HomeMy WebLinkAboutNCC221941_ESC Approval Submitted_20220523srrire;;": .
ROY COOPER
Governor
ELIZABETH S. BISER
al'ry LQ'
Secretary
BRIAN WRENN
NORTH CAROLINA
Director
Environmental Quality
May 13, 2022
LETTER OF APPROVAL WITH MODIFICATIONS
The Broadway Group of Alabama, LLC
ATTN: Mr. Robert Broadway
216 Westside Square
Huntsville, AL 35804
RE: Project Name: CRUMPLER RETAIL STORE
Acres Approved: 2.30
Project ID: ASHE-2022-003
County: Ashe
City: Walnut Hill
Address: N.C. Hwy. 16 N.
River Basin: New
Stream Classification: Nathan's Creek - Class B, Trout
Submitted By: Civil Design Concepts, P.A. - Mr. Jesse Gardner, P.E.
Date Received by LQS: April 13, 2022
Plan Type: Commercial
Dear Mr. Broadway:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this Letter of Approval with Modifications.
The Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction General Permit. After the form is reviewed and found to be complete, you will receive
a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will
receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted
for this project, you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about
the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator
of this project changes in the future, the new responsible party must obtain a new COC.
Q
North Carolina Department of Environmental Quality I Division of Energy. Mineral and Land Resources
Winston-Salem Regional Office 1 450 Hanes Mill Road Suite 3001 Winston-Salem, North Carolina 27103
336.776.9&00
Letter of Approval with Modifications
The Broadway Group of Alabama, LLC
May 13, 2022
Page 2 of 5
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely
1;red Walker, P.E.
Engineer III
Land Quality Section
Letter of Approval with Modifications
The Broadway Group of Alabama, LLC
May 13, 2022
Page 3 of 5
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
ec: Mr. Zac Lentz, P.E. -- NCDEQ LQS (zac.lentz@ncdenr.gov)
cc: WSRO file
Letter of Approval with Modifications
The Broadway Group of Alabama, LLC
May 13, 2022
Page 4 of 5
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: CRUMPLER RETAIL STORE
Project ID: ASHE-2022-003
County: ASHE
For final plan approval please address the remaining modifications below and submit a revised E&SC
packet to the Winston-Salem office.
1. Hatch or color areas on the plan that will require 7-day stabilization per NCGO10000
including conveyances etc. {NPDES NCGO100001
2. The following revisions are required for the listed temporary E&SC measures:
double row wire backed silt fence or super silt fence is required between
construction activities and sensitive waters, stabilized outlets at each conveyance,
and the temporary construction entrance must have water bar with stabilized outlet
if construction site is upgradient of adjoining public road. (G.S. 113A-57.(3))
3. Show location and details for E&SC measures including basins and post -construction
stormwater BMP's. {G.S. 113A-57.(4))
4. Place N.C. licensed contractor license number and contact information on cover sheet
of plan, if contractor has not been selected at time of E&SC plan submittal put FR's
personal contact info that can be reached 24/7 on the cover sheet of the plan.
Provide N.C. general contractor license number to LQS inspector at time of startup
notification. {G.S. 113A-57.(4)1
5. For discharges onto slope 5% or greater increase stone apron length and width and
potentially stone size to account for discharge onto grade (Tables 8.06 a&b assume
discharges onto flat ground per drawing detail). (15A NCAC 04B .01081
6. General fertilizer rates are not allowed, use soil test to determine fertilizer
application rates, generic rates only to be used if soil test cannot be performed --
provide verification that soil test could not be performed, and provide surface
preparation method and or detail. {G.S. 113A-57.(3)1
7. Provide revised original notarized Financial Responsibility/Ownership form so that
Part B.1 information matches exactly the contact information listed on the N.C.
Secretary of State's corporate search webpage. {G.S. 113A-54.1.(a)1
8. Add following language into the construction sequence: no major grading activities
or basin construction are to take place during wet weather or periods of predicted
wet weather i.e. hurricanes, install inlet protection by the end of the workday for all
constructed SW inlets, specify order in which significant E&SC measures must be
installed and related areas in which they protect i.e. TCE, then perimeter controls,
stabilized outlets, then basins, then conveyances, proceed with clearing and grubbing
for Phase X, install additional measures X, then XX, then XXX for Phase II, continue to
add stabilization and seeding for areas not stabilized, specify the order that the traps
and basins and their collection systems be installed in before any other grading takes
place on site, prior to construction of the sediment basin, silt fence shall be installed
below the toe of the proposed embankment of the sediment basin to prevent
sedimentation damage during sediment trap construction, sediment basin and trap
Letter of Approval with Modifications
The Broadway Group of Alabama, LLC
May 13, 2022
Page S of 5
embankments shall be provided with adequate groundcover immediately upon
construction, inspect and cleanout SW system before bringing online, specify when
E&SC measures are to be converted into post -construction SW BMP's i.e. sediment
basin converted to retention pond - requires separate individual sequence for
conversion. (15A NCAC 04B .0106(a)(3)}
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities