Loading...
HomeMy WebLinkAboutNCC221688_NOT Signed Certification_20241209 NCGO1 Notice of Termination (NOT) Certification Form Directions: Print this form, complete,scan and upload to the electronic NOT(Rescission)form. Then, mail the original signed form to the NC DEMLR Stormwater Program at: Division of Energy, Mineral &Land Resources Stormwater Program 512 N.Salisbury Street,6th Floor 1612 Mail Service Center Raleigh, NC 27699-1612 DO NOT MAIL THIS FORM UNTIL YOUR NOT REQUEST HAS BEEN REVIEWED AND APPROVED. THE FORM YOU MAIL MUST BE COMPLETED WITH AN ORIGINAL SIGNATURE(NOT DIGITAL) [40 CFR 122.22] General Permit Certificate of Coverage (COC) No.: NG G 2 Z AlU Name of Project: /'t'4'q' '( 4°4/ j �s/�j�,t9� /1 tie /i 4 J/195t e Per NC General Statute 143-215.6E(i), any person who knowingly makes any false statement, representation, or certification in any application,record, report,plan, or other document filed or required to be maintained under this Article or a rule implementing this Article. . .shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request,and to the best of my knowledge and belief,such information is true,complete, and accurate. an_ / Legally Responsible Organizational Entity(must match eNOT): /kG /�K *Legally Responsible Person (must match eNOT): Gc ✓/It ee4/4 k� *Title of Legally Responsible Person: 741/ #7, C"6C/ 73/e'F G/4'n Print Name&Title of Signed if Authorized Individual Differs from Legally Responsible Person: iz-9 Z *Signature: Date: *IMPORTANT NOTE: This form must be signed by a responsible corporate officer that owns or operates the construction activity,such as a president,secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV,Section B, Item (6)of the NCG010000 permit. For more information on signatory requirements,see Part IV,Section B, Item (6)of the NCG010000 permit.