Loading...
HomeMy WebLinkAboutNCC231171_NOT Closeout Documents_20250103 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300,Winston-Salem,NC 27105 (336) 776-9800 County: Davie Project: Avgol America River basin: Yadkin-PeeDee Person financially responsible:Avgol America Inc-Brian Mona,NA Director of Project#: DAVIE-2023-023 Finance Address: 178 Avgol Drive,Mocksville,NC 27028 1. Project Location: 178 Avgol Drive,Mocksville Pictures: No 2. Weather and soil conditions: Sunny,workable soil conditions Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Matt Busse Title: Inspection report: Sent Report Date given/sent: December 20,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/FormsNCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Jalen Hairston Others present: Date of inspection: December 18,2024 Time arriving on site: 3:00 PM Time leaving site: 3:10 PM cc: mbusse@landmarkbuilders.com