Loading...
HomeMy WebLinkAboutNCC191258_MODIFICATION Supporting Documents_20190924 (2)li - -- 11 -- �\• �\-� -•vim -a �1� 11 • �� \�111� �7,1 ')0�� w w iGiiL���i�ri��.���r•W�Y :��iiiir.�W��iiii� w w r ��� /. IN Ila Will - - - - --IN Ill rl=ill �•ft�1 � STONE WEIR 0-)l OUTLET \i: 1 Iyl .0 '1�dwvo: • v Sill SF SF I� FW hFj1 •, �.A�I�I�,�I l �. � Orr • M� IlY �11 NE;';' • e VI 1 •'• 'G I'`'.■.M. MEME 1 MEMO 6, "911111111110.911111.wwwww��.::�s.•.:>sa! I InU. In \ / // // STONE WEIR N OUTLET iZ2/\ \ ..•• • •• • •• • •• • •• • •• • •• • •• • •• • •• • •• I� J I � Wil ► II I P.D. &I W L � Ii �•i i •�+.Fr Sri •ti+. _ _�i STONE WEIR • i—<— OUTLET — -� �� S\ 1MAINTENANCE ESMSEPTIC NT / ,I I i N _ V I �- i 'N1b LA* I � I \ / 2 39 sf 128473 sf 27448 sf 211 0 s bs 206�5 sf 23130 / ( ,i \ 46 58 sf / ( ( ( (� TEMPORARY / �j ( ,� CONSTRUCTION ,TEMPORARY--' / CONSTRUCfION ENT 20, _ RANCE (TYP.) D.E _ilI, ENTR Pi� TYP. P V I ,I (n _ I � // STONE WEIR OUTLET I-6 I / � / I is �.S is V I 04 a �S is is isNIZ �S STONE WEIR OUTLET 8F —7 Sill Sill SP SF SP SP co -its SF SF wS/ C E0 N CQNTROL NOTI E — PLAN PO FOR CONSTRU TIONSF =4 �> \ This Ian complies with Chapter C Article 4 - Erosion Co tr o �s J 21045 sf �� p p p \ ds \ I thejown of Lewisville Unified Development Ordinance. _ o � printeclset of the'stamped/approved plans must be kept on the NOTE: MODIFICATION OF THIS PLAN MAY BE NECESSARY constri site for reference when installing required erosion �� I \' ' \ \ I control measures. IF WORKING OUTSIDE OF THE PROPOSED L ' x 1 / DISTURBED LIMITS SHOWN ON THIS PLAN. SF —`� $ {— matthewo 08/30/2019 2:42:37 PM SF� SFI ' / NOTE: / U) r Is SEDIMENT BAGS TO BE INSTALLED ON ALL EXISTING CURB INLET'S. /\-70 � \/�b / NOTE: /fv I I I ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED DURING THE COURSE OF THIS — SF SFI ,� SF I �I / PROJECT. NOTE: TEMPORARY INDIVIDUAL CONSTRUCTION 417 8 if �� / I ' / ENTRANCES NOT REQUIRED. ONE SINGLE POINT ENTRANCE ALLOWED CONTINGENT ON NO MUD NOTE: BROUGHT INTO THE STREET. w I I ��`-� / I CONTRACTOR TO VERIFY LOCATION OF ALL I ILT FENCE 4 V V �\ � EXISTING UTILITIES PRIOR TO CONSTRUCTION. ANY •�• / ----1 ��...��� ' / r I ' ' .� DISCREPANCIES TO BE REPORTED TO PROJECT WHEN THE PERSON FINANCIALLY RESPONSIBLE FOR THE / / MANAGER AND/OR ENGINEER OVERALL PROJECT IS NOT THE PERSON FINANCIALLY RESPONSIBLE FOR OFF -SITE BORROW/WASTE AREAS X NOT REGULATED BY THE PROVISIONS OF THE MINING NOTE: ACT OF 1971 AND OFF -SITE WASTE AREAS OTHER GROUND COVER SHALL BE ESTABLISED ON ALL EXPOSED THAN LANDFILLS REGULATED BY THE DEPARTMENT OF SLOPES AND FILLS WITHIN 7 CALENDAR DAYS FOLLOWING WING HUMAN RESOURCES, SUCH AREAS SHOULD BE THE COMPLETION OF ANY PHASE OF GRADING. CONSIDERED SEPARATE LAND DISTURBING ACTIVITIES PERMANENT GROUND COVER SHALL BE ESTABLISHED ON SUBJECT TO THE SEDIMENTATION POLLUTION CONTROL ALL DISTURBED AREAS WITHIN 14 CALENDAR DAYS ACT OF 1973. OFFSITE BORROW AREAS ARE SUBJECT \ ` OOP` FOLLOWING THE COMPLETION OF CONSTRUCTION. TO THE REQUIREMENTS OF THE MINING ACT OF 1971. I Q 0 Z V Z S p � lo�� / b I � sF SF SF I \20 P.D.E. CJi 00 N ICI J N SF SF / 0 / Sill SF Z= s+� SF sF sF / / STONE WEIR W / \ � / ITE 1`7 oo 0 4 I P� O 5 RgA�LjN�' ��P VICINITY MAP NOT TO SCALE POST METAL= 6' LONG, TRIANGLE STEP MAX. HOR. SPACING= 6' O.C. PLASTIC OR WIRE TIES 18-24" SYNTHETIC FILTER FABRIC (EXTRA STRENGTH) 8 . FEOW 2BACKFILL TRENCH AND 4" COMPACT THOROUGHLY NOTES: 1. TOTAL DRAINAGE AREA FLOWING TO SILT FENCE MAY NOT EXCEED 2 ACRS, IN DRAINAGE AREAS OVER 1 ACRE THE SILT FENCE SHOULD HAVE A STORAGE PIT. 2. SILT FENCES SHOULD NOT BE USED AT PIPE OUTLETS OR IN AREAS OF CONCENTRATED FLOW ( CREEKS, DITCHLINES, SWALES, ETC.) SILT FENCE DETAIL N TS DISTURBED AREA REVISIONS: ORIGINAL D.A. = 11.91± AC ADDITIONAL D.A = +14.66± AC LOT *'S (1-3, 10 -12, 16 -19, 46 -4 7, 49-50, 52, 185, 194-1R7) NEW DIMRSED AREA = 26.57± AC TOTAL DISTURBED AREA= ±26.57 AC ::1 i OUTLET / 60 EROSION CONTROL LEGEND CONSTRUCTION ENTRANCE —x—x--x x x TEMPORARY SILT FENCE x 10 STONE WEIR OUTLET —� �� DIRECTION OF FLOW DISTURBED LIMIT LINE CONTACT INFO: HOUSE PAD JESSICA MEYER, CPESC,CESSWI D.R. HORTON, INC. SPLME SEPTIC SUPPLYLINE GREENSBORO NPDES MANAGER MAINTENANCE EASEMENT PHONE: 919-460-2999 P.D.E PRIVATE DRAINAGE JAMEYERQdrhorton.com EASEMENT TOPO AND PAD GRADES PROVIDED BY JAMESTOWN ENGINEERING. NO FIELD WORK HAS BEEN PERFORMED BY EVANS ENGINEERING, INC. GRAPHIC SCALE 0 30 60 120 ( IN FEET ) I inch = 60ft. PROJECT TITLE: CONRAD FARMS PHASE 1 CON3AD FARM ROAD FORSYTH COUNTY PFAFFTOWN, NORTH CAROLNA OWNER/DEVELOPER: D.R. HORTON, INC. 4006 MENDENiALL OAKS PARKWAY, SUITE 1W HM POW, NC 272M .JESS CA Mill 9W460-2M -� vans \,,����'ot�", ���A„R�<'''%, - gineenng, Inc. = SEAL —Since 1974— I Engineers Surveyors Planners _ z 18914 = Q; = 4609 Dundaa Drive Greensboro, NC 27407 i "In '�i�o• Phone 336-854,8877 Fax 336,854-8876 Phone `gG�►\\���� FIRM LICENSE #C-0168 l l PROJECT: 125-308 DESIGN BY: TTS DRAWN BY: TTS DWG: H:\DRAVANGS\D R HORTON\CONRAD FARMS\PH 1 LOT EROSION CONTROL 5..dwg SHEET DESCRIPTION: LOT EROSION CONTROL SCALE: 1"=60' DATE: JANUARY 31, 2017 REVISIONS: SHEET NO.: 02/27/2019:ADD LOT 86 08/26/2019:ADD LOTS. 1-3. 1D-12. 16-19, 46-47. 49-50. 52,185 & 194-197 A 2400 EROSION CONTROL CONSTRUCTION SEQUENCE Iilstons" 2-12-13 1. Obtain gradinglerosion control plan approval and permit from the City of Winston- Salem Inspections. POMK Works ° partn �t 2. Contact Erosion Control Inspector to establish a pre -construction conference and stotmwater/Etoioo ad inspection schedule. sedimentation Cantor Pnwm Self Inspection -Effective October 1, 2010, persons conducting land -disturbing activities, larger than one (1) acre, must inspect their project after each phase of the ioz project, and document the inspection in writing on approved forms available from (:in L.nk ill +36.-'".80M. tluµj�Y�fm,nn the City of Winston-Salem Inspections office. The phases are as follows: 1. Installation of perimeter Erosion and Sediment Control measures- 2. Clearing and grubbing of existing ground cover. 3. Completion of any phase of grading of slopes or fills. 4. Installation of storm drainage facilities. 5. Completion of construction or developmerrt. 6. Establishment of permanent ground cover sufficient to restrain Erosion. 3. Clear site ONLY as necessary to install initial Erosion Control measures as follows: a Temporary construction entrancelexit b. Temporary diversion berms C. Temporary silt fencing SILT FENCE -TO BE PLACED ON LOW SIDE OF EACH LOT Seed embankments and disturbed areas of devices (including "clean" water diversion) upon completion of construction. See Ground Stabilization Criteria below for more information. 