HomeMy WebLinkAboutNCC212998_ESC Approval Submitted_20210521ROY COOPER
Governor
DIONNE DELLI-GATTI
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
April 28, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
EHC Homes, LP
Attention: Michael Shea, Member Manager
8008 Corporate Center Drive, Suite 300
Charlotte, North Carolina 28226
RE: Project Name: Camellia Gardens
Acres Approved: 60
Project ID: CABAR-2020-051
County: Cabarrus, City: Harrisburg
Address: Stallings Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: EHC Homes, LP
Date Received by LQS: April 20, 2021
Plan Type: Revised, Ownership Transfer
Dear Mr. Shea:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan
to be acceptable with modifications and hereby issue this letter of Approval with Modifications.
The Modifications Required for Approval are listed on the attached page. This plan approval
shall expire three (3) years following the date of approval, if no land -disturbing activity has
been undertaken, as is required by Title 15A NCAC 4B .0129.
Please be aware that your project will not be covered by the NPDES Construction Stormwater
General Permit NCGO10000 issued with the original Letter of Approval with Modifications dated
March 9, 2020. Please become familiar with all the requirements and conditions of this permit in
order to achieve compliance. As of March 1, 2019, all new construction activities are required to
complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of
Coverage (COC) under the NCG010000 Construction Stormwater General Permit. This form
MUST be submitted prior to the commencement of any land disturbing activity on the above
named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions
about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at
Paul.clark@ncdenr.gov. After you submit a complete and correct NOI Form, a COC will be
emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage
under the NCGO1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually.
This fee is to be sent to the DEMLR Stormwater Central Office in Raleigh.
NORTH CAROLINAD_E Q��
oepamnam of Enmronmamai anal\
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115
704.663.1699
Letter of Approval with Modifications
EHC Homes, LP
April 28, 2021
Page 2 of 3
Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved
erosion control plan be on file at the job site. Also, you should consider this letter to give the
Notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance
with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and
State water quality laws, regulations, and rules. In addition, local city or county ordinances or
rules may also apply to this land -disturbing activity. This approval does not supersede any
other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in
the Financial Responsibility Form, which you have provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition, it
would be helpful if you notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
i
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
c: Inspection Department
Letter of Approval with Modifications
EHC Homes, LP
April 28, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Camellia Gardens
Project ID: CABAR-2020-051
County: Cabarrus
Modifications pursuant to applicable North Carolina General Statutes and/or
Regulations:
As was listed in the original approval letter.
Comments and Recommendations:
This ESC plan approval is only for the ownership transfer of CABAR-2020-051 to new FRO
party. All conditions or modifications listed in the original Letter of Approval with
Modifications March 9, 2020 continue to apply to this plan approval. [General Comment]