HomeMy WebLinkAboutNCC222993_NOT Closeout Documents_20241001 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville,NC 28301-5094
(910)433-3300
County: Cumberland Project: Rebekah Evans 230kV Pod River basin: Cape Fear
Person financially responsible:South River Electric Membership Project#: CUMBE-2023-002
Corporation-Chris M Spears,EVP/CEO NCC222993
Address: P.O.Box 931,Dunn,NC 28335
1. Project Location: Upton Tyson Road,Grays Creek
Pictures: No
2. Weather and soil conditions: dry,workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): Mike Colletti Title:Project Manager
Inspection report: Sent Report Date given/sent: September 13,2024
9. Corrective action needed:
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self-monitoring or self-inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities must be requested by the permittee via a Notice of Termination
(NOT). The NOT is available at:https://edocs.deq.nc.gov/Forms/NCG01-Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: September 04,2024 Time arriving on site: 9:10 AM Time leaving site: 9:30 AM
cc: