Loading...
HomeMy WebLinkAboutNCC201150_ESC Approval Submitted_20200413BUNCOMBE COUNTY GOVERNMENT -MOkTl7 CAROIIAIA Buncombe County Planning and Development Nathan Pennington, CFM Pinrrrting U2rer tur LETTER OF APPROVAL WITH MODIFICATIONS AND/OR PERFORMANCE RESERVATIONS March 5, 2020 Morningstar Greenway Association Richard Kania 600-A Centrepark Drive Asheville, NC 28805 Ivlr. Kania, This office has reviewed the Erosion and Sedimentation Control Plan submitted for the project listed below. We find the plan to be acceptable with the attached modifications andlor performance reservations and hereby issue this -Letter of Approval. Please be advised that Section 26-228 requires that a copy of the approved Soil Erosion Control Plan be on file at the job site. The Buncombe County Soil Erosion and Sedimentation ontrol Ordinance is a performance oriented program requiring protection of the natural resources ,yid adjoining properties. If, following commencement of this project it is determined that the plan is inadequate, this office may require revisions to the plan and its implementation. The approval far thisproject is good for the time -frame stated on the original laird disturbing permit. This permit shall become null and void if you have not made progress to begin construction activities on the site within six months after the date of approval. Renewal of the land disturbing permit will require a new plan review submittal with associated fees. The approval of an erosion plan is conditioned on the applicant's compliance with federal and state water quality laws, regulations, and rules. A copy of the erosion control plan for any land disturbing activity that involves the utilization of ditches for the purpose of de -watering of lowering the water table must be forwarded to the director of water quality. *As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (N01) for requesting a Certificate of Coverage (CDC) under the NCG01000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the below namedproject, The N01 form may be accessed at dea.nc.gov/NCG01. Please direct all questions abo tit the NOIform or the process fo Annette Lrrcas at Anrrette.lrtca edenn ov or Paul Clark at Paul a ark a� edeMr. nv. Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1, 2019, a SI00 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh and is not collected by this local program. Once the NCGOI permit has been completed and approver{ by DEMLR, a project permit number will be given for this project that must be written an the Buncombe County Land Disturbing Permit, which must be on site throughout the construction phase of the project When the project is complete, the financially responsible party or their representative will contact Buncombe County Erosion and Sedimentation Control Office to close out the Erosion and Sedimentation Control Plan. A Certificate of Compliance will be issued for the project once the site meets the requirement as stated in the original Letter o_f'Approval and standards stated in the Buncombe County .foil Erosion and Sedimentation Control Ordinance. The responsible party will then be instructed to visit deg.nc.r;ov1NCG01 to submit an a -NOT {electronic Notice of Termination}_form for closing out the NCGOI permit. Please refer to the attached IYCGOI Fact Sheet. A Combined Self -Monitoring and Self lrnspection Form for the NCGO1 is enclosed. Please review all pertinent documents prior to starting constriction. We look forward to working with you on this project. Doug Sharp Erosion Control Officer Erosion and Sedimentation Control Tele: (828) 250-4848 cc: Project narne: Morningstar Location: Old Fort Road Date received: February 26, 2020 Date approved: March 5, 2020 Permitted Disturbance 4.71 acres Person financially responsible: Morningstar Greenway Association, Richard K.ania MODIFICATIONS AND/OR PERFORMANCE RESERVATIONS FOR NC State NCGOI Permit has to be in place before work starts. It is critical that the Erosion Control Plan and Narrative be followed to keep the site in compliance. The lower road and the borrow area are the first critical places that need to be fully stabilized. "Prior to scheduling the pre -construction meeting, llie_finartciallp responsible party or authorized agent rrrust submit an electronic copy of the Letter of Approval with Modifications and/or performance Reservations,/or requesting a Certificate of Coverage (COQ under fire NCG0.1000 Construction Stormwater General Permit to DEMLR. Once the NCGol COC# has been obtainer{, the contractor, authorized agent or owner must contact Buncombe County Erosion Control Office to schedule an on -site pre -construction meeting before beginning any grading activity. Contractor must have a copy of the latest set of plans marked "Construction Documents" and showing any revisions and/or details. Approved plans must be available at the construction site at all times for inspection by inspectors and any other governing regulatory agent. A copy of the Erosion Control Permit, a copy of the Letter of Approval with Modification and/or Performance Reservations, and a copy or the Combined Self - Monitoring and Self -Inspection Form must be available on -site W a job box or contractor's trailer at all times. These documents must be re -viewed and understood by all parties involved prior to any land disturbing aetivitie3. A working rain gauge must also be present and installed at the site for monitoring. Contractor to insure that any import or export material be from a permitted site. Erosion control measures must be installed in accordance with the approved engineering plans and maintained at all times. Alternate measures must first be approved with the engineer of record and regulatory site inspector prior to installation. Clearing limits for grading must be clearly delineated in the field as shown on the approved engineering plans, Any additional clearing or land disturbing activity that disturbs the ground surface outside of those limits will constitute a violation of the County's Ordinance and will be subject to penalties. Additional erosion control measures and BMW devices will be required if approved measures are not sufficient to contain and control sediment and runoff on the project site. Additional measures to help control and reduce on -site runoff during construction will be discussed at pre -construction meeting. Areas of construction left bare for more than 21 days without temporary ground cover could delay building construction inspections and cause possible delays in issuance of building occupancy letters. Notification must be given to this office for inspection at the completion of site stabilization of the project prior to the removal of any perimeter/pertinent erosion control measures at the site. Any deviations in the original approved construction plans or design changes to land clearing to the overall site must first be submitted for review to this regulatory office and approved prior to continuation of construction. Failure to resubmit could result in possible issuance of stop work orders, holding of any building inspections, or issuance of certificates of occupancy. Erosion control measures must be inspected and repaired if needed on a regular basis and maintained at all times. Failure to maintain erosion control measures can result in delayed building inspections, revocation of permits or possible civil penalties. Approval ofthis project is in accordance with the requirements set forth by the Buncombe County Soil Erosion and Sedimentation Control Ordinance and information provided in the approved construction plans, construction sequence, construction eletails, and documentation. Any modification of this approval in regards to soil erasion and sedimentation control must be made aware to the Buncombe County Erosion Control Qqf ce prior to any changes. SLINCOMBE COUNTY ltltnctimbe ( 'minty Planning and Development Nathan Penningt(in, C:FM LAND DISTURBING PERMIT NUMBER: ER02020-00010 NCG01 COC4: PROJECT NAME: Morningstar LOCATION: Old Fort Road RESPONSIBLE PERSON: Morningstar Greenway Association 1 Richard Kania THIS CERTIFIES THAT A LAND DISTURBING PERMIT HAS BEEN ISSUED FOR THE CONSTRUCTION WORK SET OUT ABOVE. Erosion Control Officer Ero-don and Sedimentation Contra[ (828) 2504848 ` FST BE POSTED AT THE CONSTR(l "I' ON tifTl? I.N .1 4 ( 1 lit: III ti('I E'RON1 'l lil= Tl'41E WC1R1C i5 CC)1V1IVI[:N('I,:I 1 'S l[. I� RO SION ( ()N,1'I401. I \SPF(' I OR (;IN'[-'.S FINAL APPROVAL. % ( r l'1►Y OP I IIl- IAtc SION' CONTROL L PLANS AND APPR()VAt. 1.I.1 t I it N11 S I ItE AN :111_. ULF FOR THE INSPECTORS USE AT ALL T IM1%.S. Issued: March 5, 2020 Permit expires: March 5, 1-025