HomeMy WebLinkAboutNCC231630_NOT Closeout Documents_20240603 Sedimentation/Construction Stormwater Inspection Report
North Carolina Department of Environmental Quality
Land Resources: 943 Washington Square Mall,Washington,NC 27889 (252) 946-6481
County: Pitt Project: ECU Pedestrian Plaza-Ph.3 River basin: Tar-Pamlico
Person financially responsible:East Carolina University-William E Bagnell, Project#: PITT-2023-025
Assoc.Vice Chancellor for Campus Ops.
Address: 1001 East Fourth St.,Greenville,NC 27858-4043
1. Project Location: Beckwith Dr.,Greenville
Pictures: No
2. Weather and soil conditions: 80 degrees,sunny,dry Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A.and rules? Yes If no,check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes,where? (check all that apply)
Degree of damage:
8. Contact made with(name): No contact was made. Title:
Inspection report: Sent Report Date given/sent: May 22,2024
9. Corrective action needed:
10. Comments:Permanent ground cover sufficient to restrain erosion has been established.No additional self-
monitoring or self-inspections are required.The project is in compliance and released under the SPCA.The permittee
must request termination of coverage under the NPDES General Stormwater Permit for Construction Activities
(NCG01)via a Notice of Termination(NOT).The NOT is available at https://edocs.deq.nc.gov/Forms/NCG01-
Termination.Please note that this correspondence must be uploaded as part of completing the NOT process.
Reported by: Scott Graboski Others present:
Date of inspection: May 10,2024 Time arriving on site: 4:00 PM Time leaving site: 4:15 PM
cc: