00 93.50 0.00 93.52 0.00 93.54 0.00 93.56 0.00 93.58 0.00 93.60 0.00 93.62 0.00 93.64 0.00 93.66 0.00 93.68 0.00 93.70 0.00 93.72 0.00 93.74 0.00 93.76 0.00 93.78 0.00 93.80 0.00 93.82 0.00 93.84 0.00 93.86 0.00 93.88 0.00 93.90 0.00 93.92 0.00 93.94 0.00 93.96 0.00 93.98 0.00 94.00 0.00 94.02 0.33 94.04 0.94 94.06 1.72 94.08 2.65 94.10 3.70 Elevation (feet) Primary (cfs) 94.12 4.86 94.14 6.13 94.16 7.49 94.18 8.94 94.20 10.46 94.22 12.16 94.24 13.94 94.26 15.83 94.28 17.81 94.30 19.88 94.32 22.05 94.34 24.31 94.36 26.65 94.38 29.09 94.40 31.62 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 125HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 222P: SF Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 92.00 11,830 0 92.05 13,465 632 92.10 15,100 1,346 92.15 16,735 2,142 92.20 18,370 3,020 92.25 20,005 3,979 92.30 21,640 5,020 92.35 23,275 6,143 92.40 24,910 7,348 92.45 26,545 8,634 92.50 28,180 10,003 92.55 29,815 11,452 92.60 31,450 12,984 92.65 33,085 14,597 92.70 34,720 16,293 92.75 36,355 18,069 92.80 37,990 19,928 92.85 39,625 21,868 92.90 41,260 23,891 92.95 42,895 25,994 93.00 44,530 28,180 93.05 48,616 30,509 93.10 52,701 33,042 93.15 56,787 35,779 93.20 60,872 38,720 93.25 64,958 41,866 93.30 69,043 45,216 93.35 73,129 48,770 93.40 77,214 52,529 93.45 81,300 56,492 93.50 85,386 60,659 93.55 89,471 65,030 93.60 93,557 69,606 93.65 97,642 74,386 93.70 101,728 79,370 93.75 105,813 84,559 93.80 109,899 89,952 93.85 113,984 95,549 93.90 118,070 101,350 93.95 122,155 107,356 94.00 126,241 113,566 94.05 137,614 120,162 94.10 148,987 127,327 94.15 160,360 135,061 94.20 171,733 143,363 94.25 183,106 152,234 94.30 194,479 161,673 94.35 205,852 171,682 94.40 217,225 182,259 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 126HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Summary for Pond 224P: 224 Inflow Area = 3.190 ac, 0.00% Impervious, Inflow Depth > 2.34" for 10 yr event Inflow = 13.82 cfs @ 11.96 hrs, Volume= 0.622 af Outflow = 1.74 cfs @ 12.29 hrs, Volume= 0.346 af, Atten= 87%, Lag= 19.4 min Primary = 1.74 cfs @ 12.29 hrs, Volume= 0.346 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 93.06' @ 12.29 hrs Surf.Area= 13,096 sf Storage= 12,695 cf Plug-Flow detention time= 231.9 min calculated for 0.346 af (56% of inflow) Center-of-Mass det. time= 108.7 min ( 948.6 - 839.9 ) Volume Invert Avail.Storage Storage Description #1 92.00' 25,759 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 92.00 10,786 0 0 92.50 11,926 5,678 5,678 93.00 12,993 6,230 11,908 93.50 13,844 6,709 18,617 94.00 14,722 7,142 25,759 Device Routing Invert Outlet Devices #1 Primary 93.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=1.73 cfs @ 12.29 hrs HW=93.06' (Free Discharge) 1=Broad-Crested Rectangular Weir (Weir Controls 1.73 cfs @ 0.57 fps) Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 127HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 224P: 224 Inflow Primary Hydrograph Time (hours) 242220181614121086420Flow (cfs)14 12 10 8 6 4 2 0 Inflow Area=3.190 ac Peak Elev=93.06' Storage=12,695 cf 13.82 cfs 1.74 cfs Pond 224P: 224 Primary Stage-Discharge Discharge (cfs) 1301201101009080706050403020100Elevation (feet)94 93 92 Broad-Crested Rectangular Weir Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 128HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Pond 224P: 224 Surface Storage Stage-Area-Storage Storage (cubic-feet) 25,00020,00015,00010,0005,0000 Surface/Horizontal/Wetted Area (sq-ft) 14,00012,00010,0008,0006,0004,0002,0000 Elevation (feet)94 93 92 Custom Stage Data Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 129HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Hydrograph for Pond 224P: 224 Time (hours) Inflow (cfs) Storage (cubic-feet) Elevation (feet) Primary (cfs) 0.00 0.00 0 92.00 0.00 0.60 0.00 0 92.00 0.00 1.20 0.00 0 92.00 0.00 1.80 0.00 0 92.00 0.00 2.40 0.00 0 92.00 0.00 3.00 0.00 0 92.00 0.00 3.60 0.00 0 92.00 0.00 4.20 0.00 0 92.00 0.00 4.80 0.00 0 92.00 0.00 5.40 0.00 0 92.00 0.00 6.00 0.00 0 92.00 0.00 6.60 0.00 0 92.00 0.00 7.20 0.00 0 92.00 0.00 7.80 0.00 0 92.00 0.00 8.40 0.00 0 92.00 0.00 9.00 0.00 0 92.00 0.00 9.60 0.00 0 92.00 0.00 10.20 0.04 42 92.00 0.00 10.80 0.13 214 92.02 0.00 11.40 0.38 707 92.07 0.00 12.00 12.11 9,683 92.83 0.00 12.60 1.01 12,515 93.05 1.20 13.20 0.69 12,344 93.03 0.74 13.80 0.52 12,262 93.03 0.55 14.40 0.43 12,216 93.02 0.44 15.00 0.38 12,195 93.02 0.39 15.60 0.33 12,173 93.02 0.34 16.20 0.29 12,145 93.02 0.30 16.80 0.27 12,127 93.02 0.28 17.40 0.25 12,113 93.02 0.26 18.00 0.24 12,099 93.01 0.24 18.60 0.22 12,084 93.01 0.22 19.20 0.20 12,070 93.01 0.21 19.80 0.18 12,055 93.01 0.19 20.40 0.17 12,043 93.01 0.17 21.00 0.17 12,039 93.01 0.17 21.60 0.16 12,037 93.01 0.16 22.20 0.16 12,034 93.01 0.16 22.80 0.16 12,031 93.01 0.16 23.40 0.15 12,028 93.01 0.15 24.00 0.15 12,025 93.01 0.15 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 130HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Discharge for Pond 224P: 224 Elevation (feet) Primary (cfs) 92.00 0.00 92.01 0.00 92.02 0.00 92.03 0.00 92.04 0.00 92.05 0.00 92.06 0.00 92.07 0.00 92.08 0.00 92.09 0.00 92.10 0.00 92.11 0.00 92.12 0.00 92.13 0.00 92.14 0.00 92.15 0.00 92.16 0.00 92.17 0.00 92.18 0.00 92.19 0.00 92.20 0.00 92.21 0.00 92.22 0.00 92.23 0.00 92.24 0.00 92.25 0.00 92.26 0.00 92.27 0.00 92.28 0.00 92.29 0.00 92.30 0.00 92.31 0.00 92.32 0.00 92.33 0.00 92.34 0.00 92.35 0.00 92.36 0.00 92.37 0.00 92.38 0.00 92.39 0.00 92.40 0.00 92.41 0.00 92.42 0.00 92.43 0.00 92.44 0.00 92.45 0.00 92.46 0.00 92.47 0.00 92.48 0.00 92.49 0.00 92.50 0.00 92.51 0.00 92.52 0.00 Elevation (feet) Primary (cfs) 92.53 0.00 92.54 0.00 92.55 0.00 92.56 0.00 92.57 0.00 92.58 0.00 92.59 0.00 92.60 0.00 92.61 0.00 92.62 0.00 92.63 0.00 92.64 0.00 92.65 0.00 92.66 0.00 92.67 0.00 92.68 0.00 92.69 0.00 92.70 0.00 92.71 0.00 92.72 0.00 92.73 0.00 92.74 0.00 92.75 0.00 92.76 0.00 92.77 0.00 92.78 0.00 92.79 0.00 92.80 0.00 92.81 0.00 92.82 0.00 92.83 0.00 92.84 0.00 92.85 0.00 92.86 0.00 92.87 0.00 92.88 0.00 92.89 0.00 92.90 0.00 92.91 0.00 92.92 0.00 92.93 0.00 92.94 0.00 92.95 0.00 92.96 0.00 92.97 0.00 92.98 0.00 92.99 0.00 93.00 0.00 93.01 0.12 93.02 0.33 93.03 0.61 93.04 0.94 93.05 1.31 Elevation (feet) Primary (cfs) 93.06 1.72 93.07 2.17 93.08 2.65 93.09 3.16 93.10 3.70 93.11 4.27 93.12 4.86 93.13 5.48 93.14 6.13 93.15 6.80 93.16 7.49 93.17 8.20 93.18 8.94 93.19 9.69 93.20 10.46 93.21 11.30 93.22 12.16 93.23 13.04 93.24 13.94 93.25 14.88 93.26 15.83 93.27 16.81 93.28 17.81 93.29 18.83 93.30 19.88 93.31 20.95 93.32 22.05 93.33 23.17 93.34 24.31 93.35 25.47 93.36 26.65 93.37 27.86 93.38 29.09 93.39 30.35 93.40 31.62 93.41 32.95 93.42 34.30 93.43 35.67 93.44 37.07 93.45 38.49 93.46 39.93 93.47 41.40 93.48 42.90 93.49 44.42 93.50 45.96 93.51 47.53 93.52 49.12 93.53 50.74 93.54 52.38 93.55 54.05 93.56 55.74 93.57 57.45 93.58 59.19 Elevation (feet) Primary (cfs) 93.59 60.95 93.60 62.74 93.61 64.29 93.62 65.86 93.63 67.43 93.64 69.02 93.65 70.62 93.66 72.22 93.67 73.84 93.68 75.48 93.69 77.12 93.70 78.77 93.71 80.44 93.72 82.11 93.73 83.80 93.74 85.49 93.75 87.20 93.76 88.91 93.77 90.64 93.78 92.38 93.79 94.13 93.80 95.88 93.81 97.69 93.82 99.50 93.83 101.33 93.84 103.16 93.85 105.01 93.86 106.87 93.87 108.74 93.88 110.62 93.89 112.51 93.90 114.41 93.91 116.32 93.92 118.25 93.93 120.18 93.94 122.12 93.95 124.08 93.96 126.04 93.97 128.02 93.98 130.00 93.99 132.00 94.00 134.00 Type II 24-hr 10 yr Rainfall=5.52"Site Contractor COMBINED 222 and 223 Printed 5/23/2018Prepared by AECOM Page 131HydroCAD® 10.00-16 s/n 04851 © 2015 HydroCAD Software Solutions LLC Stage-Area-Storage for Pond 224P: 224 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 92.00 10,786 0 92.02 10,832 216 92.04 10,877 433 92.06 10,923 651 92.08 10,968 870 92.10 11,014 1,090 92.12 11,060 1,311 92.14 11,105 1,532 92.16 11,151 1,755 92.18 11,196 1,978 92.20 11,242 2,203 92.22 11,288 2,428 92.24 11,333 2,654 92.26 11,379 2,881 92.28 11,424 3,109 92.30 11,470 3,338 92.32 11,516 3,568 92.34 11,561 3,799 92.36 11,607 4,031 92.38 11,652 4,263 92.40 11,698 4,497 92.42 11,744 4,731 92.44 11,789 4,967 92.46 11,835 5,203 92.48 11,880 5,440 92.50 11,926 5,678 92.52 11,969 5,917 92.54 12,011 6,157 92.56 12,054 6,397 92.58 12,097 6,639 92.60 12,139 6,881 92.62 12,182 7,124 92.64 12,225 7,369 92.66 12,267 7,613 92.68 12,310 7,859 92.70 12,353 8,106 92.72 12,395 8,353 92.74 12,438 8,602 92.76 12,481 8,851 92.78 12,524 9,101 92.80 12,566 9,352 92.82 12,609 9,604 92.84 12,652 9,856 92.86 12,694 10,110 92.88 12,737 10,364 92.90 12,780 10,619 92.92 12,822 10,875 92.94 12,865 11,132 92.96 12,908 11,390 92.98 12,950 11,648 93.00 12,993 11,908 93.02 13,027 12,168 93.04 13,061 12,429 Elevation (feet) Surface (sq-ft) Storage (cubic-feet) 93.06 13,095 12,690 93.08 13,129 12,953 93.10 13,163 13,216 93.12 13,197 13,479 93.14 13,231 13,743 93.16 13,265 14,008 93.18 13,299 14,274 93.20 13,333 14,540 93.22 13,367 14,807 93.24 13,401 15,075 93.26 13,436 15,343 93.28 13,470 15,613 93.30 13,504 15,882 93.32 13,538 16,153 93.34 13,572 16,424 93.36 13,606 16,696 93.38 13,640 16,968 93.40 13,674 17,241 93.42 13,708 17,515 93.44 13,742 17,789 93.46 13,776 18,065 93.48 13,810 18,340 93.50 13,844 18,617 93.52 13,879 18,894 93.54 13,914 19,172 93.56 13,949 19,451 93.58 13,984 19,730 93.60 14,020 20,010 93.62 14,055 20,291 93.64 14,090 20,572 93.66 14,125 20,855 93.68 14,160 21,137 93.70 14,195 21,421 93.72 14,230 21,705 93.74 14,265 21,990 93.76 14,301 22,276 93.78 14,336 22,562 93.80 14,371 22,849 93.82 14,406 23,137 93.84 14,441 23,425 93.86 14,476 23,715 93.88 14,511 24,005 93.90 14,546 24,295 93.92 14,582 24,586 93.94 14,617 24,878 93.96 14,652 25,171 93.98 14,687 25,464 94.00 14,722 25,759 121S Pre Dev't 122S Pre Dev't 123S Pre Dev't 124S Pre Dev't 221S Post CY (s) 222S Post CY (nw) 223S Post CY (ne) 224S Post CY (se) 226R (new Reach) 221P 221 222P SF 224P 224 Routing Diagram for Site Contractor COMBINED 222 and 223 Prepared by ERM, Printed 6/7/2018 HydroCAD® 10.00-20 s/n 06463 © 2017 HydroCAD Software Solutions LLC Subcat Reach Pond Link Type II 24-hr 1" Rainfall Rainfall=1.00"Site Contractor COMBINED 222 and 223 Printed 6/7/2018Prepared by ERM Page 2HydroCAD® 10.00-20 s/n 06463 