Loading...
HomeMy WebLinkAboutNCC192014_ESC Approval Submitted Signed Copy_20190926ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Dtrectar NORTH CAROLINA Environmental Quality August 20, 2019 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Ashe County Board of Education ATTN: Phyllis Yates 320 South Street Jefferson, NC 28640 RE: Project Name: Ashe County Middle School Acres Approved: 40.00 Project ID: ASHE-2020-001 County: Ashe Location: AEV Lane, Jefferson River Basin: New Stream Classification: Other Submitted By: Ashe County Board of Education Date Received by LQS: July 22, 2019 Plan Type: Institutional Dear Phyllis Yates, This office has reviewed the subject erosion and sedimentation control plan and hereby issues this Letter of Approval with Modifications and Performance Reservations. A list of the modifications and reservations is attached. This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Should the plan not perform adequately, a revised plan will be required (G.S. 113A-54.1) (b). As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted and COC issued prior to the commencement of any land disturbing activity on the above -named project. The NOI form maybe accessed at deq.nc.gov/NCG01. Please direct questions about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clarkPncdenr.gov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCG01 permit. However, a $100 fee will soon be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: ... North Carolina Department of Environmental Quality j Division of Energy. Mineral and Land Resources DI Qp 1/� 512 North Salisbury Street 11612 Mail Service Center I Raleigh, North Carolina 27699-t612 ' ,V(;gRt CAACHINA owna�a�m�ar� // 919.707.9200 Letter of Approval with Modifications and Performance Reservations Ashe County Board of Education August 20, 2019 Page 2 of 3 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Since ly, �v Dylan Reinhardt Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications and Performance Reservations NPDES NCG01 Fact Sheet cc: Jerry Baker Regional Office file Letter of Approval with Modifications and Performance Reservations Ashe County Board of Education August 20, 2019 Page 3 of 3 MODIFICATIONS and PERFORMANCE RESERVATIONS Project Name: Ashe County Middle School Project ID: ASHE-2020-001 County: Ashe MODIFICATIONS 1. The plan is approved with the modifications shown in revisions emailed on 8/20/2019. Please provide 2 physical copies of this final version to the Winston- Salem Regional Office within 2 weeks or prior to commencement of construction activity, whichever comes first 2. Please ensure the NCG01 Ground Stabilization and Materials Handling and Self - Inspection, Recordkeeping and Reporting requirements are on your plans. 3. Wattles should be staked by placing two stakes crossing each other in an X pattern through and above the wattle such that the stakes anchor it dowm. [G.S. 113A-57(3)] 4. The plan shall show in detail the outlets and contours around sediment basins and skimmer traps. [G.S. 113A-57(3)] 5. Skimmer basin F shall be designed such that its outfall will be directed off tract to ensure skimmer basin E does not treat a greater volume than for which it is designed. [G.S. 113A-57(3)] PERFORMANCE RESERVATIONS 1. Monitor and take care to ensure flow velocities from the proposed slope drains are not erosive. Keep areas downstream of graded areas undisturbed as much as feasible. 2. Take extra care to ensure western perimeter slopes and the diversion immediately below it are well stabilized. Extra maintenance of the nearby silt fence may be required while area is stabilized. 3. Additional measures maybe required -The applicant is responsible for the control of sediment on -site. If the approved erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary to stop sediment from leaving this site. [15A NCAC 4B .0115] Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities