Loading...
HomeMy WebLinkAboutNCC233081_ESC Approval Submitted_20231013 ,'o T ST ATE ROY COOPER Governor Off' ELIZABETH S.BISER �DnDw Secretory '�& ,�,,,,an *_ WILLIAM E.TOBY VINSON,JR NORTH CAROLINA interim Director Environmental Quality September 28, 2023 LETTER OF APPROVAL Piedmont Natural Gas Attn: Ms. Amber Lineback- GM Distribution/Construction 4720 Piedmont Row Drive Charlotte, North Carolina 28210 RE: Project Name: Line 122 Distribution Rebuild Project ID: Berti-2024-001 County: Bertie Acres Approved: 3.4 City: Kelford Address: Griffins Quarter Road River Basin: Roanoke Date Received by LQS: August 31, 2023 Submitted By: HDR, Inc. Plan Type: New Dear Sir, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications.The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land- disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eN01 form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. - V� North Carolina Department of Environmental Quality 1 Division of Energy,Mineral and Land Resources �J/ Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889 CAROLINANORCAROLINAo D"'^,.nt,lEnvironmental "\ /�uu.' 252.946.6481 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Sincerely, ( ,Q,J: (1.1- ... (—of- Samir Dumpor, PE Regional Engineer Land Quality Section cc w/o enc: Amber Lineback, Piedmont Natural Gas (email) Brandon Walker, PE; HDR, Inc (email) WaRO Division of Water Resources (email) Q / North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources vv Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889 NOMMH CMC4JNA o.p.vn.rn a rnv►a.n•w co...wr 252.946.6481 PROJECT INFORMATION SHEET APPROVAL DATE: September 28, 2023 RESPONSIBLE PARTY: Piedmont Natural Gas PROJECT NAME: Line 122 Distribution Rebuild COUNTY: Bertie NO.: Berti-2024-001 OFF-SITE BORROW AND/OR DISPOSAL SITE: NO.: START-UP DATE: CONTRACTOR: ON-SITE CONTACT: ON-SITE PHONE NO.: OFFICE PHONE NO.: COMPLETE &RETURN THIS FORM PRIOR TO THE START OF CONSTRUCTION TO: N.C.D.E.Q. LAND QUALITY SECTION ATTN: Bradley West 943 WASHINGTON SQUARE MALL WASHINGTON, NORTH CAROLINA 27889 donald.west@deq.nc.gov D_E Q North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Washington Regional Office 1943 Washington Square Mall I Washington,North Carolina 27889 NORncarsa_mn 252.946.6481 CERTIFI CATE OF PLAN APPROVAL rn ale 7 .. 6.t ,fi ct‘ The posting of this certificate certifies that an erosion and sedimentation control plan has been approved for this project by the North Carolina Department of Environmental Quality in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted st the primary entrance of the job site before construction begins and until establishment g of permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter 4B.0127 (b). L.� 0.4 'p s�t �! h►w► ILV),AU Cs�r. Pt.s (vte Rat t EC . . KlActital Project Name and Location 0.1 2.% S a Odra.# Date of Plan Approval Regional Engineer Certificate of Coverage Number NECT % Z024 "30