Loading...
HomeMy WebLinkAbout20150124 Ver 1_More Info Requested_20170427• McMahan Hydroelectric, LLC Attn: Mr. Andrew (McMahan 105 Durham Eubanks Road Pittsboro, NC 27312 Subject: REQUEST FOR ADDITIONAL INFORMATION Bynum Hydro Project (FERC # 4093) Dear Mr. McMahan: On March, 3, 2017, the Division of Water Resources (Division) received your application dated February 16, 2017, requesting a 401 Water Quality Certification from the Division for the subject project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. A water quality monitoring plan, as outlined in our comments on the Draft License Application on February 2, 2015, is required for processing the 401 Water Quality Certification. [15A NCAC 02H .0506(b)(2 &3)] a. Plan should include specific time periods for each specific monitoring frequency proposed (e.g. weekly between June 1st and August 31st). b. Assuming that continuous 02 monitoring in the river and tailrace will be accomplished with deployed units, what type of units will be used to collect the data. Low -profile units are desirable due to reduced risk of vandalism. c. Plan should include an inspection and calibration schedule for, 02 units to prevent membrane fouling. d. Units in river and tailrace should be situated such that they are under water at all flows. Plan should provide the specific depth of deployment for each unit. e. It would be most informative to sample reservoir on river -left (powerhouse side) at deepest point, at every foot increment in the water column to determine epi-, meta - and hypolimnion. State of North Carolina [ Environmental Quality [ WaterResources 617 Mail Service Center S Raleigh, Norfli Carolina 27699-1617 919 807 6300 McMahan Hydroelectric, LLC Request for Additional Information DDR Project # 15-0124 Page 2 of 2 f. Plan should include collection of current conditions at time of sampling (e.g., time, ambient temperature, wind, last rain event, cloud cover, gage reading, and pond level at dam crest). g. Plan should stipulate that latitude/longitude coordinates, of all sample sites will be collected and total depth of sample sites in river at both time of deployment and any return visits to harvest data or for r -maintenance will also be collected', - 2. Title 15A NCAC OIC .0107 (a) stipulates that no Department of Environmental Quality agency shall issue a permit approval while work on an environmental document is in progress. Please provide one paper copy of the Federal Energy Regulatory Commission Draft Environmental Assessment to the 401 & Buffer Permitting Branch, Pursuant to Title 15A NCAC 02H .0502(e), the, applicant shall furnish all of the above requested information for the proper consideration of the application. If all of the requested information is not received in writing within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please respond in writing within 30 calendar days of receipt of this letter by sending three copies of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617. Please be, aware that you have no authorization under the Section 401 of the Clean Water Act for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code, Please contact Jennifer Buirdette at 919-807-6364 or jenriifer.burdette@ncdenf.gov if you have any questions or concerns. Sincerely, �ftw Karen Higgins, Supervisor 401 & Buffer Permitting Branch CC' Robert Rose, PK Ventures, P 0 Box 35236, Sarasota:, FIL 34242 DWR 401 & Buffer Permitting Branch file Filenarne: 150124BynumHyidreProjec�tFERC#4093-401—IC—HoYd.docx