HomeMy WebLinkAbout20191337 Ver 1_I-5507 Stream Impacts Table_20191004STIP# I-5507 I-485 Express Lanes Stream Impacts Table
Permanent
Temporary
Permit
Stream Name/
Status/
Channel
Bank
Channel
USACE
NCDWR
Site
NRTR ID
Class
Impacts
Stabilization
Impacts
Required
Required
If (ac)
if (ac)
ac (If)
Mitigation
Mitigation
if
if
1
UT to Sugar Creek
Intermittent
28
18
<0.01
28
1
SCC
C
<0.01
(<0.01)
(13)
2A
Sugar Creek
Perennial
--
11
<0.01
S13
C
(<0.01)
(20)
2
Kings Branch
Perennial
52
70
0.04
52
3
S12
C
(0.03)
0.02
(16)
4
UT to Kings Branch
Intermittent
181
_-
181
--
SNH
C
(0.01)
s
5
UT to Sugar Creek
Perennial
473
__
<0.01
473
473
S l 1
C
(0.05)
(10)
UT to McMullen Creek
Intermittent
48
<0.01
6
--
--
--
S6
C
(<0.01)
(10)
UT to McMullen Creek
Intermittent
0.07
7
--
--
--
--
S6
C
(680)
8
UT to McMullen Creek
Intermittent
7
10
--
7
--
S6
C
(<0.01)
(<0.01
McMullen Creek
Perennial
65
0.01
104
S4
C
(0.01)
--
McAlpine Creek
Perennial
157
0.10
115
S3
C
(0.03)
--
6
UT to McAlpine Creek
Perennial
49
46
0.01
49
13
S2
C
(0.01)
(0.01)
(40)
--
UT to McAlpine Creek
Perennial
165
83
0.02
165
15
S1
C
(0.08)
(0.02)
(30)
--
1<0.01 ac (18 If) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
20.02 ac (701f) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
3The existing culvert is not buried, therefore the culvert extension will not be burried.
4<0.01 ac (301f) of temporary impacts due to the temporary bridge are included within the bank stabilization impacts
shown in the table.
50.03 ac (1221f) of temporary impacts due to the temporary bridge and installation of the drilled shaft are included
within the bank stabilization impacts.
6< <0.01 ac (38 If) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
70.02 ac (65 If) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
STIP# I-5507 I-485 Express Lanes Stream Impacts Table (continued)
Permanent
Temporary
Permit
Stream Name/
Status/
Channel
Bank
Channel
USACE
NCDWR
Site
NRTR ID
Class
Impacts
Stabilization
Impacts
Required
Required
If (ac)
if (ac)
ac (if)
Mitigation
Mitigation
if
if
UT to McAlpine Creek
Perennial
8
<0.01
15A
--
--
--
S 1
C
<0.01
20
UT to McAlpine Creek
Perennial
36
<0.01
16
--
--
--
S1
C
(<0.01)
(20)
UT to McAlpine Creek
Intermittent
10
<0.01
17
--
--
--
SB
C
(<0.01)
(10
UT to Fourmile Creek
Perennial
13
18
--
--
--
--
SD
C
(<0.01)
UT to Fourmile Creek
Perennial
15
<0.01
19
--
--
SE
C
<0.01
10
A
UT to Fourmile Creek
Perennial
69
34
<0.01
20
SF
C
(0.02)
(<0.01)
(22)
69
--
UT to Fourmile Creek
Perennial
13
<0.01
21
--
--
SG
C
<0.01
10
9
UT to Fourmile Creek
Perennial
140
24
<0.01
22
140
--
SG
C
(0.01)
(<0.01)
(49)
0
UT to Flat Branch
Intermittent
6
22
<0.01
6
24
SSC
C
<0.01
<0.01
10
UT to Flat Branch
Perennial
33
<0.01
27
--
--
--
SSB
C
(<0.01)
(20)
UT to Flat Branch
Perennial
37
<0.01
28
--
--
--
SSA
C
<0.01
20
Flat Branch
Perennial
25
<0.01
29
--
--
--
SAO
C
(<0.01)
(30)
UT to Sixmile Creek
Intermittent
<0.01
30
-
--
--
--
SAN
C
33
1
31
UT to Sixmile Creek
Intermittent
3
20
<0.01
3
SAM
C
(<0.01)
(<0.01)
(10)
UT to Sixmile Creek
Perennial
6
<0.01
32
--
--
SAL
C
<0.01
20
8<0.01 (341f) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
9<0.01 (24 If) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
10<0.01 (22 If) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table.
i i<0.01 (20 If) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
STIP# I-5507 I-485 Express Lanes Stream Impacts Table (concluded)
Permanent
Temporary
Permit
Stream Name/
Status/
Channel
Bank
Channel
USACE
NCDWR
Site
NRTR ID
Class
Impacts
Stabilization
Impacts
Required
Required
If (ac)
if (ac)
ac (If)
Mitigation
Mitigation
If
if
UT to Sixmile Creek
Intermittent
40
<0.01
33
--
--
--
SBH
C
<0.01
10
UT to Fourmile Creek
Intermittent
50
<0.01
35
--
--
--
SAJ
C
(<0.01)
(42)
UT to Fourmile Creek
Intermittent
17
<0.01
36
-
--
--
SM
C
(<0.01)
25
UT to Fourmile Creek
Intermittent
35
<0.01
37
--
--
--
SBG
C
(<0.01)
(20)
UT to Fourmile Creek
Perennial
13
37A
--
--
--
--
SSH
C
<0.01
UT to Fourmile Creek
Intermittent
32
0.01
38
-
--
--
SBD
C
0.01
(30)
UT to Fourmile Creek
Perennial
13
<0.01
39
--
--
--
SAI
C
<0.01
10
UT to Fourmile Creek
Perennial
16
<0.01
40
--
--
SAH
C
(<0.01)
(24)
12
UT to Fourmile Creek
Intermittent
52
33
<0.01
52
4
SAR
C
(<0.01
<0.01
42
13
UT to Fourmile Creek
Intermittent
125
20
<0.01
125
42
SV
C
(0.02)
(<0.01)
(12)
--
UT to Fourmile Creek
Intermittent
30
<0.01
43
--
--
SAE
C
(<0.01)
10
UT to McAlpine Creek
Perennial
26
28
<0.01
26
4414
S1
C
(<0.01)
(<0.01)
(19)
Total Stream Impacts
1376
1131
0.33
1376
473
2507
12<0.01 (33 If) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
13<0.01 (20 If) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.
14<0.01 (281f) of temporary impacts due to construction activities are included within the bank stabilization impacts
shown in the table. The existing culvert is not buried, therefore the culvert extension will not be buried.