. 44, MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION \\��
° q.eq� Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic tapdressing \ /�a.)12 I SITE ayy qo,o wtlh 2-inch stone.After each rainfall,inspect any structure used t°trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled,washed or \ / �° \ .-----„,„:„...it:
tracked onto public roatlways.
Slit Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed /\J1 / tea\
PO fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure that the removed sediment / / / \ \ v j O.a
I-- does not wash back against the fence.Adequate storage volume should be provided for behind the fence al tall times.Take care to not undermine the fence durng cleanout / / \\ ..0* \�W wr OA' operations /
z 0-3scnH;ooR°AO Spy The sod should be properly maintained to insure that the grass take holds n the areas being secured The sod should be watered as necessary to maintain adequate \ / / '- QJ I+�' y `� °`'°"'°,,,�„
2 0 moisture n the root zone and prevent dormancy of the sod.The sod should not bemowed to dose,since this couldinhibitadequate growth and stabilization of the root bed.The X
/ / \, / /]5� ,�od should be limed and fertilized as per soil type recommendations and type of gras commendations when and f possible.
1(/ ����, ,c • ,
Jq Kto UQ'ON Grassing and Mulching-The area to receive grassing and mulching should be properly fertilized and limed as necessary as an initial step in soil preparation. Once the grassing J / / ..\--.......\ i '��y" ^^' - jai �S S
o�` NR Ala T.11'1v'„ has been placed the area should be maintained as needed to insure that all areas are germinating properly.Any bare areas should be repaired.and reseeded as soon as possible. / \ s` �I
�� v��Gone If the time of year does not permit the establishment of a permanent grass then a temporary grassing should be used until the growing season permits the use°f a permanent /\ ^ //// s M n -`"=e-= i j j - y '
grass. / _ 3Y
General All measures will be inspected and corrections made after runoff producing ranfalls or at least once a week minimum.The bolder will insure that the construction activities --
VICINITY MAP any particular lot do not adversely affect any of the installed erosion control measures.If lot construction dictates.measures will be relocated on the lot tonsure that the potential for / �' / �� tip
(NOT TO SCALE) sedimentation runoff s eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested n the erosion control manual.Sodding,seeding '- • I
/ �/ 1 2
and mulching will be maintained to insure proper ground stabilizing cover. 1 Construction: Maintenance:
Waffles-Watlles shall be inspected aflersignificantrainfall events.Rillsor guillie upslope of the wattle and any undercutting is to be repaired.Sediment tleposIts that impair the fltation ///''���_/ 6//-7 .. 1.Clear the entrance and exit area of all vegetation,roots,and other objectionable 1.Per NCG-01 inspect.least once a week and after each l inch or
capability of the wane shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed sediment shall be deposited within the project in such a / \ I (// \ ' - material and properly grade it greater rainfall;make any required repairs immediately.
way that the sediment is not subject to erosion by wind or water. I 1/ 17� �_ I / / — — 2.Place the gravel to the specific grade and dimensions shown on the plans,and 2.Maintain the gravel pad in condition to prevent mud or sediment
Reinforced Silt FenceOutlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care / I / �� Smooth it. from leaving the construction site.This may require periodic
to avoid undermining the fence during cleanout Remove and replace stone as necessary as it becomes clogged with sediment.Remove all fencing materials and unstable f I / 3.Provide drainage to carry water toasediment trap or other suitable°u11M. topdressing with 2lnch stone.
17 I / j d.Use geotezlile fabdes In older to Improve stability 0f the foundation in locations 3.Immediately remove all objectionable materials spilled,weaned or
fil
sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. / ' \ / 1 subject to seepage or high water table. tracked onto public roadways.
1(/
// n / I ( ( r fl CONSTRUCTION ENTRANCE I EXIT
/ illa
1 .:.t:. \ 4/ DATE. PAGE.
(— / ) \ \) \ I (1 ) i
DATE: wire Fence Filter Fabric PAGE: I •
°,«IPaM j)
B'Max.Standard Strength fab.oath wire fence PI. i SODDING \ I ''".. I ( al 1 I ,A.' ;—.1
••G• ^H.
6•Max.Extra g bra witMMwire fence Wire Fence Wire ,� Bockfill trench
steel Post
%' lM1odr CompactLAY SOD IN A STAGGERED
Ups.. ' DO NOT LEAVE SPACES AND DO
\ 1 I I I ' '-I�� / " ) / It�.� ll II ll '� fu
Plastic or } ma surriNG ENDa AND TR MM NGPEOES 1 I ..„-,9_," / / ¶HODS ¶' I ✓< HOUSE II II HOUSES �' I
t n NLORREOT � L ::: 1
core teeCORRECT. eaMATeHanenRRaeFLY ` J I.Opp. _RD Ra �.� L AY —RGAr'J ,:I AY —HaA. J
-`1 rr Nit -ROADWAY
1 'tie aNe bench „. 111` 51�f •' LE /S / / /-- / / / L U LEoce of nit Notes. NAY r• AY
•••- /,1( !__ 1.If needed.Tree Protection fencng should be'nstalled along the buffer zone wetland
1 Fabric / / �. SILT DE RN"^C 20 / LEGEND RB INLET boundary andlor around protected trees,providing a radius of at least125 feet for each
�l& CO Tcr°N inch of trunk diameter.
Strengthfor
synlhebc rater fah.. CROSS SECTION VIEW / _ - / :` 4 BILU L
n / 2...11 Sill Fence on the sides of ea.lot.Install 51[Fence outlets shown on
e he9ht of heiment esediment ten«cones not exceed above ground.(Higher fences /yMµµµfM A);yµ' / •C 9 I rY P PO its If IOtSere2 EmConu impound volum.re Net Ns water to failure of aesgth or extra uc elbow � uli fiYM, °..OUr ry Ervr [ 0pp1 [. • >.w.: \ N6chamat Gda ramantl foldatl ustetl.fnecessa for lacement etIOW3o"Cons..Nit fine bnoffroma tiuotusro out m the gN of Nit 4P� @GM ! ---/-d� .,dl / c / zm� contlguousaneheveelRerent land owners or bulleers each to[should have ndlvldual Silt
rt..en the filter Nony at a supporc next rat pos ROLL SOD Lv 11P4771
/ SILT FENCE
MI lcory 8r Fences4.supPrt standard strength finh support to Me bottomday wire mesh fastened«cor.to the upslope side of the poste.Exptend maimenence: / J rv5 ` -'p[I•NF D I iIj / SILT FENCE OUTLET ® 3.Install required Silt Fence within l0 feet of property line to ensure there is no conflict with
the wire p p t CONTACT WIT.THE S / �� rp ll'. ENTRAN sstem.It is the resonsibili of the builder to ensure the installation of sediment
side M1coNSTRucTION 2jo septic Y P lYAs r.E SOD Is LAID. MowER nlG.z^a. IMtTs_ Erv�
R 1HE sis ismno-olmeasurestloeanot im act these tics stemandre ai of the.n..Fasten the(We reinforcement,then fabric on
__ :8.7 � cuRB INLET � p p Y p r rea(s).S VMenfa res the�mesnowpporl fence is u«dapace poststic Pp Iles should eea mmaximumve a °o eket apart.Sum 50 pound ippwtsnshoud be driven teartl /// � \ / 7. //��
securely i..ground a minimum of 24 inches, or become In....fences
"fpromgth. in.or greater rainfall,Make any upny. w APPEARANCE OF GOOD SOD T� 1 / ` 'J J \ /.A[least one Construct on Entrance/Exit s to be Installed per lot
6,Extra strength filter fat.nit.foot does not Securely / / r.1
�.... F/Imo'. 5.Waste bins and other areas dedicated for managing building material waste shall be at
ter fa.directly.pomsWire air plastic tip Iles shwa have amnmum off50 pc..tense e / „y L/ T°"Y"^'^""' 1 / least 50 feet away from storm drain inlets or drainage ditches unless it can be shown that
flrength are to avoid undermining fenced e l i I r �; pt B d /EMn c D other alternative exists.If this separation cannot be achieved,these areas must be
7,Excava.the ope fromttrech aapproximately inches wide and S inches p e promised line of posts aris I�jiil III• jilt, HEALTHY MOWED / - a-L REINFORCE contained behintl Silt Fence.
