Loading...
HomeMy WebLinkAboutNCC230730_NOT Closeout Documents_20240903 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 450 W.Hanes Mill Road, Suite 300, Winston-Salem,NC 27105 (336) 776-9800 County: Rockingham Project: Washington Solar,LLC River basin: Cape Fear Person financially responsible:National Renewable Energy corporation-Mark Project#: ROCKI-2022-024 Caddell,EVP-EPC Address: 801 Wood Ridge Center Dr.Ste A,Charlotte,NC 1. Project Location: 223 Church St.Ext.,Reidsville Pictures: Yes-Digital 2. Weather and soil conditions: 72,Sunny,Workable Initial inspection: No 3. Is the site currently under notice of No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check the violations 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since the last inspection? If yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): Title: Inspection report: Sent Report Date given/sent: August 23,2024 9. Corrective action needed: 10. Comments: A closeout inspection was conducted on August 23,2024. It was found that all the temporary sediment and erosion control measures were removed, sediment basins were filled, and permanent vegetation was stabilized.Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required. The project is in compliance and released under the NC Sediment Pollution Control Act of 1973. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. If you have any questions or concerns,please contact our office at(336)776-9800. Reported by: Mahfuz Islam Others present: Date of inspection: August 23,2024 Time arriving on site: 9:30 AM Time leaving site: 10:00 AM cc: