Loading...
HomeMy WebLinkAbout20191337 Ver 1_I-5507 Stream Impacts Table_20191004STIP# I-5507 I-485 Express Lanes Stream Impacts Table Permanent Temporary Permit Stream Name/ Status/ Channel Bank Channel USACE NCDWR Site NRTR ID Class Impacts Stabilization Impacts Required Required If (ac) if (ac) ac (If) Mitigation Mitigation if if 1 UT to Sugar Creek Intermittent 28 18 <0.01 28 1 SCC C <0.01 (<0.01) (13) 2A Sugar Creek Perennial -- 11 <0.01 S13 C (<0.01) (20) 2 Kings Branch Perennial 52 70 0.04 52 3 S12 C (0.03) 0.02 (16) 4 UT to Kings Branch Intermittent 181 _- 181 -- SNH C (0.01) s 5 UT to Sugar Creek Perennial 473 __ <0.01 473 473 S l 1 C (0.05) (10) UT to McMullen Creek Intermittent 48 <0.01 6 -- -- -- S6 C (<0.01) (10) UT to McMullen Creek Intermittent 0.07 7 -- -- -- -- S6 C (680) 8 UT to McMullen Creek Intermittent 7 10 -- 7 -- S6 C (<0.01) (<0.01 McMullen Creek Perennial 65 0.01 104 S4 C (0.01) -- McAlpine Creek Perennial 157 0.10 115 S3 C (0.03) -- 6 UT to McAlpine Creek Perennial 49 46 0.01 49 13 S2 C (0.01) (0.01) (40) -- UT to McAlpine Creek Perennial 165 83 0.02 165 15 S1 C (0.08) (0.02) (30) -- 1<0.01 ac (18 If) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. 20.02 ac (701f) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. 3The existing culvert is not buried, therefore the culvert extension will not be burried. 4<0.01 ac (301f) of temporary impacts due to the temporary bridge are included within the bank stabilization impacts shown in the table. 50.03 ac (1221f) of temporary impacts due to the temporary bridge and installation of the drilled shaft are included within the bank stabilization impacts. 6< <0.01 ac (38 If) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. 70.02 ac (65 If) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. STIP# I-5507 I-485 Express Lanes Stream Impacts Table (continued) Permanent Temporary Permit Stream Name/ Status/ Channel Bank Channel USACE NCDWR Site NRTR ID Class Impacts Stabilization Impacts Required Required If (ac) if (ac) ac (if) Mitigation Mitigation if if UT to McAlpine Creek Perennial 8 <0.01 15A -- -- -- S 1 C <0.01 20 UT to McAlpine Creek Perennial 36 <0.01 16 -- -- -- S1 C (<0.01) (20) UT to McAlpine Creek Intermittent 10 <0.01 17 -- -- -- SB C (<0.01) (10 UT to Fourmile Creek Perennial 13 18 -- -- -- -- SD C (<0.01) UT to Fourmile Creek Perennial 15 <0.01 19 -- -- SE C <0.01 10 A UT to Fourmile Creek Perennial 69 34 <0.01 20 SF C (0.02) (<0.01) (22) 69 -- UT to Fourmile Creek Perennial 13 <0.01 21 -- -- SG C <0.01 10 9 UT to Fourmile Creek Perennial 140 24 <0.01 22 140 -- SG C (0.01) (<0.01) (49) 0 UT to Flat Branch Intermittent 6 22 <0.01 6 24 SSC C <0.01 <0.01 10 UT to Flat Branch Perennial 33 <0.01 27 -- -- -- SSB C (<0.01) (20) UT to Flat Branch Perennial 37 <0.01 28 -- -- -- SSA C <0.01 20 Flat Branch Perennial 25 <0.01 29 -- -- -- SAO C (<0.01) (30) UT to Sixmile Creek Intermittent <0.01 30 - -- -- -- SAN C 33 1 31 UT to Sixmile Creek Intermittent 3 20 <0.01 3 SAM C (<0.01) (<0.01) (10) UT to Sixmile Creek Perennial 6 <0.01 32 -- -- SAL C <0.01 20 8<0.01 (341f) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. 9<0.01 (24 If) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. 10<0.01 (22 If) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. i i<0.01 (20 If) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. STIP# I-5507 I-485 Express Lanes Stream Impacts Table (concluded) Permanent Temporary Permit Stream Name/ Status/ Channel Bank Channel USACE NCDWR Site NRTR ID Class Impacts Stabilization Impacts Required Required If (ac) if (ac) ac (If) Mitigation Mitigation If if UT to Sixmile Creek Intermittent 40 <0.01 33 -- -- -- SBH C <0.01 10 UT to Fourmile Creek Intermittent 50 <0.01 35 -- -- -- SAJ C (<0.01) (42) UT to Fourmile Creek Intermittent 17 <0.01 36 - -- -- SM C (<0.01) 25 UT to Fourmile Creek Intermittent 35 <0.01 37 -- -- -- SBG C (<0.01) (20) UT to Fourmile Creek Perennial 13 37A -- -- -- -- SSH C <0.01 UT to Fourmile Creek Intermittent 32 0.01 38 - -- -- SBD C 0.01 (30) UT to Fourmile Creek Perennial 13 <0.01 39 -- -- -- SAI C <0.01 10 UT to Fourmile Creek Perennial 16 <0.01 40 -- -- SAH C (<0.01) (24) 12 UT to Fourmile Creek Intermittent 52 33 <0.01 52 4 SAR C (<0.01 <0.01 42 13 UT to Fourmile Creek Intermittent 125 20 <0.01 125 42 SV C (0.02) (<0.01) (12) -- UT to Fourmile Creek Intermittent 30 <0.01 43 -- -- SAE C (<0.01) 10 UT to McAlpine Creek Perennial 26 28 <0.01 26 4414 S1 C (<0.01) (<0.01) (19) Total Stream Impacts 1376 1131 0.33 1376 473 2507 12<0.01 (33 If) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. 13<0.01 (20 If) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried. 14<0.01 (281f) of temporary impacts due to construction activities are included within the bank stabilization impacts shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.