Loading...
HomeMy WebLinkAbout990005_Inspection_20190905type of visit: A uompuance inspection v uperanon tcevtew V structure t vamation V t ecnntcat Assistance I Reason for Visit: 0 Routine 0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Date of Visit: tj (�J j,f� Arrival Time: e: j^� Departure Time: County: VI(l� Ln Vl Region: �� Farm Name: 21c o �'�nn & 1 ITDL�1y' Owner Email: Owner Name: U V\ b0k � 1 P f Phone: (nnsFshctnv� MailingAddress: 1315 US NLNU 01 , .14AMIA,-,'O"Q' Neiyca'b Physical Address: Facility Contact: Onsite Representative: 0 ris ras S Certified Operator: `V Back-up Operator: Location of Farm: 1t�K-45 �=fug 1 Phone: lj�6- 46-1-00O1 Integrator: Certification Number: Certification Number: Latitude:�%°63 ' ()q Longitude: 'Vu4,�'Ml ,ArY1 -) 3 l-iv,�')1 ® =7 ptYv> - oy\, Discharges and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes 4 No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes [—]No ❑ NA ❑ NE ❑ Yes ❑ No ❑ Yes M No Hw ❑ Yes No ❑ NA ❑ NE ❑ NA ❑ NE ❑ NA ❑ NE Page I of 3 21412015 Continued Facility, Number: - 05- jDatc of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes 9 No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? [—]Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: - n 1 Spillway?: Designed Freeboard (in): _ �. Observed Freeboard (in): � � + 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes N No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes % No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes 0 No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes IN No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ' No 94 ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [A No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes � No ❑ NA ❑ NE ❑ Excessive Pending ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Drift ❑ Application Outside of Approved Area / ,,Wind 12.Crop TYpe(s): \ (Ky) I.Ui)1Q/ I PAM, VVC At G-YtUl Y) C05Vk1r brm 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes �No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes )] No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes IXNo ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design [:]Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement?1?7eT,-Uhmt-OTe-W€opeiato-bo�belo)v.-'" ❑ Yes No ❑ NA ❑ NE Nov Waste Application Weekly Freeboard A Waste Analysis n ° —, Weather Code [Rainfall 0 Stocking Crop Yield [�i'�6-Iv MWe+-&P@ti®ns— XMonthly and 1" Rainfall Inspections n c' a- °^* ev 22. Did the facility fail to install and maintain a rain gauge? [—]Yes �No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No 'MNA ❑ NE Page 2 of 3 21412015 Continued Facili Number: - Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑Yes � No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes ❑ No t NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? 34. Does the facility require a follow-up visit by the same agency? ❑ Yes N No ❑ NA ❑ NE ❑ Yes F,—YNo ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes XNo ❑ NA ❑ NE ❑ Yes JZ No ❑ NA ❑ NE ❑ Yes � No ❑ NA ❑ NE ❑ Yes V3 No ❑ NA ❑ NE ❑ Yes jq No ❑ NA ❑ NE ❑ Yes E] No ❑ NA ❑ NE Sails je 61 No enti-bR-1r. M6L+k(s h C m, ►t+e Cates brC1A; aV% f —OW" NFL gzaT C!©r� au cc bens n.( raj Nov rc�5pmsb _ CV,9CAC DO H-C-05 bO rd � tp A- C 0I j �� �R-- Na r A L''K I (j Oar n SLraVd wwe,k4 .I Cjkwu _a d 6u F MCy\_ hU Y�)(NMY1f,�.P�✓ h fy-cff 01 �M---A-, Cmw �M &-i � a qb CC '6ZVIS C P 2 S; 1' b16-I 11('\ ,.I l;I Reviewer/Inspector Reviewer/Inspector Page 3 of 3 Phone:Zj Date: 2/4/201 S