HomeMy WebLinkAboutNCC224055_NOT Closeout Documents_20250124 Sediment & Erosion Control Inspection Report
Gaston County Natural Resources Department
1303 Dallas-Cherryville Highway, Dallas, NC 28034
GASTON COUNTY 704 -922 -4181
Natural Resources
Project: Project Spencer Mountain
Financially Responsible Party: Bryan Builders, LLC Location: Scaley Bark RD, Gastonia
Inspection Date: 1/24/25 Inspector: Jonathan Boerger Contact: 704-922-2150
O In Compliance ()Out of Compliance Weather Conditions: Clear and dry
Violations:
❑ No approved plan,Sec. 18(k);G.S. 113A-57(4)and G.S. 113A-54(d)(4); 15A NCAC 04B.0107
❑ Failure to follow approved plan,Sec. 18(k);G.S. 113A-61.1
❑ Failure to submit revised plan,Sec. 18(c)(k);G.S. 113A-54.1(b); 15A NCAC 04B.0118(a)
❑ Failure to provide adequate groundcover,Sec.8(c)and Sec.9(b)(5);G.S. 113A-57(3); 15A NCAC 04B.0107(b)and 15A NCAC 04B.0124(e)
❑ Insufficient measures to retain sediment on site,Sec.7(e);G.S. 113A-57(3)
❑ Failure to take all reasonable measures,Sec.6(c); 15A NCAC 04B.0105
❑ Inadequate buffer zones,Sec.8(a)(1)(2);G.S. 113A-57(1); 15A NCAC 04B.0125(a)
❑ Graded slopes and fills too steep,Sec.8(b)and Sec.9(b)(4);G.S. 113A-57(2); 15A NCAC 04B.0124(d)
❑ Unprotected exposed slopes,Sec. 8(b)and Sec.9(b)(4);G.S. 113A-57(2)
❑ Failure to maintain erosion control measures,Sec. 14; 15A NCAC 04B.0113
❑ Failure to self-inspect,Sec.4(b),G.S. 113A-54.1(e)and 15A NCAC 04B.0131
❑ Other:
Sediment Damage:ONo111Yes:
Corrective Actions:
NA
Comments:
Project is complete and the site has been stabilized. The SE&SC plan for this project has been archived. This will
be the final SE&SC inspection report for this project.