Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20170359 Ver 2_Public Notice_20190924
MI 1 1 121 1 US Army Corps PUBLIC NOTICE Of Engineers Wilmington District Issue Date: September 24, 2019 Comment Deadline: October 23, 2019 Corps Action ID Number: SAW -2019-01616 The Wilmington District, Corps of Engineers (Corps) received an application from Mr. Alan Shuping of the Grandfather Golf and Country Club seeking Department of the Army authorization to dredge accumulated sediment and to conduct stream bank/shoreline stabilization activities, along with other improvements on infrastructure in an existing impoundment known as Loch Dornie, at the Grandfather Golf and Country Club, on NC Highway 105, in Linville, Avery County, North Carolina. Specific plans and location information are described below. Due to the large size/amount of plans, they can be accessed at the following link along with this Public Notice. http://www. saw.usace.army.mil/Missions/Re ue 1�atoryPermitProre a�m.aspx Applicant: AGENT (if applicable): Authority Mr. Alan Shuping Grandfather Golf and Country Club Post Office Box 368 Linville, North Carolina 28646 Ms. Keven Arrance Hazen and Sawyer 4011 West Chase Blvd. Suite, 500 Raleigh, North Carolina 27513 The Corps evaluates this application and decides whether to issue, conditionally issue, or deny the proposed work pursuant to applicable procedures of the following Statutory Authorities: ® Section 404 of the Clean Water Act (33 U.S. C. 1344) ❑ Section 10 of the Rivers and Harbors Act of 1899 (33 U. S. C. 403) ❑ Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413) Location Location Description: Project Area (acres): 23 Nearest Town: Linville, NC Nearest Waterway: Linville River River Basin: Catawba (03050101) Latitude and Longitude: 36.101170 N, -81.852862 W Existing Site Conditions The project is located within the existing Grandfather Golf and Country Club residential development. Existing site conditions are comprised of an approximately 38 -acre man made impoundment (Loch Dornie) with a surrounding golf course and residential homes. There are six uninhabited islands and one inhabited island within the lake. Land use within the project vicinity includes the golf course, administrative and recreational buildings associated with the golf course and country club, other recreational areas, residential properties (both single and multi -family), and undeveloped forested areas. Recreational facilities and areas include a clubhouse, maintained lawn areas, a beach adjacent to the lake, a walking path, and pedestrian bridges. The lake impounds a reach of the Linville River which ultimately drains to the Catawba River. Applicant's Stated Purpose The project consists of numerous enhancements on the site to improve the usability and the safety of the lake which is a primary recreational feature of this existing development. The primary purposes are: 1) to dredge accumulated sediments from the Linville River and Loch Dornie; 2) to improve unstable river banks and lake shoreline areas; 3) to replace pedestrian bridges that have become unsafe and hazardous; 4) and, to protect sanitary sewer assets. Project Description The proposed project consists of numerous enhancements within the Grandfather Golf and Country Club (GGCC) property. The primary goal of the project is to remove accumulated sediments from within Loch Dornie and the Linville River channel while providing bank and shoreline stabilization. The project components include dredging accumulated sediments, reconstruction of uninhabited islands in Loch Dornie, removal of seven pedestrian bridges and replacement of five of the seven bridges, sanitary sewer replacement and protection, bank and shoreline stabilization, construction of a new event lawn and pedestrian path, and erosion and sediment control measures in the environmental release channel. Loch Dornie has received sediments from areas upstream of the GGCC property that have been transported by the Linville River and deposited in the lake when water flows slowed. The sediments are proposed to be dredged from the lake and reused onsite for shoreline stabilization. Additionally, in the upper portion of the lake, Loch Dornie is split into narrow lake canals that are referred to as the "east channel" and the "west channel". At the split, a large amount of -2- cobble has been deposited by the river and is altering the flow patterns in the two lake channels, occasionally eliminating flows in the east channel. The cobble is proposed to be removed by dredging and reused onsite for shoreline stabilization. Currently, there are six uninhabited islands in Loch Dornie. These islands are proposed to be removed or modified as part of the project. The uninhabited islands are characterized by deteriorating shorelines. Four of the six islands are currently connected by pedestrian footbridges (Bridges A through E). GGCC proposes to remove or modify the six uninhabited islands and construct two new uninhabited islands in approximately the same location in Loch Dornie. The two new, larger islands will be connected by three new pedestrian footbridges (Proposed Bridge #1, #2, and #3). The footbridges will be made of fiber reinforced plastic (FRP) with concrete bridge abutments at each end. Bridges #1 and #2 will span the waterway and avoid permanent impacts to the lake and lakebed. Bridge #3 will consist of three 60 -foot long sections that will require two support piers to be constructed in the lake. Three options for the piers have been designed; the option selected shall depend on the foundation conditions encountered during construction. Dependent upon geotechnical conditions, the piers will consist of either treated wooden piles driven to depth adequate for support, or concrete supports or wooden piles anchored into a cast -in-place concrete. The two piers are assumed to be 15 feet tall and 2.5 to 2.5 feet wide. The long dimension will be 9.5 feet at the top and roughly 18 feet at the base. The dimensions of two cast -in-place concrete bases to establish a level foundation for each pier are assumed to be 22 feet long, 7 feet wide, and 2 feet deep. The new islands will be constructed with gentler sloping shorelines that are designed to be more stable and withstand greater sheer stresses than the current shorelines. Fill materials used to construct the two new islands are anticipated to consist of suitable dry borrow material, dredged lakebed and cobble materials from within the project area. The shorelines will be landscaped and planted to improve the resiliency and stability of the new land surface. The large island is proposed to be 0.61 acre in size, and the small island is proposed to be 0.26 acre in size. Within the project area, there are a total of seven existing pedestrian bridges (Bridges A through G). Five of the existing bridges (Bridges A through E) connect land on either side of Loch Dornie with the aforementioned five uninhabited islands. Bridge F connects land along the western shore of Loch Dornie with the inhabited island that is situated between the west and east channels of the upper Loch Dornie. Bridge G spans the Linville River immediately upstream of the west and east channel split. Bridge G has been closed to users due to its lack of structural integrity and severe risk of structural failure. Bridges F and G are proposed to be replaced. Bridge F is proposed to be replaced in place with Bridge #4. Bridge G is proposed to be replaced by Bridge #5 and will be adjusted slightly from the alignment of the existing bridge in order to simplify sanitary sewer reconnection. There are three segments of sanitary sewer pipes that need replacement or protection. Two segments are currently attached to the substructure of Bridges F and G described in the preceding paragraph. These two sanitary sewer pipes will be replaced in-kind and in similar fashion. The new sewers will be attached to the substructure of the new bridges. As the alignment and length of Bridge F is to remain unchanged, the associated 6 -inch diameter sewer will also be replaced with the same length of pipe as is present. As Bridge G will be realigned from its current -3- position, the associated 8 -inch diameter sewer will likewise be extended. With 96 feet of existing sewer being replaced with 105 feet of new sewer. The third sanitary sewer segment is proposed to be protected. The third segment consists of an exposed pipe crossing the Linville River in the northern most portion of the project area. Protection of the sewer is proposed to be accomplished by construction of a grade control sill (GCS) around the pipe. The GCS consists of rock that will be placed to protect the 8 -inch diameter pipe across the full width of the river. Bank and shoreline stabilization measures are proposed along reaches of the Linville River, the east and west lake channels of Loch Dornie, and Loch Dornie. A total of eight locations are proposed for bank or shoreline stabilization, not including the previously described island construction and associated shoreline stability design. Bank stabilization (BS) #1 is located within the Linville River in the upstream most portion of the project area. BS #1 consists of construction of a 208 foot long imbricated rock wall along the west bank of the river, regrading the east bank of the river to create a floodplain bench, and installation of 5 GCSs in the bed of the river. BS #2 is located along the west bank of the Linville River immediately downstream of Bridge G. The BS #2 location is immediately upstream of the transition from flowing river to impounded open water area. Stabilization of the BS #2 site consists of constructing an imbricated rock wall along 80 feet of the west bank of the river that will tie into an existing stacked rock wall and will match the existing bank surface. The imbricated rock wall is needed to provide structural support to a very steep bank adjacent to a building. BS #2 will also protect the new bridge and sanitary sewer manhole from hazards associated with future erosion of the stream bank. BS #3 and #4 are associated with the shoreline along the inhabited island in Loch Dornie. BS #3 is located along the west bank of the east lake channel. The BS #3 site has nearly vertical banks and is at high risk of undermining the structural integrity of private residences on the island if left in its current condition. BS #4 is located along the south bank of the inhabited island and is located where the east and west lake channels converge in Loch Dornie. Due to the current geometry and location of the bank at the BS #4 site, the conditions are appropriate to allow the development of eddies during times of high flows. BS #4 is needed to protect private residential structures, provide increased shoreline stability, and improve accessibility and safety along the south end of the inhabited island. BS #5 and #6 are located along the western shore of Loch Dornie. BS #5 consists of construction of a littoral shore and retention of the existing location of the lake's edge of water. BS #6 includes backfilling the site to smooth the line of the shore and reduce shoreline slope to reduce the risk of future erosive forces along the segment of shoreline. BS #6 involves shifting the edge of water eastward. BS #7 and #8 are located along the eastern shore of Loch Dornie. BS #7 is located near the downstream end of the east lake channel of upper Loch Dornie. BS #7 is triangular in shape and shows evidence of ongoing erosion of the existing shoreline. The area has a history of maintenance issues, primarily related to the steep slope above normal pool elevation and the frequent sediment deposition. The area is proposed to be backfilled, shifting the edge of water to the southwest. Within the BS #7 area, an existing stormwater pipe discharges into Loch Dornie. The pipe is proposed to be extended by 105 feet through the area to be backfilled in order to retain the existing discharge into the lake. BS #4, #6, and #7 have been designed to encourage water movement that is anticipated to promote self -maintenance of the newly dredged areas, thereby reducing future maintenance needs. BS #8 is located adjacent to the existing clubhouse on the eastern shore of the lake. The shoreline at the BS #8 site is proposed to be extended into the lake. The northern portion of the BS #8 site is to be graded with gentler slopes than are currently present, and the southern section of BS #8 site is proposed to be stabilized with a concrete retaining wall. The area around BS #8 is often used by residents and visitors to GGCC and presents a hazard due to the steep, abrupt slopes and ongoing erosion. The design of BS #8 provides for shoreline stabilization and pedestrian safety as well as the construction of an event lawn. The event lawn will provide an outdoor space for recreation and gatherings with the scenic lake as a backdrop. The proposed enhancements of the GGCC property include path improvements for an approximately 1,300 -foot long, 6 -foot wide pedestrian path along the west side of Loch Dornie. The current path is maintained grass, follows the existing sanitary sewer alignment and is occasionally used for maintenance access. The proposed pedestrian path improvements will connect the club's administrative offices, fitness center and recreation area to multiple residences and condos surrounding upper Loch Dornie as well as the island bridges that connect over to the clubhouse. An additional 200 feet of pedestrian path improvements will connect Loch Dornie Drive to proposed Bridge#4 and extend briefly east of Bridge #4 on the inhabited island. The path is proposed to consist of compacted subgrade with 4 -inch deep compacted aggregated base topped with 4 -inch thick granite screenings. The edges of the path will be maintained in perpetuity by 6 -inch tall aluminum edging that will be held in place by 12 -inch long aluminum stakes. Presently, pedestrians share the paved roadways with vehicular traffic. The roads are two- lane facilities with narrow, vegetated shoulders, presenting a safety concern for pedestrians. The proposed pedestrian path will provide a safe alternative to sharing the road as well as a more scenic, aesthetically pleasing route. Loch Dornie discharges water over the spillway, located at the southeastern corner of the lake, and through an environmental release pipe. GGCC is required to maintain a minimum flow through the environmental release pipe to support aquatic life in the Linville River downstream of the Loch Dornie dam. To accommodate the proposed in -water work of the project, the lake will be drawn down to establish dry work areas, which will result in no water passing over the spillway and the only flows from the lake being through the environmental release pipe. Water diversion and erosion and sedimentation control measures will be in place to protect water quality. During large storm events, however, water in the lake is expected to rise and be characterized in higher than normal turbidity due to suspended sediments. In order to protect downstream water quality during the lake draw -down period, the project also includes an additional level of treatment that is the placement of erosion and sediment control measures below the dam in the environmental release channel. These measures consist of floc logs or blocks to introduce polyacrylamide and coir log rolls to trap suspended sediments. Erosion and sediment control measures will be implemented and maintained in good condition throughout the construction period. Measures shall include silt fencing along the downgradient limits of disturbance, turbidity curtains in Loch Dornie immediately downstream of the work - 5 - areas and immediately upstream of the spillway, and floc logs and coir log rolls in the environmental release channel. Additionally, all work conducted in the river or lake will be performed in dry work conditions. The river will be diverted away from active construction areas and will be conveyed via gravity diversion pipes as needed to ensure dry work zones. The lake will be drawn down at the commencement of construction in order to establish dry work areas to accommodate the proposed lake dredging, island reconstruction, and shoreline stabilization. Construction access to the construction area will be provided by the existing roads at the GGCC. Vehicular and equipment access within the limits of disturbance shall be provided via existing access paths, stabilized construction entrances, and temporary access paths. The temporary access paths are proposed to be constructed of Geoterra structural mats or similar construction matting. The access paths will generally be 12 feet wide and located in upland areas. Four points of direct stream or lake access or crossing are proposed along the access paths, and all other stream crossings coincide with existing site access paths and existing culverts. Stabilized construction entrances shall be installed where temporary access paths intersect the existing paved roadways. Stabilized construction entrances will consist of a gravel pad measuring at least 50 feet in length, 12 feet in width, and 6 inches in depth. The gravel will be placed on filter fabric. The construction entrance is to be inspected weekly and following each rainfall producing 0.5 inch or more of rain. Indirect impacts may result from the proposed project. Potential indirect impacts include alterations of downstream water quality, temporary alteration of the aesthetic quality of the site, and increased traffic within the GGCC property during construction. Downstream water quality will be protected by implementation of suitable stormwater Best Management Practices (BMPs) and a project -specific approved erosion and sedimentation plan. The environmental release channel, which maintains minimum flows from the lake to the downstream reach of Linville River, will provide protection to Linville River from suspended sediments and turbidity via temporary placement of flocculent blocks and coir logs/wattles at the outfall pipe inlet and within the environmental release channel. The visual character of the GGCC will be temporary altered during construction. The aesthetic impact is part of the reason behind scheduling construction during the off-season, allowing the number of residents and guests to be affected by the visual impact to be reduced in comparison to the number of people onsite during GGCC's season. Winter scheduling also minimizes the effects of increased traffic associated with construction as there are fewer vehicles onsite during the winter months. The proposed construction schedule was developed, giving consideration to restrictions associated with encroachment into trout waters and buffers along trout waters as well as the dates of the GGCC off-season. The trout waters and buffer time -of -year restriction is herein requested to be adjusted via WRC variance to allow in -water work and land disturbance within the protected buffer beginning on January 1. Work is proposed to begin in November and be completed by April 30. During the months of November and December, work is proposed to consist of site preparation and other activities upgradient of the landward limit of the trout buffer, which is 25 feet wide and abuts the top of bank of the Linville River and Loch Dornie. These activities include installation of stabilized construction entrances and staging areas in high ground, disassembling of existing wood bridge structures, replacement of existing Bridge G with proposed Bridge #5, and construction of a retaining wall section in high ground by the clubhouse. Bridge #5 will be assembled on high ground immediately adjacent to the proposed location then lifted into place using a crane. January 1, in -water work and buffer -disturbing work is proposed to commence. This work shall consist of major grading, dredging, and wall construction, and is expected to occur over a three-month period, ending on or about March 31. Final stabilization measures, bridge construction, and landscaping is one month, occurring from April 1 to April 30. Construction equipment is anticipated to include large excavators, bulldozers, and dump trucks. Small skid steer loaders are expected to be utilized onsite as well. A crane is proposed to be used for placing some of the bridge structures. Additionally, jackhammers or similar equipment may be used, if found to be necessary, where bedrock is encountered. A pile driver may be used to install proposed bridge piers. Below is a table summarizing the proposed impacts described above. Site # Impact Type Type of Impact Waterbody Name Stream Impact Length linear feet SI Sanitary Sewer Protection Permanent Linville River 6 S2 Bank Stabilization #1 Permanent Linville River 208 S3 Construction Access for S2 Temporary Linville River 12 S4 Grade Control Sills (4i Permanent Linville River 65 S5 Bank Stabilization #2 Temporary Linville River 54 S6 Bridge and sewer replacement Temporary Linville River 5 Area Impact (acres) L1 Dredging Accumulated Sediments Permanent Loch Dornie 5.92 L2 Island Construction Permanent Loch Dornie 1.07 L3* Shoreline Stabilization Permanent Loch Dornie 1.12 L4 Dewatering and turbidity curtain Temporary Loch Dornie 4.60 L5** Bridge Pier Footing Permanent Loch Dornie 0.01 *Impact site L3 includes BS#3 through BS#8 **Impact site L5 includes 308 square feet (0.007 acre) As noted in the table above, a total of 279 linear feet of stream channel/stream bank will be permanently impacted from bank stabilization activities along with 71 linear feet of temporary impacts. Approximately 8.12 acres of open water will be permanently impacted by dredging activities along with 4.6 acre of temporary impacts to open water. With regards to volume of material that will be dredged, approximately 25,118 cubic yards will be dredged from Impact Site L1. Of that dredged material, approximately 7,238 cubic yards of material will used for island reconstruction and bank/shoreline stabilization at Impact Sites L2 and U. -7- Also for additional reference, a previous Department of the Army permit requested was submitted in 2017 but withdrawn pending project revisions. Design elements that were added between 2017 and 2019 include the island reconstruction, grade control sills, sanitary sewer protection, bridge replacement, and the extent of temporary dewatering. Avoidance and Minimization The applicant provided the following information in support of efforts to avoid and/or minimize impacts to the aquatic environment. As stated by the applicant, full avoidance of impacts can only be accomplished with a no -build alternative, which leaves bridges in imminent danger of collapse, risks a failure of sanitary sewer pipelines and associated spillage of raw sewage into the Linville River, and allows the effects of accumulated sediments to remain and continue to increase. The effects of accumulated sediments include restriction of flow, potential increase in water temperature, excessive growth of vegetation in shallow lake areas, and possibly increased sedimentation downstream during high flows. Stormwater Best Management Practices (BMPs) have been included in the project design to ensure that water quality is protected during construction. BMPs include silt fencing with stone outlets, turbidity curtains downstream of work area and upstream of the lake spillway, and routine inspection and maintenance of erosion and sediment control measures. Shoreline stabilization has been designed to be resilient to high flows that are characteristic of the project vicinity. Shoreline and bank stabilization measures will protect downstream water quality by reducing eroded sediments in the waterway and by providing vegetated shore areas that will facilitate nutrient and sediment removal from stormwater prior to entering the waterways. Additionally, the island reconstruction and shoreline stabilization components have been designed to improve flow patterns through the lake and encourage more favorable sediment transport and sediment deposition patterns, which will help to minimize future maintenance dredging needs and eliminate offsite disposal of dredged materials. The construction schedule has been set to restrict in -water work during trout spawning period, allowing in -water work and land disturbance within the 25 -foot trout waters buffer to commence no earlier than January 1. The construction schedule requires a variance from the NC Wildlife Resources Commission (WRC), which is being requested for concurrent review. As a variance was previously authorized by WRC for the project, it is anticipated that construction will be permitted to begin in January. Lake and river access points and/or crossings will be provided by existing access paths and four temporary construction access paths. The access plan strikes a balance between minimizing the number of access points and crossings and minimizing excessive vehicular and equipment movements within the lake and river beds. All in -water work will be performed under dry conditions. Dry work areas will be established using stream diversions to direct river flows into the west or east channel as needed, draw -down of the lake by 8 feet, gravity -fed piped conveyance of river flows through work areas, and a siphon and pump system to maintain the lake drawdown. The siphon and pump system will be installed at the downstream end of the lake and will be used to temporarily dewater the lake, pumping water over the lake spillway as needed to maintain the lake drawdown. All cast -in-place concrete work shall be performed in dry conditions. All necessary measures will be taken to ensure that surface waters do not contact wet concrete. Turbidity curtains will be installed at two locations in the lake. A pair of turbidity curtains will be installed immediately upgradient of the northern edge of water during lake drawdown to capture suspended sediments at the downgradient edge of the work area associated with the dredging and island reconstruction. A turbidity curtain will be installed between the edge of water during lake drawdown and the siphon and pump system that will be placed at the lake spillway. Silt fencing with stabilized outlets will be installed along the downgradient edge of upland work areas. The silt fence will be inspected regularly and maintained as needed to ensure efficacy. Dredging methods were evaluated for the proposed project. Hydraulic dredging of the lake and river bed was considered but determined to not meet the needs of the project. The time required to remove the necessary volume of material and the cost associated with hydraulic dredging would result in extending the construction schedule into the GGCC's in -season time and roughly doubling the cost for the dredging. Compensatory Mitigation The applicant did not propose any compensatory mitigation. Essential Fish Habitat Pursuant to the Magnuson -Stevens Fishery Conservation and Management Act, this Public Notice initiates the Essential Fish Habitat (EFH) consultation requirements. The Corps' initial determination is that the proposed project would not effect EFH or associated fisheries managed by the South Atlantic or Mid Atlantic Fishery Management Councils or the National Marine Fisheries Service. Cultural Resources Pursuant to Section 106 of the National Historic Preservation Act of 1966, Appendix C of 33 CFR Part 325, and the 2005 Revised Interim Guidance for Implementing Appendix C, the District Engineer consulted district files and records and the latest published version of the National Register of Historic Places and initially determines that: ❑ Should historic properties, or properties eligible for inclusion in the National Register, be present within the Corps' permit area; the proposed activity requiring the DA permit (the undertaking) is a type of activity that will have no potential to cause an effect to an historic properties. ® No historic properties, nor properties eligible for inclusion in the National Register, are present within the Corps' permit area; therefore, there will be no historic properties affected. The Corps subsequently requests concurrence from the SHPO (or THPO). ❑ Properties ineligible for inclusion in the National Register are present within the Corps' permit area; there will be no historic properties affected by the proposed work. The Corps subsequently requests concurrence from the SHPO (or THPO). ❑ Historic properties, or properties eligible for inclusion in the National Register, are present within the Corps' permit area; however, the undertaking will have no adverse effect on these historic properties. The Corps subsequently requests concurrence from the SHPO (or THPO). ❑ Historic properties, or properties eligible for inclusion in the National Register, are present within the Corps' permit area; moreover, the undertaking may have an adverse effect on these historic properties. The Corps subsequently initiates consultation with the SHPO (or THPO). ❑ The proposed work takes place in an area known to have the potential for the presence of prehistoric and historic cultural resources; however, the area has not been formally surveyed for the presence of cultural resources. No sites eligible for inclusion in the National Register of Historic Places are known to be present in the vicinity of the proposed work. Additional work may be necessary to identify and assess any historic or prehistoric resources that may be present. The District Engineer's final eligibility and effect determination will be based upon coordination with the SHPO and/or THPO, as appropriate and required, and with full consideration given to the proposed undertaking's potential direct and indirect effects on historic properties within the Corp s-indentified permit area. Endangered Species Pursuant to the Endangered Species Act of 1973, the Corps reviewed the project area, examined all information provided by the applicant and consulted the latest North Carolina Natural Heritage Database. Based on available information: ® The Corps determines that the proposed project would not affect federally listed endangered or threatened species or their formally designated critical habitat. ❑ The Corps determines that the proposed project may effect federally listed endangered or threatened species or their formally designated critical habitat. -10- ❑ The Corps initiates consultation under Section 7 of the ESA and will not make a permit decision until the consultation process is complete. ❑ The Corps will consult under Section 7 of the ESA and will not make a permit decision until the consultation process is complete. ❑ The Corps has initiated consultation under Section 7 of the ESA and will not make a permit decision until the consultation process is complete. ❑ The Corps determines that the proposed project may effect federally listed endangered or threatened species or their formally designated critical habitat. Consultation has been completed for this type of activity and the effects of the proposed activity have been evaluated and/or authorized by the National Marine Fisheries Service (NMFS) in the South Atlantic Regional Biological Opinion or its associated documents, including 7(a)(2) & 7(d) analyses and Critical Habitat assessments. A copy of this public notice will be sent to the NMFS. ❑ The Corps is not aware of the presence of species listed as threatened or endangered or their critical habitat formally designated pursuant to the Endangered Species Act of 1973 (ESA) within the project area. The Corps will make a final determination on the effects of the proposed project upon additional review of the project and completion of any necessary biological assessment and/or consultation with the U.S. Fish and Wildlife Service and/or National Marine Fisheries Service. Other Required Authorizations The Corps forwards this notice and all applicable application materials to the appropriate State agencies for review. North Carolina Division of Water Resources (NCDWR): The Corps will generally not make a final permit decision until the NCDWR issues, denies, or waives the state Certification as required by Section 401 of the Clean Water Act (PL 92-500). The receipt of the application and this public notice, combined with the appropriate application fee, at the NCDWR Central Office in Raleigh constitutes initial receipt of an application for a 401 Certification. A waiver will be deemed to occur if the NCDWR fails to act on this request for certification within sixty days of receipt of a complete application. Additional information regarding the 401 Certification may be reviewed at the NCDWR Central Office, 401 and Buffer Permitting Unit, 512 North Salisbury Street, Raleigh, North Carolina 27604-2260. All persons desiring to make comments regarding the application for a 401 Certification should do so, in writing, by October 15, 2019 to: NCDWR Central Office Attention: Ms. Karen Higgins, 401 and Buffer Permitting Unit (USPS mailing address): 1617 Mail Service Center, Raleigh, NC 27699-1617 -11- Or, (Physical address): 512 North Salisbury Street, Raleigh, North Carolina 27604 North Carolina Division of Coastal Management (NCDCM): ❑ The application did not include a certification that the proposed work complies with and would be conducted in a manner that is consistent with the approved North Carolina Coastal Zone Management Program. Pursuant to 33 CFR 325.2 (b) (2) the Corps cannot issue a Department of Army (DA) permit for the proposed work until the applicant submits such a certification to the Corps and the NCDCM, and the NCDCM notifies the Corps that it concurs with the applicant's consistency certification. As the application did not include the consistency certification, the Corps will request, upon receipt, concurrence or objection from the NCDCM. ® Based upon all available information, the Corps determines that this application for a Department of Army (DA) permit does not involve an activity which would affect the coastal zone, which is defined by the Coastal Zone Management (CZM) Act (16 U.S.C. § 1453). Evaluation The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered including the cumulative effects thereof, among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, flood plain values (in accordance with Executive Order 11988), land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. For activities involving the discharge of dredged or fill materials in waters of the United States, the evaluation of the impact of the activity on the public interest will include application of the Environmental Protection Agency's 404(b)(1) guidelines. Commenting Information The Corps of Engineers is soliciting comments from the public; Federal, State and local agencies and officials, including any consolidated State Viewpoint or written position of the Governor; Indian Tribes and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects and the other public interest factors listed above. -12- Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement (EIS) pursuant to the National Environmental Policy Act (NEPA). Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Requests for a public hearing will be granted, unless the District Engineer determines that the issues raised are insubstantial or there is otherwise no valid interest to be served by a hearing. The Corps of Engineers, Wilmington District will receive written comments pertinent to the proposed work, as outlined above, until 5pm, October 23, 2019. Comments should be submitted to Ms. Amanda Jones, Asheville Regulatory Field Office, 151 Patton Avenue, Room 208, Asheville, North Carolina 28801, at (828) 271-7980, extension 4225. - 13 - OFFICE BUILDING - J MAINTENANCE. g _ N� \ BUILDING t -_ _ �� �� •i i�),�,,,_� -iceA�o ,ipin, �;�re,,. SCE #6 �•� ��=G'3i-P��- � 6i5'� /ii,�"% ��� _ ���r�%o /iii G'ip �`i��� 4i iii/„�i��N���ii, CLIFTON 'ENVIRONMENTAL RELEASE PIPE r `� PARK FLOW TO HAVE FLOCCULANT LOG ` ,�i,i ��. � ` \\ � / -�� 9 � %moi 9��_�__ ��••-- _ __S"'�� � _ 'C � i i � ii ��`�ij° `jig i 1 �,1j; ftir//,'✓,� a'�G;f;,���� -, 1 - ;, -- � i`% LOCH DORNIE DRAWN DOWN APROXIMATELY 8 FEET _ INTERIM DRAINAGE / i� - j°3 SCE#3 CHANNEL a/ ��� 1PHAS WEST ECHANNEL LOCH DORNIE 3' _ _ - ����� DREDGE , - ���=_ �,�� a PHASE SIPHON PUMP SYSTEM FOR `7 ih7o/,9�” ;%;%%?; !' _ NORMALPOOL �� TEMPORARILVDEWATERING i����c,c ELEVATION 3787.5 TURBIDITY CURTAIN. TYP TURBIDITY cuRTAINTYP, '�R _-.N�A!f ��__' �.,'a �,/,� /i �; '����-- _ - - )�' ,y ��,_ ��_S�� Iii ,r i✓i� i �`; TV°- 71 -SILT FENCE .TYP PHAS E �STAGING AREA #1 APPROXIMATE ol�i`CION �#2 - _ �WET DRAWN Dowty �/' iii MATERIAL n,�� �"> _',i�— , ��� �� �� �,✓ ����spa,, _~ �niN /'� _ `•`\4��: - ,/��% 1 ii/�/� _� ii' ��� STOCKPILE �'� i1i�4zr, ION3779.5 SCE #' ELEVAT= �� iii+ j0i � �;�'/;�,�;;��_� ��• ...�� ... � ._..._ o �� ��, �--- - � �`�1'`-, >'���_._����,.�����-':� %�i - iii;' �di,'�_'r�_ �� - ------------� �A�`�� � %�, �� ill /�'2Tn ��;�, �'__�_� ��✓'' uV ���`� i� �'t ��— TEMPORARY DRY MATERIAL I PHASE IB EASTERN BANK EXCAVATION AT / ��� - - _ _ .'I_�•\ i� :� - - ���:`- _ _ _ _ �< _tel -�j'� — �Pp CLUBHOUSE BRIDGE J,.�`� O� ��i�� �_ i" G@ _�`�F. �1i._-'\:: _ _ _ _ _ - T'i ��� /4 ��� iii t `\ • `i` scE'-�----�>_-�����` PRINCIPAL _J SPILLWAYWEIR �r - PHASE IB �\ 1 i _ R :A SITE ACCESS AND -- TEM PORARY STOCKPILE CONSTRUCTION MAT OF EXCAVATED MATERIAL ACCESS PATH i PHASE_ 1 B PEDESTRIAN SAFETY FENCE, TYP / LIMITS NDISTURBANCE DISTURBB ANCE. TYP SCALE: 1" = 120' 120 60 0 120' 1" = 120' LEAD ENGINEER'. T. SCHUELEF2 DATE. AUGUST 2019 GRANDFATHER GOLF& suPPORnNCENGINEER��� COUNTRY CLUB EROSION & SEDIMENT CONTROL HAZENNo 32453-002 S T E WA RT LINVILLE, NORTH CAROLINA STEWARTNO L19013 LANDSCAPE ARCHITECT PHASE 1 OF 2 DESIGNED BY J. MCSWAIN HAZENAND SAWYER STEWART DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& EOO1 DRAWN BY'. J. MCSWAIN 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 1/2" 1" DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE REV ISSUED FOR DATE gy CHECKED BY'. T. SCHUELER OFFICE - -MAINTENANCE- - � BUILDING BUILDING u_ -'a<�`c-�a�� ,:-: �/ - ��� '__ _____�_ ii'�II��I�(Iirilnu�l(�Ii�pGr�<<;''il ��"--'--ter•' 'I�` <I e� ENVIRONMENTAL RELEASE FLOW TO HA VE FLOCCULANT I � , TREATMENT (LOG OR OUTFALL I� I , "i�i`� �' I'I' I A T '/.G�o„'✓;� r/''"�rr' , y' �� ���r��_�- i�� �� _c �: � ,_ � �� �^ � j � _ �.,I �1,1A „ Ilii I I R� DORNIE DRAWN DOWN - ,y APROXIMATELY 8 FEET ' � G �_� •�... � o G ,, `" /! G"�4 � �� ��- 'mac, lam, � ya _�'��ryr' y,U - / SCE#3, / I I� .,<g•9(o �%f%yr"'rJs�r�;% ,?�'�'�''m 2/ �Li%rr� �%�S/',�gr;rr� 1_AI�� •'� �1 � °off , I I - Sp �PHASE—,pD` e III ' l /; r?od %''"%'r"•/"i y . \r °I1 nl jlql l � DIVERSION #3 PHASE IA/iC SIPHON/PUMP SYSTEM FOR TEMPORARILY DEWATERING �"�' �" ' - �--� � NORMAL POOL TURBIDITv EVATION3787.5 CU RTAIN. TYP EL= lR/��� ir"/r", r�'i'i% /',%" '//i'i , .1 /� I .•\ h '�/�`� - __ �� ' ii9 �'-�'' �iV / �+aa TURBIDITY CURRTAIN. TYP, ",r ;%r ' ��� li!=ti�l'�', -1 '�..,' Q' `o> ,i�-rl ;l; L%�� � �/, ri�smr=��-,!; ; 1�1 1� P,� �••hg�l:, �- J/ �/,7�(/r� �`q,✓'r',r'i�,ir' �/%� ,i' I f' -I i�r -__ _ o � � I 1 rL�� /"y��'� !�-{ 11� 4\I�i1+ S�.cy \ �`a�_ __ �' _ /`.,N�ICI�: �/„j•�Y�,l;, %r r� j a I, ',olp•�/ _ `')'' / ,�', ��� IV �' / �_I , y� � �J' < p ISI )if �-�'l� �a -SILT FENCE. TYP ' ' %r• ' i/ ��" /\S"'�_ 1 `� as ` �; 1 = > 'ai I +I rjl, N�.` SCE #4 71{i \ _ pp � STAGING AREA #1'' APPROXIMATE ORARY 11 it DRAWN DOWN ,��li I'>„ y' i� r i1�111\ �� �✓ \� ��' WET MATERIAL _ �1 11�IrcT i'I _1 11 1 II II �� _ ELEVATION = 3779.5 � 1. , , S _ II 111 11 - _ _- _ AI' STOCKPILE SCE#1 - 111 I / _, .�� -��A� �� � '_� 1�liil a 1, PHASE -- �111%- 111 2C 11' _ n ill /ir%�� r''/''' wt' ,�s , -:� ,, —' -_ � - �.•, �I `� '�I P�_ moi. _ ,�j"_ _,,���I_ II ' 1 i i �--_/ 1 4��`�- ��i�� ��ia, �'� , `i��_L, Id I _ p IIpA� 1 3�, �� rY�, �� �� �-___�'�-___ ___ � � I '�� _ _ �_ _ i- � `irk -.= a,l 1 '1`1 el`ii' •�S%C �___'1i i i oo ��� � ':�� w�l,•�l� <_=' zrF�_ - _; ,_ , � -_ -_ „_ .x,1111 ��= - ,11, J�1/''�-' - 5f' �� - - DIVERSION #2 yf. __ i —�� - - -- �\\ I 7"`_ ,\1i L�� � � �� 1�I�/_a __ ��/ �__,_ _ 1 _ �id111 `'�; �.Ir — � - -_�_ --- -- 'a ,-� ,-�� � T 1S"=��� --' - ">— � _ _�-�6CF-=�'6"- _ _----� X I -- DIVERSION#a �ryii�% ��� r_� � J�� IL¢� - - � � � �� \�\ �t _ - _ - _ — , - - -1 ��� ti - �/lam _ P -1\ _ •/� • � 6' - _ y --- — �� - BRIDGE -� OI � CLUBHOUSE O SCE#2 PRINCIPAL SPILLWAY WEIR GRAVITY - -- DIVERSION#3' PHASE - 2E DIVERSION #5 Y PEDESTRIAN SAFETY l CRFF/�RQ / FENCE, TYPLIMITS OF PLAN DISTURBANCE. TYP SCALE: 1"= 120' 120 60 0 120' 1" = 120' LEAD ENGINEER'. T. $CHUELEF2 DATE'. AUGUST 2019 GRANDFATHER GOLF & Hazen , COUNTRY CLUB EROSION & SEDIMENT CONTROL HAZEN NO 32453-002 SUPPORTING ENGINEER'. S T E WA RT LINVILLE, NORTH CAROLINA STEWARTNO L19013 LANDSCAPE ARCHITECT PHASE 2 OF 2 DESIGNED BY J. MCSWAIN HAZEN AND SAWYER STEWART DRAWING NUMBER'. 4011 WEST CHASE BOULEVARD. SUITE 500 2235. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING & E002 DRAWN BY'. J. MCSWAIN 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 1/2" 1" C 11 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE V THEN DRAWING IS NOT TO FULL SCALE REV ISSUED FOR DATE By CHECKED BY'. T. $CRUELER N� v -� OFFICE -- _ BUILDING - - � NOTES: -MAINTENANCE �� 1. PLANS SHOW COMBINATION OF GIS. LIDAR. AND BUILDING -- j — ��\\ MAY 10. 2019 SURVEY DATA 00 \ / 1 ( I / 1(\ I \ �I •/: /0 j � � � CLIFTON � / vv v /r /�I �/ �i �— PARK v ////r� i t r 15�— FX PEDESTRIAN BRIDGE AND Do P1 SANITARY PIPE CROSSING voo LOCH DORNIE ff i /'ir,r 1 //r' /r// / j/ / NORMAL POOL BX PEDESTRIAN—\ `\ BRIDGE TYP ELEVATION 3787.5 EX ISLAND RIVEBRIDGE <oo ISLAND. TYP EX EDGE OF WATER 111111 I 7\ j/ 1 FAIRWAY 18 i� / \ �� /i— — to 1114\11[—� \\\\\� \\\ \I �1f1 \\ \woo —�=ioo — _�-� __ �_ �< \� s \°• jl\ BRIDGE CLUBHOUSE �,`] \ /J�ll\�� — _-- \ _\, -- �\ ` ! PRINCIPAL SPILLWAY WEIR EX COBBLE DEPOSITION EX PEDESTRIAN BRIDGE AND < i FAIRWAY 17 / Po' SANITARY PIPE CROSSING �\ co ' cR9Y LOD PLAN 120 60 0 120' SCALE: 1" = 120' 1" = 120, LEAD ENGINEER'. T. SCHUELEF2 DATE. AUGUST 2019 GRANDFATHER GOLF & ENGINEER HazenSUPPORTING COUNTRY CLUB EXISTING CONDITIONS & DEMO PLAN HAZEN NO 32453-002 LANDSCAPE ARCHITECT '. S T E WA RT LINVILLE, NORTH CAROLINA STEWARTNO L19013 '. OVERALL DESIGNED BY J. MCSWAIN HAZENAND SAWYER STEWART DRAWING NUMBER'. 4011WESTCHABE BOULEVARD. SUITE 500 2235. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING & DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 C 1 00 DO NOT USE FOR CONSTRUCTION CENSE NO C-0381 CENSE NO C-1051 SITE ENHANCEMENTS FTHIS BAR DOES NOT MEASURE I"THEN DRAWING IS NOT TO FULL SCALE REV I ISSUED FOR DATE JBYCHECKED BY T. SCHUELER \ SEE INSET 1 IIIIIIl1`��%. 11 iiia I � Illillll l � /I llillllll I lirlll '�� /Illyill r��\ I ` I I r I l % ��i�r! :''� I � ' %:G"'i / � •, � r " 'I'�I(i� I l � , NOTE: SURVEY FOR THIS AREA PENDING /f��i/ice In II� id/g/ li �I li I'I l i ii A �i V� IT III�I�III I INSET 1 SCALE: 1"=30' I I ( II ' , , '' 1111111 �'I dnl�f4l'h lljl �lvo 11411 �l , 007 l����ll;�"I��;Iv,�; � /' II' � I � — A lun��lll'lliilnlon q,wll�iv v 00^ °O7 ;�I 11 v v_ __ v $ Ill 11ll;l4d 1 ", �� � ; � � ---I• I'J�`"v'����II'����I�II�;I;; �I / � I",�I1�I� v� v �� -- _ v\ c�, � °g �' �-11 __'/f«Ilpq��Jillgii,ll�� o,illl I v iQof J li' IIIIv'I�A�� V`v�vav v11n1o11y'11 0�� u)I,'ll/,� I hullv�A , v /I Irl vunl �,nA,� I v _— BUILDING J c v I I ISIA�11�� v- v 1 i I I J. MCSWAIN ,— III iii I ------- __— -- I I t I II I I I' BUILDING I 11 iiia I � Illillll l � /I llillllll I lirlll '�� /Illyill r��\ I ` I I r I l % ��i�r! :''� I � ' %:G"'i / � •, � r " 'I'�I(i� I l � , NOTE: SURVEY FOR THIS AREA PENDING /f��i/ice In II� id/g/ li �I li I'I l i ii A �i V� IT III�I�III I INSET 1 SCALE: 1"=30' I I ( II ' , , '' 1111111 �'I dnl�f4l'h lljl �lvo 11411 �l , 007 l����ll;�"I��;Iv,�; � /' II' � I � — A lun��lll'lliilnlon q,wll�iv v 00^ °O7 ;�I 11 v v_ __ v $ Ill 11ll;l4d 1 ", �� � ; � � ---I• I'J�`"v'����II'����I�II�;I;; �I / � I",�I1�I� v� v �� -- _ v\ c�, � °g �' �-11 __'/f«Ilpq��Jillgii,ll�� o,illl I v iQof J li' IIIIv'I�A�� V`v�vav v11n1o11y'11 0�� u)I,'ll/,� I hullv�A , v /I Irl vunl �,nA,� I III \ \ vI DEMO FENCE � \ 0l'\I\\\"�'� FAIRWAY 17 Inl�ov,P V I \�2� w�\v`� y / \\ v �' t IT I \,\y\�\��I \'t\v l !OQ 11�IP J11 _TMI I ; '�''II/ 11t, ` TSH 1l1 \JIP II QO O3a�z5eP ELYj \ \ \ PLAN MATCH LINE - SEE DWG C102 8 T ��\���i SCALE: 1" = 30' 75% DESIGN DO NOT USE FOR CONSTRUCTION Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 �a STEWART STEWART 223 S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA LOCH DORNIE DREDGING & SITE ENHANCEMENTS NOTES: 1. EXISTING GIS CONTOURS USED FOR TOPOGRAPHY OUTSIDE OF SURVEY. 2. AERIAL IMAGERY WAS USED TO DETERMINE A PORTION OF THE GOLF CART PATH., GOLF CART BRIDGE., AND FAIRWAY BOUNDS. OEM EXISTING CONDITIONS & DEMO PLAN AREA 1 0 1/2" 1 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE. �I 30 15 0 30' DATE AUGUST 2019 HAZEN NO 32453-002 STEWART NO L19013 DRAWING NUMBER'. v _— BUILDING J c v I I ISIA�11�� v- v 1 i I I J. MCSWAIN ,— III iii �i ------- __— -- I I t I II I I I' BUILDING I J I I I 1 III \ \ vI DEMO FENCE � \ 0l'\I\\\"�'� FAIRWAY 17 Inl�ov,P V I \�2� w�\v`� y / \\ v �' t IT I \,\y\�\��I \'t\v l !OQ 11�IP J11 _TMI I ; '�''II/ 11t, ` TSH 1l1 \JIP II QO O3a�z5eP ELYj \ \ \ PLAN MATCH LINE - SEE DWG C102 8 T ��\���i SCALE: 1" = 30' 75% DESIGN DO NOT USE FOR CONSTRUCTION Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 �a STEWART STEWART 223 S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA LOCH DORNIE DREDGING & SITE ENHANCEMENTS NOTES: 1. EXISTING GIS CONTOURS USED FOR TOPOGRAPHY OUTSIDE OF SURVEY. 2. AERIAL IMAGERY WAS USED TO DETERMINE A PORTION OF THE GOLF CART PATH., GOLF CART BRIDGE., AND FAIRWAY BOUNDS. OEM EXISTING CONDITIONS & DEMO PLAN AREA 1 0 1/2" 1 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE. �I 30 15 0 30' DATE AUGUST 2019 HAZEN NO 32453-002 STEWART NO L19013 DRAWING NUMBER'. v I,,,la'ti LEAD ENGINEER'. T. SCHUELER SUPPORTING ENGINEER'. LANDSCAPE ARCHITECT'. DESIGNED BY J. MCSWAIN DRAWN BY S. KANE CHECKED BY. T. SCHUELER III \ \ vI DEMO FENCE � \ 0l'\I\\\"�'� FAIRWAY 17 Inl�ov,P V I \�2� w�\v`� y / \\ v �' t IT I \,\y\�\��I \'t\v l !OQ 11�IP J11 _TMI I ; '�''II/ 11t, ` TSH 1l1 \JIP II QO O3a�z5eP ELYj \ \ \ PLAN MATCH LINE - SEE DWG C102 8 T ��\���i SCALE: 1" = 30' 75% DESIGN DO NOT USE FOR CONSTRUCTION Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 �a STEWART STEWART 223 S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA LOCH DORNIE DREDGING & SITE ENHANCEMENTS NOTES: 1. EXISTING GIS CONTOURS USED FOR TOPOGRAPHY OUTSIDE OF SURVEY. 2. AERIAL IMAGERY WAS USED TO DETERMINE A PORTION OF THE GOLF CART PATH., GOLF CART BRIDGE., AND FAIRWAY BOUNDS. OEM EXISTING CONDITIONS & DEMO PLAN AREA 1 0 1/2" 1 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE. �I 30 15 0 30' DATE AUGUST 2019 HAZEN NO 32453-002 STEWART NO L19013 DRAWING NUMBER'. MATCH LINE - SEE DWG C101 ——r ' SSMH `ail lt\i r'jill ' it TOP l is ELEV. 3822.56 \ \ �ri�1�i�„ I�iii ii iii— ,�' m p���� � sfa• crr FAIRWAY 17 QQ i, �', DEMO PEDESTRIAN BRIDGE AND ' �i�ili��'ii'iii���i'� lgi , �� i'ii� X � SANITARY PIPE CROSSING � V'',��I �';1 W.E.: 3824.1}, ���b;nl��n „�;;;qhJ /' Q'�I�ylo'l��- ��� /SEE DWG C400 FOR NEW SANITARY DESIGN SEE DWG B501-B504 FOR NEW BRIDGE DESIGN SSMH p> '' d I o�� g, V`���An TOP ELEV: 3821.39 -I ����iil� SSMH '��,�\� q`�� TOP ELEV: 3808.32 i i�A�t�ti�4 �A���i `A\ V', )�_ � = � ,1:,';.:i�` it 1 1_0� ` o SSMH g TOP EL:3810.40 _8"TRUSS IN (SE)I.E.: 3805.98 LANDSCAPE 8" TRUSS IN(NW)I.E.:3805.87,.AND / I� FENCING lam- --s \--------- / --- `- -------- -- tcb --_--,-� M -j_- ��i BUILDING /111LIM ITS�OF EXITING DRY STACK ROCK WALL �� ' �� TEE 18 ` / o SSMH ELEV: 3806.21 ii i l ���1���� �A P��`�` /� --- �� ' \ S \ TOP ELEV: 3811.33 .. \ ) 8" DIP IN (SW) LE.: 3808.21 'iliii�%��'4„ HDPE IN (SE I.E.: 3808.00 p�� 38" TRUSS IN (NE) LE.:3807.37 J''i' �J �*� / i� 8" TRUSS OUT (NW) LE:3801.28 ¢- �` / J o BUILDING HA'��A�``� TEE 18 i COBBLE DEPOSITION` ��� ��A.�� � � �sa I ` � �- � � �i � - 4 1\ INS i � 5 / SSMH TOP ELEV: 3831.00 / l BUILDINGC - BUILDINGCA' �`\�� MATCH LINE SEE DWG C103 TEE 18 I \ \�l�l �\� �� �' 2 30 15 0 30' PLAN00 1"=30' Q LU SCALE: V=30' LU co LEAD ENGINEER'. T. SCHUELEF2 ® DATE AUGUST 2019 GRANDFATHER GOLF & SUPPORTING ENGINEER H"en COUNTRY CLUB EXISTING CONDITIONS & DEMO PLAN HAZENNO 32453-002 S T E WA RT LINVILLE, NORTH CAROLINA STEWARTNO L19013 LANDSCAPE ARCHITECT AREA 2 DESIGNED BY J. MCSWAIN . HAZEN AND SAWYER STEWART DRAWING NUMBER' 4011 WESTCHABE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& DRAWN BY S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 1/2" 1" C 1 02 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE REV ISSUED FOR DATE By CHECKED BY'. T. SCHUELER �TrF18 MATCH LINE - SEE DWG C102 BUILDINGC �> — _ / __Pli �il'iplpii�'u�i ill ,� ��/ii,���� j� — x — + BUILDINGC �� V I ���, "��A — ----- / �ddu �I' �h�� -- y v I �� o \ D DRIV ISLAM {PAT SSMH V TOP ELEV'. 3811.80 ♦ / � �/��' ,�'(;� 1 u, � �_ _-- - \ � V., �A.,,� A,_�—� BUILDINGC FAIRWAY18` -41 11 NAS. 3787.9 BUILDING SSMH ELEV'.19 BUILDING BUILDING 'LU LU Ma' � + 2+ II' iii A ` i��'+ W'` BUILDING \\1W BUILDING `� \ i n SSMH + BUILDING �i SSMH 't I +TOP ELEV'. 3811.38+x', \ C;7 C7 EXE E v V`NA�` OF WATERS BUILDING BUILDINGA �I,1 TOP ELEV'. 3799.45 BUILDING _MATCH LINE -SEE DW 0 I PLAN 3190 SCALE: SCALE: 1" = 30' 30 15 0 30' 1" = 30' LEAD ENGINEER'. T. SCHUELEF2 ^ GRANDFATHER GOLF & DATE. AUGUST 2019 SUPPORTING ENGINEER. COUNTRY CLUB EXISTING CONDITIONS & DEMO PLAN HAZEN NO.. 32453-002 LANDSCAPE ARCHITECT . 75% DESIGN DO NOT USE FOR CONSTRUCTION H"enS T E WA RT HAZEN AND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 2235. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-0381 LICENSE NO C-1051 LINVILLE, NORTH CAROLINA AREA 3 STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWN BY S. KANE LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. C 103 0 1,2" 1" IFTHISBARDOES NOTMEASUREI"THEN DRAWING IS NOTTO FULLSCALE REV ISSUED FOR DATE BY CHECKED BY'. T. SCH UELER MATCH LINE SEE DWG C102 U-1 W Loo �lcp I � � �� �� `� A'--��� �:.A"moi ✓� ��' i � 4" CPP TO BE EXTENDED__ \ \ \ \ \ \<b 3791.384`�INV"CPPSEE DWG C204 \\\ \ \\ =�/ BUILDING 4'CPP \ \V 3787 IN vV oa FAIRWAY IB BUILDING LOCH ` DORNIEI A MATCH LINE -SEE DWGS C105 & C106'- PLAN SCALE: 1" = 30' °Q LEAD ENGINEER. T. SCHUELER A - LANDSCAPE ARCHITECT'. - DESIGNED BY FAIRWAY 18 DRAWN BY S. KANE CHECKED BY. T. SCHUELER Loo �lcp I � � �� �� `� A'--��� �:.A"moi ✓� ��' i � 4" CPP TO BE EXTENDED__ \ \ \ \ \ \<b 3791.384`�INV"CPPSEE DWG C204 \\\ \ \\ =�/ BUILDING 4'CPP \ \V 3787 IN vV oa FAIRWAY IB BUILDING LOCH ` DORNIEI A MATCH LINE -SEE DWGS C105 & C106'- PLAN SCALE: 1" = 30' °Q LEAD ENGINEER. T. SCHUELER SUPPORTING ENGINEER'. - LANDSCAPE ARCHITECT'. - DESIGNED BY J. MCSWAIN DRAWN BY S. KANE CHECKED BY. T. SCHUELER 75% DESIGN DO NOT USE FOR CONSTRUCTION Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 A STEWART STEWART 223 S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA LOCH DORNIE DREDGING & SITE ENHANCEMENTS EXISTING CONDITIONS & DEMO PLAN AREA 4 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOTTO FULL SCALE. 