II :I. 'I I / ITYRa tip
I 6.Inlels downstream of disturbances should ba rotected;streets should be swat when
8,Place 12 inch.of fah. .ho.m and side of Red bringg Mmove all earenagto gradeiand stebizs and eb n afteele rthe'wmcenbun°g I/I Ei II `,,,II II ijI I I/ _�•' 'ti7 I Sn FE � rsL P P
«a q. Me inter fabric na comp ct rhaough compauwn°f the backs is ar a rea has p p y b zed. D DEAD (I I ' - 0 � '{' N . sediment from the construction activity is present
willt0.oos.silt to kbemar..existing.es. — WITH DErvaE RooT MAT FOR / I� �s N„ -E - r` ' -""" 1� -\NCEnvron men tat.jpeg T.Details for Silt Fence Silt Fence Outlets Construction Entrances and other measures are
sin been roar stabilized. _ otrz'TH CK
to
3o LAND RoOTs SHOULD BE
-'- ✓ a'TH cK I /� �/ 2 I 0 I� LE x provided on additional sheets Erosion and sediment control details are not drawn to scale
/ / u -- I20 TYPICAL LOT LAYOUT WITH CURB AND GUTTER
..\NC-Envirmment0l.jpeg STRENGTH. / I\\ I I / �� ' O I# 23NrE -''
SILT FENCE
) ) )� 7/ — zs WATION TTLE .Io�PI „oJ
I
I'.
" I �.V oFodCE �� / I CONSTRUCTION SCHEDULE
� ,, \ s�\ I EN c�Io C si I.Obtain all necessary permits and plan approvals.Erosion and Sediment Control(E&SC)permit and a Certificate of Coverage(COC)must be
// / //- L""'IC A*. �M L Ne obtained before any i snit x,disturbingaccessible
ssible duoccur.A copy ve the E&SC permit,the COC and a hard copy ve the plan must be kept on site,
// n. preferably m a permits box,and euessible during inspection.
eeacGETE 2.Install gravel construction entrances first,then s I fences,reinforced sdt fence
A'SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY \IY / / WAS"°u^EN ,N � /^\ ( outlets and wailed
DATE: PAGE: AS REQUIRED BY NCGS 113A-54.1"I S AVAILABLE FOR USE.IT 1U I, �'t1 / \ \ 3.Finish clearing and grubbing any necessary areas on the lotsusthey are started.
CAN BE COMPLETED BY HAND OR COMPLETED AS AN EXCEL ///// / / ZS ill 1
4 mlrv. SPREADSHEET. ) / f \ r FEN •� 4.Begin lot grading and excavation achvrties
AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE 7/ / / `_ 'SILT FENCE 21 5.Begin or continue with house construction aahvipes
- - - L FENCE APPROVED EROSION AND //// / ITYP 1orvcR� \ 5 Finish all rough grading avd house cooswcnon
^1 SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT / / j :ICI ]Install driveways,walks and patios
IIIIIIII IIIIIIII IIIIIIII l SITE.RULE ISA NCAC 04B 0131 STATES THAT / I I •SnRUcna WAs„oo �q a Begin fine goedmg of lot areas
- 1- °...DOCUMENTATION SHALL BE ACCOMPLISHED BY INITIALING I / / / / / y \9� N cE \ H.Final gassing,mulching and eicbJlnng of lot In moat cases this will involve the installation of sod on the lot The city Peeve will remain in
AND DATING EACH MEASURE OR PRACTICE SHOWN ON A COPY /// o Ian 26 -� 0- place until the lot is sodded or grassing is stabilized and takes hold
OF THE APPROVED EROSION AND SEDIMENTATION CONTROL �N\'i0 N 3 \ 10.The contractor shall conduct self-inspections of the erosion and sedimentation control measures and complete the following
PLAN OR BY COMPLETING,DATING AND SIGNING AN INSPECTION I / /// / / / / / E T `L,f�A rsro tar / \ z' combined self-inspection form found on the DEMLRwebsite
REPORT THAT LISTS EACH MEASURE,PRACTICE OR DEVICE I '// / / CONSTRUCTION a https://wwwdegncgov/aboupdivisions/energy-mineral-and-land-resources/etofmwater/st°nnwater-program/npdes-conshuction program.