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 121S: Pre Dev't Runoff = 0.09 cfs @ 13.35 hrs, Volume= 0.060 af, Depth> 0.03" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1" Rainfall Rainfall=1.00" Area (ac) CN Description * 24.590 75 24.590 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 6.7 165 0.0212 0.41 Sheet Flow, Cultivated: Residue<=20% n= 0.060 P2= 3.36" 1.8 106 0.0038 0.99 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.4 150 0.0220 5.84 70.07 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.040 0.1 24 0.0083 3.73 26.33 Pipe Channel, 36.0" Round Area= 7.1 sf Perim= 9.4' r= 0.75' n= 0.030 Corrugated metal 9.9 384 0.0016 0.64 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 0.9 32 0.0063 0.62 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 Corrugated metal 7.8 384 0.0026 0.82 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 27.6 1,245 Total Summary for Subcatchment 122S: Pre Dev't Runoff = 0.01 cfs @ 15.26 hrs, Volume= 0.008 af, Depth> 0.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1" Rainfall Rainfall=1.00" Area (ac) CN Description * 5.330 73 5.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Direct Type II 24-hr 1" Rainfall Rainfall=1.00"Site Contractor COMBINED 222 and 223 Printed 6/7/2018Prepared by ERM Page 3HydroCAD® 10.00-20 s/n 06463 © 2017 HydroCAD Software Solutions LLC Summary for Subcatchment 123S: Pre Dev't Runoff = 0.01 cfs @ 15.57 hrs, Volume= 0.005 af, Depth> 0.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1" Rainfall Rainfall=1.00" Area (ac) CN Description * 3.710 73 3.710 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 30.0 Direct Entry, Summary for Subcatchment 124S: Pre Dev't Runoff = 0.01 cfs @ 15.26 hrs, Volume= 0.004 af, Depth> 0.02" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1" Rainfall Rainfall=1.00" Area (ac) CN Description * 3.190 73 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 10.0 Direct Entry, Summary for Subcatchment 221S: Post CY (s) Runoff = 6.46 cfs @ 12.08 hrs, Volume= 0.456 af, Depth> 0.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1" Rainfall Rainfall=1.00" Area (ac) CN Description * 24.590 87 24.590 100.00% Pervious Area Type II 24-hr 1" Rainfall Rainfall=1.00"Site Contractor COMBINED 222 and 223 Printed 6/7/2018Prepared by ERM Page 4HydroCAD® 10.00-20 s/n 06463 © 2017 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 1.7 165 0.0212 1.59 Sheet Flow, Smooth surfaces n= 0.011 P2= 3.36" 1.4 106 0.0038 1.25 Shallow Concentrated Flow, Paved Kv= 20.3 fps 0.4 150 0.0220 6.67 80.08 Channel Flow, Area= 12.0 sf Perim= 11.0' r= 1.09' n= 0.035 0.6 24 0.0083 0.71 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 Corrugated metal 7.9 384 0.0016 0.81 Shallow Concentrated Flow, Paved Kv= 20.3 fps 0.9 32 0.0063 0.62 0.03 Pipe Channel, 3.0" Round Area= 0.0 sf Perim= 0.8' r= 0.06' n= 0.030 1.2 118 0.0110 1.69 Shallow Concentrated Flow, Unpaved Kv= 16.1 fps 14.1 979 Total Summary for Subcatchment 222S: Post CY (nw) Runoff = 1.51 cfs @ 11.98 hrs, Volume= 0.077 af, Depth> 0.17" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1" Rainfall Rainfall=1.00" Area (ac) CN Description * 5.330 85 5.330 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment 223S: Post CY (ne) Runoff = 1.92 cfs @ 11.97 hrs, Volume= 0.088 af, Depth> 0.28" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1" Rainfall Rainfall=1.00" Area (ac) CN Description * 3.710 89 3.710 100.00% Pervious Area Type II 24-hr 1" Rainfall Rainfall=1.00"Site Contractor COMBINED 222 and 223 Printed 6/7/2018Prepared by ERM Page 5HydroCAD® 10.00-20 s/n 06463 © 2017 HydroCAD Software Solutions LLC Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Subcatchment 224S: Post CY (se) Runoff = 0.00 cfs @ 24.00 hrs, Volume= 0.001 af, Depth> 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Type II 24-hr 1" Rainfall Rainfall=1.00" Area (ac) CN Description * 3.190 69 3.