30 15 0 30' 1"=30' DATE. AUGUST 2019 HAZEN NO 32453-002 STEWART NO L19013 DRAWING NUMBER'. 0 1/2" 1" C104 FOR BRIDGE WORK, SEE DWG I B401 - B404 VA REMOVE SANITARY LINE (MANHOLE TO MANHOLE), FOR SANITARY WORK, SEE DWG C400 / LEAD ENGINEER'. SUPPORTING ENGINEER'. LANDSCAPE ARCHITECT'. DESIGNED BY'. DRAWN BY'. CHECKED BY'. /3790- o_B"_��-� \ f i I ' I I ' l ASPHALT DEMO LOCH ORNIE - = 3782----' �� EX EDGE OF WATER --- _ J \ XPi \ • ���— __ \ T.SCHUELER J. MCSWAIN S. KANE 75% DESIGN T. SCHUELER DO NOT USE FOR CONSTRUCTION \ MATCH LINE - SEE DWG C104 LOCH DORNIE DEMO PEDESTRIAN BRIDGE "D" 'T II 3798.25 �\ -- DEMO PEDESTRIAN � _ i--- BRIDGE "E" 'aA oi v A ,A i ilii i�'' `��` (70 ', BUILDING / I — --— A LOCH >> A DORNIE SSMH �DT,OP ELEV'. 3795.52 Hazen Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 "A STEWART STEWART 223 S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 GRANDFATHER GOLF& COUNTRY CLUB LINVILLE, NORTH CAROLINA LOCH DORNIE DREDGING & SITE ENHANCEMENTS ---------- � I I \ ----------� I I I EXISTING CONDITIONS & DEMO PLAN AREA 5 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOTTO FULL SCALE. 30 5 0 30' 1"=30' DATE. AUGUST 2019 HAZEN NO 32453-002 STEWART NO L19013 DRAWING NUMBER'. C105 cb I� --- AG_l%� -C. 1MATCHLINE-SEEW�_A0 O�X\_F i-Wa�,.�A`�TAEEJ�� R \l�AI_F\/I A ��-AI, ;RW0\a A'Y 18 EXISTING � , 8 EXISTING ISLANDTYP i—_ `- ,\ , o Bi,'A"y\uiv� L� yii D -V LOCH EXROCKPg LL TY DORNIE A ` oa ISLAND � � , e', ' A•. `-• ,�a����cBUILDING AD, �D U�G�IL D I N � aG ALU D, qTHIS AREA NOT 'TO LOCH Z BE DISTURBEDDORNIE LOCHL,/ter zI r\ / DEMO PATH, STORMWATERDORNIE DRAINAGE SYSTEM, AND VEGETATION AROUNDDEMO CLUBHOUSE THAT ISPEDESTRIAN GREEN 18 // FLAGGED FOR REMOVAL "E" B 1p DE ---__ BRIDEMO 'r `'BL PEDESTRIAN -- — — — — - ----- Y BRIDGE "A" V �DEMOPEDESTRIAN BRIDGE "C" DEMO PEDESTRIAN BRIDGE „B„ LOCH ------ DORNIE J ---------- -ND ISLAREMOVE AND SALVAGE FLAG4 POLE, LIGHTING AND � - / \ v ELECTRIC CONTROLS \ MATCH LINE -SEE DWG C107 A LOCH�____----- i I � i ,. 'i, I �-� DORNIE \V ----------r ------ PLAN SCALE: V=30' 30 15 0 30' LEAD ENGINEER'. T. SCHUELER DATE. AUGUST 2019 GRANDFATHER GOLF & SUPPORTING ENGINEER'. COUNTRY CLUB EXISTING CONDITIONS & DEMO PLAN HAZEN NO 32453-002 LANDSCAPE ARCHITECT. Hc -- ST E WA RT HAZENAND SAWYER STEWART LINVILLE, NORTH CAROLINA AREA STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWING NUMBER'. 4011 WESTCHABE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& 0 1/2" 1" DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0106 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IFTHISBAR DOES NOTMEASUREI"THENDRAWINGISNOTTOFULLSCALE REV ISSUED FOR DATE By CHECKED T. SCHUELER MATCH LINE -SEE DWG C105 % ,MATCH LINE -SEE DWG C106 I \;--_,:"✓iii � �A`,� � /��,i �, �_ _ _ _— ���__ %� ��i 85MH ,TOP ELEV'. 3798 84 EX EDGE \ OF WATER aoi Gol 001 001 TOPELEV 379849 AV T, LE>Qw�., 1 ; EX GRASSED UTILITY t� / ACCESS PATH v_L LOCH DORNIE I .3795./ 1 1 1 bV \l 1 `v� 1 =------ / 1 / TOP ELEV'. 3794.35--_ , $9_lOD 1 STOP ELEV'. 3792.97 1 BUILDING -� MATCH LINE SEE THIS SHEET\ O z PLAN \1 \\\ \I\ \1,1 111 \ 1 _ SCALE: 1" = 30' 1 00 Q LU I, 1 MATCH LINE - SEE THIS SHEET�_� El EX GRASSED UTILITY ACCESS PATH 4 BUILDING 3793.89. LOCH DORNIE -`- -- - i ,%,� 'per EX EDGE OF WATER \ SSMH i I TOP ELEV'. 379433' / SSMH TOP ELEV'. 3795.20 P y 3 5 i \ i r _lam I PLAN 30 15 0 30' SCALE: 1" = 30' 1"=30' LEAD ENGINEER'. T. SCHUELER DATE. AUGUST 2019 GRANDFATHER GOLF & SUPPORTING ENGINEER. �' COUNTRY CLUB EXISTING CONDITIONS & DEMO PLAN HAZEN NO.. 32453-002 Hc' LINVILLE, NORTH CAROLINA AREA 7 LANDSCAPE ARCHITECT. ,�-n S T E WA RT HAZENAND SAWYER STEWART STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWING NUMBER'. 4011 WESTCHABE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& 0 1/2" 1" DRAWN BY S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 % C 1 0 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IFTHISBAR DOES NOTMEASUREI"THEN DRAWING IS NOTTO FULLSCALE / REV ISSUED FOR DATE By CHECKED T. SCHUELER N� NOTES: 1. PLANS SHOW COMBINATION OF GIS. LIDAR .AND MAY 10. 2019 SURVEY DATA CLIFTON PARK i X//�/iii/ IE — V r -,\,A \ / /j // Q /��/�� SHORERN LOCH DORNIE / \\� l •-... //////// / J��T/ j// // l/ /"\ `�— \\ \ \ ,. DREDGE / ISLAND DRIVE 1 4 I / Ifl // S� ���/ice/ii/ / // / �/i i / i/ ✓\� \o — \\ / I LAWN PEDESTRIAN PATH //ii / //�l �\ voov \ LOCH DORNIE EX ISLAND II / /j %//% // //// // / /\ti / —,} \ \� g° �\ �e •� \\\ ` DRIVE BRIDGE\ NORMAL POOL oo I ELEVATION = 3787.5 REMOVE ISLAND \Loa EX EDGE 1 OF WATER CLUBHOUSE EVENT LAWN SMALL ISLAND. 1 I )\ p I f/ I ' \ 1 r REMOVE ISLAND ISLAND PROTECTION'., FOREBAY POOL TO BE EXCAVATED FAIRWAY 17 Loa �LpO Loo <oa A FK PLAN SCALE: 1" = 120' 120 60 0 120' 1"= 120' LEAD ENGINEER'. T. $CHUELER DATE. AUGUST 2019 GRANDFATHER GOLF& ENGINEERLANDSCAPE ARCHITECT HazenSUPPORTING COUNTRY CLUB GRADING & DREDGING PLAN HAZEN NO 32453-002 '. S T E WA RT LINVILLE, NORTH CAROLINA STEWARTNO L19013 . OVERALL DESIGNED BY J. MCSWAIN HAZENAND SAWYER STEWART DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& ^ DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 1/2" 1" C200 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOTTO FULL SCALE REV ISSUED FOR DATE By CHECKED BY'. T. $CFI UELER BEACH AREA PARKING`//_� Go \�——�\ FAIRWAY 18ED I X� ��-Loo l CD�, ,, \ ���� Vli J V Il ! —\Q\ 1 v 9 �v llt V �lll A I ipp —� �o goo T Loa � \ \ / \ i\`}/' r\ // ����� % — --�, f '" — �" .. }II\}1 (�^ �\ 1\\}t1�11i1� �/ \ \\ \\� \\\ \\\�\\\\\\\�\� 1 �, \ `l tll 4j �.00 -• _��-tt� — � — 1 ° i\ ---"^f �� •, �L t. / , \°• \ \\� • // \� ) \\ ,— `° STREAM STABILIZATION AND BANK PROTECTION ✓ /%/ \`� — �' i❑ \\\\\\\ 1 �c@yo �"_` —Il���l\�~ \ �\ \\\ •; / BRIDGE 0\\ r ,\ _CLUBHOUSE GiP �,.`lhrJ j(��� _ — --_—\ —\, -- \ !'' ., I\� ��'1\ 1 \ © 1, PRINCIPAL ` iJ)l 'ILti SPILLWAY WEIR LOCH DORNIE POINT _ FAIRWAY 18 FILL COBBLE DEPOSITION TO BE REMOVED AND REUSED FOR NEW 7 REMOVE ISLAND ISLAND PROTECTION'., FOREBAY POOL TO BE EXCAVATED FAIRWAY 17 Loa �LpO Loo <oa A FK PLAN SCALE: 1" = 120' 120 60 0 120' 1"= 120' LEAD ENGINEER'. T. $CHUELER DATE. AUGUST 2019 GRANDFATHER GOLF& ENGINEERLANDSCAPE ARCHITECT HazenSUPPORTING COUNTRY CLUB GRADING & DREDGING PLAN HAZEN NO 32453-002 '. S T E WA RT LINVILLE, NORTH CAROLINA STEWARTNO L19013 . OVERALL DESIGNED BY J. MCSWAIN HAZENAND SAWYER STEWART DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& ^ DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 1/2" 1" C200 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOTTO FULL SCALE REV ISSUED FOR DATE By CHECKED BY'. T. $CFI UELER /➢,',I,r =_ � r ill I%aril � � �/11,11//�'v�'�P;v��_,.-----;;II,➢a4'n���� �Av / BUILDING J i v 170 LF NEW SPLIT-RAIL \ —FENCE', SEE DETAIL DWG C301 II � . I i -- -- -- -- -- — -- 0 \� Avv/Avv\v� \ SEE INSET IRW#2 i REPLACEMENT'. SEE \ I l l I l I / BUILDING J vN O i O 'I I II LINVILLE RIVE�t STATIONING SEE DWG C300 v _goo v v _ \ \� \ IIII�,III\I , DESIGN INFORMATION SEE DWG C300 FAIRWAY 77 I /➢,',I,r =_ � r ill I%aril � � �/11,11//�'v�'�P;v��_,.-----;;II,➢a4'n���� �Av / BUILDING J i v 170 LF NEW SPLIT-RAIL \ —FENCE', SEE DETAIL DWG C301 II � . I i -- -- -- -- -- — -- 0 � � A A `I /\ \ / \� Avv/Avv\v� " vV IRW#2 i REPLACEMENT'. SEE \ DETAIL DWG C301 BUILDING J vN O i O FOR IMBRICATED ROCK WALL (IRW) DESIGN INFORMATION SEE DWG C300 v _goo v v _ \ \� \ - FOR GRADE CONTROL SILL (GCS) DESIGN INFORMATION SEE DWG C300 FAIRWAY 77 I cp / \A POTENTIAL BOULDER �I HARVEST AREA'., SEE NOTE 3 � � A A `I /\ \ / 111\�1 ---- ,— Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 NOTES: 1. EXISTING GIS CONTOURS USED FOR TOPOGRAPHY OUTSIDE OF SURVEY. 2. AERIAL IMAGERY WAS USED TO DETERMINE A PORTION OF THE GOLF CART PATH, GOLF CART BRIDGE, AND FAIRWAY BOUNDS. I III I BiII I� I \ 3. BUILDER HARVEST AREA (TO BE DEFINED AT NEXT IIIIIII�/ `� DESIGN STAGE). INSET 1 SCALE: V= 30' PIAN MATCH LINE — SEE DWG C202 SCALE: 1"= "A STEWART STEWART 223S WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 30 15 0 30' 1" = 30' \� Avv/Avv\v� " vV IRW#2 i REPLACEMENT'. SEE \ DETAIL DWG C301 BUILDING J vN O i O FOR IMBRICATED ROCK WALL (IRW) DESIGN INFORMATION SEE DWG C300 v _goo v v _ \ \� \ - FOR GRADE CONTROL SILL (GCS) DESIGN INFORMATION SEE DWG C300 FAIRWAY 77 I cp 111\�1 ---- ,— Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 NOTES: 1. EXISTING GIS CONTOURS USED FOR TOPOGRAPHY OUTSIDE OF SURVEY. 2. AERIAL IMAGERY WAS USED TO DETERMINE A PORTION OF THE GOLF CART PATH, GOLF CART BRIDGE, AND FAIRWAY BOUNDS. I III I BiII I� I \ 3. BUILDER HARVEST AREA (TO BE DEFINED AT NEXT IIIIIII�/ `� DESIGN STAGE). INSET 1 SCALE: V= 30' PIAN MATCH LINE — SEE DWG C202 SCALE: 1"= "A STEWART STEWART 223S WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 30 15 0 30' 1" = 30' \� Avv/Avv\v� " vV \ i REPLACEMENT'. SEE \ DETAIL DWG C301 BUILDING J vN O i O \ v�\ 111\�1 ---- ,— Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 NOTES: 1. EXISTING GIS CONTOURS USED FOR TOPOGRAPHY OUTSIDE OF SURVEY. 2. AERIAL IMAGERY WAS USED TO DETERMINE A PORTION OF THE GOLF CART PATH, GOLF CART BRIDGE, AND FAIRWAY BOUNDS. I III I BiII I� I \ 3. BUILDER HARVEST AREA (TO BE DEFINED AT NEXT IIIIIII�/ `� DESIGN STAGE). INSET 1 SCALE: V= 30' PIAN MATCH LINE — SEE DWG C202 SCALE: 1"= "A STEWART STEWART 223S WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 30 15 0 30' 1" = 30' " 300 LF -SPLIT -RAIL FENCE \ i REPLACEMENT'. SEE \ DETAIL DWG C301 111\�1 ---- ,— Hazen HAZEN AND SAWYER 4011 WESTCHABE BOULEVARD. SUITE 500 RALEIGH. NORTH CAROLINA 27607 LICENSE NO C-0381 NOTES: 1. EXISTING GIS CONTOURS USED FOR TOPOGRAPHY OUTSIDE OF SURVEY. 2. AERIAL IMAGERY WAS USED TO DETERMINE A PORTION OF THE GOLF CART PATH, GOLF CART BRIDGE, AND FAIRWAY BOUNDS. I III I BiII I� I \ 3. BUILDER HARVEST AREA (TO BE DEFINED AT NEXT IIIIIII�/ `� DESIGN STAGE). INSET 1 SCALE: V= 30' PIAN MATCH LINE — SEE DWG C202 SCALE: 1"= "A STEWART STEWART 223S WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-1051 30 15 0 30' 1" = 30' NOTES: 1. CONTRACTOR TO AVOID ALL EXISTING STRUCTURES MATCH LINE 1 �\1 `11h11,11 1 1 INCLUDING DOCKS AND DECKING. 2. SEE DWGS E002 -E203 FOR DETAILS AND PHASING FOR -SEE DWG C209� WATER HANDLING DREDGING AND EARTHWORK. -- -- -- -- - -- 1 u j` -- _ -- -- -- o - -- -- -- 1 SSMH \ \\ 1X11 Ir 1 lii li 111 - t1 ,Ar11u\ g TOP ELEV: 3822.56 \ 1 1 `� �1�111 i I�iiilii Il , O FAIRWAY 77 � n `Viiiii�ll \ l iii ',11111 o%111/ii 11 - ?III `iligil`1�. , �` � $ Vv`}V „11d1y� 1 1 "\J, �1�v110; .1111151 I,011,1i1m11y1A'o1 1 1 liiilJbl 1111 ii\\ LINVILLE RIVER 1111 t111 1111\`` „111l„,1 ,,i 1,11„ 11 "I,K 3 1` ,1 STATIONING 1, , i1y111,11 I ' 1111111`hl W.E.: 3824.1 i�iilii�lilNil L 4r�h � "iiii i SSMH pp ,P11 TOP ELEV: 3821.39 �111'PilPull 1 LOD \�\� �1;�;A x11'.... �v 11''11'1 nlil SSMH VA1v1111v11n1 h TOP ELEV: 3808.32 n t,1u1111 11��1\, 1 111 1 I I 11 I I 11' 11111 I 111 1 I ' 1' IIID IIS � �p � 1 ,1111',11, ' 111 111 iii 1 i 1 1u1111 , i 1' f%� '�41\ g ' FOR PROPOSED BRIDGE 5 WORK, �\\ 1`i I \ , SEE DWG B501 -B504 �1�;1111 ;11;11111111111111'; `111 11r��,�%11,1Y� ��.�1 111 v a 11( �S11 1 1 GREEN 17`1 �I�� 1'1 11'V1 � r FOR PROPOSED SANITARY SEWER WORK -SEE DWG C400 1'l ,i�l, 1i11j111i i11owi111 / �JRW H3!.:�:,pd 1\I i, 111 j/ 1�T Vi'�- < oA_�/\,--/\ bp^; 11 / pp ss FOR IMBRICATED ROCK WALL (IRW) DESIGN INFORMATION \ w 11 0r SEE DWG C300 1 II �ss 87RU53 1 BUILDING „SSMH \ ' / 111111,11 1180(_' ����� ,' , \ SSMH \ ELEV: 3806.21 �i 11111i1�j1 3 \�`� /� --- � 1 \ S1 TOP ELEV: 3811.33 "� i . �1 A ) 8" DIP IN (SW) LE.: 3808.21 l�� ''i, ,' 1 ' ' % , 1N 1� i " ' ! 11✓✓1 'O i��)��C,'o ��I\ 4.' HDPE IN (SE) I.E.: 3808.00 `� >i A� 3 a' \ 8"TRUSS IN NE I.E.: 3807.37 ��..- ( ) REMOVED A DSREUSED FOR ,1 1 't 1, 8" TRUSS OUT (N W) LE: 3801.28 NEW ISLAND PROTECTION'. POOL TO BE A EXCAVATED �1 1/ BUILDING� / i\-- ` DREDGE BOTH UPPER LOCH DORNIE CHANNELS SSMH TOP ELEV: 3831.00 TEE BUILDINGC__ MATCH LINE -SEE DWG C203j reE 13 ca _ 1 w N �i Z U PLAN--- .��� SCALE :1"=30' co LEAD ENGINEER. T. $CRUELER® GRANDFATHER GOLF & SUPPORTING ENGINEER H"en COUNTRY CLUB GRADING & DREDGING PLAN LANDSCAPE ARCHITECT. LINVILLE, NORTH CAROLINA AREA DESIGNED BY J. MCSWAIN STEWART HAZENAND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 2235. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& $. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 �cHEvcvKEBDyBY DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS REV ISSUED FOR DATE By T. $CRUELER 4 3 0 6 V 7 7 1 flommill 0 1/2" 1 IF THIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOT TO FULL SCALE. 30 5 0 30' DATE. AUGUST 2019 HAZEN NO 32453-002 STEWART NO L19013 DRAWING NUMBER'. C202 NOTES: - k TEE 78 __ 1. CONTRACTOR TO AVOID ALL EXISTING STRUCTURES �' INCLUDING DOCKS AND DECKING. � 2. SEED GS E002 -E203 FOR DETAILS AND PHASING FOR LINE -SEE DWG 0202 WATER HANDLING.. DREDGING, AND EARTHWORK44/. -- �/ o - `�� `�A�. - - � BUILDING A V�� A ,---_-- DREDGE BOTH UPPER Op _ v �LOCH ooRNIECHANNELs� �EasTANowesT) •`A:AA,.�`A� � `����I SSMH ------ -- V - BUILDINGC ISLAND �i\ _ — \ `�\A ` ` 1���� DRIVE BRIDGE :%i"i% / im iii �`����� \ ���\,\ _ ���i�` , '!` �\ I I ' FAIRWAY18` PROPOSED COBBLE SWAL i I " \ \�\ LINVILLE RIVER � STATIONING BUILDING BUILDING SSMH TOP ELEV.3803.20 BUILDING BUILDING B i ROPOSEWITH DREDGEMATERIAL ,� \ /~ BUILDING � I � i � A�� � A `� , � \,�, �V i � ��� � I ii �� v � �W i I A/ n�� SSMH BUILDINGD �� � i � � � TOP ELEV.- 380274`� �1 V A� BUILDING A ciga\ ` ,i ♦ i'i' ��� ��A, ���0, �'� __- _, %sl�i i /y;� iii � i', i � / V� , � ��',��r� '- ,i/�.J ;�a�-'''� V / i'`� i `�i'' �'}` v/ BUILDING E ,`� i �v�A BUILDINGA BUILDING MATCH LINE -SEE DWG C205 '�':'i/ �J -3 — �� PLAN--- \ SCALE: 1" = 30' LEAD ENGINEER. T. SCHUELER SUPPORTING ENGINEER'. LANDSCAPE ARCHITECT'. DESIGNED BY J. MCSWAIN DRAWN BY S. KANE 75% DESIGN DO NOT USE FOR CONSTRUCTION REV ISSUED FOR DATEq CHECKED BY'. T. SCHUELER GRANDFATHER GOLF & Hazen COUNTRY CLUB GRADING & DREDGING PLAN LINVILLE, NORTH CAROLINA AREA 3 ®i 3TEWART HAZENAND SAWYER STEWART 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 112" 1 LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE. 30 15 0 30' DATE AUGUST 2019 HAZEN NO 32453-002 STEWART NO L19013 DRAWING NUMBER'. C203 LEAD ENGINEER. T. SCHUELER SUPPORTING ENGINEER'. - MATCH LINE - DESIGNED BY J. MCSWAIN SEE DWG C202 S. KANE CHECKED BY. T. SCHUELER i LEAD ENGINEER. T. SCHUELER SUPPORTING ENGINEER'. - LANDSCAPE ARCHITECT'. - DESIGNED BY J. MCSWAIN DRAWN BY S. KANE CHECKED BY. T. SCHUELER CONNECT 4" CPP TO EXISTING DRAIN PIPE AND EXTEND NEW LENGTH TO WATERS EDGE �op FAIRWAY 18 PROPOSED FILL- �� AND SHORELINE STABILIZATION FAIRWAYI8\\, Hazen AE STEWART HAZENAND SAWYER STEWART 4011 WESTCHABE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 .DING \ GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA LOCH DORNIE DREDGING & SITE ENHANCEMENTS GRADING & DREDGING PLAN AREA 4 IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOTTO FULL SCALE. 30 5 0 30' 1"=30' DATE. AUGUST 2019 HAZEN NO 32453-002 STEWART NO L19013 DRAWING NUMBER'. 0 1,2" illC204 BUILDING � r � \ 4" PP IN 3788 LOCH �� A DORNIE MATCH LINE - SEE DWG C207 I-------- ---' I I NOTES: 1. CONTRACTOR TO AVOID ALL EXISTING STRUCTURES INCLUDING DOCKS AND DECKING. 2. SEE DWGS E002 -E203 FOR DETAILS AND PHASING FOR WATER HANDLING., DREDGING., AND EARTHWORK. 30 5 0 30' 1" = 30' LEAD ENGINEER'. T. SCHUELEF2 GRANDFATHER GOLF& DATE. AUGUST 2019 SUPPORTING ENGINEER. COUNTRY CLUB GRADING & DREDGING PLAN HAZEN NO.. 32453-002 LANDSCAPE ARCHITECT . 75% DESIGN DO NOT USE FOR CONSTRUCTION HazenS T E WA RT HAZEN AND SAWYER STEWART 4011 WESTCHABEBOULEVARD.SUITE500 2235 WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-0381 LICENSE NO C-1051 LINVILLE, NORTH CAROLINA AREA 5 STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWN BY S. KANE LOCH DORNIE DREDGING & SITE ENHANCEMENTS DRAWING NUMBER'. 0205 0 1/2" 1" IFTHISBARDOES NOTMEASUREI"THEN DRAWING IS NOTTO FULLSCALE REV ISSUED FOR DATE BY CHECKED BY'. T. SCH UELER NOTES: 1. CONTRACTOR TO AVOID ALL EXISTING STRUCTURES INCLUDING DOCKS AND DECKING. 4" CPP , i , - \� �� `- � MATCHLINE-SEE e �� I - �� v % INV'. 3788 \ ���2. SEE DWGS E002 -E203 FOR DETAILS AND PHASING FOR DWGS C205 & C206 �� �\ - �� roq V -MATCH LINE - SEE DWG C204p�� �,�� `� WATER HANDLING, DREDGING, AND EARTHWORK. -' \ _ FAIRWAY 7 - - - A LINVILLE RIVER8` .STATIONING n., REMOVE ISLAND co LOCH PROPOSED LARGE ^� \� �� I ' , 1 �` i \��� �J\ j //.� i �� %moi L� ISLAND WITH DREDGE / ��� �� \ - �\� j�\ / r ����(((b� MATERIAL AS FILL i ExRocKwALLTYP, ISLAND REVETMENT. TYP SEE DETAIL DWG C300 � ' � � / / � /�� � � � � I /%j' I i � �% ,� � / l i I �� / I BUILDING FORPROPOSED \BRIDGE SEE DWG B301 - B307 \ A / i i /i i' V90 LOCHS DORNIE // r % WALL �� i LARGEISLAND i/ GREEN 18 -- I j li , ll ��', /, 41 `� i 'BRIDGE ABUTMENT \X O� , LOCATION. TYP `�\ i �� FOR PROPOSED /l{ BRIDGE 1 WORK. / SEE DWG B101 -B104` l i v�1C6 V '/ - ,------' ._ ��� � . . � VA`�� � ' � i i ' '�/, �y A HN2 --�_ ---_-- - -- � � •A , � � � � � �_ SSLA � MALL IND � I l PROPOSEDEVENT LAWN GRADING —3180 IREMOVE ISLAND i LOCH _ DORNIE i \ FOR PROPOSED BRIDGE 2 WORK. ' SEE DWG B201 - B204 RETAINING WALL.'i- \ SEE DETAIL DWGW100-W101 - -- MATCH LINE EE D� C207 V I ��--- v— LOCH v ; , 8 —�� , ------ IDORNIr vv II ---- — LN� / ) PLAN SCALE: 1" = 30' I i 30 15 0 30' 1"=30' LEAD ENGINEER'. T. $CHUELEF2 DATE. AUGUST 2019 GRANDFATHER GOLF& ENGINEER'. HazenSUPPORTING COUNTRY CLUB GRADING & DREDGING PLAN HAZEN NO 32453-002 LINVILLE, NORTH CAROLINA AREA B LANDSCAPE ARCHITECT . - S T E WA RT HAZENAND SAWYER STEWART STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& 0 1/2" 1" DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0206 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IFTHISBAR DOES NOT MEASURE I"THEN DRAWING IS NOTTO FULL SCALE CHECKED BY'. T. $CFI UELER REV ISSUED FOR DATE By ssmH ATCH LINE EEDW , DWG C205 ;MATCH LINE -SEE G C206 I / MATCH LINE -SEE THIS SHEET,, M - S -- - - -r- 379&84 yQ_� PROPOSED PEDESTRIAN I PATH GRADING i�� n 37875 BUILDING _ _ l iii � fli I I Q i i PROPoseD FILL WITH od�, °p> — —� — DREDGE MATERIAL � 00>P ELEV., 3793.89, I i Cb� // - '�V A f - p0/ /� i '/i i ��i l 1 V '101o� a°� all LOCH DORNIE 001� y �Icq� V" '3787.5 i' a TOP ELEV: 379&49 PROPOSED FILL WITH i ' �� / l/ J �/ — /�\PROPOSED PATH • � � '� __ _ C \� / DREDGEMATERIAL _ / (�/ Lj — i' / r' SSMH / j/ zLOCH I /��vo TOP ELEV., 3794.33 �� �DORNIE � � -- � lig � / — � � � � ��� �•�, � � .00�' � � � _f�� `- ---- ' I��� `�� i - i Q`; — �\\ - -_- - _ - - - - If PROPOSED FILL WITH--_— `�"�' DREDGE MATERIAL 1 0\J- ----------- `,TO P ELl, 3794.35 .A`2 PROPOSED PATH SSMH TOP ELEV.' 3792.97 SSMH TOP ELEV. 3795.20 � �� ��'���i�i�i �liiii it ii'�i�i - �� � �` V`• i _ PROPOSED PEDesTRIAN �A`� \�7\\ too `\ \\� �� PATH GRADING BUILDING —� MATCH LINE -SEE THIS SHEET -7- PLAN PLAN Vv 1\�A\'���� PLAN --- SCALE: 1" = 30' �� �4 0V �, �i'�1�� �`�` A �� �' �� i 30 15 0 30' SCALE:1"=30' ill 30' LEAD ENGINEER'. T. SCHUELER DATE. AUGUST 2019 GRANDFATHER GOLF& SUPPORTING ENGINEER'. COUNTRY CLUB GRADING & DREDGING PLAN HAZEN NO 32453-002 HazenSTEWARTA LINVILLE, NORTH CAROLINA AREA 7 LANDSCAPE ARCHITECT . - HAZENAND SAWYER STEWART STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& 0 1/2" 1" DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 % C20 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IFTHISBAR DOES NOT MEASURE I"THEN DRAWING IS NOTTO FULL SCALE / REV ISSUED FOR DATE By CHECKED T. SCHUELER PLAN 120 60 0 120' "=,20' SCALE: 1" = 120' LEAD ENGINEER'. T. $CHUELEF2 DATE. AUGUST 2019 GRANDFATHER GOLF & ENGINEER'. HazenSUPPORTING COUNTRY CLUB GRADING & DREDGING PROFILES HAZENNO 32453-002 LANDSCAPE ARCHITECT '. S T E WA RT HAZENAND SAWYER STEWART LINVILLE, NORTH CAROLINA OVERALL STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 2235. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING & 0 1/2„ 1„ DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 �i �i 0 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE I" THEN DRAWING IS NOT TO FULL SCALE LL REV ISSUED FOR DATE BY CHECKED BY'. T. $CHLIELER 3845 3840 3835 3830 3825 3820 3815 3810 3805 3800 LEFT FAIRWAY 17 RIGHT J -CLUSTER BUILDING LIMITS, TYP EX SIDEWALK RIGHT FAIRWAY 17 PROP FENCE EX FENCE PROPGRADE PROP FENCE APPROVED �- ELEV: 3830.00ML GRADE L IRW #1 � d �•iA N1 11 ELEV:3826.00 �1- --PROP 1 1 IRW #2 v EX FENCE, ---FENCE�- 0 tT 9 TYP 1 DD -YR ELEV: 3820.0 6 8' THICK I ROCK WALL;LL; SEE E ROCK WG C300 BAS ELEV: 3816.91 EFLOW ELEV: 3818.70 ELEV: 100:1 FOR BOULDER NZE- — 2' 8 R CK WALL' SEE EX R CK SIZING CHART —00 6' 2'T ICK GRADE PROP GRADE ELEV: 3810.92 0 THICK ELEV: 3823.93 ELEV: 3823.40 ELEV: 3808.71 ® • SII o IRW #1 � ELEV: 3818.57 —ur ELEV: 3818.53 0 100:1 10D -YR ELEV: 3816.9 �Ig��iu•u����i#u�l 6' r ' 3845 3845 3840 3840 3835 3835 3830 3830 3825 3825 3820 3820 3815 3815 3810 3810 3805 3805 3800 3800 3840 3835 3830 3825 3820 3815 -0+50 3840 3835 3830 3825 3820 3815 0+00 0+50 STA 0+79 RIGHT FAIRWAY 17 J -CLUSTER �- L 11111S_IIIIIIIIIII 1111 �FAN"11I mm �•iA --PROP - Yl�l�p�■J� SEE DETAIL C301 EX FENCE, -0+50 3840 3835 3830 3825 3820 3815 0+00 0+50 STA 0+79 3845 3845 3840 3840 3835 3835 3830 3830 3825 3825 3820 3820 3815 3815 3810 3810 3805 3805 3800 3800 LEFT RIGHT FAIRWAY 17 J -CLUSTER ---�yU]aSVa1� --PROP - EX FENCE, ---FENCE�- TYP PROP FENCE EX GRADE EX GRADE PROP GRADE 00 ELEV: 3823.93 ELEV: 3823.40 '� ® • SII o IRW #1 � ELEV: 3818.57 —ur ELEV: 3818.53 0 100:1 10D -YR ELEV: 3816.9 �Ig��iu•u����i#u�l 6' r ' ELEV: 381267 BASEFLOW ELEV •"'�:111��1:�f_ ROCK SIZING CHAT _"llME DWG 0300 FOR / 3845 3845 3840 3840 3835 3835 3830 3830 3825 3825 3820 3820 3815 3815 3810 3810 3805 3805 3800 3800 LEFT RIGHT FAIRWAY 17 J -CLUSTER EX FENCE, TYP PROP FENCE EX GRADE EX GRADE PROP GRADE ELEV: 3823.93 ELEV: 3823.40 '� RW #2 o IRW #1 � ELEV: 3818.57 � ELEV: 3818.53 0 100:1 10D -YR ELEV: 3816.9 6' r ' ELEV: 381267 BASEFLOW ELEV ROCK SIZING CHAT DWG 0300 FOR / 8' R CK SIZING CHART e D G C300 FOR ELEV: 3801.21 3845 3840 3835 3830 3825 3820 3815 3810 3805 3800 -1+00 0+00 0+50 -0+75 0+00 0+50 -0+75 0+00 0+60 STA 3+13 STA 3+80 STA 4+41 HORIZONTAL SCALE'. 1-20' 20' PROFILE 20 10 0 20' H:1"=20' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-11 LEAD ENGINEER'. T. SCHUELEF2 DATE. AUGUST 2019 � GRANDFATHER GOLF & SUPPORTING ENGINEER. H".en C COUNTRY CLUB GRADING & DREDGING PROFILES HAZEN NO.. 32453-002 LANDSCAPE ARCHITECT. -STEWART E WA RT LINVILLE, NORTH CAROLINA (J -CLUSTER BANK STABILIZATION) STEWART NO.. L19013 DESIGNED BY J. MCSWAIN HAZENAND SAWYER STEWART DRAWING NUMBER'. 4011 WESTCHABE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& C221 DRAWN BY. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 1/2" 1" DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS FTHISBAR DOES NOTMEASUREI"THENDRAWINGISNOTTOFULLSCALE REV ISSUED FOR DATEFBY CHECKED BY'. T. SCHUELER NOTES: 1. ALL PROFILES FACING DOWNSTREAM 3815 3810 3805 3800 3795 3790 3785 3780 377 0010 JO 10 3810 3810 3805 3805 3800 3800 3795 3795 3790 3790 3785 3785 3780 3780 3775 3775 PROFILE 20 10 0 20' H:1"=20' -V: 1"=5' 5 0 5 PROP LEAD ENGINEER'. T. SCHUELER EX GRADE FENCE GRANDFATHER GOLF& EX GRADE DATE. AUGUST 2019 SUPPORTING ENGINEER. PROP GRADE COUNTRY CLUB ELEV: 3804.33 �V IRW #3 LANDSCAPE ARCHITECT '. H"en - S T E WA RT HAZEN AND SAWYER STEWART LINVILLE, NORTH CAROLINA (IRW #3 & EAST CHANNEL) STEWARTNO L19013 TRUSS 100 -YR ELEV: 3795.9 DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& 0 112„ 1" DRAWN BY'. S. KANE 75% DESIGN m c 1 a CENSE NO C-0381 LICENSE NO C-1051 1 SEX 8" REV I ISSUED FOR I DATE By CHECKED BY T. SCHUELER BASEFLOW ELEV:3788.1 ROCK WALL' SEE I ZOCK SIZING CHART DIA G C300 8, 1 U g' 4 2 THICK 2' ELEV: 3778.25 0010 JO 10 3810 3810 3805 3805 3800 3800 3795 3795 3790 3790 3785 3785 3780 3780 3775 3775 5 -0+50 0+00 0+60 -0+70 0+00 STA 8+39 STA 9+40 3800 3795 3790 3785 3780 3775 IORMALPOOL -0+50 EX GRADE 0+00 STA 12+86 3800 3800 3795 3795 3790 3790 3785 3785 3780 3780 3775 3775 0+90 -0+60 EX GRADE ALPOOL 3787.9 - 0+00 STA 15+13 3800 3795 3790 3785 3780 3775 0+40 3815 3815 3810 3810 3805 3805 3800 3800 3795 3795 3790 3790 3785 3785 3780 3780 3775 3775 NORMALPOOL ELEV: 3787.9 - 1+00 -0+50 ELEV: 3793.5 DREDGE 0+00 STA 11 +48 NOTES: 3815 1. ALL PROFILES FACING DOWNSTREAM 3810 3805 3800 3795 3790 3785 3780 3775 0+50 HORIZONTAL SCALE'. 1-20' 20' PROFILE 20 10 0 20' H:1"=20' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-5' LEAD ENGINEER'. T. SCHUELER GRANDFATHER GOLF& EX GRADE DATE. AUGUST 2019 SUPPORTING ENGINEER. COUNTRY CLUB GRADING & DREDGING PROFILES HAZEN NO.. 32453-002 LANDSCAPE ARCHITECT '. H"en - S T E WA RT HAZEN AND SAWYER STEWART LINVILLE, NORTH CAROLINA (IRW #3 & EAST CHANNEL) STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& 0 112„ 1" DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 C222 DO NOT USE FOR CONSTRUCTION CENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS SEX 8" REV I ISSUED FOR I DATE By CHECKED BY T. SCHUELER TRUSS 100 -YR ELEV: 3793.8 NORMALPOOL ELEV: 3787.9 - p! J PROP GRADE COBBLE BE AND -R ION EUSED FOR NEW 5 -0+50 0+00 0+60 -0+70 0+00 STA 8+39 STA 9+40 3800 3795 3790 3785 3780 3775 IORMALPOOL -0+50 EX GRADE 0+00 STA 12+86 3800 3800 3795 3795 3790 3790 3785 3785 3780 3780 3775 3775 0+90 -0+60 EX GRADE ALPOOL 3787.9 - 0+00 STA 15+13 3800 3795 3790 3785 3780 3775 0+40 3815 3815 3810 3810 3805 3805 3800 3800 3795 3795 3790 3790 3785 3785 3780 3780 3775 3775 NORMALPOOL ELEV: 3787.9 - 1+00 -0+50 ELEV: 3793.5 DREDGE 0+00 STA 11 +48 NOTES: 3815 1. ALL PROFILES FACING DOWNSTREAM 3810 3805 3800 3795 3790 3785 3780 3775 0+50 HORIZONTAL SCALE'. 1-20' 20' PROFILE 20 10 0 20' H:1"=20' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-5' LEAD ENGINEER'. T. SCHUELER GRANDFATHER GOLF& DATE. AUGUST 2019 SUPPORTING ENGINEER. COUNTRY CLUB GRADING & DREDGING PROFILES HAZEN NO.. 32453-002 LANDSCAPE ARCHITECT '. H"en - S T E WA RT HAZEN AND SAWYER STEWART LINVILLE, NORTH CAROLINA (IRW #3 & EAST CHANNEL) STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWING NUMBER'. 4011 WESTCHASE BOULEVARD. SUITE 500 223 S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& 0 112„ 1" DRAWN BY'. S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 C222 DO NOT USE FOR CONSTRUCTION CENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS FTHISBARDOESNOTMEASUREI"THEN DRAWING IS NOT TO FU LL SCALE REV I ISSUED FOR I DATE By CHECKED BY T. SCHUELER 3800 3795 3790 3785 3780 -7. FAIRWAY 18 WESTERN SHORE H:1"=30' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-5' LEAD ENGINEER'. T. SCHUELEF2 SUPPORTING ENGINEER'. PROP GRADE ezcwwe / \ 100 -YR ELEV: 3793.4 LANDSCAPE ARCHITECT 75% DESIGN DO NOTUSEFORCONSTRUCTION 'R LINVILLE, NORTH CAROLINA LOCH DORNIE 4 y LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRY FILL av aAnoe� 0 1/2" 1" FHISBARDOESNOTMEASUREI"THEN DRAWING IS NOT TO FU LL SCALE REV ISSUED FOR DATE By CHECKED BY'. T. SCHUELER WET RLLROP N.RED.E 1011— PGRADE 3800 3795 3790 3785 3780 3775 -1+95 -1+00 0+00 -2+00 -1+00 0+00 1+00 2+00 STA 18+03 WET RLL 3+00 1+00 2+00 3+00 STA 19+68 WET FILL JOVV 3795 3790 3785 3780 3775 4+00 4+40 3800 SHORE 3795 3790 3785 3780 3775 4+00+10 LEGEND ODREDGE/EXCAVATE DRY RLL WET FILL ISLAND PERIMETER BERM UNDERCUT' NOTES: 1. ALL PROFILES FACING DOWNSTREAM HORIZONTAL SCALE'. 1-30' 30' PROFILE 30 15 0 30' H:1"=30' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-5' LEAD ENGINEER'. T. SCHUELEF2 SUPPORTING ENGINEER'. GRANDFATHER GOLF& COUNTRY CLUB GRADING & DREDGING PROFILES DATE. AUGUST 2019 HAZEN NO.'. 32453-002 LANDSCAPE ARCHITECT 75% DESIGN DO NOTUSEFORCONSTRUCTION H"enS T E WA RT HAZEN AND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 2235. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-0381 LICENSE NO C-1051 LINVILLE, NORTH CAROLINA LOCH DORNIE STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWN BY'. S. KA NE LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. C223 0 1/2" 1" FHISBARDOESNOTMEASUREI"THEN DRAWING IS NOT TO FU LL SCALE REV ISSUED FOR DATE By CHECKED BY'. T. SCHUELER 3800 3795 3790 3785 3780 3775 ELEV: DWG a0uu 3795 3790 3785 3780 3775 -1+65 -1+00 0+00 1+00 2+00 3+00 4+00 4+70 STA 20+49 3800 3795 3790 3785 3780 3775 3770 FILL DWG 0+00 1+00 2+00 3+00 4+00 5+00 STA 21+77 3800 WESTERN SHORE 3795 / 3790 3785 3780 3775 3770 6+00 6+30 LEGEND PROFILE ODREDGE/EXCAVATE H:1"=30' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-5' DRY FILL WET FILL GRANDFATHER GOLF& ISLAND PERIMETER BERM DATE. AUGUST 2019 UNDERCUT' NOTES: 1. ALL PROFILES FACING DOWNSTREAM HORIZONTAL SCALE'. 1-30' 30' PROFILE 30 15 0 30' H:1"=30' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-5' LEAD ENGINEER'. T. SCHUELER GRANDFATHER GOLF& DATE. AUGUST 2019 SUPPORTING ENGINEER'. AH"en COUNTRY CLUB GRADING & DREDGING PROFILES HAZEN NO.'. 32453-002 LANDSCAPE ARCHITECT '. S T E WA RT HAZEN AND SAWYER STEWART LINVILLE, NORTH CAROLINA (LOCH DORNIE) STEWARTNO L19013 DESIGNED BY J. MCSWAIN DRAWING NUMBER'. 4011WESTCHABE BOULEVARD. SUITE 500 223S. WEST STREET. SUITE 1100 LOCH DORNIE DREDGING& 0 112" 1" DRAWN BY S. KANE 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 C224 DO NOT USE FOR CONSTRUCTION LICENSE NO C-0381 LICENSE NO C-1051 SITE ENHANCEMENTS FHISBARDOESNOTMEASUREI"THEN DRAWING IS NOT TO FU LL SCALE REV ISSUED FOR DATE By CHECKED BY'. T. SCHUELER 3805 3800 3795 3790 3785 3780 3775 3770 EVENT LAWN DESIGN It SEE DWG 3787.9 3805 3800 3795 3790 3785 3780 3775 3770 0+00 1+00 2+00 3+003+10 STA 23+89 3810 3805 3800 3795 3790 3785 7 3 80 -0+30 0+00 STA 51+76 LEAD ENGINEER. T. SCHUELER SUPPORTING ENGINEER'. - LANDSCAPE ARCHITECT'. - DESIGNED BY J. MCSWAIN DRAWN BY S. KANE EX GRADE - T. SCHUELER STEWARTNO L19013 HAZENAND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 223S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. 225 I EX GRADE i 100 -YR ELEV: 3793.8 / EX 8" _ TRUSS _ NORMALPOOL ELEV: 3787.9 / 1 / DREDGE 3 80 -0+30 0+00 STA 51+76 LEAD ENGINEER. T. SCHUELER SUPPORTING ENGINEER'. - LANDSCAPE ARCHITECT'. - DESIGNED BY J. MCSWAIN DRAWN BY S. KANE CHECKED BY. T. SCHUELER 3815 3810 3810 3805 3805 3800 3800 3795 3795 3790 3790 3785 3785 3780 -- 0+60 -0+45 75% DESIGN DO NOT USE FOR CONSTRUCTION 0+00 STA 53+13 3815 3810 3805 3800 3800 3795 3795 3790 3790 3785 3785 3780 3780 0+80 -0+45 3787.9 3800 3795 3790 3785 3780 0+00 0+40 STA 54+91 NOTES: 1. ALL PROFILES FACING DOWNSTREAM HORIZONTAL SCALE'. 1-20' 20' PROFILE 20 10 0 20 H:1"=20' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-5' GRANDFATHER GOLF& CLUB GRADING & DREDGING PROFILES DATE AUGUST 2019 HAZENNO 32453-002 HazenCOUNTRY S T E WA RT LINVILLE, NORTH CAROLINA (WESTERN CHANNEL AND EVENT LAWN) STEWARTNO L19013 HAZENAND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 223S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. 225 0 1/2" V FHIS BAR DOES NOT MEASURE I"THEN DRAWING IS NOTTO FULLSCALE. EX GRADE i / Ex e• TRUSS 100 -YR ELEV: 3793.5 -7t PROP GRADE / NORMALPOOL ELEV: 3787.8 n DREDGE 0+60 -0+45 75% DESIGN DO NOT USE FOR CONSTRUCTION 0+00 STA 53+13 3815 3810 3805 3800 3800 3795 3795 3790 3790 3785 3785 3780 3780 0+80 -0+45 3787.9 3800 3795 3790 3785 3780 0+00 0+40 STA 54+91 NOTES: 1. ALL PROFILES FACING DOWNSTREAM HORIZONTAL SCALE'. 1-20' 20' PROFILE 20 10 0 20 H:1"=20' -V: 1"=5' 5 0 5 VERTICAL SCALE'. 1-5' GRANDFATHER GOLF& CLUB GRADING & DREDGING PROFILES DATE AUGUST 2019 HAZENNO 32453-002 HazenCOUNTRY S T E WA RT LINVILLE, NORTH CAROLINA (WESTERN CHANNEL AND EVENT LAWN) STEWARTNO L19013 HAZENAND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 223S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. 225 0 1/2" V FHIS BAR DOES NOT MEASURE I"THEN DRAWING IS NOTTO FULLSCALE. JOOJ 3800 3795 3790 3785 3780 ISLAND DRIVE PROFILE 20 10 0 20' H:1"=30' -V: 1"=3' 5 0 5 WESTERN SHORE EX GRADE GRANDFATHER GOLF& DATE. AUGUST 2019 SUPPORTING ENGINEER '. COUNTRY CLUB HAZEN No.'. 32453-002 LANDSCAPE ARCHITECT 75% DESIGN DO NOTUSEFORCONSTRUCTION 100 -YR ELEV: 3793.3 GRADING & DREDGING PROFILES STEWARTNG L19013 DESIGNED BY J. MCSWAIN DRAWN BY'. S. KA NE LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. C226 1 REV ISSUED FOR DATE By CHECKED BY'. T. SCHUELER i PROP GRADE NORMAL POOL 30:1 ELEV: 3787.9 1 RY FILL DREDGE 100 -YR ELEV: 3793.4 40:1 WET FILL NORMALPOOL ELEV: 3787.9 --- \� ----- ----� 40:1 -- — .�-- DREDGE PROP GRADE -2+20 -2+00 3810 3805 3800 3795 3790 NORM ELEV: 3785 3780 AL POOL 3787.9 -1+00 STA 56+92 3810 3805 3800 3795 3790 3785 3780 -0+50 0+00 0+80 STA 58+27 3805 3800 3795 3790 3785 7 3805 3800 3795 3790 3785 3780 0+00 0+40 3 80 0+00 1+00 A -A 2+00 3805 3800 3795 3790 3785 3780 2+75 NOTES: 1. ALL PROFILES FACING DOWNSTREAM HORIZONTAL SCALE'. 1-20' 20' PROFILE 20 10 0 20' H:1"=30' -V: 1"=3' 5 0 5 EX GRADE LEAD ENGINEER'. T. SCHUELEF2 GRANDFATHER GOLF& DATE. AUGUST 2019 SUPPORTING ENGINEER '. COUNTRY CLUB HAZEN No.'. 32453-002 LANDSCAPE ARCHITECT 75% DESIGN DO NOTUSEFORCONSTRUCTION 100 -YR ELEV: 3793.3 GRADING & DREDGING PROFILES STEWARTNG L19013 DESIGNED BY J. MCSWAIN DRAWN BY'. S. KA NE LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. C226 1 REV ISSUED FOR DATE By CHECKED BY'. T. SCHUELER i PROP GRADE NORMAL POOL 30:1 ELEV: 3787.9 1 RY FILL DREDGE -- — -- 40:1 WET FILL 3 80 0+00 1+00 A -A 2+00 3805 3800 3795 3790 3785 3780 2+75 NOTES: 1. ALL PROFILES FACING DOWNSTREAM HORIZONTAL SCALE'. 1-20' 20' PROFILE 20 10 0 20' H:1"=30' -V: 1"=3' 5 0 5 VERTICAL SCALE'. 1-5' LEAD ENGINEER'. T. SCHUELEF2 GRANDFATHER GOLF& DATE. AUGUST 2019 SUPPORTING ENGINEER '. COUNTRY CLUB HAZEN No.'. 32453-002 LANDSCAPE ARCHITECT 75% DESIGN DO NOTUSEFORCONSTRUCTION H"enS T E WA RT HAZEN AND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 223S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-0381 LICENSE NO C-1051 LINVILLE, NORTH CAROLINA GRADING & DREDGING PROFILES STEWARTNG L19013 DESIGNED BY J. MCSWAIN DRAWN BY'. S. KA NE LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. C226 0 1/2" 1" FHISBARDOESNOTMEASUREI"THEN DRAWING IS NOT TO FU LL SCALE REV ISSUED FOR DATE By CHECKED BY'. T. SCHUELER REMOVE a 0 SECTION OF 8" . u / PIPE WITHIN MANHOLE o \ ; WATERTIGHT FRAME AND COVER FLUSH WITH GRADE SEE NOTE 2 3815 3810 3805 It 3800 3795 3790 3785 3784 -0+15 41 OPP 8"TRUSS IN (SE) I.E.: 3805.98 \ `1 8" TRUSS OUT (NW) I.E.: 3805.87 SSMH -2(4'0) RIM'. 3812.06 REMOVE EXISTING SSMH 8" TRUSS IN (SE) I. E.'. 3806.24 RIM'. 38E EX 8" RJ DIP OUT (NW) I. E.'.3806. 14 40 WATERTIGHT FRAME \\\\ AND COVER FLUSH \ ■ 1�WITH GRA DE� \ SCALE: 1" = 10' FkisryN APpNOkO UpS� � 1 TRUMP/ �FEM1 8 MNZ °,6 z �s�.. x r�imrco a ga + +_ + Z oz FRAME (SEE SPECS) O g o vii NF mmrco t0 a m m0 f W f Z acs N m MANHOLE STEPS AT 16" OC o_ I +a oa o Z d DOGHOUSE 48 INCH C-33-0602 0+00.0 3808.8100 1 SLOPE ill" PER FT SSMH-2 N W H W F Z W m N W 3812.0600 1 3806.1400 105 LF 105 LF 8" DIP @ 1.00Yo SANITARY CLASS R CONCRETE FILL EX-SSMH-4 6INCH DIP COMPACTED #57 NOTE'. PIPE HUNG FROM PROPOSED BRIDGE 5. SEE DWG B501 FOR DETAIL INV OUT: 3808.14 (RJ DIP) INV IN:3805.09 (RJ DIP) INV IN: 3803.15 (TRUSS) V OUT: 3803.11 (TRUSS) 1OD-YR ELEV: 3796.04 0+00 J_1f17111117 1+00 3815 3810 3805 V / Nn I \ \ ,fie EX-SSMH-4 RIM'. 3796.01 Vp0 6" PVC IN I.E.'. 3793.97 6"TR USS OUT I.E.'.3793.89 IDA? ONI'S3 OR I \ /\ 137 LF 6"TRUSS PIPE TO BE REMOVED i 1 FX-SSMH I I i i \ _ 8"PVO if '� M 3800 89 00 6" PVC IN (I) I. E.'. 3795.97 j 6" RJ DIP IN (G) I.E.'. 3797.48 t 12" TRUSS IN (F) I. E.'. 3791.44 6" PVC IN (H) I. E.'. 3791.41 m/ 12" TRUSS OUT (J) I. E.'. 3791.14 UAN v \" SC vL 10' NOTES: ' CONSTRUCTION SEQUENCE BRIDGE 5 6 CONNECT PROPOSED 8" RJ DIP TO SSMH-2 REMOVE HORIZONTAL SCALE 1-10' 10' WATERTIGHT PLUG AT EXISTING UPSTREAM SSMH. 10 5 0 10' 1. SSMH-1 SHALL BEA DOGHOUSE MANHOLE. SEE 1. INSTALL SCAFFOLDING AS REQUIRED FOR BRIDGE DETAILS C-33-0601 AND C-33-0602 THIS SHEET. INSTALLATION. 7. REMOVE EXISTING BRIDGE AND EXISTING 8" TRUSS PIPE BETWEEN EX-SSMH-1 AND SSMH-2. PLUG 1 0 1 2. SSMH-1 SHALL BE FLUSH WITH PROPOSED GRADING 2 CONSTRUCT PROPOSED BRIDGE AND RJ DIP SEWER EX-SSMH-1 AFTER REMOVING EXISTING 8" TRUSS VERTICAL SCALE'. 1"= 1' BY STEWART., INC. HANGING FROM BRIDGE. PIPE. 3. RJ DIP SHALL BE INSULATED ON AERIAL CROSSING 3. INSTALL DOGHOUSE SSMH-1 AND CONNECT EXISTING BETWEEN STATIONING AS SHOWN ON PLANS 8" TRUSS PIPE. CUT AND REMOVE PIPE WITHIN ACCORDING TO INSUL-TEK DUCTILE IRON SYSTEM MANHOLE. CONNECT PROPOSED 8" RJ DIP TO SSMH-1. SPECIFICATIONS ORE UIVALENT 4. PLUG 8" TRUSS AT EXISTING SSMH UPSTREAM FROM 4. RJ DIP SHALL BE CASED WITHIN ABUTMENTS WITH PROPOSED SSMH-2. STEEL CASING. SEE DETAIL 2 ON B402 AND B502. 5. INSTALL SSMH-2AS SHOWN AND REMOVE EXISTING 8" 5. SEE B401 FOR BRIDGE 4 CONSTRUCTION SEQUENCE. 7RU55 PIPE AS NECESSARY FOR INSTALLATION. 3785 3784 1+15 +FLOW - CHANNEL �8 2" MANHOLE SECTION C-33-0601 VG AS REQUIRED IAX (2) PER MANHOLE COVER AND CIVIL STRUCTURES - SANITARY FRAME (SEE SPECS) 3800 ID AREA TYPE DIAMETER STANDARD STATION TOP ELEV MANHOLE STEPS AT 16" OC c 3795 DOGHOUSE 48 INCH C-33-0602 0+00.0 3808.8100 1 SLOPE ill" PER FT SSMH-2 3790 WATERTIGHT 48 INCH C-33-0601 1+05.3 3812.0600 1 3806.1400 105 LF e SANITARY CLASS R CONCRETE FILL EX-SSMH-4 6INCH DIP COMPACTED #57 137.3 LF 3785 3784 1+15 +FLOW - CHANNEL �8 2" MANHOLE SECTION C-33-0601 VG AS REQUIRED IAX (2) PER CRUS HED#57 STONE BASE 8" THICK MIN DOGHOUSE PRECAST MANHOLES C-33-0602 R- PIPE OD ,6"MIN PLACE MH BASE SECTION SUCH THAT IT IS EMBEDDED 4" MIN IN CONCRETE FLOOR SLAB. CLASS"A" CONCRETE SQUARE SLAB, SIDE LENGTH 12" GREATER THAN OUTSIDE DIAMETER OF MANHOLE BASE. LEAD ENGINEER'. T. $CHUELER NOTES: CIVIL STRUCTURES - SANITARY PIPE SCHEDULE BENCH ID AREA TYPE DIAMETER STANDARD STATION TOP ELEV LOWEST ELEV OUT SSMH-1 BRIDGE5 DOGHOUSE 48 INCH C-33-0602 0+00.0 3808.8100 1 3803.1100 SSMH-2 BRIDGE5 WATERTIGHT 48 INCH C-33-0601 1+05.3 3812.0600 1 3806.1400 CRUS HED#57 STONE BASE 8" THICK MIN DOGHOUSE PRECAST MANHOLES C-33-0602 R- PIPE OD ,6"MIN PLACE MH BASE SECTION SUCH THAT IT IS EMBEDDED 4" MIN IN CONCRETE FLOOR SLAB. CLASS"A" CONCRETE SQUARE SLAB, SIDE LENGTH 12" GREATER THAN OUTSIDE DIAMETER OF MANHOLE BASE. LEAD ENGINEER'. T. $CHUELER NOTES: FLOW CHANNEL PIPE SCHEDULE BENCH DATE. AUGUST 2019 SUPPORTING ENGINEER'. LANDSCAPE ARCHITECT AREA USE FROM TO SIZE TYPE CLASS LENGTH BRIDGE5 SANITARY SSMH-2 SSMH-1 8INCH DIP 350 105 LF BRIDGE4 SANITARY EX-SSMH-3 EX-SSMH-4 6INCH DIP 350 137.3 LF CRUS HED#57 STONE BASE 8" THICK MIN DOGHOUSE PRECAST MANHOLES C-33-0602 R- PIPE OD ,6"MIN PLACE MH BASE SECTION SUCH THAT IT IS EMBEDDED 4" MIN IN CONCRETE FLOOR SLAB. CLASS"A" CONCRETE SQUARE SLAB, SIDE LENGTH 12" GREATER THAN OUTSIDE DIAMETER OF MANHOLE BASE. LEAD ENGINEER'. T. $CHUELER NOTES: FLOW CHANNEL 1. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN OF THE BOTTOM SLAB. BENCH DATE. AUGUST 2019 SUPPORTING ENGINEER'. LANDSCAPE ARCHITECT 2 THIS DETAIL SHALL BE USED FOR � H"enSTEWART HAZEN AND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 223S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-0381 LICENSE NO C-1051 STORMWATER STRUCTURES ONLY. FLEXIBLE RUBBER DOGHOUSE TYPE MANHOLES SHALL NOT BE USED FOR PROCESS STRUCTURES. SLEEVE BOOT DESIGNED BY M. BATE DRAWN BY'. M.BATE LOCH DORNIE DREDGING& SITE ENHANCEMENTS 3. FILL ANNULAR SPACE BETWEEN 0 1/2" 1" IFTHISBARDOESNOTMEASUREI"THEN DRAWING ISNOTTOFULLSCALE OUTSIDE OF PIPE AND MH WITH CONCRETE OR MASONRY TO INSURE WATERTIGHTNESS. CRUS HED#57 STONE BASE 8" THICK MIN DOGHOUSE PRECAST MANHOLES C-33-0602 R- PIPE OD ,6"MIN PLACE MH BASE SECTION SUCH THAT IT IS EMBEDDED 4" MIN IN CONCRETE FLOOR SLAB. CLASS"A" CONCRETE SQUARE SLAB, SIDE LENGTH 12" GREATER THAN OUTSIDE DIAMETER OF MANHOLE BASE. LEAD ENGINEER'. T. $CHUELER GRANDFATHER GOLF& DATE. AUGUST 2019 SUPPORTING ENGINEER'. LANDSCAPE ARCHITECT 75% DESIGN DO NOT USE FOR CONSTRUCTION � H"enSTEWART HAZEN AND SAWYER STEWART 4011WESTCHABE BOULEVARD. SUITE 500 223S. WEST STREET. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO C-0381 LICENSE NO C-1051 COUNTRY CLUB LINVILLE, NORTH CAROLINA SANITARY SEWER PLAN, PROFILE, & DETAIL HAZEN NO.'. 32453-002 STEWART NO Ll 9013 DESIGNED BY M. BATE DRAWN BY'. M.BATE LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. A C400 0 1/2" 1" IFTHISBARDOESNOTMEASUREI"THEN DRAWING ISNOTTOFULLSCALE REV ISSUED FOR DATE gy CHECKED BY'. T. $CHUELER AREA 1 (NO AMENITIES WORK) W \ 1 /� 1 II1/fill �i , // p BRIDGE 5 STORM DRAINAGE NETWORK YPECODE. DOWNSTREAM AD AREA DRAIN [UPSTREAM STRC STRCUPSTREAMRD. DOWNSTREAM ELEVRDEEVFLOW PSTR EAM INVERT DOWNSTREAM INVERT — 200 — PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA EXISTING MAJOR CONTOUR — — — EX ST NO MINOR CONTOUR m PROPOSED STORM DRAINAGE j—i ®� PROPOSED AREA DRAIN LOCH DORNIE DREDGING& SITE ENHANCEMENTS FLOW DIRECTION — LOP — LIMITS OF DISTURBANCE L \� / a �� l r I \\ `REALIGN SEWER LINE LINE \� \ EE SEWER PLANS / — I 0_ `III— POP / sS 41 \ a v IF \� 30 5 0 30' \ \\ \ AREA 3 (NO AMENITIES ..0 RK) 30' GRADING AND STORM DRAINAGE NOTES: APPLIES TO SHEETS L202 -L207 1. CONTRACTORSHAII RFPORT ANY -APF DISCRFPANCIFS TO THF OWNFR'S RFPRFSFNTATIVF PRIOR TO BEGINNING CONSTRUCTION OPERATIONS. 2. THE MAXIMUM SLOPE ALONG ANY HANDICAP ACCESSIBLE PATHWAY SHALL NOT EXCEED 5 D AND SHALL NOT E%GEED A 2 D% CROSS SLOPE. HANDICAP RAMPS INDICATED ON PLANS SHALL BEA MAXIMUM OF 1/12 SLOPES WITH A MAXIMUM RISE OF 3D" BETWEEN LANDINGS. NON -CURB CUT RAMPS SHALL HAVE HANDRAILS AND GUARDS PER DETAILS WITH 5LANDINGS AT THE BOTTOM AND TOP OF RAMP. 3. ALL PROPOSED ELEVATIONS SHOWN ARE EDGE OF PAVEMENT ELEVATIONS UNLESS OTHFRWISF SPFCIFIFD 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THATALL NEWLY CONSTRUCTED STORM DRAINAGE IMPROVEMENTS AND RECEIVING STORM DRAINAGE SYSTEMS REMAIN CLEANOFSEDIMENT ANDDEBRIS. PRIOR TO OWNER ACCEPTANCE OF SYSTEM, THE CONTRACTORSHAII COORDINATF AND PROVIDFA VISUAI ORSFRVATIONVIDFOOFAII STORM DRAINAGE IMPROVEMENTS 12" AND LARGER. THE VISUAL OBSERVATION SHALL BE PFRFORMFD IN THF PRFSFNCF OF THF OWNFR'S RFPRFSFNTATIVF THF CONTRACTOR SHAII ROVIDE TWO (2) DVD COPIES OF THE ENTIRE DRAINAGE VISUAL OBSERVATION. 5. PRI OR TO ISSUANCE OF A BUILDING CERTIFICATE OF OCCUPANCY THE CONTRACTOR SHALL ROVIDE THE OWNER WITH THE VIDEO INSPECTION OF THE STORM SEWER SYSTEM. (BOTH PUBLIC AND PRIVATE). THIS SUBMITTAL MAY NEED TO BE REVIEWED AND ACCEPTED BY THE LOCAL JURISDICTION PRIOR TO THE ISSUANCE OF THE BUILDING CO. 6. REFER TO THE EROSION CONTROL DETAILS SHEET FOR THE SEQUENCE OF CONSTRUCTION 7. INTERIM GRADING SHALL BE PROVIDED THAT ENSURES THE PROTECTION OF STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, AND WASHOUT. 8. INTERIM GRADING SHALL BE PROVIDED TO DIRECT WATER AWAY FROM BUILDINGS AND PRFVFNT PONDING 9. TIF ROOF I FADFRS WHFRF POSSIRI F TO UNDFRGROUND STORM SYSTFM CONTRACTOR TO FIELD VERIFY LOCATE AND INSTALL WHERE POSSIBLE ORAS SHOWN ON PLANS. WHERE ROOF LEADERS DAYLIGHT AT GRADE A SPLASH BLOCK APPROVED BY THE OWNER'S RFPRFgFNTATIVF SHAI I RF INSTAI I FD 1D. MA % IMUM SLOPE ACROSS ANY HANDICAPPED PARKING SPACE AND AISLE SHALL NOT EXCEED 2% IN ANY DIRECTION. 11. PRO POSED CONTOURS ARE APPROXIMATE. SPOT ELEVATIONS AND ROADWAY PROFILES SHALL BE USED IN CASE OF DISCREPANCY. 12 PI ACF RACKFII I AND FII I MATFRIAI S IN I AYFR NOT MORF THAN R INCHFS IN 1 OOSF DFPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT, AND NOT MORE THAN 4 INCHES IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND -OPERATED TAMPERS. PLACE BACKFILL AND FILL MATERIALS EVENLY ON ALL SIDES TO REQUIRED ELEVATIONS, AND UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE. COMPACT SOIL TO NOT LESS THAN 95 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 698 FOR EACH LWEROFBACKFILL OR FILL MATERIAL UP TO TWO FEET OF FINISHED GRADE. COMPACTSOIL TO NOT LESS THAN 98 PERCENT OF MAXIMUM DRY UNIT WEIGHT ACCORDING TO ASTM D 698 FOR FACH I AYFR OF RACKFII I OR FII I MATFRIAI FOR THF FINAI TWO FFFT 13. SITE GRADING IMMEDIATELY ADJACENT TO FOUNDATION OF BUILDING SHALL SLOPE NOT LESS THAN 12D AWAY FOR MINIMUM DISTANCE OF 1D FEET. ALTERNATIVE METHOD SHALL BE PROVIDED TO DI VFRT WATFR AWAY FROM FOUNDATION VIA SWAI FS SI OPFD AT A MINIMUM OF 2% OR IMPERVIOUS SURFACES SLOPED AWAY A MINIMUM OF 2% AWAY FROM BUILDING. 14. CONTRACTOR SHALL ADJUST RIM ELEVATIONS OF EXISTING MANHOLES, METERS, VALVES, ETC. AS REQUIRED TO MEET NEW FINISHED GRADES. 15. CONTRACTOR SHALL SLOPE GRADES TO ASSURE POSITIVE STORMWATER FLOW TO KEEP WATER FROM POOLING ALONG CURBS AND WALLS. i6. TOP OF WALL ELEVATIONS INDICATE THE ELEVATION AT THE TOP OF THE CAP, UNLESS OTHERWISE NOTED. 17. BOTTOM OF WALL ELEVATIONS INDICATE THE ELEVATION OF THE FINISHED GRADE. LEAD ENGINEER'. R. MASSEY LANDSCAPE ARCHITECT N/A DESIGNED BY. J. WARNER H"-.en — S T E WA R T GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA MENITIES RADING & STORMWATER PLAN AREA 2 DATE. JULY 2019 HAZEN NOSTEWART 32453-002 3TEWARTNG.. L19o13 75% DESIGN DO NOT USE FOR CONSTRUCTION HAZENAND SAWYER TEWART 011 WESTCHABE BOULEVARD, SUITE 500 223 S. WESTSTREET.. SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. L2�2 DRAWN BY J.WARNER HEGKED BY'. REV ISSUED FOR DATE BY R. MASSEY 0 1/2" 1" IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE. i AREA 4 (NO AMENITIES IES WORK)* a ��. \ \\� \\\\ \\ � \ 'a°Bs - � - \ � � � � � -> - �- ---i-- -- � - - - �" O�c,V~ Pei -�y- - -- - - \ � \ � - ✓ - %l - - � \I \�-- ALL.Po�QQOa l��.., J I I l ll o IV V rl\ � I i / I 1 PLAN SCALE: 1" = 30' 1(16 LOF 12'H`PE@1 .549 \s V\�y -3793.10 \ 1 \ \ l SII \ \ \ \ \ INVIN=3790125 1 \\ RIM ELEV = 3792.80 INV OUT = 3790 25 /II MATCH LINE -SES DVvG L.207. �. — 200 — PROPOSED MAJOR CONTOUR LEAD ENGINEER'. R. MASSEY PROPOSED MINOR CONTOUR 200 EXISTING MAJOR CONTOUR — 1 PROPOSED STORM DRAINAGE P PROPOSED AREA DRAIN FLOW DIRECTION — LOD — ALL.Po�QQOa l��.., J I I l ll o IV V rl\ � I i / I 1 PLAN SCALE: 1" = 30' 1(16 LOF 12'H`PE@1 .549 \s V\�y -3793.10 \ 1 \ \ l SII \ \ \ \ \ INVIN=3790125 1 \\ RIM ELEV = 3792.80 INV OUT = 3790 25 /II MATCH LINE -SES DVvG L.207. �. — 200 — PROPOSED MAJOR CONTOUR LEAD ENGINEER'. R. MASSEY PROPOSED MINOR CONTOUR 200 EXISTING MAJOR CONTOUR — EXISTI NG MINOR CONTOUR PROPOSED STORM DRAINAGE HAZEN NOSTEWART 32453-002 PROPOSED AREA DRAIN FLOW DIRECTION — LOD — LIMITS OF DISTURBANCE OEM u. 30 15 0 30' LEAD ENGINEER'. R. MASSEY 75% DESIGN DO NOT USE FOR CONSTRUCTION � Hazen — S T E WA R T HAZENAND SAWYER STEWART 4011 WESTCHABE BOULEVARD, SUITE 500 223 S. WESTSTREET, SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA AMENITIES GRADING & STORMWATER PLAN AREA 5 DATE. JULY 2019 LANDSCAPEARCHITECT'. N/A HAZEN NOSTEWART 32453-002 DESIGNED BY'. C. CROSBY 3TEWARTNG.. L19o13 LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. L205 DRAWN BY C.CROSBY 0 1/2" 1" IFTHIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOTTO FULL SCALE. CHECKED BY'. R. MASSEY REV ISSUED FOR DATE By cONaINGeETE RETAINWALL \ \ \ CONNECTUNDEODO NEAREST ,/ ae CONCRETEw+,� STORM STRUCTURE N I1N0VM8 AOEDULETV==3739749.83.S939 CONTRACTO TOR 1 FIELD VERIFY 93.30�RIDRAINAGE DIRECTION AND INFORMATION CONTRACTOR . \ \ ?O CONTACT ENGINEER \ II FOR DESIGN DIRECTION \ RIM ELEV = 3796.50 �� , �, - 1 H -AD N% -3)'.. S , \ \ INV IN=3793.73 108 -AD , ( ) RIM ELEV=3799.28 \ y pII INV OUT 792!!R 9 �. BR!D Ez\. \\\ \\ —� ' I\ our=\\�\\\ J BRIDGE3 R,V„ \\ ^ ``` \ �- \ v \ \ 68 LF 8' HDPE Q 0.54% \ = \. \ ,1••i �\ \ \� I ( 1 - 73 LF 12"HDPE ,.,9%<.— .t F 3793.50 a1n• +3793.05 - - „I _' 59 LF 24" HDPE 8.7,% \ 3 11 { , { �1 \ , RIM ELEV = 3792.87 IN = 3788.63 (105 -AD) / 101 -AD //) I' -\I� �' _ �-� \ \\ �INVIN= 3791.63 (,07 -AD) RIM ELEV=3797.85 e-(21 4) INV IN = 3788.87 O \ \ I , �\ INV IN = 379,.40 I .RIM ELEV-3792.55 _=\ 13 LF 12- HOPE @13.01% Y \ \ \INVOUT=3790.90 1 INrrVIN=379000(St=ture-(25)) - � � / �. \ \\ ` ��\��+3793.10 \ \ \\ \� \\ I 12 HDP _ \\� •_ `\\�Vg\ 49 LF \E(oj 3.43 INv.oIi��=379000' INV OUT \�— 7,16 LF 12" HDPE 1.54% \ 10SAD \\ \ % 72 LF 30 \ J _ _ 94.37 �\ RIM ELEV =37 •-- =..J 1 ({, INV OUT 3790-30 "HDPE X2.62 o J � /. \ --ice / I(• \ \\ _.\ �; I �\\ INVOUT-37&5A5) L' \� c j! \\\\\. I I" CONCRETE_/ W \�. jl 1 �'. tom'._ \'\,\ I /nl�n'1 RETAINING WALL'.'\\\` \ `l J/ / \INV OLi? sig\\\'\ @12.02%\ \\\ \\ – eo n TOP OF WALL ELEVATION'S SEE/ `� \ ENLARCEIMENT, SHEET 206.1 — -:.\ PLAN -- MATCH _ SEE GvVG L207. '... \ ` 1- \'\'V j SCALE: 1 = 30' 1 - 200 - PROPOSED MAJOR CONTOUR LEAD ENGINEER'. R. MASSEY PROPOSED MINOR CONTOUR � Hazen - S T E WA R T HAZENAND SAWYER STEWART 4011 WESTCHABE BOULEVARD, SUITE 500 223 S. WESTSTREET, SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 EXISTING MAJOR CONTOUR AMENITIES GRADING & STORMWATER PLAN AREA 6 EXISTING MINOR CONTOUR PROPOSED STORM DRAINAGE I�I PROPOSED AREA DRAIN FLOW DIRECTION - LOD LIMITS OF DISTURBANCE 30 15 0 30' 1"=30' LEAD ENGINEER'. R. MASSEY 75% DESIGN DO NOT USE FOR CONSTRUCTION � Hazen - S T E WA R T HAZENAND SAWYER STEWART 4011 WESTCHABE BOULEVARD, SUITE 500 223 S. WESTSTREET, SUITE 1100 RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 GRANDFATHER GOLF & COUNTRY CLUB LINVILLE, NORTH CAROLINA AMENITIES GRADING & STORMWATER PLAN AREA 6 DATE. JULY 2019 LANDSCAPE ARCHITECT N/A HAZEN NOSTEWART 32453-002 DESIGNED BY'. C. CROSBY 3TEWART NG.. L19o13 LOCH DORNIE DREDGING& SITE ENHANCEMENTS DRAWING NUMBER'. L2�6 DRAWN BY C.CROSBY 0 1/2" ," IFTHIS BAR DOES NOT MEASURE 1"THEN DRAWING IS NOTTO FULL SCALE. CHECKED BY'. R. MASSEY REV ISSUED FOR DATE By Ile ,I SCALE :n1'N 10' 10 0 0PL' LEAD ENGINEER'. R. MASSEY . JULY 2019 GRANDFATHER GOLF & MENITIES DATE LANDSCAPE ARCHITECT HazenHAZEN NO N/A COUNTRY CLUB STEWART 32453-002 '. LINVILLE, NORTH CAROLINA RADING & STORMWATER PLAN 3TEWARTNG.. L19013 DESIGNED BY. J. WARNER STE WART AREA 6 ENLARGEMENT HAZENAND SAWYER TEWART DRAWING NUMBER'. DRAWN BY J.WARNER 011 WESTCHABE BOULEVARD, SUITE 500 223 S. WESTSTREET.. SUITE 1100 LOCH DORNIE DREDGING& 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 1/2° 1° L206. HEGKED BY'. DO NOT USE FOR CONSTRUCTION LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE. � REV ISSUED FOR DATE BY R. MASSEY RADING LEGEND: - 200 - PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR - 200 - EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR HKOPOSEU S I OKM UKAINAGE j®e PROPOSED AREA DRAIN FLOW DIRECTION - LOD LIMITS OF DISTURBANCE Ile ,I SCALE :n1'N 10' 10 0 0PL' LEAD ENGINEER'. R. MASSEY . JULY 2019 GRANDFATHER GOLF & MENITIES DATE LANDSCAPE ARCHITECT HazenHAZEN NO N/A COUNTRY CLUB STEWART 32453-002 '. LINVILLE, NORTH CAROLINA RADING & STORMWATER PLAN 3TEWARTNG.. L19013 DESIGNED BY. J. WARNER STE WART AREA 6 ENLARGEMENT HAZENAND SAWYER TEWART DRAWING NUMBER'. DRAWN BY J.WARNER 011 WESTCHABE BOULEVARD, SUITE 500 223 S. WESTSTREET.. SUITE 1100 LOCH DORNIE DREDGING& 75% DESIGN RALEIGH. NORTH CAROLINA 27607 RALEIGH. NORTH CAROLINA 27603 0 1/2° 1° L206. HEGKED BY'. DO NOT USE FOR CONSTRUCTION LICENSE NO.'. C-0381 LICENSE NO.'. C-1051 SITE ENHANCEMENTS IF THIS BAR DOES NOT MEASURE 1" THEN DRAWING IS NOT TO FULL SCALE. � REV ISSUED FOR DATE BY R. MASSEY