Loading...
HomeMy WebLinkAboutCumberland Contractor Yard - ACP NC Cumberland (CY 10-A) ESC Plans_05222018EROSION & SEDIMENT CONTROL PLAN CUMBERLAND COUNTY, NORTH CAROLINA ATLANTIC COAST PIPELINE PROJECT PROJECT CONTACTS OWNER/APPLICANT CONSULTANT ERM NC, INC. LICENSE #F-1223 15720 BRIZHAM HILL AVENUE, SUITE 120 CHARLOTTE, NORTH CAROLINA 28277 SCOTT ROBINSON, PE 704-541-8345 scott.robinson@erm.com LOCATION MAP 1" = 2,000 FEET WHEN PRINTED FULL SIZE DOMINION ENERGY TRANSMISSION, INC. 5000 DOMINION BOULEVARD GLEN ALLEN, VA 23060 PHONE: 804-335-4923 EXISTING INFORMATION SOURCES CONTOURS AND BASE MAP PROVIDED BY I3 CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. PLAN REPRODUCTION WARNING THE PLANS HAVE BEEN CREATED ON 24"X36" SHEETS FOR REDUCTIONS, REFER TO GRAPHIC SCALE. THE PLANS HAVE BEEN CREATED FOR FULL COLOR PLOTTING, AND SET OF THE PLANS THAT IS NOT PLOTTED IN FULL COLOR SHALL NOT BE CONSIDERED ADEQUATE FOR CONSTRUCTION PURPOSES. ***WARNING*** INFORMATION MAY BE LOST IN COPYING AND/OR GRAY SCALE PLOTTING. NORTH CAROLINA SHEETS 2-3 CONTRACTOR YARDS - CUMBERLAND COUNTY (CY SPR 10-A) SHEET INDEX -X/XX/201X SHEET 1 - COVER SHEET SHEET X - SHEET TITLE MOST RECENT ISSUE OR REVISION DATE MOST RECENT REVISION NUMBER FILLED CIRCLE INDICATES DRAWING INCLUDED WITHIN THIS ISSUE DRAWING INDEX LEGEND 05/22/2018 SHEET 3 - CUMBERLAND (CY SPR10-A) INITIAL CLEARING & GRADING SHEET 2 - CUMBERLAND (CY SPR10-A) AERIAL OVERVIEW SHEET 7 - ESCP DETAILS SHEET 6 - ESCP DETAILS 4 SHEET 8 - ESCP DETAILS SHEET 9 - ESCP NOTES ERM SHEET 4 - CUMBERLAND (CY SPR10-A) PERMANENT PCSO 05/22/20184 05/22/20184 05/22/20184 05/22/20184 05/22/20184 05/22/20184 05/22/20184 SHEET 5 - CUMBERLAND (CY SPR10-A) CROSS-SECTIONS05/22/20184 GAGA GA GA E E E E E TS GP G 281 G G LM PIEDMONT LM PIEDMONT 90 410045701 LAT:35°02'38.27" LON:78°49'20.7146" APPROX. LOCATION APPROX. LOCATION wcuc 051e 90 E Q U I P M E N T LM PIEDMONT S09° 33' 45.90"E1326.907S82° 48' 15.42"W 1195.159N08° 35' 40.83"W789.151N12° 47' 30.74"W671.599N66° 28' 1 7 . 5 5 " E 445.385 S75° 03' 0 7 . 7 6 " E 541.718 JOHN S HAIR PARCEL 0457-40-6622 (52.4 ACRES) MARY J YOUNG PARCEL 0457-20-1369 (41.2 ACRES) HOWARD H R & RICHARD KING PARCEL 0457-21-1811 (6.7 ACRES) JEANNE BRYAN DAVIS PARCEL 0457-20-4762 (0.45 ACRES) ELLA J CLARK PARCEL 0456-39-9627 (60.4 ACRES) MARTHA L HAIR & KATHY RADCLIFF PARCEL 0457-51-1976 (1.7 ACRES) GATE POSTS 92 949494949494949292 92949290929494 96 9 6 94 96949294 92949650' 30' CLEANOUT (TYP) 10'10' 3' 4' 20' 30' 8' 36' 2' CLASS 'B' RIP RAP WEIRTOP ELEVATION =92.5' #57 WASHED STONE SAND FILTERTOP ELEVATION =92.0' 1.50 SKIMMER DEWATERING DEVICE1-1/4" SKIMMER DAM EMBANKMENTCOMPACTED FILL ROCK DAM (CLASSB STONE) EMERGENCY SPILLWAY 1' WIDE GROUT ZONETO PREVENT SEEPAGETHROUGH RIPRAP CROSS SECTION THROUGH EMBANKMENT AND SKIMMER PIPE CROSS SECTION THROUGH EMERGENCY SPILLWAY (CROSS SECTION A-A') VARIES VARIES3:1 3:1 3:1 3:1 CLEANOUT STAKE CLASS B STONE PAD SKIMMER SEDIMENT BASIN CROSS SECTIONS BERMEMERGENCY SPILLWAY PONDING DEPTHON INFILTRATION TRENCH 1' WIDE GROUTSTRIP 12"12" CLASS B RIP RAP12" DEPTH TYPE 1 NON-WOVENFILTER FABRIC TYPE 1 NON-WOVENFILTER FABRICFOR INFILTRATION BASIN TYPE 2 WOVENFILTER FABRIC FORRIP RAP SPILLWAY PROVIDE 6" OVERLAP OFWOVEN AND NON-WOVENFILTER FABRIC (NON-WOVENUNDER WOVEN) 12" DEEP, 1.5" TO 2.5" DIACLEAN, WASHED STONE4" SAND FILTER LAYER CLEAN,WASHED SAND, NCDOT C33 2" DEEP, CLEAN, WASHED NO. 57 STONEOBSERVATION WELL PORT -LOCATE NEAR CENTER OFEACH INFILTRATION TRENCH DETAILOBSERVATION WELL PORT 8" SCREW CAP ANDFITTING 8" DIA., C-900 PVCPIPE, 18" HEIGHTOBSERVATION PORT PIPETO BE OPEN ON THEBOTTOM, AND SITS ON FILTERFABRIC LAYERFILTER FABRIC18" NOTES:1)CONSTRUCTION OF THE INFILTRATION BASINS TO BEGIN AFTER ALL UPSLOPE AREASARE STABILZED WITH GRASS AND NO EVIDENCE OF EROSIVE CONDITIONS.2)PROVIDE ONE OBSERVATION PORT FOR EACH INFILTRATION TRENCH.3)SEE SHEET 6 FOR INFILTRATION TRENCH DETAIL. 3:13:1 NOTES:1)CONSTRUCTION OF THE SAND FILTER TO BEGIN AFTER ALL UPSLOPE AREAS ARESTABILZED WITH GRASS AND NO EVIDENCE OF EROSIVE CONDITIONS.2)SEE SHEET 6 FOR SAND FILTER DETAIL. INFILTRATION TRENCH TYPICAL CROSS SECTION SAND FILTER CROSS SECTION 12" 8' 18" DEEP, CLEANWASHED ASTM C-33 SAND6" PERFORATED PVC@ 0.50% 2" CLEAN, WASHEDNO. 57 STONE ELEV=92.0ELEV=92.5 PONDING DEPTHON INFILTRATION TRENCH 6" C-900 SOLID WALL PVC PIPE @ 0.50% 6" CLEANOUTW/ SCREW CAP6" C-900 SOLIDWALL PVCCLEANOUT (TYP)SEE PLAN FORLOCATIONS FOREBAYELEV=92.0 FOREBAYBERM CLASS BRIP RAP 4" DEPTHNO. 57 STONE 6:16:1 CLASS ARIP RAP 6" C-900 PERFORATEDPVC PIPE @ 0.50% 30' - 6" C-900 SOLID WALLPVC PIPE @ 0.50% COUPLER-CONVERSIONFROM SOLID WALL TOPERFORATED PIPE 3' - 6" C-900 SOLID WALLPVC PIPE @ 0.50% SAND FILTERUNDERDRAIN LAYOUT TYPE 2 WOVENFILTER FABRIC UNDERFOREBAY BERM TYPE 1 NON-WOVENFILTER FABRIC OVERHEAD ELECTRIC LINEE UNDERGROUND GAS LINEG FENCE xSTREAM DITCH PRIVACY FENCE UTILITY POLE GP GUY POLE GUY ANCHORGA UTILITY VALVE POST LM LINE MARKER TS TEST STAND TBM TEMPORARY BENCH MARK GRAVEL AREA. TOP SOIL SEGREGATION AREA WETLANDwcuc 051e FUEL TANK AREA (25' x 250') TRAILER (24' x 60') GRAVEL AREA. STORAGE UNITS TOP SOIL SEGREGATION AREA 1000 200 0 100 200 CUMBERLAND CUMBERLAND CONTRACTOR YARD AERIAL OVERVIEW 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED.ACCORD ROADUNNAMED TRIBUTARY TO LOCKS CREEK GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC ERM 15720 Brixham Hill Ave, Suite 120 License #F-1223 ERM NC, INC. Charlotte, NC 28277 (704) 541-8345 AS NOTED 05/22/2018WTS 05/22/2018NJB 4-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 --ISSUED FOR REVIEWWTS08/04/171 --ISSUED FOR REVIEWNJB02/12/20182 --ISSUED FOR REVIEWNJB04/30/20183 --ISSUED FOR REVIEWWTS05/22/20184 2 OF 9 LIMITS OF DISTURBANCE LIMITS OF CONSTRUCTION UNNAMED POND DOWNING ROAD NC ST A T E H I G H W A Y 2 4 CLIN T O N R O A D DOWNI N G R O A D FLOW ARROW PROPOSED CONTOUR EXISTING CONTOUR 125 GAGA GA GA E E E E E TS GP 281LM PIEDMONT LM PIEDMONT 90410045701 LAT:35°02'38.27" LON:78°49'20.7146" wcuc 051e 90 E Q U I P M E N T TRAI L E R S LM PIEDMONT G R A V E L R O A D S09° 33' 45.90"E1326.907S82° 48' 15.42"W 1195.159N08° 35' 40.83"W789.151N12° 47' 30.74"W671.599N66° 28' 1 7 . 5 5 " E 445.385 S75° 03' 0 7 . 7 6 " E 541.718 JOHN S HAIR PARCEL 0457-40-6622 (52.4 ACRES) MARY J YOUNG PARCEL 0457-20-1369 (41.2 ACRES) HOWARD H R & RICHARD KING PARCEL 0457-21-1811 (6.7 ACRES) JEANNE BRYAN DAVIS PARCEL 0457-20-4762 (0.45 ACRES) ELLA J CLARK PARCEL 0456-39-9627 (60.4 ACRES) MARTHA L HAIR & KATHY RADCLIFF PARCEL 0457-51-1976 (1.7 ACRES) GATE POSTS GRAVEL PARKING LOT (12.3 ACRES) GRAVEL PARKING LOT (3.2 ACRES) GRAVEL PARKING LOT (3.2 ACRES) TOPSOIL SEGREGATION (2.9 ACRES) TOPSOIL SEGREGATION (1.0 ACRES) STOR A G E U N I T S FUEL T A N K S 92 949494949494949292 92949290929494 96 9 6 94 96949294 92949650' 8' 8' 8' 8' 5' 50' 22' 22' 50' 30'AA' STAKE 2' WIDE GROUT ZONE TO PREVENT SEEPAGE THROUGH RIPRAP ROPE 3'x3' CL A STONE APRON STAKE ROPE STAKE ROPE 3'x3' CL A STONE APRON ROCK DAM BASIN #224 W/ 50 LF WEIR TOP BERM 94.1 WEIR ELEV. 93.0 BOTTOM ELEV 92.0 NCDEQ DTL. 6.63 BASIN TO BE CONVERTED TO SAND FILTER AFTER SITE IS STABILIZED PROVIDE STAKE WITH SEDIMENT CLEANOUT ELEVATION=92.5 BAFFLES 50' EMERGENCY SPILLWAY CLASS B RIP RAP ON TYPE 2 FILTER FABRIC PROVIDE GROUT CORE (REF. SHEET 6) 50' EMERGENCY SPILLWAY CLASS B RIP RAP ON TYPE 2 FILTER FABRIC PROVIDE GROUT CORE (REF.SHEET 6) 50' EMERGENCY SPILLWAY CLASS B RIP RAP ON TYPE 2 FILTER FABRIC PROVIDE GROUT CORE (REF.SHEET 6) BAFFLES PROVIDE STAKE WITH SEDIMENT CLEANOUT ELEVATION=92.5 PROVIDE STAKE WITH SEDIMENT CLEANOUT ELEVATION=92.5 BAFFLES TOP O F B E R M = 9 5 . 1 TOP O F B E R M = 9 5. 1 95 95 94 93 92 9493 93TOP OF BERM = 95.195949594939294 94TOP OF BERM = 9 4 . 1 9293 9392 94 94 TO P O F B E R M = 9 4 . 1 9293 93 92 9494TOP OF BERM = 94.1929393929294 94 TOP OF BERM = 9 4 . 1 92 93 93 9494TOP OF BERM = 94.1919393929091 90 89 89 BASIN 222 INFILTRATION TRENCH 9293BASIN 221 INFILTRATION TRENCH BASIN 224 SAND FILTER 92 9294 95 93 94 93 93 92.59293 95 94 93 93 OVERHEAD ELECTRIC LINEE UNDERGROUND GAS LINEG FENCE xSTREAM DITCH PRIVACY FENCE UTILITY POLE GP GUY POLE GUY ANCHORGA UTILITY VALVE POST LM LINE MARKER TS TEST STAND TBM TEMPORARY BENCH MARK GRAVEL AREA. TOP SOIL SEGREGATION AREA WETLANDwcuc 051e FUEL TANK AREA (25' x 250') TRAILER (24' x 60') STORAGE UNITS 1000 BERM EMERGENCY SPILLWAY PONDING DEPTH ON INFILTRATION TRENCH 1' WIDE GROUT STRIP 12" 12" CLASS B RIP RAP 12" DEPTH TYPE 1 NON-WOVEN FILTER FABRIC TYPE 1 NON-WOVEN FILTER FABRIC FOR INFILTRATION BASIN TYPE 2 WOVEN FILTER FABRIC FOR RIP RAP SPILLWAY PROVIDE 6" OVERLAP OF WOVEN AND NON-WOVEN FILTER FABRIC (NON-WOVEN UNDER WOVEN) 12" DEEP, 1.5" TO 2.5" DIA CLEAN, WASHED STONE 4" SAND FILTER LAYER CLEAN, WASHED SAND, NCDOT C33 2" DEEP, CLEAN, WASHED NO. 57 STONE OBSERVATION WELL PORT - LOCATE NEAR CENTER OF EACH INFILTRATION TRENCH DETAIL OBSERVATION WELL PORT 8" SCREW CAP AND FITTING 8" DIA., C-900 PVC PIPE, 18" HEIGHT OBSERVATION PORT PIPE TO BE OPEN ON THE BOTTOM, AND SITS ON FILTER FABRIC LAYER FILTER FABRIC18" NOTES: 1)CONSTRUCTION OF THE INFILTRATION BASINS TO BEGIN AFTER ALL UPSLOPE AREAS ARE STABILZED WITH GRASS AND NO EVIDENCE OF EROSIVE CONDITIONS. 2)PROVIDE ONE OBSERVATION PORT FOR EACH INFILTRATION TRENCH. 3)SEE SHEET 6 FOR INFILTRATION TRENCH DETAIL. 3: 1 3:1 INFILTRATION TRENCH TYPICAL CROSS SECTION 100 0 50 100 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED. CUMBERLAND CUMBERLAND CY INITIAL CLEARING & GRADING UNNAMED TRI B U T A R Y TO LOCKS CRE E K GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC ERM 15720 Brixham Hill Ave, Suite 120 License #F-1223 ERM NC, INC. Charlotte, NC 28277 (704) 541-8345 AS NOTED 05/22/2018WTS 05/22/2018NJB 4-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 --ISSUED FOR REVIEWWTS08/04/171 --ISSUED FOR REVIEWNJB02/12/20182 --ISSUED FOR REVIEWNJB04/30/20183 --ISSUED FOR REVIEWWTS05/22/20184 3 OF 9 LIMITS OF DISTURBANCE (35.1 ACRES) LIMITS OF CONSTRUCTION (40.8 ACRES) PROPOSED COMPOST FILTER SOCK OR SILT FENCE NC S T A T E H I G H W A Y 2 4 DOWN I N G R O A D ACCORD ROADFLOW ARROW ROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) OUTLET PROTECTION PROPOSED CULVERT PROPOSED DIVERSION SWALE EX. 18" CULVERT ROCK CONSTRUCTION ENTRANCE (REF. SHEET 6) DIVERSION SWALE (REF. SHEET 6) DIVERSION SWALE (REF. SHEET 6) DIVERSION SWALE (REF. SHEET 6) PROP. (2) 18" CULVERT & OUTLET PROTECTION (REF. SHEET 8) PROP. (2) 18" CULVERT & OUTLET PROTECTION (REF. SHEET 8) UNNAMED POND INFILTRATION TRENCH COMPOST FILTER SOCK OR BSRF (REF.SHEET 5) COMPOST FILTER SOCK OR BSRF (REF.SHEET 6) COMPOST FILTER SOCK OR BSRF (REF.SHEET 6) COMPOST FILTER SOCK OR BSRF (REF.SHEET 6) PROPOSED CONTOUR125 EXISTING CONTOUR BAFFLE TEMPORARY BRIDGE CROSSING (REF. SHEET 8) TEMPORARY BRIDGE CROSSING SCM MAINTENANCE EASEMENT SCM MAINTENANCE EASEMENT SCM MAINTENANCE EASEMENT GAGA GA GA E E E E E TS GP 281LM PIEDMONT LM PIEDMONT 90410045701 LAT:35°02'38.27" LON:78°49'20.7146" wcuc 051e 90 E Q U I P M E N T TRAI L E R S LM PIEDMONT G R A V E L R O A D S09° 33' 45.90"E1326.907S82° 48' 15.42"W 1195.159N08° 35' 40.83"W789.151N12° 47' 30.74"W671.599N66° 28' 1 7 . 5 5 " E 445.385 S75° 03' 0 7 . 7 6 " E 541.71 8 JOHN S HAIR PARCEL 0457-40-6622 (52.4 ACRES) MARY J YOUNG PARCEL 0457-20-1369 (41.2 ACRES) HOWARD H R & RICHARD KING PARCEL 0457-21-1811 (6.7 ACRES) JEANNE BRYAN DAVIS PARCEL 0457-20-4762 (0.45 ACRES) ELLA J CLARK PARCEL 0456-39-9627 (60.4 ACRES) MARTHA L HAIR & KATHY RADCLIFF PARCEL 0457-51-1976 (1.7 ACRES) GATE POSTS GRAVEL PARKING LOT (12.3 ACRES) GRAVEL PARKING LOT (3.2 ACRES) GRAVEL PARKING LOT (3.2 ACRES) TOPSOIL SEGREGATION (2.9 ACRES) TOPSOIL SEGREGATION (1.0 ACRES) STOR A G E U N I T S FUEL T A N K S 92 949494949494949292 92949290929494 96 9 6 94 96949294 92949630' X 20' SAND FILTER FOREBAY WEIR FOREBAY 3' X 3' CL A STONE APRON SAND FILTER UNDERDRAINS (REF. SHEET 7) 100' 25' 132' 26' 76' 105' 30' 20' 100' X 25' X 1' DEEP INFILTRATION TRENCH 1' DEEP, VARIED DIMENSION INFILTRATION TRENCH OVERHEAD ELECTRIC LINEE UNDERGROUND GAS LINEG FENCE xSTREAM DITCH PRIVACY FENCE UTILITY POLE GP GUY POLE GUY ANCHORGA UTILITY VALVE POST LM LINE MARKER TS TEST STAND TBM TEMPORARY BENCH MARK GRAVEL AREA. TOP SOIL SEGREGATION AREA WETLANDwcuc 051e FUEL TANK AREA (25' x 250') TRAILER (24' x 60') STORAGE UNITS 1000 BERM EMERGENCY SPILLWAY PONDING DEPTH ON INFILTRATION TRENCH 1' WIDE GROUT STRIP 12" 12" CLASS B RIP RAP 12" DEPTH TYPE 1 NON-WOVEN FILTER FABRIC TYPE 1 NON-WOVEN FILTER FABRIC FOR INFILTRATION BASIN TYPE 2 WOVEN FILTER FABRIC FOR RIP RAP SPILLWAY PROVIDE 6" OVERLAP OF WOVEN AND NON-WOVEN FILTER FABRIC (NON-WOVEN UNDER WOVEN) 12" DEEP, 1.5" TO 2.5" DIA CLEAN, WASHED STONE 4" SAND FILTER LAYER CLEAN, WASHED SAND, NCDOT C33 2" DEEP, CLEAN, WASHED NO. 57 STONE OBSERVATION WELL PORT - LOCATE NEAR CENTER OF EACH INFILTRATION TRENCH DETAIL OBSERVATION WELL PORT 8" SCREW CAP AND FITTING 8" DIA., C-900 PVC PIPE, 18" HEIGHT OBSERVATION PORT PIPE TO BE OPEN ON THE BOTTOM, AND SITS ON FILTER FABRIC LAYER FILTER FABRIC18" NOTES: 1)CONSTRUCTION OF THE INFILTRATION BASINS TO BEGIN AFTER ALL UPSLOPE AREAS ARE STABILZED WITH GRASS AND NO EVIDENCE OF EROSIVE CONDITIONS. 2)PROVIDE ONE OBSERVATION PORT FOR EACH INFILTRATION TRENCH. 3)SEE SHEET 6 FOR INFILTRATION TRENCH DETAIL. 3: 1 3:1 INFILTRATION TRENCH TYPICAL CROSS SECTION NOTES: 1)CONSTRUCTION OF THE SAND FILTER TO BEGIN AFTER ALL UPSLOPE AREAS ARE STABILZED WITH GRASS AND NO EVIDENCE OF EROSIVE CONDITIONS. 2)SEE SHEET 6 FOR SAND FILTER DETAIL. SAND FILTER CROSS SECTION 12" 8' 18" DEEP, CLEAN WASHED ASTM C-33 SAND 6" PERFORATED PVC @ 0.50% 2" CLEAN, WASHED NO. 57 STONE ELEV=92.0 ELEV=92.5 PONDING DEPTH ON INFILTRATION TRENCH 6" C-900 SOLID WALL PVC PIPE @ 0.50% 6" CLEANOUT W/ SCREW CAP 6" C-900 SOLID WALL PVC CLEANOUT (TYP) SEE PLAN FOR LOCATIONS FOREBAY ELEV=92.0 FOREBAY BERM CLASS B RIP RAP 4" DEPTH NO. 57 STONE 6:16:1 CLASS A RIP RAP TYPE 2 WOVEN FILTER FABRIC UNDER FOREBAY BERM TYPE 1 NON-WOVEN FILTER FABRIC 100 0 50 100 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED. CUMBERLAND CUMBERLAND CY PERMANENT PCSO MEASURES UNNAMED TRI B U T A R Y TO LOCKS CRE E K GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC ERM 15720 Brixham Hill Ave, Suite 120 License #F-1223 ERM NC, INC. Charlotte, NC 28277 (704) 541-8345 AS NOTED 05/22/2018WTS 05/22/2018NJB 4-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 --ISSUED FOR REVIEWWTS08/04/171 --ISSUED FOR REVIEWNJB02/12/20182 --ISSUED FOR REVIEWNJB04/30/20183 --ISSUED FOR REVIEWWTS05/22/20184 4 OF 9 LIMITS OF DISTURBANCE (35.1 ACRES) LIMITS OF CONSTRUCTION (40.8 ACRES) PROPOSED COMPOST FILTER SOCK OR SILT FENCE NC S T A T E H I G H W A Y 2 4 DOWN I N G R O A D ACCORD ROADFLOW ARROW ROCK CONSTRUCTION ENTRANCE (OR APPROVED ALT.) OUTLET PROTECTION PROPOSED CULVERT PROPOSED DIVERSION SWALE EX. 18" CULVERT ROCK CONSTRUCTION ENTRANCE (REF. SHEET 6) DIVERSION SWALE (REF. SHEET 6) DIVERSION SWALE (REF. SHEET 6) DIVERSION SWALE (REF. SHEET 6) PROP. (2) 18" CULVERT & OUTLET PROTECTION (REF. SHEET 8) PROP. (2) 18" CULVERT & OUTLET PROTECTION (REF. SHEET 8) TEMPORARY BRIDGE CROSSING (REF. SHEET 8) UNNAMED POND INFILTRATION TRENCH COMPOST FILTER SOCK OR BSRF (REF.SHEET 6) COMPOST FILTER SOCK OR BSRF (REF.SHEET 6) COMPOST FILTER SOCK OR BSRF (REF.SHEET 6) COMPOST FILTER SOCK OR BSRF (REF.SHEET 6) PROPOSED CONTOUR125 EXISTING CONTOUR BAFFLE TEMPORARY BRIDGE CROSSING SCM MAINTENANCE EASEMENT SCM MAINTENANCE EASEMENT SCM MAINTENANCE EASEMENT NOTES: 1)CONSTRUCTION OF THE SAND FILTER TO BEGIN AFTER ALL UPSLOPE AREAS ARE STABILZED WITH GRASS AND NO EVIDENCE OF EROSIVE CONDITIONS. 