North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105
(336) 776-9800
County: Davie Project: Avgol America River basin: Yadkin-PeeDee
Person financially responsible:Avgol America Inc-Brian Mona,NA Director of Project#: DAVIE-2023-023
Finance
Address: 178 Avgol Drive,Mocksville,NC 27028
1. Project Location: 178 Avgol Drive,Mocksville
Pictures: No
2. Weather and soil conditions: Sunny,workable soil conditions Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Matt Busse Title:
Inspection report: Sent Report Date given/sent: December 20,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/FormsNCGO1-Termination.
Please note that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Jalen Hairston Others present:
Date of inspection: December 18,2024 Time arriving on site: 3:00 PM Time leaving site: 3:10 PM
cc: mbusse@landmarkbuilders.com