THEWASHEDST - SHOWN ON 1HE APPROVED EROSION AND SEDIMENTATION I/ Ts I Twelve monthsof complete roepecttonfovine shall be kept on see and available for inspecpon at ellpmes I[is recommendeda
- CONTROL PLAN.' / = be kit box Ref G S 113A 54.1 nrou G S I13A ST Sections ISA NCAC 04A 0101 thou h ISA STEEL FENCE P FRONT VIEW /// / / / / 8 L M I \ copy pt iv a peimrts gh g
WIRE FENCE \\ / / / I 27 NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities.
HARDWARE CLOTHN11
EWLY
/// //// ( Lot Plan 1 i.Self-inspections for erasion and sedimentation control meaures are to be performed at least Once every seven calendar days and
within 24 hours of every rain event of greater than 1 inch.Any needed repairs shall be made immediately to maintain measures as
/ / designed.All ESC measures shall be maintained as specified in the construction details on this plan.A min gauge shall be installed
_ W Tulare L. atmepm;eGaa fnrmnnin rig.
WASHED STONE cbu L CLOTH IN TRENCH ,// / / / e E Tulare Lane 12.Inspecti0v and final acceptance letters.When the project is complete,the inspection
shall contact DEMLR to close out the E&SC
FILTER u57 GROUNDRIC NOTES: inT SOLID G APART ROUND AND HARDWARE / Plan.After DEMLR informs the nominee of the project close out,via inspection report,the permitted shall visit
said 1.Hardware clotlt end gavel should overlay the silt fence et least 12 ••deq.vc.gov/NCG01"to submit an electronic Notice or-termination(e-NOT).A$100 annual general permit fee will be charged
.1.psa inches` GROUND STABILIZATION ��� 7 28 until b NOT has been filled out.
2.Stone outlets should be placed on low elevation areas of silt fence
o URv and based on field conditions. Lot Plan
SITE AREA STABILIZATION / /// 7 / CONSTRUCTION
MAINTENANCE: EXCEPTIONS
P 1.PerNCG-01,Inspectoutletatlestonceaweekandaftereach1Inchor DESCRIPTION TIME FRAME // R i
HARDWARE CLOTH FILTER FAaRICIN TRENCH greater rainfall event.complete any required repairs immediately. PERIMETER DIKES, 7 DAYS NONE / CONSTRUCTION I
z.Freshen stone when sedimemaccumulation exceedsoinches. SWALES, DITCHES // / LLIII I I NOTE
BURY WIRE FENCE AN O 3.Keep mesh free of debris to provide adequate flow. & SLOPES
/// 29 i /
SECTION VIEW 4.Ramovesetlimentwhenhalfofstoneoutletiscovered. , I LglPlan To minimize the amount of disturbance at anyone time, The lots listed hereon are to be
5.Replace stone as needed to facilitate de-watering. HIGH QUALITY 7 DAYS NONE / coNu rau N I ^c,
NC-Envir Bme Ion peg SILT FENCE OUTLET WATER ZONES � constructed in phases.No construction or disturbance is to be performed on a next phase until
(HQW) / / the ground on the previous phase has been stabilized.
SLOPES STEEPER 7 DAYS IF SLOPES AREI
THAN 3:1 10' off LESS IN / Lot I 30 The phase schedule for this submission is as follows:
LENGTH AND ARE /� "D" I CONSTRUCTION
NOT STEEPER /
THAN 2:1, 14 3 - LIMITS
PHASE 1-Lots 3,5,7,9,11,23,25,27,29&31-4.54 Acres disturbance this phase.
I
DAYS ARE / 4
ALLOWED I31 zzD
SLOPES 3:1 OR 14 DAYS 7 DAYS FOR /7/
CONSTRUCTION N I ID
DATE: PAGE: a PHASE 2-Lots 1,13,15,21&33-2.62 Acres disturbance this phase.