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, Summary for Reach 226R: (new Reach) Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth > 0.02" for 1" Rainfall event Inflow = 0.02 cfs @ 15.36 hrs, Volume= 0.013 af Outflow = 0.02 cfs @ 15.39 hrs, Volume= 0.013 af, Atten= 0%, Lag= 1.7 min Routing by Stor-Ind+Trans method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Max. Velocity= 0.62 fps, Min. Travel Time= 0.3 min Avg. Velocity = 0.62 fps, Avg. Travel Time= 0.3 min Peak Storage= 0 cf @ 15.38 hrs Average Depth at Peak Storage= 0.01' Bank-Full Depth= 2.00' Flow Area= 18.0 sf, Capacity= 181.21 cfs 5.00' x 2.00' deep channel, n= 0.035 Side Slope Z-value= 2.0 '/' Top Width= 13.00' Length= 10.0' Slope= 0.0400 '/' Inlet Invert= 94.00', Outlet Invert= 93.60' Type II 24-hr 1" Rainfall Rainfall=1.00"Site Contractor COMBINED 222 and 223 Printed 6/7/2018Prepared by ERM Page 6HydroCAD® 10.00-20 s/n 06463 © 2017 HydroCAD Software Solutions LLC Summary for Pond 221P: 221 Inflow Area = 24.590 ac, 0.00% Impervious, Inflow Depth > 0.22" for 1" Rainfall event Inflow = 6.46 cfs @ 12.08 hrs, Volume= 0.456 af Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 91.39' @ 24.00 hrs Surf.Area= 51,670 sf Storage= 19,872 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 91.00' 308,000 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 91.00 49,357 0 0 91.50 52,297 25,414 25,414 92.00 55,253 26,888 52,301 92.50 58,224 28,369 80,670 93.00 88,767 36,748 117,418 94.00 95,276 92,022 209,440 94.10 95,930 9,560 219,000 95.00 101,848 89,000 308,000 Device Routing Invert Outlet Devices #1 Primary 93.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=91.00' (Free Discharge) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 222P: SF Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth > 0.22" for 1" Rainfall event Inflow = 3.42 cfs @ 11.97 hrs, Volume= 0.165 af Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 92.39' @ 24.00 hrs Surf.Area= 24,688 sf Storage= 7,180 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Type II 24-hr 1" Rainfall Rainfall=1.00"Site Contractor COMBINED 222 and 223 Printed 6/7/2018Prepared by ERM Page 7HydroCAD® 10.00-20 s/n 06463 © 2017 HydroCAD Software Solutions LLC Volume Invert Avail.Storage Storage Description #1 92.00' 182,259 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 92.00 11,830 0 0 93.00 44,530 28,180 28,180 94.00 126,241 85,386 113,566 94.40 217,225 68,693 182,259 Device Routing Invert Outlet Devices #1 Primary 94.