HomeMy WebLinkAboutNCC192100_ESC Approval Submitted_20191002N'
ROY COOPER
Governor
MICHAEL S. REGAN
somfury
S. DANIEL SMITH
Dbvcgvr
NORM
September 18, 2019
LETTER OF APPROVAL WITH MODIFICATIONS
Southeastern Development and Marketing Inc.
Attention: Mr. Ken Lingafelt, President and Registered Agent
501 North 14th Street
Fernandina Beach, Florida, 32034
RE: Project Name: Cedar Creek (Clearing Only) [Express Review]
Acres Approved: 27.38
Project ID: CABAR-2020-016
County: Cabarrus, City: Midland
Address: Highway 24/27
River Basin: Yadkin — Pee Dee
Stream Classification: Others
Submitted By: Burton Engineering Associates
Date Received by LQS: September 9, 2019
Plan Type: New
Dear Mr. Lingafelt:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required
by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic
Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of
any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the N0I form to Annette Lucas at
Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
correct NOI Form, a COC will be emailed to you within three business days. A $100 fee will be charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
Title 15A NCAC 4B A 118(a) and the NCGO 1 permit require that the following documentation be kept on
file at the job site:
ig; D7-EQ �;Wxx
__P
1%1-�
Nortft Carolina Department of Environmental Qua9ty I Division of Energy, MEneral and tared Resources
Mooresville Reglonal Office II' 610 East Curter Avenue. Su#e 301 1 Mooresville, North Carolina 28115
Letter of Approval with Modifications
Southeastern Development and Marketing INC.
September 18, 2019
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office
of the proposed starting date for this project. Please notify us if you plan to have a preconstruction
conference.
Your cooperation is appreciated.
Sincerely,
s . it—
Zahid S. Khan, CPM, CPESC, CPSWQ
Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCGO1 Fact Sheet
c: Burton Engineering Associates, 5950 Fairview Road, Ste 100, Charlotte, NC 28210
Inspection Department
Letter of Approval with Modifications
Southeastern Development and Marketing INC.
September 18, 2019
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Cedar Creek (Clearing Only)
Project ID: CABAR-2020-016
County: Cabarrus
Modifications vursuant to a licable North Carolina General Statates and/or R la 'ons:
1. Please note that this approval is only for clearing. Any type of grubbing and grading
needs new plan for this site. Any required post -construction storm water practices
should be shown on the final grading sheet and erosion control during conversion
should be addressed within the construction sequence. [15A NCAC 4B .0106, G.S. 113
A-57(3)].
2. Additional measures maybe required -The applicant is responsible for the control of sediment
on -site. If the approved erosion and sedimentation control measures prove insufficient, the
applicant must take those additional steps necessary to stop sediment from leaving this site.
[15A NCAC 4B .0115].