2)SEE SHEET 6 FOR SAND FILTER DETAIL. SAND FILTER CROSS SECTION 12" 8' 18" DEEP, CLEAN WASHED ASTM C-33 SAND 6" PERFORATED PVC @ 0.50% 2" CLEAN, WASHED NO. 57 STONE ELEV=92.0 ELEV=92.5 PONDING DEPTH ON INFILTRATION TRENCH 6" C-900 SOLID WALL PVC PIPE @ 0.50% 6" CLEANOUT W/ SCREW CAP 6" C-900 SOLID WALL PVC CLEANOUT (TYP) SEE PLAN FOR LOCATIONS FOREBAY ELEV=92.0 FOREBAY BERM CLASS B RIP RAP 4" DEPTH NO. 57 STONE 6:16:1 CLASS A RIP RAP TYPE 2 WOVEN FILTER FABRIC UNDER FOREBAY BERM TYPE 1 NON-WOVEN FILTER FABRIC RIP-RAP LINED EMERGENCY SPILLWAY UNDISTURBED GROUND 13" SEASONAL HIGH WATER TABLE INFILTRATION TRENCH CONCRETE SPILLWAY GROUTING INFILTRATION TRENCH 222 SECTION A-A SECTION B-B ELEV: 88.92 ELEV: 92.00 ELEV: 91.00 ELEV: 94.00 WATER QUALITY STORAGE VOLUME PROPOSED FILL MATERIAL ELEV: 90.0 2.1' EMERGENCY SPILLWAYPROPOSED FILL MATERIAL UNDISTURBED GROUND LIMITS OF SPILLWAY GROUT SEASONAL HIGH WATER TABLE OBSERVATION WELL WITH SCREW TOP LID SECTION B-B EMERGENCY SPILLWAYPROPOSED FILL MATERIAL UNDISTURBED GROUND LIMITS OF SPILLWAY GROUT SEASONAL HIGH WATER TABLE RIP-RAP LINED EMERGENCY SPILLWAY UNDISTURBED GROUND 5" SEASONAL HIGH WATER TABLE EMERGENCY SPILLWAYPROPOSED FILL MATERIAL UNDISTURBED GROUND INFILTRATION TRENCH CONCRETE SPILLWAY GROUTING INFILTRATION TRENCH 221 SECTION A-A SECTION B-B ELEV: 89.0 ELEV: 92.00 ELEV: 91.00 ELEV: 93.00 WATER QUALITY STORAGE VOLUME PROPOSED FILL MATERIAL ELEV: 89.4 2.1' LIMITS OF SPILLWAY GROUT SEASONAL HIGH WATER TABLE OBSERVATION WELL WITH SCREW TOP LID wcuc 051e 9294 50' 8' 132' 26' 76' 105' 22' 1' DEEP, VARIED DIMENSION INFILTRATION TRENCH 94 94 TOP OF BERM = 9 4 . 1 9293 9392 94 94 T O P O F B E R M = 9 4 . 1 9293 93 9293BASIN 221 INFILTRATION TRENCH AAB B 90LM PIEDMONT 9292945' 100' 25' 50' 22' 100' X 25' X 1' DEEP INFILTRATION TRENCH TOP O F B E R M = 9 5. 1 95 95 94 93 92 9493 93TOP OF BERM = 95.1959495949392BASIN 222 INFILTRATION TRENCH 92 92A AB B9030' X 20' SAND FILTER FOREBAY WEIR FOREBAY 3' X 3' CL A STONE APRON SAND FILTER UNDERDRAINS (REF. SHEET 7) 8' 8' 30' 20' 94 94 TOP OF BERM = 9 4 . 1 92 93 93 9494TOP OF BERM = 94.1919393929091 90 89 89 BASIN 224 SAND FILTER 92.592AAB B RIP-RAP LINED EMERGENCY SPILLWAY UNDISTURBED GROUND 5" SEASONAL HIGH WATER TABLE EMERGENCY SPILLWAYPROPOSED FILL MATERIAL UNDISTURBED GROUND INFILTRATION TRENCH CONCRETE SPILLWAY GROUTING INFILTRATION TRENCH 221 SECTION A-A SECTION B-B ELEV: 89.0 ELEV: 92.00 ELEV: 91.00 ELEV: 93.00 WATER QUALITY STORAGE VOLUME PROPOSED FILL MATERIAL ELEV: 89.4 2.1' LIMITS OF SPILLWAY GROUT SEASONAL HIGH WATER TABLE OBSERVATION WELL WITH SCREW TOP LID 1.CONTOURS AND BASE MAP PROVIDED BY I3 ENGINEERING AND CONSULTING, LLC WITH ADDITIONAL CONTOURS OBTAINED FROM THE USGS NATIONAL ELEVATION DATASET. THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING ITS ACCURACY. 2.DISCREPANCIES FOUND IN THE PROJECT EXISTING CONDITIONS MUST BE REPORTED TO THE PROJECT ENGINEER/OWNER. 3.NO GUARANTEE OR ASSURANCE IS GIVEN BY THE OWNER OR ENGINEER AS TO THE ACCURACY, COMPLETENESS, OR VALIDITY OF THE EXISTING UTILITIES. CONTRACTOR TO PERFORM "CALL BEFORE YOU DIG" TO COORDINATE WITH UTILITY COMPANIES, AND LOCATE AND IDENTIFY ALL UTILITIES PRIOR TO CONSTRUCTION. 4.DOMINION RESERVES THE RIGHT TO USE EITHER, OR BOTH, 12" COMPOST FILTER SOCK OR STANDARD SILT FENCE, FOR ANY APPLICATION IN WHICH EITHER OF THESE TWO CONTROL MEASURES ARE SPECIFIED. CUMBERLAND CUMBERLAND CY CROSS-SECTIONS GENERAL NOTES AND COMMENTS:SYM.DATE BY REVISION INFORMATION PROJECT/TASK APP.SEAL APP. FOR CONST.: SCALE: APP. FOR BID: CHECKED: DRAWN: DIR/FILE: DISTRICT: TITLE: COUNTY:DWG. NO.GROUP REV.STATE: 925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000 Atlantic Coast Pipeline, LLC ERM 15720 Brixham Hill Ave, Suite 120 License #F-1223 ERM NC, INC. Charlotte, NC 28277 (704) 541-8345 AS NOTED 05/22/2018WTS 05/22/2018NJB 4-ACP\North Carolina\ - ATLANTIC COAST PIPELINE NC --ISSUED FOR REVIEWNJB03/10/170 --ISSUED FOR REVIEWWTS08/04/171 --ISSUED FOR REVIEWNJB02/12/20182 --ISSUED FOR REVIEWNJB04/30/20183 --ISSUED FOR REVIEWWTS05/22/20184 5 OF 9 INSTALL 2' WIDE OPENING AT ELEV. 93.1 WHEN SITE IS STABILIZED AND INFILTRATION TRENCH IS CONSTRUCTED BASIN 224 (SAND FILTER)INFILTRATION TRENCH 222INFILTRATION TRENCH 221 30 0 15 30 30 0 15 30 30 0 15 30 A-A ELEV: 94.0 50' WIDE ELEV. 88.92 50' WIDE ELEV: 93.0 50' WIDE ELEV: 93.0 ELEV: 89.0 ELEV. 88.3 BOTTOM FILTER ELEV: 90.3 1-411-421-431-458"4" x 8"Trench24"26"22"GENERAL NOTES AND COMMENTS:SYM.DATEBYREVISION INFORMATIONPROJECT/TASKAPP.SEALAPP. FOR CONST.:SCALE:APP. FOR BID:CHECKED:DRAWN:DIR/FILE:DISTRICT:TITLE:COUNTY:DWG. NO.GROUPREV.STATE:925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000Atlantic Coast Pipeline, LLCERM15720 Brixham Hill Ave, Suite 120License #F-1223ERM NC, INC.Charlotte, NC 28277 (704) 541-8345AS NOTED05/22/2018WTS05/22/2018NJB4-ACP\North Carolina\-ATLANTIC COAST PIPELINENC--ISSUED FOR REVIEWNJB03/10/170--ISSUED FOR REVIEWWTS08/04/171--ISSUED FOR REVIEWNJB02/12/20182--ISSUED FOR REVIEWNJB04/30/20183--ISSUED FOR REVIEWWTS05/22/20184 6 OF 9EROSION AND SEDIMENT CONTROL PLAN DETAILS1-441-46    —’ CLEANOUT (TYP)10'10'3'4'20'30'8'36'2'CLASS 'B' RIP RAP WEIRTOP ELEVATION =92.5'#57 WASHED STONESAND FILTERTOP ELEVATION =92.0'6" C-900 PERFORATEDPVC PIPE @ 0.50%30' - 6" C-900 SOLID WALLPVC PIPE @ 0.50%COUPLER-CONVERSIONFROM SOLID WALL TOPERFORATED PIPE3' - 6" C-900 SOLID WALLPVC PIPE @ 0.50%GENERAL NOTES AND COMMENTS:SYM.DATEBYREVISION INFORMATIONPROJECT/TASKAPP.SEALAPP. FOR CONST.:SCALE:APP. FOR BID:CHECKED:DRAWN:DIR/FILE:DISTRICT:TITLE:COUNTY:DWG. NO.GROUPREV.STATE:925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000Atlantic Coast Pipeline, LLCERM15720 Brixham Hill Ave, Suite 120License #F-1223ERM NC, INC.Charlotte, NC 28277 (704) 541-8345AS NOTED05/22/2018WTS05/22/2018NJB4-ACP\North Carolina\-ATLANTIC COAST PIPELINENC--ISSUED FOR REVIEWNJB03/10/170--ISSUED FOR REVIEWWTS08/04/171--ISSUED FOR REVIEWNJB02/12/20182--ISSUED FOR REVIEWNJB04/30/20183--ISSUED FOR REVIEWWTS05/22/20184 7 OF 9EROSION AND SEDIMENT CONTROL PLAN DETAILS2-42’2-412-432-44SAND FILTER(OR FABRIC EQUIVALENT)TRENCH FILLED WITH 1.5 - 2.5 INCHDIAMETER CLEAN STONE. DIMENSIONSOF THE TRENCH ARE TO BE 82'x20'PROTECTIVE LAYER OF FILTER FABRICPEA GRAVEL FILTER LAYEROVERFLOW BERMOBSERVATION WELLWITH SCREW TOP LIDRUNOFF FILTERS THROUGH GRASS BUFFERSTRIP, GRASS CHANNEL, OR SEDIMENTVAULTRUNOFF EXFILTRATES THROUGHUNDISTURBED SUBSOILS WITH A MINIMUMRATE OF 0.5 INCHES PER HOUR“” “” 2-45 2"-5"(5-12.5cm)62412"(30cm)6"(15cm)6"(15cm)4"-6"(10-15cm)86"(15cm)574"(10cm)314"(10cm)6"(15cm)ABCABC CRITICAL POINTSA. OVERLAPS AND SEAMSB. PROJECTED WATER LINEC. CHANNEL BOTTOM/SIDE SLOPEVERTICES NOTES:1.HORIZONTAL STAPLE SPACING SHOULD BE ALTERED IFNECESSARY TO ALLOW STAPLES TO SECURE THE CRITICALPOINTS ALONG THE CHANNEL SURFACE.2.IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKELENGTHS GREATER THAN 6"(15CM) MAY BE NECESSARY TOPROPERLY SECURE THE RECP'S.INSTALLATION NOTES:1.PREPARE SOIL BEFORE INSTALLING ROLLED EROSION CONTROL PRODUCTS (RECPS), INCLUDING ANY NECESSARYAPPLICATION OF LIME, FERTILIZER, AND SEED.2.EROSION CONTROL MATTING TO BE NORTH AMERICAN GREEN OR APPROVED EQUAL.3.BEGIN AT THE TOP OF THE CHANNEL BY ANCHORING THE RECPS IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH WITHAPPROXIMATELY 12"(30CM) OF RECPS EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. USESHOREMAX MAT AT THE CHANNEL/CULVERT OUTLET AS SUPPLEMENTAL SCOUR PROTECTION AS NEEDED. ANCHORTHE RECPS WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN THE BOTTOM OF THE TRENCH.BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO THE COMPACTED SOIL AND FOLD THEREMAINING 12"(30CM) PORTION OF RECPS BACK OVER THE SEED AND COMPACTED SOIL. SECURE RECPS OVERCOMPACTED SOIL WITH A ROW OF STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OFTHE RECPS.4.ROLL CENTER RECPS IN DIRECTION OF WATER FLOW IN BOTTOM OF CHANNEL. RECPS WILL UNROLL WITHAPPROPRIATE SIDE AGAINST THE SOIL SURFACE. ALL RECPS MUST BE SECURELY FASTENED TO SOIL SURFACE BYPLACING STAPLES/STAKES IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE.5.PLACE CONSECUTIVE RECPS END-OVER-END (SHINGLE STYLE) WITH A 4"-6" OVERLAP. USE A DOUBLE ROW OFSTAPLES STAGGERED 4" APART AND 4" ON CENTER TO SECURE RECPS.6.FULL LENGTH EDGE OF RECPS AT TOP OF SIDE SLOPES MUST BE ANCHORED WITH A ROW OF STAPLES/STAKESAPPROXIMATELY 12"(30CM) APART IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THETRENCH AFTER STAPLING.7.ADJACENT RECPS MUST BE OVERLAPPED APPROXIMATELY 2"-5" (5-12.5CM) (DEPENDING ON RECPS TYPE) ANDSTAPLED.8.IN HIGH FLOW CHANNEL APPLICATIONS A STAPLE CHECK SLOT IS RECOMMENDED AT 30 TO 40 FOOT (9 -12M)INTERVALS. USE A DOUBLE ROW OF STAPLES STAGGERED 4"(10CM) APART AND 4"(10CM) ON CENTER OVER ENTIREWIDTH OF THE CHANNEL.9.THE TERMINAL END OF THE RECPS MUST BE ANCHORED WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12"(30CM) APART IN A 6"(15CM) DEEP X 6"(15CM) WIDE TRENCH. BACKFILL AND COMPACT THE TRENCH AFTER STAPLING.3-42SEEDING AND MULCHINGSEE SEED MIXES, SOIL AMENDMENTS, AND MULCHSPECIFICATIONS SPECIFIED IN THE ACPRESTORATION AND REHABILITATION PLAN.1.SEEDBED PREPARATION: AREAS TO BE SEEDEDSHALL BE DISKED TO A DEPTH OF 4-IN TO 6-INWHENEVER FEASIBLE, AND SMOOTHLY GRADED.2.IN TOPSOILED AREAS, SOIL TO BEREDISTRIBUTED EVENLY AND STABILIZED PRIORTO SEEDING.3.STABILIZATION MEASURES SHALL BE INITIATEDAS SOON AS PRACTICABLE IN PORTIONS OF THESITE WHERE CONSTRUCTION ACTIVITIES HAVETEMPORARILY OR PERMANENTLY CEASED, BUTIN NO CASE MORE THAN 21 DAYS AFTER THECONSTRUCTION ACTIVITY IN THAT PORTION OFTHE SITE HAS PERMANENTLY CEASED.4.WHERE THE INITIATION OF STABILIZATIONMEASURES WITHIN 7 DAYS AFTERCONSTRUCTION ACTIVITY TEMPORARILY ORPERMANENTLY CEASES IS PRECLUDED BYSNOW COVER, STABILIZATION MEASURES SHALLBE INITIATED AS SOON AS CONDITIONS ALLOW.5.WHERE CONSTRUCTION ACTIVITY WILL RESUMEON A PORTION OF THE SITE WITHIN 21 DAYSFROM WHEN ACTIVITIES CEASED (E.G., THETOTAL TIME PERIOD THAT CONSTRUCTIONACTIVITY IS TEMPORARILY HALTED IS LESS THAN14 DAYS), THEN STABILIZATION MEASURES DONOT HAVE TO BE INITIATED ON THAT PORTIONOF THE SITE BY THE SEVENTH DAY AFTERCONSTRUCTION ACTIVITIES HAVE TEMPORARILYCEASED.6.AREAS WHERE THE SEED HAS FAILED TOGERMINATE ADEQUATELY (UNIFORM PERENNIALVEGETATIVE COVER WITH A DENSITY OF 80%)WITHIN 30 DAYS, SEEDING AND MULCHING MUSTBE RE-SEEDED IMMEDIATELY, OR AS SOON ASWEATHER PERMITS.3-413-43GENERAL NOTES AND COMMENTS:SYM.DATEBYREVISION INFORMATIONPROJECT/TASKAPP.SEALAPP. FOR CONST.:SCALE:APP. FOR BID:CHECKED:DRAWN:DIR/FILE:DISTRICT:TITLE:COUNTY:DWG. NO.GROUPREV.STATE:925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000Atlantic Coast Pipeline, LLCERM15720 Brixham Hill Ave, Suite 120License #F-1223ERM