FLATTER SLOPES GREATER
THAN 50• IN /
sin sock/Wattle sac seek/WattleLENGTH ----'7 I I/
No e
�_ Mn be FLD -1 1. 05 materials providing °" ALL OTHER AREAS 14 DAYS NONE(EXCEPT o 32
Flow, Area to be.-u�-'L, n1., g-.It u,aawatde. substitutedcities may he for WITH SLOPES 01 Ian
2 Fill sin son... FOR PERIMETERS I coNSTRucnoN of
it it ^2 x2 e N readcom FLATTER THAN 4:1 AND HOW ZONES) or" M 3 TOTAL DISTURBED ACREAGE: 7.16 ACRES
Stakes Stakes desired
be eta patella.
secrloN ».avoiw..of'°� I LOTS EROSION CONTROL FOR 19 LOTS
SECTION doe snsoaNelm located below
fiat areas should he ion at edge of the I 33 LOTS 1, 3, 5, 7, 9, 11, 13, 15, 21, 23, 25, 27, 29, 31 & 33
9mels)should ends
come the
ewron to
r Plan
N
�° eMg. from going dean e LIMITS N I °.„ 0 TH[N S O N RIDGE
roast.' � r on
V) W inch x 2 inch cr.s section should.ddven
Slakes should be ptaced at aZ/- for
Trench inverfirena Plumb,through Olecenter or.silt
a""`o II td„`pIa`e°'na°'°`" ° BENJAMIN STOUT REAL
WoTo od Mulch or Oam at ground a-Min. 5 1
UN1RENCHED INSTALLATION ght of oft mee. In the event staking is not possible t)Pe. ) Lot Plan \3a
..BK.ran•t5.ar,°�..°=nn.n,,,w„,°.r.°°t.,_ p ea g .even. General Erosion Control Notes o
ISOMETRIC VIEW \ ti ESTATE SERVICES, INC.
1. after 1. Only the areas shown shall be disturbed.
SO. FLOW PATESeach 1 inch or reater as 2. All disturbed areas shall be grassed and Remove 6. ELEVATION TOWNSHIP JOHNSTON COUNTY, N.C.
tar uim«areMulch or as«°�e •'i,i rowawa D00 DIam.1.COMPOST oc n`" 3 needed to- area meats p site Ogg °, mulched as soon as possible and maintained E.wEM-� 1,EASEMENT SCALE: 1 120' OCTOBER 2023
«rose `s°' :chi" I'aao col ludo n/ceno°i,1 e/50 ms'"'i'e for tsysL.,` ed until pemanent cover is established.a Old
a GRAPHIC SCALE
ab«IF Ww�a P 11 11 cold sgrk/"«u;tmca�m` oe3`mi is s`mi '+•°°° °° lent s If ponying ^e;�a excessive.Me spI` a Se 'Road zo o so zo zoo dao
tittle (cos m) (ss m) (sgg m) mite SR_
�.agirnbo 1a ,,. an anc.shardhinspectedp 1 ENGINEERS
dft , ;a eOl a m;a d,rn m«,°reh«bee permanently the areaabo
Rota s°"wae °ntillew •
,„„,„ ,"trot Ii.i,n1 t aunt Ii.',imt degSerehaIswn °naeare°lazed. 71' PLANNERS ( rn FEET)
L inch = 120 fL
SILT SOCK/WATTLE FOR PERIMETER AND INLET PROTECTION / SURVEYORSR MOORMAN, KIZER & REITZEL, INC. 5 BROADFOOT AVE.
/ \ MOORMAN, KIZER & REITZEL, INC. FAYETTEVILLE, N.C. PHONE (910) 484-5191 LICENSE #: F-0106 FAX (910) 484-0388
LAST SAVED:10/23/2023 1:23 PM UST PLOTTED:10/23/2023 1:51 PM PLOTTED BY.Dennis Gilbert FILENAME.G\CURRENT JOBS\BENJAMIN STOUT REAL ESTATE SERVICES INC\23-2510-21 JOHNSON RIDGE-EC 0PNNS\JOHNSON RIDGE EC-LOTS 1,3.5.7.E----.DWG