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=92.00' (Free Discharge) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Summary for Pond 224P: 224 Inflow Area = 3.190 ac, 0.00% Impervious, Inflow Depth > 0.00" for 1" Rainfall event Inflow = 0.00 cfs @ 24.00 hrs, Volume= 0.001 af Outflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 100%, Lag= 0.0 min Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Stor-Ind method, Time Span= 0.00-24.00 hrs, dt= 0.03 hrs Peak Elev= 92.00' @ 24.00 hrs Surf.Area= 10,791 sf Storage= 25 cf Plug-Flow detention time= (not calculated: initial storage exceeds outflow) Center-of-Mass det. time= (not calculated: no outflow) Volume Invert Avail.Storage Storage Description #1 92.00' 25,759 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 92.00 10,786 0 0 92.50 11,926 5,678 5,678 93.00 12,993 6,230 11,908 93.50 13,844 6,709 18,617 94.00 14,722 7,142 25,759 Device Routing Invert Outlet Devices #1 Primary 93.00'50.0' long x 5.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.34 2.50 2.70 2.68 2.68 2.66 2.65 2.65 2.65 2.65 2.67 2.66 2.68 2.70 2.74 2.79 2.88 Type II 24-hr 1" Rainfall Rainfall=1.00"Site Contractor COMBINED 222 and 223 Printed 6/7/2018Prepared by ERM Page 8HydroCAD® 10.00-20 s/n 06463 © 2017 HydroCAD Software Solutions LLC Primary OutFlow Max=0.00 cfs @ 0.00 hrs HW=92.00' (Free Discharge) 1=Broad-Crested Rectangular Weir ( Controls 0.00 cfs) Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 A3.2 Composite Curve Number Calculations 1 - MRLC Land Cover Data - PreContractor Yard 10ALand Cover Classification11 11 11 11 13 13 13 13 21 21 21 21 22 22 22 22 42 42 42 42 52 52 52 52 61 61 61 61 81 81 81 81 82 82 82 82 90 90 90 90 99 99 99 99Hydrologic Soil GroupABCDABCDABCDABCDABCDABCDABCDABCDABCDABCDABCDCN Table 1100 100 100 100 100 100 100 100 98 98 98 98 98 98 98 98 30 55 70 77 30 48 65 73 32 58 72 79 39 61 74 80 67 78 85 89 30 55 70 77 98 98 98 98DA ID121S 0.01 2.19 0.34 0.21 1.43 1.63 1.27 2.95 0.03 0.10 9.32 4.35 0.38 0.06 0.17 0.16 24.59 75122S 0.03 0.07 0.02 1.57 0.40 1.34 1.20 0.12 0.46 0.12 0.03 5.34 50123S0.81 0.38 0.57 0.02 0.52 1.423.71 73124S1.13 0.89 1.52 3.54 73Notes:DA (acres) CN Calculated 2 - MRLC Land Cover Data - PostContractor Yard 10ALand Cover Classification11 11 11 11 13 13 13 13 21 21 21 21 22 22 22 22 42 42 42 42 52 52 52 52 61 61 61 61 81 81 81 81 82 82 82 82 90 90 90 90 99 99 99 99Hydrologic Soil Group A B C D A B C D A B C D A B C D A B C D A B C D A B C D A B C D A B C D A B C D A B C DCN Table 1 100 100 100 100 100 100 100 100 98 98 98 98 98 98 98 98 30 55 70 77 30 48 65 73 32 58 72 79 39 61 74 80 67 78 85 89 30 55 70 77 98 98 98 98DA ID221S 0.03 0.35 0.29 0.34 0.11 1.41 0.45 0.01 0.02 0.03 0.02 0.78 1.06 0.08 0.35 0.22 5.57 79221S-C10.01 0.10 0.02 0.12 0.01 0.02 0.00 1.27 1.08 3.41 6.03 96221S-C20.82 0.23 0.06 1.11 0.10 0.11 0.19 1.72 2.33 0.56 5.35 0.40 12.98 87222S 0.08 0.19 0.03 0.06 0.01 0.68 0.00 0.57 0.04 0.07 2.47 0.51 0.62 5.34 85223S 0.00 0.23 0.18 0.22 0.27 0.02 0.25 0.16 0.43 1.95 3.71 89224S 0.131.75 0.25 0.14 0.20 0.52 0.19 3.18 69225S0.05 0.300.35 77Notes:DA (acres) CN Calculated Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018, REV 06-07-2018 A3.3 Sediment Basin Calculations Sediment Basin 221 w/ Infiltration Revision 1 Designed by CNelson Checked by Project Name CY SPR 10‐A Project Number Site Location (City/Town) Fayetteville NW Total Drainage Area (acres) 24.59 Step 1. Determine Peak Flow, Q10 for the basin drainage area Q10 (cfs) 133 Source: Hydraflow Express ‐ Grading Phase Output File Step 2.  