Loading...
HomeMy WebLinkAboutNCC222784_NOT Closeout Documents_20240816 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 127 Cardinal Drive Extension,Wilmington,NC 28405 (910) 796-7215 County: New Hanover Project: Porters Neck-Castle Hayne-Folkston River basin: Cape Fear Person financially responsible:Duke Energy Progress,LLC-Nuwan Wijesuriya Project#: NEWHA-2023-002 Address: 410 South Wilmington Street NCO2,Raleigh,NC 1. Project Location: Porters Neck Road,Kirkland Pictures: Yes-Digital 2. Weather and soil conditions: 80s cloudy Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? No If no,check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply) Degree of damage: 8. Contact made with(name): none Title: Inspection report: Sent Report Date given/sent: July 31,2024 9. Corrective action needed: 10. Comments: File closed. Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCG01)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https://edocs.deq.nc.gov/Forms/NCG01-Termination.Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Brian Lambe Others present: Date of inspection: July 24,2024 Time arriving on site: 10:00 AM Time leaving site: 11:00 AM CC: