Loading...
HomeMy WebLinkAboutNCC191673_NOI Application_20191001Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 8/29/2019 4:34:12 PM (NCG01 NOI Submission) Approve by Farkas, Jim J 8/30/2019 11:39:14 AM (Review- Construction NOI 15443) • The task was assigned to Farkas, Jim J by round robin distribution 8/29/2019 4:34 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 2, 2019 5:00 PM 8/29/2019 4:34 PM Submit by McCoy, Suzanne 10/l/2019 8:19:55 AM (Payment Verification for NCC191673) * Kylind Services. • McCoy, Suzanne assigned the task to McCoy, Suzanne 10/l/2019 8:19 AM • Georgoulias, Bethany changed the task's due date to September 29, 2019 5:00 PM 9/5/2019 12:54 PM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 11, 2019 5:00 PM 8/30/2019 11:39 AM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * The Villages of Reedy Fork phase 4 section 3M 2. County* Guilford 1r-i)iTII1T7i1)Mfi1i(-_ToIa10141 3. Highway or Street Oakgate Drive (Turner Smith Rd. is listed on plans. Site is at North Address * end of Oakgate Dr. which is located off of Turner Smith Rd. Street narre only is acceptable if no address nurrber assigned yet 4. City or Township * Greensboro 5. State * NC 6. Zip Code* 27405 7. Latitude * Enter the latitude in decirral degrees 36.1941 8. Longitude* Enter the longitude in decirral degrees (MIST be negative) -79.6922 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 09/03/2019 Estirrated Construction Project Start Date 10. Date to End* 05/01 /2020 Estirrated Construction Project End Date 11. SIC (Primary)* Residential, Single Family Houses (SFE) (1521) Standard Industrial aassification for Developrrent 12. Acres to be 9.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 8.24 (acres)* 14. Post- 3.16 construction (Estirrated) impervious area (acres) * NCC Project NCC-GUILF-2019-The Villages of Reedy Fork phase 4 section 3M Tracking ID Assignedautoratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find Waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Reedy Fork Creek Waterbody* Nan-eof waterbody into which stornvvater runoff will discharge 15b. Waterbody 16-11-(9) Index No. * NCWaterbody Index Nunber Stormwater fJ No discharges will flow r Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization GHD-Reedy Fork, LLC Name * 2. First Name* Jeff ff Corporation, enter Registered Agent First l\brre 3. Last Name * White ff Corporation, enter Registered Agent Last Barre 3b. Title Manager 4. Permitee E-mail jwhite@greenhawkcorp.com Address* 5. Permittee 919-422-5741 Telephone No.* 6. Permittee Mailing Street Address Address* 1330 Sunday Drive Suite 105 Address Line 2 City Raleigh Postal / Zip Code 27607 Check box if the V Yes street address the same as mailing address 7. Permittee Street Street Address Address* 1330 Sunday Drive Suite 105 Address Line 2 City Raleigh Fbstal / Zip Code 27607 State / Province / Region NC Country us State / Province / Region NC Country us C. Site Contact Information Part C. Roiect Site Contact hforrration 1. Type of Individual Ownership* 2. Primary Site Kevin Contact - First Name * 3. Primary Site Pegram Contact - Last Name * 4. Title Principal 5. Site Contact E- kevin@kylindservices.com mail Address* 6. Site Contact 336-669-3209 Telephone No.* 7. Organization Kylind Services, Inc. Name 8. Site Contact Street Address Mailing Address* P.O. Box 38872 Address Line 2 oty Greensboro Fbstal / Zip Code 27438 9. Consultant Name (optional) First and Last nave 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Province / Region NC Country us D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 08/28/2019 Approved * 2. E&SC Plan Project 2951 Number/ID* Assigned by agency or local program 3. E&SC Plan f State DEQ Office Approved by r Local Program 4. Local Program* City of Greensboro Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Reedy Fork Hardie Farm section 3M Approval Letter Approval 297.23KB (2951) (002) 8-28-19.pdf letter/documentation Mist be R7F forrrffi 6. NOI Certification CCF_000002.pdf 596.83KB Form Mist be RDFfornet This is an Express r No Review Project* r Yes E. Certification North Carolina General Statute 143-215.6B (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * V The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * V If the Erosion and Sediment Control Plan approved by the delegated program is not compliant with Part II (Stormwater Pollution Prevention Plan) of the NCG010000 General Permit, I will nonetheless ensure that all conditions of Part II of the permit are met on the project at all times. * I7 I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person' Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature ,2�� lvh, e Type Name* Jeffrey White Title Manager Organization GHD-Reedy Fork, LLC Date * 08/29/2019 F. Tracking and COC Info NOI Tracking No. 15443 NC Reference No. NCG01-2019-1673 Uses 'count _nunber'variable (increrrented by SP) Certificate of NCC191673 Coverage (COC) Uses'count_nunber'variable (incremented by SF) No. * Count Number 1673 Sequential nunber for subrrittal that is increrrented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)