Determine any site limitation for the sediment pool elevation, emergency spillway or top of da Min. Pool Elevation (ft) 91 Max. Pool Elevation (ft) 93 Step 3. Determine basin volumes (cf)      Compute min. volume required (3600 cu.ft per acre of distrubed area)      Specity Sediment cleanout level to be marked (one‐half the design volume) Disturbed acreage (ac) 21.8 Min. Volume (cu.ft) 78,480         Sediment cleanout elevation (ft) Step 4. Determine area and shape of basin:      Check length/width ratio (should be 2:1 to 6:1)      Compute min. basin surface area  (435 sq.ft/cf) Min. Surface Area (sq. ft) 57,855         Min. Surface Area @ Elev 106.7           91 29,222               Proposed Basin Design 91.5 51,128               92 54,024               Elevation Surface  Area (sf) Incre. Vol  (cu.ft.)Cum. Vol 92.5 56,935               93 59,864               91 49,357         ‐                ‐                91.5 52,297        25,414        25,414         92 55,253        26,888        52,301         92.5 58,224        28,369        80,670         93 88,767        36,748        117,418      WEIR 94.1 95,930        101,583      219,001      TOP Basin Design Check PCSO Req'd Volume Surface Area 95,930        ok 85,691 cf Volume (cf)117,418      ok PCSO Provided Volume 117,418      cf ok Weir Design Q= CLH^1.5 C = 2.8 H = 0.97 L =50 Basin Id. Sediment Basin 222 w/ Infiltration Rev 1 REV 5‐22‐2018 Designed by CNelson Checked by Project Name CY SPR 10‐A Project Number Site Location (City/Town) Fayetteville NW Total Drainage Area (acres) 9.04 Step 1. Determine Peak Flow, Q10 for the basin drainage area Q10 (cfs) 63.2 Source: Hydraflow Express ‐ Grading Phase Output File Step 2.  Determine any site limitation for the sediment pool elevation, emergency spillway or top of dam Min. Pool Elevation (ft) 92 Max. Pool Elevation (ft) 94 Step 3. Determine basin volumes (cf)      Compute min. volume required (3600 cu.ft per acre of distrubed area)      Specity Sediment cleanout level to be marked (one‐half the design volume) Disturbed acreage (ac) 9.04 Min. Volume (cu.ft) 32,544         Sediment cleanout elevation (ft) Step 4. Determine area and shape of basin:      Check length/width ratio (should be 2:1 to 6:1)      Compute min. basin surface area  (435 sq.ft/cf) Min. Surface Area (sq. ft) 27,492         Min. Surface Area @ Elev 92.8              Proposed Basin Design  Elevation Surface Area  (sf) Incre. Vol  (cu.ft.)Cum. Vol 92 11,830         ‐                ‐                93 44,530        28,180        28,180         94 126,241      85,386        113,566      WEIR 95.1 217,225      188,906      302,472      TOP Basin Design Check PCSO Req'd Volume Surface Area 126,241      ok 31,502 cf Volume (cf)113,566      ok PCSO Provided Volume 32,000        cf ok Weir Design at elev=93.1 Q= CLH^1.5 C = 2.8 H = 0.59 L =50 Basin Id. Sediment Basin 224  / Sand Filter Rev 1 Designed by CNelson Checked by Project Name CY SPR 10‐A Project Number Site Location (City/Town) Fayetteville NW Total Drainage Area (acres) 3.19 Step 1. Determine Peak Flow, Q10 for the basin drainage area Q10 (cfs) 17.5 Source: Hydraflow Express ‐ Grading Phase Output File Step 2.  