HomeMy WebLinkAboutNCC222784_NOT Closeout Documents_20240816 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215
County: New Hanover Project: Porters Neck-Castle Hayne-Folkston River basin: Cape Fear
Person financially responsible:Duke Energy Progress,LLC-Nuwan Wijesuriya Project#: NEWHA-2023-002
Address: 410 South Wilmington Street NCO2,Raleigh,NC
1. Project Location: Porters Neck Road,Kirkland
Pictures: Yes-Digital
2. Weather and soil conditions: 80s cloudy Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? No If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): none Title:
Inspection report: Sent Report Date given/sent: July 31,2024
9. Corrective action needed:
10. Comments: File closed.
Permanent ground cover sufficient to restrain erosion has been established.No additional
self-monitoring or self-inspections are required.Project is in compliance and released under
the SPCA.Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities(NCG01)must be requested by the permittee via a Notice of
Termination(NOT).The NOT is available at:
https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Brian Lambe Others present:
Date of inspection: July 24,2024 Time arriving on site: 10:00 AM Time leaving site: 11:00 AM
CC: