HomeMy WebLinkAboutNCC192079_ESC Approval Submitted_20190927 r'a%TAiE o
ROY COOPER '
In
MICHAEL S.REGAN
Secretary
S.DANIEL SMITH NORTH CAROUNA
tnrerfm Dirertor iEnvironmental Quality
June 12, 2019
LETTER OF APPROVAL
Albemarle Properties LLC
ATTN: T,AIlen Pipkin, Manager
10320 Durant Rd.,Ste 113
Raleigh, NC 27614
RE: Project Name: 70 Mosswood Boulevard
Project ID: FRANK-2019-033
Acres Approved: 5.10
County: FRANKLIN, City: Youngsville Address: Mosswood Boulevard
River Basin: Neuse, Stream Classification: Other
Submitted By: Blakely Design Group
Date Received by LQS: May 23, 2019
Plan Type: New
Dear Mr. Pipkin:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval moist be
posted at the job site. This plan approval shall expire three(3)years following the date of approval,
if no land-disturbing activity has been undertaken,as is required by Title 15A NCAC 413.0129.
As ol'April 1,2019,all new construction activities are required to complete and submit an electronic
Notice of Intent (NO[) form requesting a Certificate of Coverage (COC) under the NCGO10000
Construction Stormwater General Permit. This form MUST be submitted prior to the commencement
of any land disturbing activity on the above named project. The NOI form may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at
Annettejucas@ncdenrgyov or Paul Clark at P_aul_clark0ncdenr.gvv. After you submit a complete and
correct NOI form,a CPOC will be emailed to you within three business days. Initially, DEMLR will
not charge a fee for the coverage under the NCG01 permit. However,on or after June 1,2019,a$100
fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
North Carolina Department of£nvironmental Qualky Ohmision or Energy,Mineral and Land Resource;
Raleigh Regional office :1628 Mail Service Center;3800 Barrett Drwe Raleigh,North Carol"27609
919J91A200
Albermarle Properties LLC
June 12,2019
Page 2 of 2
Title 15A NCAC 413.0118(a)and the NCGO1 permit require that the following documentation be kept
on fife at the job site:
1. The approved E&SC plan as well as any approved deviation.
Z. The NCGO1 permit and the COC,once it is received.
3. Records of inspection made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973(North Carolina General Statute 113A-51 through 66),this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws,regulations, and rules. 1n addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project. Please notify us if you plan to have a
preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Say Castle, ,+
Regional Engineering Associate
DEMLR
Enclosures: Certificate of Approval
NCGOI Fact Sheet
cc: Taylor Blakely,PE[tayl4r2blakelydesignmet)-Electronic Copy
DEMLR- Raleigh Regional Office File