HomeMy WebLinkAboutNCC217126_ESC Approval Submitted_20211222ROY COOPER.
Governor
JOHN.N.[CHOLSON
Interim secretary
BRIAN WRENN
Director
NORTH CAROLINA
Envirommn fal Quafiity
June 28, 2021
LETTER OF APPROVAL
Express Option
Flagship Ventures, LLC
Attn: Stephen B. Eastman, Jr., Manager
P.O. Box 19205
Raleigh, NC 27619
RE: Project Name: Nelson Farms -Phase 1
Acres.Approved: 31.8
Project ID: HARNE-2021-150
County: Harnett
City: Lillington
Address: Old US 421
River Basin: Cape Fear
Stream Classification: WS-IV Watershed
Submitted By: The Nau Company, PLLC
Date Received by LQS: 6/25/2021
Plan Type: Express
Dear Mr. Eastman:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval
must be posted at the job site. This plan shall expire three (3) years following the date of
approval, if no land disturbing activity has been undertaken, as required by Title 15A NCAC
4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC
issued prior to the commencement of any land disturbing activity on the above -named project.
The NOI form may be accessed at de .ne. ov/NCG01. Please direct questions about the NOI
form to Annette Lucas at Annette. Iucas&cdenr,or Paul Clark at Paul.clarkkncdenr.gov.
After you submit a complete and correct NOI Form, a COC will be emailed to you within three
business days. A $100 fee will be charged annually until a Notice of Termination is issued. This
fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation
be kept on file at the job site:
North Carolina Department of Environmental Quality 14ivision of Energy, Mineral and Land Resources
of Fayetteville Regional Office 1225 Green Street. Suite 7141 Fayetteville, North Carolina 28301
YOATF::C?bCiFf Li
NN .tmf m ia+mfty �/"�'� 910.433.3300
Letter of Approval
Flagship Ventures, LLC
June 28, 2021
Page 2 of 2
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan. be on file
at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of
periodic inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the .
commencement of this project, it is determined that the erosion and sedimentation control plan is
inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North
Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form
if there is any change in the information included on the. form. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding
the acreage will be a violation of this permit and would require a revised plan and additional
application fee. In addition, it would be helpful if you notify this office of the proposed starting
date for this project.
Your cooperation is appreciated.
Sincerely,
Jodi Pac dl'(K�
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NPDES NCGO1 Fact Sheet
cc: Laura Harris, Booth & Associates, LLC (electronic copy)
Eddie Cranford, Building Inspector (electronic copy)
DEMLR - Fayetteville Regional Office File