Determine any site limitation for the sediment pool elevation, emergency spillway or top of dam Min. Pool Elevation (ft) 90 Max. Pool Elevation (ft) 92 Step 3. Determine basin volumes (cf)      Compute min. volume required (3600 cu.ft per acre of distrubed area)      Specity Sediment cleanout level to be marked (one‐half the design volume) Disturbed acreage (ac) 3.19 Min. Volume (cu.ft) 11,484         Sediment cleanout elevation (ft) Step 4. Determine area and shape of basin:      Check length/width ratio (should be 2:1 to 6:1)      Compute min. basin surface area  (435 sq.ft/cf) Min. Surface Area (sq. ft) 7,613            Min. Surface Area @ Elev 90.5              Proposed Basin Design  Elevation Surface Area  (sf) Incre. Vol  (cu.ft.)Cum. Vol 92 10,786         ‐                ‐                92.5 11,926        5,678           5,678            93 12,993        6,230           11,908        WEIR 93.5 13,844        6,709           18,617         94 14,722        13,858        32,475        TOP Basin Design Check PCSO Req'd Volume Surface Area 14,722        ok 11,117 cf Volume (cf)32,475        ok PCSO Provided Volume 11,908 cf ok Weir Design Q= CLH^1.5 C = 2.8 H = 0.25 L =50 Basin Id. Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018 REV 06-07-2018 A3.4 Infiltration Basin Calculations 6/7/2018 Dominion ACP  CY_SPR10A Infiltration Basin Sizing Calculations Design Calculations: Minimum Surface Area Formula: SA = DV/(FS*(K*T)) where SA Surface Area FS Factor of Safety (min of 2 recommended) DV Design Volume K Hydraulic Conductivity (Infiltration Rate) (in/hr) T Maximum Dewatering Time (72 hours) Basin No. 221 Design Volume Required:1 inches runoff Drainage Area: 24.59 Acres Total Design Volume = (24.59 Ac) * (43,560 sf/ac) * (1 in /12"/ft) Design Volume DV= 88904.65 cf Storage Volume Elevation=92.65 ft 88905 cf T ‐ Maximum drawdown time:72 hrs K ‐ Field infiltration Rate:0.11 in/hr FS ‐ Factor of Safety:2 SA = DV/(FS*(K*T)) Surface Area Required, SA = 5613 sf Provided SA =5672 sf Recalculate Drawdown T=71 hrs with actual size basin 6/7/2018 Dominion ACP  CY_SPR10A Infiltration Basin Sizing Calculations Design Calculations: Minimum Surface Area Formula: SA = DV/(FS*(K*T)) where SA Surface Area FS Factor of Safety (min of 2 recommended) DV Design Volume K Hydraulic Conductivity (Infiltration Rate) (in/hr) T Maximum Dewatering Time (72 hours) Basin No. 222 Design Volume Required:1 inches runoff Drainage Area: 9.04 Acres Total Design Volume = ( 9.04 Ac) *( 43,560 sf/ac) * (1 in /12"/ft) Design Volume DV= 32683.94 cf Storage Volume Elevation=93.1 ft 33042 cf T ‐ Maximum drawdown time: 72 hrs K ‐ Field infiltration Rate:0.11 in/hr FS ‐ Factor of Safety:2 SA = DV/(FS*(K*T)) Surface Area Required, SA = 2270 sf Provided SA =2500 sf Recalculate Drawdown T=60 hrs with actual size basin Atlantic Coast Pipeline Project NC Contractor/Pipeline Yard ESC Plan – Hydraulic Calculations 02-12-2018 REV 06-07-2018 A3.5 Sand Filter Calculation 6/7/2018 Dominion ACP  CY_SPR10A Sand Filter Basin Sizing Calculations Basin No. 224 Design Calculations: Calculate the Design Volume: Design Volume Required:1 inches runoff Drainage Area: 3.19 Acres Total Design Volume = (3.19 Ac) * (43,560 sf/ac) * (1 in /12"/ft) Design Volume DV= 11575 cf Discounted Design Volume = 0.75 * 11,575 cf = 8,681 cf Provided Sand Filter Volume 600 cf Provided Forebay Volume 11356 cf Total Volume Provided 11956 Minimum Surface Area Formula: Ponding Depth = 12 " Require Sand Filter Infiltration Rate greater than 2 in/hr Depth of Sand Media 18 in Required Rate 2 in/hr SA = (DV)(Df) / (R * (Hf+Df)*(Tf))SA Surface Area (sf) DV Design Volume (cf) DV 4340.5 cf Df Filter Bed Depth ( ft) Df 1.5 ft R Media Infiltration Rate (ft/day) R 3.5 ft/day C33 Media Hf Avg Ht of Water above Filter(ft) Hf 0.5 ft Tf Drain Time (days) Tf 2 days Surface Area SA = 465.1 sf Provided SA 600 sf