Loading...
HomeMy WebLinkAboutNCC240160_Site Plan or Location Map_20240118 4111,1,r1 ) SODDING ON a1AD DATE: PAGE: DATE: PAGE: 1 SILT s TIGHT,AGAINST EACH OTHER_ m Y 4 ".. A"SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY NCGS i _ - 0M1N' _ / FENCE / a FR ¢ •' AAAAn oraunxceeccc 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR COMPLETED AS AN f. ROAD .CDAOR ^" - EXCEL SPREADSHEET. '` IIII II I IIII IIIII"IIIIIII - SR k � kPRo r, AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED EROSION AND General Erosion Control Notes L. / fe 'f0 u SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A NCAC 04B. • • a0 /y°y 0131 STATES THAT"...DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING AND DATING 1.Only the areas shown shall be disturbed. . - / ' Am Nay MixcoasEcr ATCHED cxso wwascnv. EACH MEASURE OR PRACTICE SHOWN ON A COPY OF THE APPROVED EROSION AND 2.All disturbed areas shell be grassed m and Q' �l tlsoMeo� O REPORT THAT SEDIMENTATIOLISTSNEACH LMEASURE.PRACTICE O OR BY IR DEVICE SHOWN ON THE APPROVEDNG DATING AND SIGNING AN TION mulched as soon as possible and maintained THE WASHED SR • �\`G / •� 4 ro ..YY o�ow M SE \/r/,/• 1•� ,r� n pemaneM rover is established. li QJ �'� 'L� F.w„w pe SITE��=y y- EROSION AND SEDIMENTATION CONTROL PLAN.' STEEL FENCE POST WIRE �m • � •ir / S"ft,,,_ e 1�1 H BawAaEa FENCE ~ agNTYIEW `\FILTER FABRIC, �, "" ., y.�.4�1r_'!r_a, 7 �� mt�'+1 mi� )iul all, II„11NG WASHEOSTONE _POST SET MAX CLOTHNTRENCHAND HARDWARE Mn % i i if i •i '�' I ) He Sin FILTER .aT 3'FILTER GROUND Nwosi h 11hV •i i i v wax wrirkVa ° aP°°"eP6LXew t HoxaS. `MOWER Persuant to G.S.113A(3), provisions for permanent ground cover sufficient to restain 'A IN NOTES: g car iii� �',;,�` w V,o o°o 1.Hardware cloth and gravel should overlay the silt fence at least 12 Course Aooregate n '�s erosion w�'p 6°fir inches. z o APPEARANCE OF GOOD SOD S,t,S2 must be accomplished for all disturbed areas within 14 working days or 90 colander days 2.Stone outlets should be placed on low elevation areas of silt fence Construction: Maintenance: ✓N end based on field conditions. 1.Clear the entrance and exit area of all vegetation, j°5 1 i,III (whichever IS shorter) following completion of construction. `\\ MAINTENANCE: roots, other objectionable L Per nance: inspect at least once aweek and alter each linch or o Ail I I I x�. alien F 1.Per NCG_ inspect outlet at lest once a week and after each 1 inch or malarial and properly grade it greater rainfall;make any required repairs immediately. B7 b ,Pp VICINITY MAP ll :, II IIIII n,.1,aaxaa.. HARDWARE CLOTH FILTER FABRIC IN TRENCH 2.Place the gravel to the specific grade and dimensions shown on the plane,and 2.Maintain the gavel pad in a condition to prevent mud or sedimentro N.Ts. 4 I VIq J II greater rainfall event complete am required repairs immediately. smooth it. from leaving the construction site.This may require periodic • I 2.Freshen stone when sediment accumulation exceeds 6 inches. 3.Provide drainage to wrty water to a sediment trap or other suitable outlet toptlressing with 2 inch stone. °°s°o 3 Keep mesh free of debris to provide adequate flow. 4 Use geotext le fabr in order to improve stability of the foundation to locations 3 Immediately remove all objectionable materials spilled,washed or � ro,a. x SECTION.. 4,Remove sediment when half of stone outlets covered. subject to seepage cs or high water table. tracked onto publcroatlways i!;�-. _ asmua*x a»w W oC£ pry^' n entel.jpeg 5.Replace stone as needed to facilitate dewaterng a-cm xoaoorxauaes SILT FENCE OUTLET CONSTRUCTION ENTRANCE/EXIT CONSTRUCTION SCHEDULE ' 1.obtain all necessary permits and plan apP vale on and Segment Contrel(E&SC)perm and a Cerbnnah of Coverage / / l ` i I (COC)must be obtained before coy land dla urbing activities occur.A copy of the EftSC permit,tthe COC and a hard copy of the \ / \ IIplan must be kept on site.preMrablytin a permits box,and accessible during inspection.2 Install gravel construction entrances iris d en silt knees,reinforced silt fence / \mlctsaaring.es. 76/ \ ) 3.Finish clearing and grubbing any nwessary areas ou the lots as Rey are started. U4.Begin lot grading and excavation activities / I \ IIIDATE: �e'M re�, wire Fence\ Filter Fabric PAGE: 5,Begun or continue with house consWetion activities.6.FiasM1 ell mugM1 grading and house construction. / I `CP °^°�� 6Max.Extra strengt„abric wtout wire fen Wire Fence ' Beckfill tie, T Irutall do Iks d / IIII `� dO9MYIX8.Begin fi grind g fl G steel Poete-sh Nc9.Final gra-g g d bi--g f I I l ill- I h-stall ion of sod on the lot The silt fence willremain in place until M1 1 dd d b I' d d ak M1 Id. / III II /��/ 10 The con hall J If' f h - d d' i I w and complete the following / 18 snUpabpe ombined If f f J th DEMLR b III / Plastic or Y_ n roe -' http:/ deq g b di i gy - d d s/ p g M pd nstruct on program /II ) Wire ties M1bn Twelve months f I f shall be kept and availablef all 1 recommendeda / copy be kept b Ref G.5.113A 541tao through 52 Sec ISA NCAC 04AOlol through15A / 11I NCAC 04E0504General P NCG 010000 NPDES for Construction A / - _ _ - - • �( selift, a 'o and sedimentation control measures are m be pert ed least every calendar days and / - _ _ - - - - _ - - = F // III 1 /X K n mX K'( lt=aOg tr4;ro within2 h f very rain event ofgreahr Man l inch.Any needed repel tell be made immediately to maintain measures as I designed.All ESG urea shall be maintained az specified in the can details this plan A min gauge shall be ins�lea 'rivate Road _ a theprejatsiteformonitoring Upton Tyson Road - i" FIImrFahac w dune m m 12.Inspec[ion and final acceptance Idlers.When the project is complete,the perminees shall curiae[DENIER to close out the E&SC _ - benglM1 or extra strength symbetic0lterabrin. CROSS SECTION VIEW Plan.After DEMLR informs the perm a of the project clan na inspection report,the penance shall visit - - - - - - - - _ _ - III aboveground.lHl9her lances "deq.uc.govMC001" submit electronic Notice fterminatMn(e-NOT).A$I00 annual general permitfee will be charged IIIIIthat the volumes Cent.dOeScause nfail eXOeedre of eswnea bo aril the a-Nor rise been rhea one 6 tram fabric horn a continuous roll cm to the length of Web 'rm avoiajoina when joint.are r 16 CONSTRUCTION % / -1---.......----, � 1 III �:e°retrme onlrsa�pDpuDpatwlth4aem Inimamoved mN.ne DM. Maintenance, the Rey Ma nysl:pre s:e :L o."es.Enena 4.NM of the fence pose mesh t Wire t to eor plast bottomic zip nessould have f Me Iran..Fasten a minimum pound tensile shength.en lakfic on a hhor greater anfent ^Il Make ces at ay required once a pendmmetlater each l MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION /� LIMITS \ / \ 1 1 III / ameamum ofe pa. ppa ss oultl Mtlnven bat ofaeetll,Mntfenne toll e.mar,tle S Gravel Construction Entrance-The grovel pad should rem ondition to prev mud or sedimentfrom leaving the construction \ 1 I I / �rgtn mte'ro urey or become''''' reside d'''''a This may nemiedperiodic topdassing with 2-inch stone.After eachrainfall,inspect any sta used to tap sediment and clean n out as necessary. (/ II rmbactl Nyhm poem.Wi oc'paso zlD tl�ehoultl M1aveaminlmum o150 pountl mns,le e Immediately remove all objectionable materials spilled,wsahe4 or Necked ohm public roadways. I 1 1 I II III ' foot c re mesh au prof °^ remavoldunlermWnrthue to durlrgn thelegu'e / atey4 inches wide and 9 inches deep along Me proposed tine 0f the Posy ens Silt Fence-Sediment fan«asholld Sc inspected at least once a week and after each rainfall event Any repairs should be made immediately. \ REMAINDER OF II I\ 1 m Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed \ , I ` long the battmm and side of the trench Me conmb fag of properly m insure that the removed sediment does not wash back against the fence.Adequate storage volume should he provided for behind Me fence OT 1 TO REMAIN 1 III ' the.non MO soil over the Otter form end compact.Thorough compaction W the Mckatt is drainage a're 4.Remove ell saha fencing properly stabilized. Excavate DIN oar st all brow.Take caremvot undwmtine the fence dung deanout operations. I ROADSIDE BITCH B.Place not. Hecmenre. UNDISTURBED I 1'II I I g.no waMu vim mbampm e4vlgo-eea. Sodding The sod 1 din insure that the take holds a Me areas beta secured.The sod should be watered ace \ CONSTRUCIIION g properly ymainmine grass being ssary CONSTRUCT) to maintain adequatem -M ozone end prevent dormancy of the sod The sod should not be mowedhclose,since M' Id-M bit adequate ENTRANCE ..WCEnvAa e,lal jive growth d stabilization of the bed.tThe sod should be limed and fertilized as per soil type recommendations and type ofgre recommendations when a rp N. ) \ 1 I �`a 7 DAY GROUND OVER SILT FENCE Lot Plan I o •ill= IN DITCH WHERE PIPES Once the and MMehing-The area he recarea shouldve be gannained ing as needed be to inure dv that fens me germed inating properly.Any an initial step iusoiuld be repaireon.d, \78/ \ - I )QQ.,y Done the gaming has been planed,the area should be maintained as needed to insure that al area.me germinaring properq.Anr bare areas shouts he repaired, _ RB t III HAVE BEEN INSTALLED F and reseeded as soon asp possible.If the- of year does not permit the establishment f p g M temporary greasing should be used until Me - DRIV WAY DATE: PAGE, growing season permits 0 f permanent grass - I Diversion Berme-Diversion bshallh inspected weekly mafter each mnuffproducing m Malthey - a'®,a am Mere \ \ - PIP�IN DITCH I z� mAr.to be 1. Other mardials providing NOTE ra pmaelon �I re CZ FLOW �I have been no breaches F b B burl not exceed 18 in height,and shall beplaced- - - M1 construction ids. r,-, re -n ubamumd tar Once the house construe- - ,Led and Me lots ready to receisod,then Me b shall be d d incorporated- hgraded l ea \ \ / I I III z Il�,�l� -'�Il lit ryvnln mmcepmoY and covered immediately 'h d.All paper care shall be takes to msare that the berm lid d he applicable detail with the berm material do rot tar compacted sufnciently insure that the berm remains in place during the course of the Lion activities. \ I III / SECTOR Stakes SECTION Bmkea w 11 installed toaof m a.a minimum beyond vials)located Mow General-All measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the gat areas nouteaM mated vile edge of Na activitiesconstruction any particular lot do not adversely affect any of the installed erosion control measures.If la construction dictates,measures will be relocated 76 I land on the lot to insure thatthe potential for sedimentation mnoffis eliminated as much as possible.Silt fences and gravelwtutruetion entrances will be maintained as suggested 1 I III / N alle()should be tuns CC.s upu°lb�to in the erosion con,manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. \ from Ong around Me end e�o tiMev- RO sMy.. silt and srem g0 ble stems MO a 2 T" trim had \ CONSTRUCTION // 2 DRIVNAY III ^�/ / and venicelly plumb,through hardwood Mould LIMITS Lot Plan PIPE IN DITCH 1' II II pelf i inch Qz GROUND STABILIZATION �- \ / / Wood Mulch d4M Mnaad visa ��. .m m �. e ntstaking tak�isnt cell NTaALLL. groan ,a. SITE AREA STABILIZATION •+-• '� s. °`"` EXCEPTIONS a'� NTREN HEOtN DESCRIPTION TIME FRAME � � er \ / / I�*�y� u c s ,�„"arenremv„maw,p�L0104r.��„�,,,. Iemhamntn weme aud�°u"a�eWna. PERIMETER DIKES, 7 DAYS NONE . ,`;•-o _°`...°"• r / 7 DAY GROUN A COVER ISOMETRIC VIEW SCE SWALEs,DITCHES& - ROADSIDE DITCH I Paint tltaomk,W100 leant yand aaer SLOPES JOINT DRIVEWAY IN DITCH WHERE PIPES compost mmxurwRpw aaccusediment,rainfall.n d. HIGH QUALITY 7DAYS NONE �R 1n ° n11 °„.��aoAa„ 3 / 3 II III II II HAVE BEEN INSTALLED ter Dmre,ss Sack, ,Wattle most f clogged or WATER ZONES n: n / CONSTRUCTION rot d n.. ...... ...m, non.. Nm.m, moo sbi n5n„ m>adequate °b^ ("QW) �°1 S r q��" -''M, •° 1 REMAINDER OF Lot Plan ENTRANCE II III IVI Sh tFlow_._ Pre SLOPES STEEPER 7DAVS IF SLOPES ARE 10' II' HII�IR "• ""m""`"w'"e I name tnnnlaxl neat nze.l tad ml nm.I tropmllarger diameter ore tar sure. IIII=,y-1L-11=,11' "D & 0 THAN 3:1 OR LESS IN LENGTH I.IIGI:I-IKII= a.m.a.uwed.r. ,�, I LOT3TO REMAIN // rr� I III II I won are mete:urehaaes shen ame in..unly tea. AND ARE NOT „a."..,„",".. I UNDISTURBED m,Wy;a"m is:t9°*.'""tinl iia°tian"t�te'ema,I lei l,9°mm'"",l n+4 ° Silt amWmns,and insp.. e,b bone, STEEPER THAN 2:1, / III 14 DAYS ARE hl SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION ALLOWED ,,,,,E;a'"' E. r L ` III II SLOPES 3:1 OR 14 DAYS 7 DAYS FOR I . _ 1\ FLATTER SLOPES GREATER \O THAN 50'IN LENGTH U''T�-'� 7., 1111IIO CONSTRUCTION I I O III ;IIII (kI rRA 011 : �=II.•I \ LIMITS I I I III I I\ ALL OTHER AREAS 14 DAYS NONE(EXERS FOR 11=-' I¶11 1 WITH SLOPES PERIMETERS AND II-=II I� - ,I FLATTER THAN 4:1 HQW ZONES) \ I I 1 III III\ ..mry._.p�.�.,..�..a•m._�.om �, /� I I I III �I III) I DATE: PAGE: \ I� ' III m "C" 'F" "G" "H" I III lv IIII I PAGE 1 of 2 u u 7 ®� �- \1 1Q III II LOT EROSION CONTROL PLAN 1-3 ¶'HOUS ¶' JL HW JL �HOU$y HW e- HOUS �'HW HODS HW 1 ` IIICi) I I FOR LOTS AG / I �� TOTAL DISTURBED ACREAGE:2.62 ACRES Eo T`- � .+�� ' •���r v v III • II MICHAEL O'HERN Notes: \ \ \ \ III I LEGEND 1.Ifb needed Tree Protection teeing should Installed along the buffer zone,wetland \ ) \ \ -� III �� _ LOT RECOMBINATION boundary and/or around protected trees,providing a radius of M least 1.25 feet for each DIRECTIONFLOVV 4= Inch of Silt nk Fence on the \ SILT 2.Install SM Fence on the low adjasedsmnemeach lot Install SiltRance pointss shown re / \ III N FOR RSlorvsptreH �rD-TC schematic/diagram and Feld adjusted,if necessary,for placement at low points.If lots are \ � � � _ ADDLE,atLT SO B Fencesous and have different land owners or builders,each lot should have individual Silt III W Nash ''cad S...2224 = = = K I M A S H HOMES L L C. SILT FENCE OUTLET ® 3.Install required Silt Fence within 10 feet of property line to ensure there is no conflict with T cosoroocTON ENTRANCE septic system.It is the responsibility of the builder to ensure the installation of sediment W ►{r2 r"� 1 control measures does not impact the septic system and repair erea(s). I y` L °' "ea.[one pn.buptipnEmr°^she/Exiti.to lein.talledperlol \ Ili III f - 24GRAYS CREEK TOWNSHIP CUMBERLAND COUNTY,N.C. 5.Waste bins and other areas dedicated for managing building material waste shall be alleast 50 feet away from storm drain inletsordrainage ditches unless k can be shown that = = SCALE:1"=60' NOVEMBER 2023 no other alternative exists.If this separation cannot be achieved,these areas must be contained behind Silt Fence. / III 6.Inlets downstream of disturbances should be protected;streets should be swept when III l �� GRAPHIC SCALE sediment from the construction activity is present. / III 60 0 30 80 120 240 7.Details for Silt Fence,Silt Fence Outlets,Construction Entrances and other measures are ' h III 11 provided on additional sheets.Erosion and sediment control details are not drawn to L_ scale. TYPICAL LOT LAYOUT WITH ROADSIDE DITCHES III III ENGINEERS ( IN FEET) NOTE-DIVERSION DITCHES AND WATTLES WILL NOT BE UTILIZED IN ROADSIDE DITCHES III PLANNERS 1 inch= 60 ft. IVICNI III I I SURVEYORS MOORMAN,KIZER&REITZEL,INC. 115 BROADFOOT AVE. FAYETfEVILLE,N.C. IIII III MOORMAN KIZER&REITZEL INC. PHONE(910)484-5191 FAX(910)484-0388 License#:F-0106