Loading...
HomeMy WebLinkAboutNCC233006_NOT Closeout Documents_20241126 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall,Washington, NC 27889 (252) 946-6481 County: Wayne Project: Wendy's-Goldsboro,NC River basin: Neuse Person financially responsible:Delight Raleigh 1,LLC-Richard Krumholz, Project#: WAYNE-2024-012 Co-President Address: PO Box 780794,Wichita,KS 67278 1. Project Location: US Highway 117 Bypass,Goldsboro Pictures: No 2. Weather and soil conditions: Sunny,cool,dry Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): No one Title: Inspection report: Sent Report Date given/sent: October 16,2024 9. Corrective action needed: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of 10. Comments: coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Bradley West Others present: Date of inspection: October 15,2024 Time arriving on site: 12:00 PM Time leaving site: 12:20 PM cc: NCC233006