Loading...
HomeMy WebLinkAboutNCC233736_NOI Application_20240103 Action History (UTC-05:00)Eastern Time(US&Canada) Submit by Anonymous User 12/18/2023 11:28:05 AM (NCG01 NOI Submission) Approve by Brooklyn.Broussard 12/19/2023 6:41:17 AM (Review-NOI 174077 Knott Farm Subdivision) • The task was assigned to DEMLR NCG01 NOI Review Team.The due date is: December 21,2023 5:00 PM 12/18/2023 11:28:12 AM • The task was assigned to Brooklyn.Broussard by round robin distribution 12/18/2023 11:28:12 AM Submit by Tev.Holloman 1/3/2024 4:09:46 PM(Payment Verification for NCC233736) •Knott Farm Development, LLC • The task was assigned to DEMLR NCG01 Payment Team.The due date is:January 30,2024 5:00 PM 12/19/2023 6:41:33 AM • Tev.Holloman assigned the task to Tev.Holloman 1/3/2024 4:08:18 PM applicationConstruction Stormwater: Notice of Intent (NOI) National Pollutant Discharge Elimination System(NPDES) General Permit 1 OOOO:STORMWATER DISCHARGES associated with construction activities NORTH CAROUNA Environmental Quality A. Project Information Part A. Project Location and Waterbody Information ................................................................................................................................................................................................................................................................................................................................................................................................... Are you submitting an NOI that was rejected before? No Yes 1a.Project Name* Knott Farm Subdivision 1b.Specific Lot Numbers This field may be used to list specifc lot numbers. 1c.Parcel ID Number(s)(PIN) List all PINs associated with this project. 1775944415 2.County* Wake 3.Highway or Street Address* 0 Edgemont Road Street name only is acceptable if no address number assigned yet 4.City or Township* Wendell 5.State* NC 6.Zip Code* 27591 7. Latitude* Enter the latitude in decimal degrees 35.8214 8. Longitude* Enter the longitude in decimal degrees(MUST be negative) -78.3957 If you do not know the latitude and longitude coordinates for this project,you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 01/01/2024 Estimated Construction Project Start Date 10.Date to End* 05/01/2024 Estimated Construction Project End Date 11.SIC(Primary)* Residential,Single Family Houses(SFE)(1521) Standard Industrial Classification for Development 12.Acres to be 10.00 disturbed* (including off-site borrow and waste areas) 13.Total site area 41.20 (acres)* 14. Post-construction 4.27 impervious area (Estimated) (acres)* Project Tracking ID NCC-WAKE-2024-Knott Farm Subdivision Assigned automatically(not used) Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies-not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a.Receiving Waterbody* Fall Branch(Rocky Branch) Name of waterbody into which stormwater runoff will discharge 15b.Waterbody Index No.* 27-57-8-(1) NC Waterbody Index Number Stormwater discharges will flow to additional waters* No Yes 15c.Additional Receiving Waterbody Fall Branch Waterbody name 15d.Waterbody Index No. 27-57-9 NC Waterbody Index Number 15e.Additional Receiving Waterbody Buffalo Creek Waterbody name 15f.Waterbody Index No. 27-57-16-(2) NC Waterbody Index Number 16a.Is this project subject to the NC Sediment Pollution Control Act?* Yes No, not subject to NC SPCA 17. Is this project funded with ARPA(American Rescue Plan Act)grant funds? No Yes This question was added to the eNO1 on 1/26/2023 and will not be answered in applications submitted prior to that date. B. Permittee Information Part B. Permittee Information-Legally Responsible Entity and Individual ...................................................................................................................................................................... Important:The person who signs the NOI Certification Form and signs the Certification in Section E of this application form must be the same person as listed in THIS SECTION,or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV,Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. 1. Permittee* Legally Responsible Entity Knott Farm Development, LLC If permittee is an individual,enter first and last name in this field.Otherwise,enter organization/business name. Note: If the permittee is a business,the business must be registered with the INC Secretary of State.You can verify the registration here. Permittee must be the same entity that is responsible for the land-disturbing activity as listed on the NC SPCA Financial Responsibility/Ownership(FRO)Form. 2. First Name* Elton If Corporation,enter Registered Agent First Name 3. Last Name* Ange If Corporation,enter Registered Agent Last Name 3b.Title Managing Member 4. Permitee E-mail Address* rustyange@angeconstruction.com 5. Permittee Telephone No.