HomeMy WebLinkAboutNCC221800_MODIFICATION Supporting Doc (OTHER ESC REVIS)_20250305 H 1DE RSON COUNW
SOIL EROSION AND SEDIMENT CONTROL OFFICE
February 4, 2025
LETTER OF APPROVAL WITH CONDITIONS
Attn: Peter Radchishin
Big Hill Construction, LLC
120 Dogwood Road
Candler,NC 28715
RE: Project Name: Big Hills at Horse Shoe
Acres Approved: 22.50 (increase of 5.08 acres)
Project ID: SESC 2021-09-02R
County: Henderson
City: N/A
Address: Adjacent to 2777 Brannon Road(35.3455, -82.6016)
PIN: 9529-59-5596; 9529-68-1993
River Basin: French Broad River Basin
Stream Classification: Brock Creek; WS-IV; 6-48
Submitted By: Nicholas M. Bowman
Date Received by HC: January 24, 2025
Plan Type: Revisions
Dear Peter Radchishin,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be
posted at the job site. This plan shall expire three (3)years following the date of approval, if no land
disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete,you will receive
a link with payment instructions for the $100 annual permit fee. After the fee is processed,you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future,the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be
kept on file at the job site:
100 NORTH KING STREET, SUITE 118
HENDERSONVILLE, NC 28792
TELEPHONE: (828) 694-6521
LETTER OF APPROVAL
BIG HILLS AT HORSE SHOE
FEBRUARY 4,2025
PAGE 2 OF 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this
project, it is determined that the erosion and sedimentation control plan is inadequate to meet the
requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute
113A-51 through 66),this office may require revisions to the plan and implementation of the revisions
to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Deb Johnston, PE
Site Development Director
Enclosures: Certificate of Approval
ec: Nicholas M. Bowman, Civil Davis Solutions, PA
Stan Aiken PE, DEQ—Asheville
LETTER OF APPROVAL
BIG HILLS AT HORSE SHOE
FEBRUARY 4,2025
PAGE 3 OF 3
CONDITIONS
• ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. PROJECT
CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS OFFICE.
• A DRIVEWAY PERMIT REQUIRED FRO THE JURISDICTION HAVING AUTHORITY(IF
REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS
PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE.
• OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER.
• REVISED LIMITS OF DISTURBANCE OUTLINED ON SHEET C6.a DATED NOVEMBER
19, 2024
• FOLLOW THE SELF-INSPECTION, RECORDKEEPING AND REPORTING
REQUIREMENTS DESCRIBED ON SHEET D15 OF THE APPROVED DRAWING"SITE
DEVELOPMENT PLAN FOR BIG HILLS AT HORSE SHOE"AND DATED APRIL 18, 2022,
WHICH IS INCORPORATED INTO THIS LETTER OF APPROVAL.
Financial Responsible Ownership Signature:
Print Name and Title:
Date: