HomeMy WebLinkAboutNCC233006_NOT Closeout Documents_20241126 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481
County: Wayne Project: Wendy's-Goldsboro,NC River basin: Neuse
Person financially responsible:Delight Raleigh 1,LLC-Richard Krumholz, Project#: WAYNE-2024-012
Co-President
Address: PO Box 780794,Wichita,KS 67278
1. Project Location: US Highway 117 Bypass,Goldsboro
Pictures: No
2. Weather and soil conditions: Sunny,cool,dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No one Title:
Inspection report: Sent Report Date given/sent: October 16,2024
9. Corrective action needed:
Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring
or self-inspections are required.Project is in compliance and released under the SPCA.Termination of
10. Comments: coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be
requested by the permittee via a Notice of Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be
uploaded as part of completing the NOT process.
Reported by: Bradley West Others present:
Date of inspection: October 15,2024 Time arriving on site: 12:00 PM Time leaving site: 12:20 PM
cc: NCC233006