* 9193883636 6. Permittee Mailing Address* Street Address 113 Edinburgh South Drive Address Line 2 Ste. 100 City State/Province/Region Cary INC Postal/Zip Code Country 27511-6456 us Check box if the street address the same as mailing address Yes 7.Permittee Street Address Street Address 113 Edinburgh South Drive Address Line 2 Ste. 100 City State/Province/Region Cary NC Postal/Zip Code Country 27511-6456 US 8.Type of Ownership* Ownership is only individual if an individual is named in B.1.above. Non-Government C. Site Contact Information Part C. Project Site Contact Information ................................................................................................................................................................................................................................................................................................................................................................................................ 1. Primary Site Contact-First Name* Rusty 2. Primary Site Contact-Last Name* Ange 3.Title 4.Site Contact E-mail Address* rustyange@angeconstruction.com 5.Site Contact Telephone No.* 919-388-3636 6.Organization Name 7.Site Contact Mailing Address* Street Address 113 Edinburgh South Drive Address Line 2 Ste. 100 City State/Province/Region Cary NC Postal/Zip Code Country 27511-6456 us 8.Consultant Name (Optional) Benjamin Mayo First and Last name 9.Consultant E-mail ben.mayo@bnkinc.com This person will be copied on all correspondence. 10.Consultant Telephone No. 919-645-3553 11. Billing E-mail (For Annual Fee correspondence) rustyange@angeconstruction.com Default is legally responsible person e-mail 12. Billing Telephone (For Annual Fee correspondence) 9193883636 Default is legally responsible person telephone D. E&SC Plan Part D. Erosion&Sediment Control(E&SC)Plan Approval Information ...................................................................................................................................................................... 1. Date E&SC Plan 12/12/2023 Approved* 2. E&SC Plan Project SEC-096903-2023 Number/ID* Assigned by agency or local program 3. E&SC Plan State DEQ Office Approved by* Local Program 4. Local Program* Wake County Documentation of E&SC Plan approval and the signed Notice of Intent(NOI)Certification Form is required for a complete application. Please also upload a site map showing the overall extent of the project(for linear projects,can include the beginning point and end point coordinates in the"Notes"box below). 5. E&SC Plan Knott Farm Approval letter or Subdivision_WC_Subdivision_WatershedManage... 297.27KB Grading Permit V.1_W M_12-12-2023.pdf Must be PDF format 6.Signed FRO Financial Responsibility/Ownership Form 07 FRO.pdf 147.32KB Must be PDF format 7.Site Location Map Must be PDF format(limit 20 MB) C0.0-Cover.pdf 700.84KB Please do not upload entire set of E&SC plans. 8. Notes(Optional) Provide any additional information that might help the reviewer better understand how uploaded documents support the application.Include additional waterbodies if necessary. 9. NOI Certification KNOTT FARM NCG01 NOI.pdf 831.82KB Form Must be PDF format This is an Express No Review Project* Yes E. Certification North Carolina General Statute 143-215.613(1)provides that: Any person who knowingly makes any false statement,representation,or certification in any application,record,report,plan,or other document filed or required to be maintained under this Article or a rule implementing this Article;or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article;or who falsifies,tampers with,or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars($10,000). Under penalty of law, I certify that: * I am the person responsible for the construction activities of this project,for satisfying the requirements of this permit,and for any civil or criminal penalties incurred due to violations of this permit. * The information submitted in this NOI is,to the best of my knowledge and belief,true, accurate,and complete based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information. * I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II(Stormwater Pollution Prevention Plan)of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* The Legally Responsible Person named on this Notice of Intent Authorized Responsible Person"(signing on behalf of Legally Responsible Person named in Part B) Important:The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee,that individual must be an authorized responsible person within the same organization as the Permittee. 'An authorized individual is a responsible corporate officer who owns or operates the construction activity,such as a president,secretary,treasurer,or vice president,or a manager that is authorized in accordance with Part IV, Section B, Item(6)of the NCG010000 General Permit. For more information on signatory requirements,see Part IV,Section B, Item(6)of that permit. Signature CJ/rr'ii/ �i�i Type Name* Elton Ange Title Managing Member Organization Legally Responsible Entity Knott Farm Development, LLC Date* 12/18/2023 F. Tracking and COC Info NOI Tracking No. 174077 NC Reference No. NCG01-2023-3736 Indicates NCG01 or NCG25.Uses NOI number until approved,then uses NUMBER incremented by SP(passed from workflow if eNOI approved) Certificate of NCC233736 Coverage(COC)No.* Uses NOI number until approved,then uses NUMBER incremented by SP(formatted and passed from workflow if eNOI approved) Initial Invoice No. NCC233736-2023 Invoice Due Date 1/18/2024 Initial Fee $ 120.00 Fee increased to$120,effective October 3,2023 Invoice Status OPEN