RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN
Project: Triangle Lake Road Commercial Site
Location: 2001 Baker Road, High Point, NC 27260
Land Disturbing Permit: # EN 210226 2382
Dear Sir or Madame:
The Engineering Services Department has completed the review process for the revised Soil
Erosion Sedimentation Control Plan submitted to our department on 10/01/2021 for the
project referenced above. Based on our review, the plan is hereby approved.
This plan approval will specifically cover the Erosion and Sediment Control measures
required for both the Grading Phase and the Building Phase for the proposed Disturbed
Area under SP 210046. If a different identity (from the Grading Phase) executes the
Building Phase, this approved Erosion and Sediment Control Plan (E&SCP) may be
transferred to the firm/person executing the Building Phase. Prior to transferring the plan,
written authorization and a Financial Responsibility Form must be submitted to our office for
review. The terms and conditions of the approved plan shall remain in place unless otherwise
noted.
The Erosion Control Measures shown on the plan(s) are approximate. Some field adjustment
may be required to make the measures work correctly.
An Erosion Control Financial Guarantee (Surety) is required to be submitted prior to any
Land -Disturbing activities. This refundable guarantee shall remain in force until the work is
completed in accordance with the Land -Disturbance Permit and the work is approved by the
Engineering Services Director. The amount of the guarantee required is $2000.00 per
disturbed acre and can be in the form of a Check, Irrevocable Letter of Credit, Equivalent
Security or Surety Bond. The Check, Irrevocable Letter of Credit or Equivalent Security can
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517
be deposited with the City or held in escrow with a Financial Institution as per Section 2.6.5
— Performance Guarantee of the City of High Point Development Ordinance. Surety bonds
will be held by the city until released.
This letter will serve notice that:
• As per NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND
INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be
carried out by the staff of Department of Environmental Quality or other qualified
persons authorized by the Commission or Department of Environmental as necessary
to carry out its duties under the Act and no person shall refuse entry or access to any
representative of the Commission or any representative of a local government who
requests entry for purposes of inspection.
• As per High Point Development Ordinance 2.5.10.G.1 and 2, the Land -Disturbing
Permit will become null and void one (1) year from the date of issuance. You may
request in writing, 180-day permit extension 30 days prior to the expiration date, for
good cause.
• The approval of the draft Erosion and Sediment Control Plan and the Land Disturbing
Permit issued by the City of High Point is conditional based on the applicant's
compliance with Federal and State water quality laws, regulations, and rules.
• The approval of the draft Erosion and Sediment Control Plan is based in part on the
accuracy of the information provided on the submitted Financial Responsibility Form.
If any changes to the submitted Financial Responsibility Form (e.g. ownership,
address, company name) occur, then you are required to submit an amended form
showing such changes.
• The approval of the draft Erosion and Sediment Control Plan does not supersede any
other permit or approval.
• This Letter of Approval must be posted at the site of the land disturbing activity along
with the Land -Disturbing Permit, the approved Erosion and Sediment Control Plan, a
copy of the NPDES/NCGO 10 Permit, and a copy of the Certificate of Coverage
(COC).
• Records of Inspections must be kept on site for twelve (12) months.
• All data used to complete the e-NOI and all Inspection Records must be maintained
for a period of three (3) years and available upon request (40 CFR 122.41).
• Construction site pollutants must be maintained on -site and not allowed to reach the
state's waters. Any spent fluids from construction traffic must be cleaned up and
disposed of properly. Any herbicide, pesticide and fertilizer must be used in
accordance to the label restrictions. All wastes composed of building materials shall
be disposed of in accordance with North Carolina General Statues, Chapter 130A,
Article 9 — Solid Waste Management, and rules governing the disposal of solid waste
(NC Administrative Code Section 15A NCAC 1313). No dumping of paint and other
liquid building material waste in storm drains. Concrete materials onsite, including
excess concrete, must be controlled, and managed to avoid contact with surface
waters, wetlands, or buffers. No concrete slurry shall be discharged from the site.
2
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax: 336.883.4118 Phone: 336.883.3194 TDD: 336.883.8517
• Only minor deviation from the approved plan can be approved by the Erosion Control
Inspector. Deviations are limited to the following deficiencies:
o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam,
rolled erosion control practices, etc.).
o Relocation of E&SC Measures that improve the overall stormwater and
sediment control.
• Erosion Control Measures must be maintained until site is stabilized with sufficient
ground cover. The Sedimentation Pollution Control Act of 1973 (NCGS 113A-51
through 66) is performance -oriented, requiring protection of existing natural resources
and adjoining properties. If following the commencement of this project, the
approved E&SCP is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973, revisions to the plan may be required by the Erosion
Control Inspector.
• A condition of this approval is that the streets in this phase must be kept free of
sediment.
• Erosion Control Measures to prevent construction traffic from tracking sediment onto
the streets must be maintained. Any debris or sediment shall be cleaned from the
street surface immediately.
A new Land -Disturbing Permit will not be required to be issued for this revision.
Site Data:
Project Name: PTI of USA, LLC
Land -Disturbing Permit (CHP Project Tracking ID): # EN 210226 2382
Limits of Disturbance (in acres) approved: 9 acre per FR/OF
Address: at/near 2001 Baker Road
City: High Point
State: NC
Zip Code: 27260
County: Guilford
Latitude (in decimal degrees): 35.952 degrees*
Longitude (in decimal degrees): -79.956 degrees*
River Basin: Cape Fear
Receiving Water -Body: Triangle Lake
Stream Index: 17-7-2*
Draft E&SCP submitted by: FEI - Civil Engineers and Land Surveyors
Date(s) draft E&SCP Received: October 01, 2021
Plan Type: E&SCP
Is this site part of a project covered under a common plan of development: No (new
Ian)
at/near Construction Entrance
** Could not pull up information on NC Surface Water Classifications Map 9-28-
2021. Information shown could be incorrect.
3
City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA
Fax: 336,883.4118 Phone: 336.883.3194 TDD: 336.883.8517
Additional Information:
You will be required to complete and submit an electronic Notice of Intent (NOI) form
requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater
General Permit from the Department of Environmental Quality (DEQ). Detailed information
can be found on the North Carolina Environmental Quality's website at
https://deq.nc. gov/about/divisions/energy-mineral-land-resources/energy-mineral-land-
permits/stormwater-permits/construction-sw
Please call me if you have any questions or comments.
Sincerely,
Scott E. Ford
Engineering Services Department
(336) 883-3353
cc: File,
Engineer — Ravindra Bissram, PE, c/o FEI, Civil Engineers and Land Surveyors, 8518