HomeMy WebLinkAbout20191300 Ver 1_PCN Form Submission (2)_20190930DWR
IDIOM n of Water Resources
Pre -Construction Notification (PCN) Form
September 29, 2018 Ver 3
21nitial Review
Has this project met the requirements for acceptance in to the review process?*
r Yes
r No
Is this project a public transportation project?*
C Yes r No
Change only if needed.
BIMS # Assigned
20191300
Is a payment required for this project?*
r No payment required
r Fee received
r Fee needed - send electronic notification
Select Project Reviewer*
Joanne Steenhuis:eads\jhsteenhuis
Information for Initial Review
1a. Name of project:
U-5710A Drysdale Road Extension
1a. Who is the Primary Contact?*
Mason Herndon
1b. Primary Contact Email:*
tmherndon@ncdot.gov
Date Submitted
9/30/2019
Nearest Body of Water
Bradley Creek
Basin
White Oak
Water Classification
SC, HOW:#
Site Coordinates
Version# *
1
Reviewing Office*
Wilmington Regional Office - (910) 796-7215
1c. Primary Contact Phone:*
(910)341-2036
Latitude: Longitude:
34.230801-77.830615
FA. Processing Information U
County (or Counties) where the project is located:
Flew Hanover
Is this project a public transportation project?*
r Yes r' No
Is this a NCDOT Project?*
r Yes r No
(NCDOT only) T.I.P. or state project number:
W-5710A
WBS # (?)
50115.1.2
1a. Type(s) of approval sought from the Corps:
W Section 404 Permit (wetlands, streams and waters, Clean Water Act)
r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act)
1b. What types) of permit(s) do you wish to seek authorization?
W Nationwide Permit (NWP)
r' Regional General Permit (RGP)
r' Standard (IP)
1c. Has the NWP or GP number been verified by the Corps?
r Yes r No
Nationwide Permit (NWP) Number:
NWP Numbers (for multiple NWPS):
1d. Type(s) of approval sought from the DWR:
rJ 401 Water Quality Certification - Regular
F Non-404 Jurisdictional General Permit
F Individual Permit
23 - Categorical Exclusions
le. Is this notification solelyfor the record because written approval is not required?
For the record only for DWR 401 Certification:
For the record only for Corps Permit:
r 401 Water Quality Certification - Express
r Riparian Buffer Authorization
1f. Is this an after -the -fact permit application?*
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts?
r Yes r No
Acceptance Letter Attachment
U-5710A - Division 3 - STIR - WO 01.pdf
1h. Is the project located in any of NC's twenty coastal counties?
r Yes r No
1i. Is the project located within a NC DCM Area of Environmental Concern (AEC)?
r Yes r No r Unknown
1j. Is the project located in a designated trout watershed?
r Yes r No
B. Applicant Information
1d. Who is applying for the permit?
r Owner R Applicant (other than owner)
le. Is there an Agent/Consultant for this project?
r Yes r No
2. Owner Information
2a. Name(s) on recorded deed:
North Carolina Department of Transportation
2b. Deed book and page no.:
WA
2c. Responsible party:
Karen E. Collette, P.E.
2d. Address
Street Address
5501 Barbados Blvd.
Address line 2
City
Castle Hayne
Fbstal / Zip Code
28429
State / Pirmince / Fbgion
North Carolina
Country
United States
70.37KB
*
r Yes r No
r Yes r No
u
2e. Telephone Number: 2f. Fax Number:
(910)341-2000 (910)675-0143
2g. Email Address:*
kecollette@ncdot.gov
3. Applicant Information (if different from owner)
3a. Name:
Mason Herndon
3b. Business Name:
North Carolina Department of Transportation
3c.Address
Street Address
5501 Barbados Blvd
Address Line 2
City
State / Province / Region
Castle Hayne
North Carolina
Fbstal / Zip Code
(Duntry
28429
United States
3d. Telephone Number: 3e. Fax Number:
(910)341-2036 (910)675-0143
3f. Email Address:*
tmherndon@ncdot.gov
C. Project Information and Prior Project History
1. Project Information
1b. Subdivision name:
(if appropriate)
WA
1c. Nearest municipality / town:
Wilmington
2. Project Identification
2a. Property Identification Number:
N/A
2c. Project Address
Street Address
Intersection of Military Cutoff and Eastwood Rd.
Address Line 2
city
Wilmington
Postal / Zip (ode
28405
3. Surface Waters
3a. Name of the nearest body of water to proposed project:*
Bradley Creek
3b. Water Resources Classification of nearest receiving water:*
SC, HOW:#
3c. What river basin(s) is your project located in?*
White Oak
3d. Please provide the 12-digit HUC in which the project is located.
030203020502
4. Project Description and History
2b. Property size:
4.25
Sate / Province / legion
NC
(buntry
USA
4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:*
The general land -use in the vicinity of the project is characterized as opened forested area, residential and commercial developments. To the East of the project is a Mesic Mixed Forest
and a new multi use development is being proposed (Centerpoint). On the West of the project is the Eastport residential subdivision. North and South of the project is mostly commercial
development.
4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?*
C Yes r No r Unknown
4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR)
U-5710 Topo Map.pdf 2.29MB
4e. Attach an 81/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR)
U-5710A_Soil_Map.pdf 524.73KB
4f. List the total estimated acreage of all existing wetlands on the property:
0.067
4g. List the total estimated linear feet of all existing streams on the property:
525 (Intermittent)
4h. Explain the purpose of the proposed project:*
The North Carolina Department of Transportation (NCDOT) is proposing a Northwest quadrant connection between US 74 (Eastwood Road) and SR 1409 (Military Cutoff Road). The
south end of this proposed connection will create a new signalized intersection along Eastwood Road located approximately 800 feet west of Military Cutoff Road, whereas the north end
ties into the existing intersection of Military Cutoff Road at Drysdale Drive (and is thus tentatively named Drysdale Drive E)tension). Removing left turns from the main intersection
improves the efficiency of the intersection.
4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:*
The proposed project will construct a 4 lane variable width median roadway on new location. The project will also include a multiuse path and sidewalk. A stormwater pond for the
Eastport subdivision will have to be relocated. The pond will be owned and managed by the City of Wilmington. The project will impact a small depression wetland and 525 linear feet of
an intermittent UT to Bradley Creek. However only 372 linear feet are considered loss of Waters of the US. Included in the proposed permanent impacts are 91 linear feet of channel
improvements to correct vertical stream banks and to remove sediment prohibiting positive flow. The project also includes 62 linear feet of stream relocation which is required to
accommodate a planned development (CenterPoint) that is proposed adjacent to the project.
Standard road building equipment such as trucks, bulldozers and excavators will be used to construct the project.
4j. Please upload project drawings for the proposed project.
U5710A_Permit Drawings_20190821.pdf 3.75MB
5. Jurisdictional Determinations
Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?*
r Yes r No C Unknown
Comments:
5b. If the Corps made a jurisdictional determination, what type of determination was made?*
r Preliminary r Approved r Not Verified r^ Unknown r WA
Corps AID Number:
SAW-2015-00703
5c. If 5a is yes, who delineated the jurisdictional areas?
Name (if known): John Jamison and Vicki Miller
Agency/Consultant Company: HDR Engineering Inc
Other:
5d. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR
5/3/2018
5d1. Jurisdictional determination upload
final signed U 5710 PJD tear sheet.pdf 1.8MB
6. Future Project Plans
6a. Is this a phased project?*
r Yes r No
Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed projector related activity?
D. Proposed Impacts Inventory
1. Impacts Summary
la. Where are the impacts associated with your project? (check all that apply):
,R Wetlands W Streams -tributaries F Buffers
F Open Waters r Pond Construction
2. Wetland Impacts
2a1 Reason (?) 2b. Impact type * (?) 2c. Type of W.* 2d. W. name * 2e. Forested* 1!i-lisclicition
f. Type of 29. Impact
*(?) area*
1
Roadway Fill
P
Small -Basin Wetland
WB
Yes
Both
0.038
F71Mech.
Clearing
P
Small -Basin Wetland
WB
Yes
Both
0.007
(acres)
2g. Total Temporary Wetland Impact
0.000
2g. Total Wetland Impact
0.045
2h. Comments:
3. Stream Impacts
2g. Total Permanent Wetland Impact
0.045
3a. Reason for impact (?)
3b.lmpact type *
3c. Type of impact*name
*
3e. Stream Type *
3f. Type of
3g. S. width *
3h. Impact
(?)
Jurisdiction*
length*
S1
60" RCP crossin 9
Permanent
Fill JSA
Intermittent
Both
7
372
Average (feet)
(linear feet)
S2
Channel lmP rovement
Permanent
Excavation
SA
Intermittent
Both
7
91
Average (feet)
(linear feet)
S3
Channel Work
Tem ora
P rY
Dewaterin g
�SA
Intermittent
Both
7
34
Average (feet)
(linear feet)
�
Channel Relocation
Permanent
Relocation
�SA :Iff::]
Both
7
62
Average (feet)
(linear feet)
31. Total jurisdictional ditch impact in square feet:
0
3i. Total permanent stream impacts: 3i. Total temporary stream impacts:
525 34
31. Total stream and ditch impacts:
559
3j. Comments:
Only 372 If. of stream is permanent loss of waters of the U.S. that requires mitigation. Channel improvements involves correcting vertical banks and
removing sediment to restore positive flow. The channel relocation will be constructed to the existing stream dimensions but with flatter and more
stable slopes. This reach of stream has been modified by excavation and currently unstable.
E. Impact Justification and Mitigation
1. Avoidance and Minimization
1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project:
Slopes throughout the project are being proposed at 3:1 to minimize impacts. Stream impacts have been minimized to the maximum extent practicable
and open channels have been utilized as much as possible given the constraints on this project requirements and the adjacent proposed
development.
1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques:
All utilities relocation will be installed within the e>asting roadway fill section. Appropriate BMP's will be used throughout the project to prevent offsite
sediment and turbidity.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State?
r Yes t^ No
2c. If yes, mitigation is required by (check all that apply):
r DWR I7 Corps
2d. If yes, which mitigation option(s) will be used for this project?
r Mitigation bank rJ Payment to in -lieu fee r Permittee Responsible
program Mitigation
4. Complete if Making a Payment to In -lieu Fee Program
4a. Approval letter from in -lieu fee program is attached.
r Yes r No
4b. Stream mitigation requested:
(linear feet)
372
4d. Buffer mitigation requested (DWR only):
(square feet)
N/A
4f. Non -riparian wetland mitigation requested:
(acres)
0
4h. Comments
4c. If using stream mitigation, what is the stream temperature:
warm
4e. Riparian wetland mitigation requested:
(acres)
N/A
4g. Coastal (tidal) wetland mitigation requested:
(acres)
WA
F. Stormwater Management and Diffuse Flow Plan (required by DWR)
1. Diffuse Flow Plan
la. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules?
r Yes r No
If no, explain why:
Project is not located within a protected basin.
2. Stormwater Management Plan
2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?*
r Yes r No
Comments:
NCDOT will abide by all requirements of the NPDES permit NCS000250. Post construction treatment of stormwater runoff has been proposed to the mammum extent practicable by
utilizing a storamter vegetated Swale at the outfall prior to the water discharging into jurisdictional waters.
G. Supplementary Information
1. Environmental Documentation
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?*
r Yes r No
1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina)
Environmental Policy Act (NEPA/SEPA)?*
r Yes
r No
Comments:*
This project falls under the federal categorical exclusion rules. A CE document was prepared and signed by FHWA documenting that the project is
compliant with these rules.
2. Violations (DWR Requirement)
2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or
Riparian Buffer Rules (15A NCAC 2B .0200)? *
r Yes r No
3. Cumulative Impacts (DWR Requirement)
3a. Will this project result in additional development, which could impact nearby downstream water quality?*
r Yes r No
3b. If you answered "no," provide a short narrative description.
The project area is already predominantly commercial and residential development.
4. Sewage Disposal (DWR Requirement)
4a. Is sewage disposal required by DWR for this project?*
r Yes r Nor N/A
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or habitat?*
r Yes r No
5b. Have you checked with the USFWS concerning Endangered Species Act impacts?*
f Yes r No
5d. Is another Federal agency involved?*
r Yes r No r Unknown
5e. Is this a DOT project located within Division's 1-8?
r Yes r No
5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat?
Natural Heritage database, USFWS IPAC and field surveys. Question 5a is check yes due to the listing of NLEB in New Hanover County which is cover
by the PBO between USFWS and NCDOT. All other protected species have a determination of "No Effect".
Consultation Documentation Upload
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as an Essential Fish Habitat?*
r Yes r No
6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?*
NOAA Essential Fish Habitat Mapper
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?*
f Yes r No
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?*
NCDOT HEU review and SHPO database
7c. Historic or Prehistoric Information Upload
U-5710 Historical NSR Reports.pdf 1.97MB
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain?*
r Yes r No
8c. What source(s) did you use to make the floodplain determination?*
FEMA Flood Mapping Tool
F
Miscellaneous
Comments
See attached cover letter below.
Miscellaneous attachments not previously requested.
U-5710A Permit Application Letter.pdf 211.6KB
Signature
*
W By checking the box and signing below, I certify that:
• I have given true, accurate, and complete information on this form;
• I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
• I intend to electronically sign and submit the PCN form.
Full Name:
Mason Herndon
Signature
W174W 4�
Date
9/30/2019