NC, INC.Charlotte, NC 28277 (704) 541-8345AS NOTED05/22/2018WTS05/22/2018NJB4-ACP\North Carolina\-ATLANTIC COAST PIPELINENC--ISSUED FOR REVIEWNJB03/10/170--ISSUED FOR REVIEWWTS08/04/171--ISSUED FOR REVIEWNJB02/12/20182--ISSUED FOR REVIEWNJB04/30/20183--ISSUED FOR REVIEWWTS05/22/20184 8 OF 9EROSION AND SEDIMENT CONTROL PLAN DETAILS3-44PIPE OUTLET TO FLAT AREA - NO WELL DEFINED CHANNELPIPE OUTLET TO WELL DEFINED CHANNELMAINTENANCE1.INSPECT RIPRAP OUTLET STRUCTURES WEEKLY AND AFTER SIGNIFICANT (0.5INCH OR GREATER) RAINFALL EVENTS TO SEE IF ANY EROSION AROUND ORBELOW THE RIPRAP HAS TAKEN PLACE, OR IF STONES HAVE BEEN DISLODGED.IMMEDIATELY MAKE ALL NEEDED REPAIRS TO PREVENT FURTHER DAMAGE.CONSTRUCTION SPECIFICATIONS1.ENSURE THAT THE SUBGRADE FOR THE FILTER AND RIPRAP FOLLOWS THEREQUIRED LINES AND GRADES SHOWN IN THE PLAN. COMPACT ANY FILLREQUIRED IN THE SUBGRADE TO THE DENSITY OF THE SURROUNDINGUNDISTURBED MATERIAL. LOW AREAS IN THE SUBGRADE ON UNDISTURBEDSOIL MAY ALSO BE FILLED BY INCREASING THE RIPRAP THICKNESS.2.THE RIPRAP AND GRAVEL FILTER MUST CONFORM TO THE SPECIFIED GRADINGLIMITS SHOWN ON THE PLANS.3.FILTER FABRIC (MIRAFI 500X OR APPROVED EQUAL), WHEN USED, MUST MEETDESIGN REQUIREMENTS AND BE PROPERLY PROTECTED FROM PUNCHING ORTEARING DURING INSTALLATION. REPAIR ANY DAMAGE BY REMOVING THERIPRAP AND PLACING ANOTHER PIECE OF FILTER CLOTH OVER THE DAMAGEDAREA. ALL CONNECTING JOINTS SHOULD OVERLAP SO THE TOP LAYER IS ABOVETHE DOWNSTREAM LAYER A MINIMUM OF 1 FOOT. IF THE DAMAGE IS EXTENSIVE,REPLACE THE ENTIRE FILTER CLOTH.4.RIPRAP MAY BE PLACED BY EQUIPMENT, BUT TAKE CARE TO AVOID DAMAGINGTHE FILTER.5.THE MINIMUM THICKNESS OF THE RIPRAP SHOULD BE 1.5 TIMES THE MAX.STONE DIAMETER.6.RIPRAP MAY BE FILED STONE OR ROUGH QUARRY STONE. IT SHOULD BE HARD,ANGULAR, HIGHLY WEATHER-RESISTANT AND WELL GRADED.7.CONSTRUCT THE APRON ON ZERO GRAD WITH NO OVERFILL AT THE END. MAKETHE TOP OF THE RIPRAP AT THE DOWNSTREAM END LEVEL WITH THERECEIVING AREA OR SLIGHTLY BELOW IT.8.ENSURE THAT THE APRON IS PROPERLY ALIGNED WITH THE RECIEVING STREAMAND PREFERABLY STRAIGHT THROUGHOUT ITS LENGTH. IF A CURVE IS NEEDEDTO FIT THE SITE CONDITIONS, PLACE IT IN THE UPPER SECTION OF THE APRON.9.IMMEDIATELY AFTER CONSTRUCTION, STABILIZE ALL DISTURBED AREAS WITHVEGETATION.3-45 EROSION AND SEDIMENT CONTROL PLAN NARRATIVETHE EROSION AND SEDIMENT (E&S) CONTROL MEASURES FOR THE PIPELINE AND CONTRACTOR YARD CONSTRUCTION ACTIVITIES PRIMARILYCONSIST OF BUT ARE NOT LIMITED TO COMPOST FILTER SOCK, BELTED SILT RETENTION FENCE, SUPER SILT FENCE, SLOPE BREAKERS,SEDIMENT TRAPS, AND TEMPORARY AND PERMANENT SEEDING AND MULCHING. BEST MANAGEMENT PRACTICES (BMP) SPECIFICATIONS FORTHE E&S CONTROL PLAN (E&SCP) ARE TO BE UTILIZED BY THE CONSTRUCTION CONTRACTOR ACCORDING TO THE PROVIDED PLAN.GENERAL CONSTRUCTION NOTES:1.DISCHARGING SEDIMENT LADEN WATER WHICH WILL CAUSE OR CONTRIBUTE TO THE DEGRADATION OF A BENEFICIAL USE OF A WATEROF THE STATE FROM THE CONSTRUCTION SITE, A DEWATERING SITE, OR SEDIMENT BASIN/TRAP INTO ANY SURFACE WATER WITHOUTFILTRATION OR EQUIVALENT TREATMENT IS PROHIBITED.2.THE DISCHARGER SHALL AMEND THE EROSION & SEDIMENT CONTROL PLAN WHENEVER THERE IS A CHANGE IN THE CONSTRUCTION OROPERATIONS, WHICH MAY EFFECT THE DISCHARGE OF POLLUTANTS TO SURFACE WATERS OR GROUNDWATER.3.DISCHARGES ORIGINATING FROM OFF-SITE SOURCES, WHICH FLOW THROUGH OR ACROSS THE AREAS DISTURBED BY CONSTRUCTION,MAY BE DIVERTED AROUND THE ACTIVE CONSTRUCTION AREA WHENEVER POSSIBLE.4.DUE TO VARYING SITE CONDITIONS, ADDITIONAL SEDIMENT CONTROL BMPS MAY BE NECESSARY BEYOND THE MEASURES SHOWN ONTHE E&S CONTROL PLAN.5.CONTACT THE DEMLR RALEIGH REGIONAL OFFICE (CONTACT NUMBER: (919) 791-4200) OR FAYETTEVILLE REGIONAL OFFICE (CONTACTNUMBER: (910) 433-3300) AT LEAST 48 HOURS PRIOR TO COMMENCING IN LAND DISTURBING ACTIVITY FOR EACH SECTION OF THEPROJECT.6.STAGING AREAS, ASSEMBLY AREAS, TEMPORARY EQUIPMENT AND NON-HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATEDOUTSIDE 100-YR FLOOD ZONES. HAZARDOUS MATERIAL STORAGE AREAS SHALL BE LOCATED AT LEAST 100 FEET BACK FROM SURFACEWATER BODIES.7.EQUIPMENT STORAGE IN CONSTRUCTION STAGING AREAS SHALL BE LOCATED A MINIMUM OF 100 FEET AWAY FROM A STREAM ORWETLAND EDGE.8.AT MINIMUM, ALL BMPS ARE TO BE INSPECTED ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENTGREATER THAN 0.5-INCH PER 24-HOUR PERIOD DURING THE ENTIRE PROJECT. A WRITTEN REPORT MUST ALSO BE COMPLETED,DOCUMENTING EACH INSPECTION AND, IF NECESSARY, ANY REPAIR, REPLACEMENT OR MAINTENANCE ACTIVITY.9.THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT ANY EXISTING FACILITY SHOWN ON THE DRAWINGS, AND ANYOTHER WHICH IS NOT ON RECORD OR NOT SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL POTHOLE EXISTING UTILITIES AT THEPOINTS OF CONNECTION AND ALL UTILITY CROSSINGS TO DETERMINE EXACT LOCATIONS PRIOR TO THE START OF WORK. ANYDISCREPANCIES BETWEEN THESE DRAWINGS AND EXISTING CONDITIONS SHALL BE REPORTED TO THE ENGINEER OF RECORDIMMEDIATELY.10.ALL WORK WITHIN A PUBLIC RIGHT-OF-WAY SHALL BE COORDINATED WITH THE AGENCY HAVING JURISDICTION.11.ALL REQUIRED PERMITS MUST BE OBTAINED PRIOR TO STARTING WORK.12.DURING CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONSTRUCTION, STABILIZATION AND MAINTENANCE OF ALLEXISTING AND PROPOSED SITE EROSION & SEDIMENTATION CONTROL DEVICES AND FACILITIES.13.THE CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILLBE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTIONOF THE PROJECT, INCLUDING EROSION & SEDIMENTATION DEVICES AND SAFETY OF ALL PERSONS AND PROPERTY; THAT THISREQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTIONCONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD THE ENGINEER OF RECORD HARMLESS OF ANY AND ALL LIABILITY,REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THESOLE NEGLIGENCE OF ENGINEER OF RECORD.14.AS SITE SPECIFIC CONDITIONS MAY WARRANT, THE E&SC PLAN MAY REQUIRE MINOR MODIFICATIONS TO ENSURE PROPER PROTECTIONOF RECEIVING WATERS. THE RESPECTIVE PROJECT ENVIRONMENTAL INSPECTOR (EI) WILL IDENTIFY SITE SPECIFIC AREAS WHERE ACERTAIN BMP MODIFICATION(S) IS NECESSARY TO EITHER OMIT OR ENHANCE BMPS IN SUCH AREAS. THIS PROCESS ENTAILS THE EI TOIDENTIFY LOCATIONS WHERE BMPS WILL NEED TO BE ALTERED, SUBSTITUTED OR OMITTED AND CONTACT THE DOMINION GASCOMPLIANCE SPECIALIST TO REVIEW PROPOSED CHANGES. UPON REVIEW AND APPROVAL BY THE DOMINION COMPLIANCE SPECIALIST,THE EI WILL REDLINE, DATE, AND SIGN THE E&SCP DRAWING(S) DEPICTING THE REDLINE CHANGE(S). ONCE THIS PROCESS ISCOMPLETED, THE EI WILL NOTIFY NCDEQ OF SUCH MINOR MODIFICATION REDLINE AMENDMENTS AS REQUIRED BY THE GENERALPERMIT.SEQUENCE OF CONSTRUCTION1.A PRE-CONSTRUCTION MEETING SHOULD TAKE PLACE PRIOR TO START OF CONSTRUCTION ACTIVITIES.2.INSTALL SILT FENCE AROUND THE PROJECT SITE AS SHOWN ON THE PLANS, AND INSTALL TEMPORARY DIVERSION DITCHES ANDSTRUCTURES TO SEPARATE ON-SITE AND OFF-SITE RUN-OFF. ALL MEASURES TO BE INSTALLED WITHIN THE LIMITS OF DISTURBANCE.3.INSTALL EROSION CONTROL AROUND TOPSOIL STORAGE AREA.4.CLEAR AND GRUB THE AREA FOR THE BMP AND INSTALL CHANNEL CONVEYANCE STABILIZATION, THE BASIN AND SKIMMER PER THEPLANS.5.ONCE INITIAL EROSION CONTROL MEASURES HAVE BEEN INSTALLED AND PRIOR TO SEDIMENT REMOVAL ACTIVITIES, THE SITE IS TO BEINSPECTED BY NCDEQ - DEMLR.6.GRADE SITE ACCORDING TO THE CONTRACT DOCUMENTS. MAINTAIN EROSION CONTROL DEVICES AS NEEDED.7.GRASS OR OTHERWISE STABILIZE ALL AREAS AS THEY ARE BROUGHT TO FINAL GRADES.8.THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZEEROSION. INSPECT AND REPAIR MEASURES AFTER EACH RAINFALL AS NEEDED THROUGHOUT THE PROJECT. NOTE THAT THERE ARE NOPERMANENT SEDIMENT CONTROL MEASURES ON THIS SITE. A PERMANENT INFILTRATION TRENCH FOR WATER QUALITY IS PROPOSEDAFTER REMOVAL OF SEDIMENT CONTROL PRACTICES. REMOVE SEDIMENT FROM BASIN WITH USE OF SILT BAG PRIOR TO CONSTRUCTIONOF INFILTRATION BASIN.9.CONTRACTOR TO REMOVE EROSION CONTROL DEVICES AT THE CONCLUSION OF THIS CONTRACT UPON APPROVAL BY NCDEQ-DEMLR. REMOVE EROSION CONTROL FOR THE TOPSOIL SEGREGATION AREA AND SEED AREA. REMOVE BMP, DIVERSIONS, AND ESTABLISHGRASS ON THE ENTIRE SITE PRIOR TO REMOVAL OF SILT FENCE. REPAIR AND GRASS STABILIZE ALL DENUDED AREAS. ALL AREAS WILLBE RETURNED TO THE STATE OF EXISTING CONDITIONS PRIOR TO CONTRACT COMPLETION AS A MINIMUM.10.IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONTAIN SEDIMENT ONSITE. ADDITIONAL EROSION CONTROL MEASURES MAY BEREQUIRED BY THE ENGINEER.11.ALL EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNINGAND DESIGN REQUIREMENTS AND LAND DEVELOPMENT STANDARDS.MAINTENANCE SCHEDULEAFTER FULL REVEGETATION HAS BEEN ACHIEVED, ALL BMPS WILL BE REMOVED AND ANY LAND DISTURBED BY REMOVAL WILL BEPERMANENTLY STABILIZED. UNLESS OTHERWISE SPECIFIED, ALL MAINTENANCE MUST BE COMPLETED IMMEDIATELY AFTER AN INSPECTIONIDENTIFIES THAT A BMP IS NOT FUNCTIONING AS REQUIRED.·THE ROW AND ESC DEVICES WILL BE INSPECTED DAILY AT THE ACTIVE CONSTRUCTION SITE AND AT LEAST ONCE EVERY SEVENCALENDAR DAYS FOR ACTIVELY DISTURBED AREAS, 14 CALENDAR DAYS FOR RESTORED AREAS, AND WITHIN 24 HOURS AFTER ANYSTORM EVENT GREATER THAN ONE-HALF-INCH PER 24-HOUR PERIOD.·SEDIMENT MUST BE REMOVED WHERE ACCUMULATION REACHES ONE-HALF THE ABOVE GROUND HEIGHT OF THE CONTROL MEASURE.·EROSION CONTROL MEASURES, WHICH HAVE BEEN UNDERMINED OR TOPPED, SHALL BE REPAIRED IMMEDIATELY.·OTHER REQUIRED REPAIRS OR MAINTENANCE SHALL BE MADE IMMEDIATELY.·TEMPORARY AND PERMANENT E&S CONTROL BMPS SHALL BE MAINTAINED AND REPAIRED AS NEEDED TO ASSURE CONTINUEDPERFORMANCE OF THEIR INTENDED FUNCTION.·A SELF-INSPECTION AND COMPLETION OF SELF-INSPECTION FORM IS REQUIRED AFTER EACH PHASE OF CONSTRUCTION IS COMPLETED.SELF-INSPECTION FORM CAN BE FOUND HERE: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control/formsMATERIAL WASTE HANDLING AND RECYCLING1.SOLID WASTE DISPOSAL SHALL BE HANDLED THROUGH ONE OF THE LOCAL LICENSED WASTE MANAGEMENT PROVIDERS AND PERMITTEDDISPOSAL FACILITIES. THE CONTRACTOR WILL PROVIDE MOBILE AND COVERED WASTE RECEPTACLES AS NEEDED ALONG THE PROJECTLIMITS. CONTRACTOR SHALL ALSO PROVIDE A COVERED DUMPSTER FOR CONSOLIDATION OF WASTE FOR PICK UP AND DISPOSAL FORTHE DURATION OF THE PROJECT. ALL SOLID WASTE SHALL BE DISPOSED OF AT A LICENSED PERMITTED MUNICIPAL LANDFILL.2.THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY PERMITS AN DOR DISPOSAL FEES. THE CONTRACTOR SHALL BE SOLELYRESPONSIBLE TO ASSURE THAT ALL MATERIALS AREA HANDLED AND DISPOSED OF IN ACCORDANCE WITH APPLICABLE LAWS, RULES,AND REGULATIONS, INCLUDING BUT NOT LIMITED TO THOSE ISSUED BY THE ENVIRONMENTAL PROTECTION AGENCY, NCDEQ, ANDOCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION.3.CONTRACTOR SHALL PRACTICE GOOD HOUSEKEEPING FOR THE DURATION OF THE PROJECT INCLUDING THE ROUTINE REMOVAL ANDDISPOSAL OF SOLID WASTE.4.CONTRACTOR SHALL KEEP RECORDS OF PROPER SOLID WASTE DISPOSAL AND PROVIDE COPIES TO THE EI.POLLUTANT CONTROLS·SPILLS OCCURRING DURING CONSTRUCTION, OPERATION, AND MAINTENANCE ARE TO BE REPORTED IMMEDIATELY TO THEMONITORING CENTER IN ACCORDANCE WITH DOMINION POLICIES, PLANS, AND PROCEDURES. DOMINION'S ENVIRONMENTALHEALTH AND SAFETY DEPARTMENT WILL BE RESPONSIBLE FOR CONTACTING THE APPROPRIATE AGENCIES, EXCEPT AS PROVIDEDFOR BELOW.·ANY FACILITY OWNER/OPERATOR WHO IS SUBJECT TO THE SPCC RULE MUST COMPLY WITH THE REPORTING REQUIREMENTSFOUND IN 40 CFR 112.4. A DISCHARGE MUST BE REPORTED TO THE EPA REGIONAL ADMINISTRATOR (RA) WHEN THERE IS ADISCHARGE OF:··MORE THAN 1,000 GALLONS OF OIL IN A SINGLE DISCHARGE TO NAVIGABLE WATERS OR ADJOINING SHORELINES,··MORE THAN 42 GALLONS OF OIL IN EACH OF TWO DISCHARGES TO NAVIGABLE WATERS OR ADJOINING SHORELINES OCCURRINGWITHIN ANY TWELVE-MONTH PERIOD.·IF A DOMINION REPRESENTATIVE CANNOT BE PROMPTLY CONTACTED AND THE SPILL HAS IMPACTED WATER, THE PERSONDISCOVERING THE SPILL OR RELEASE WILL CONTACT THE NATIONAL RESPONSE CENTER AT 1-800-424-8802 AND REPORT THERELEASE. THAT PERSON WILL CONTINUE CALLING DOMINION UNTIL A REPRESENTATIVE IS REACHED.BMP INSTALLATION AND REMOVAL SEQUENCECONSTRUCTION MUST BE IN ACCORDANCE WITH THE FOLLOWING SEQUENCE. THIS SEQUENCE IS DESIGNED TO MINIMIZE SOIL EROSIONAND SEDIMENTATION. THE CONTRACTOR MAY DEVIATE SLIGHTLY FROM THE STAGING OF PERMANENT SITE IMPROVEMENTS, BUT NODEVIATION FROM THE RELATIVE ORDER OF EROSION AND SEDIMENTATION CONTROL MEASURES WILL BE ALLOWED.THE STAGING OF EARTHMOVING ACTIVITIES FOR THIS PROJECT IS A GENERAL DESCRIPTION OF THE WORK REQUIRED. ALL WORK SHALLBE COMPLETED IN ACCORDANCE WITH COMPANY STANDARDS, THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITYREGULATIONS AND ALL OTHER APPLICABLE FEDERAL, STATE OR LOCAL REQUIREMENTS.THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN INCLUDING THE SOIL EROSION CONTROL DRAWINGS AND NARRATIVESHALL BE AVAILABLE ON SITE AT ALL TIMES DURING EARTH DISTURBANCE.1.STAKE AND/OR FLAG ALL LIMITS OF DISTURBANCE FOR CONSTRUCTION ACTIVITIES, CLEARLY IDENTIFYING WETLAND AND STREAMEDGES. INSTALL SIGNS TO DESIGNATE THE AREA TO IDENTIFY IMPORTANT PROJECT ATTRIBUTES SUCH AS WETLANDSTREAMBOUNDS, EXCLUSION AREAS ETC.2.INSTALL ROCK CONSTRUCTION ENTRANCES IMMEDIATELY BEFORE INITIAL DISTURBANCES. THE ROCK CONSTRUCTIONENTRANCES TO BE UNDERLAIN BY FILTER FABRIC. ALL CONSTRUCTION TRAFFIC SHOULD USE ONLY ROCK CONSTRUCTIONENTRANCE FOR INGRESS AND EGRESS. ALL MUD OR SEDIMENT TRACKED ONTO THE EXISTING ROADWAY SHALL BE REMOVED BYTHE CONTRACTOR AS NECESSARY.3.INSTALL SILT FENCE AND COMPOST FILTER SOCKS AS DEPICTED ON THE ESC PLAN AND AS NECESSARY ALONG THE ACCESSROADS TO PREVENT SEDIMENT LADEN RUNOFF FROM ENTERING DOWNSTREAM WATER BODIES. MAINTAIN THE CONTRACTOR ANDPIPE YARD SITE, ACCESS ROADS, ASSOCIATED DITCHES, AND NECESSARY OUTLET PROTECTION AS REQUIRED.4.PRIOR TO AND SIMULTANEOUS WITH GRADING AND EXCAVATION, INSTALL REMAINING EROSION CONTROL DEVICES (ECD) SHOWNON THE PLANS WITHIN THE L.O.D.5.COMMENCE GRADING AND ASSOCIATED CUT AND FILL SLOPES. THE EARTH MOVING ACTIVITY SHALL BEGIN IN AREA OF CUT SO THATTHE CUTS CAN BE PLACED IN AREAS OF FILL. REMOVE TOPSOIL FROM AREAS TO RECEIVE FILL PRIOR TO FILLING.6.FINALIZE UTILITY INSTALLATION AND ROADWAY GRADES AND PLACE TOPSOIL ON THE CUT AND FILL AREAS. STABILIZE CUT ANDFILL SLOPES, AFTER PLACEMENT OF STOCKPILED TOPSOIL ON EXCAVATED SLOPES, AND AS DIRECTED.7.RE-DISTRIBUTION OF WET SEDIMENT FROM DEVICES AND FACILITIES SHALL ONLY BE PERMITTED UPHILL OF AN EFFECTIVESEDIMENT CONTROL DEVICE OR FACILITY. SEDIMENT LADEN RUNOFF SHALL NOT BE ALLOWED TO FLOW DIRECTLY INTO WATERBODIES.8.ANY EXPOSED TOPSOIL PILES SHOULD BE STABILIZED & SEEDED PER THE PERMIT REGULATIONS, AND BY TABLES SHOWN ON THEAPPROVED EROSION CONTROL PLANS AND MULCHED AS SPECIFIED BY THE PROJECT OWNER.9.UPON MINIMUM 80% UNIFORM PERENNIAL VEGETATIVE GROWTH, REMOVE TEMPORARY SEDIMENT CONTROLS. REMOVEACCUMULATED SEDIMENTS WITHIN THE TRAPS, RE-GRADE TRAPS TO FINAL CONTOURS. STABILIZE SITE PER THE PLANS.EROSION AND SEDIMENT CONTROL DETAIL NOTES1.THE DETAILS ON EROSION AND SEDIMENT CONTROL DETAIL SHEETS 4 THROUGH 6 CORRESPOND TO E&S CONTROL MEASURESSPECIFICALLY IDENTIFIED ON THE E&SC PLAN AND DETAILS TO E&S CONTROL MEASURES THAT WHILE NOT SPECIFICALLY IDENTIFIEDON THE E&SC PLANS, COULD POTENTIALLY BE REQUIRED.GENERAL NOTES AND COMMENTS:SYM.DATEBYREVISION INFORMATIONPROJECT/TASKAPP.SEALAPP. FOR CONST.:SCALE:APP. FOR BID:CHECKED:DRAWN:DIR/FILE:DISTRICT:TITLE:COUNTY:DWG. NO.GROUPREV.STATE:925 White Oaks Blvd. Bridgeport, West Virginia 26330 / 681-842-8000Atlantic Coast Pipeline, LLCERM15720 Brixham Hill Ave, Suite 120License #F-1223ERM NC, INC.Charlotte, NC 28277 (704) 541-8345AS NOTED05/22/2018WTS05/22/2018NJB4-ACP\North Carolina\-ATLANTIC COAST PIPELINENC--ISSUED FOR REVIEWNJB03/10/170--ISSUED FOR REVIEWWTS08/04/171--ISSUED FOR REVIEWNJB02/12/20182--ISSUED FOR REVIEWNJB04/30/20183--ISSUED FOR REVIEWWTS05/22/20184 9 OF 9EROSION AND SEDIMENT CONTROL PLAN NOTES