4. Begin clearing, grubbing, and stripping of site as required. Earthen -material stockpiles on -site for later distribution and/or removal, areas dedicated for management of land clearing and demolition debris, construction and domestic waste, and hazardous or toxic waste shall be located at least 50 feet away from storm drain inlets and surface waters (unless it can be shown that no other alternatives are reasonably available), and within areas protected by Erosion Control measures. 5. Begin site grading. Maintain Erosion Control devices in accordance with the maintenance plan. Install additional Erosion Control measures as required. 6. Install storm drainage system and utilities. Storm piping shall be installed to the point where it enters each device. Completion of piping will ONLY be allowed once the site has been deemed stable by the Erosion Control Inspector. Install protection around all inlets as storm drain system is installed. ��ti'1I11I! 2'1r1'll ll'!'�J �lii.t)l�.l l �-i L� SITE MU STAMILIZATION STAMLIZAIION DESMPIION TIMFRAW M MEFRAM EXCEPTIONS Perimeter dikes, swales, 7 days None ditches, & slopes Slopes steeper than 3:1 7 days If slopes are 10' or less in length & are not steeper than 2:1,14 days allowed Slopes 3:1 or flatter 14 days 7 days for slopes > SO feet in length All other areas with 14 days None slopes flatter than 4:1 7. Prior to the Contractor demobilizing from the site (at approximately 45 days prior to demobilization), the Financially Responsible Party (or their designee) will notify Joe Fogarty (City of Winston-Salem Stormwater Engineer, 336-747-6961) and the designated Erosion Control Inspector of their anticipated date to leave the site. An on -site inspection will be conducted prior to the leave date by Mr. Fogarty and the designated Erosion Control Inspector to make certain all action items have been addressed by the Contractor. 8. Continue to maintain Erosion Control measures until vegetative cover has been established over all disturbed areas and site has been stabilized. Remove Erosion Control measures ONLY after final inspection and approval by Inspector. EROSION CONTROL MAi WENANC'E PLAN 1. Inspect all sedimentation and Erosion Control devices for stability and function each week and following each rainfall event. 2. Remove silt/sediment from temporary devices when accumulated volume has reached 50% capacity. 3. Remove accumulated silt(sediment from behind temporary sediment fence when depth exceeds approximately 0.5'. Repair and replace silt fence as necessary. 4. Seed and stabilize temporary diversion berms immediately after construction including "clean" water diversion berms. Re-gradefrepair berms as required. 5. Contractor shall appoint an on -site inspector and maintain records of inspections in accordance with the provisions of the general NPDES Stornwater discharge permit for construction activities. STREET TYPICAL LOT EROSION CONTROL PLAN DENOTES DRAINAGE FLOW ARROWS -MAY NOT DEPICT ACTUAL FLOW DIRECTION ON EACH LOT CONSTRUCTION ENTRANCE(TYP) HERBtACEOLN PLAT 4keding rsconrrwlr�da�lolts for ply shlftedon t;lenllelopnwxit Imp a do Ilse p"rg tab SW: 6 mm - 3 ym wNhimA w n galIto in Doe plrl w m) NON-MATWF SPFCNM Table 6.11.b .� -_--_----- .. ,.,. •. _.11 _yam -71 • _ro `__ e - yL _7 • 1 n. 1. u. ut .t 1 ._ 1 . ---+�1-.��------- 1 r L:r L.:..A.r. 11� m N[M n -.., t. i ,. t ----- --- ---------- Ptacdice SrwAwds and Speafrcadons Table 6.24c Permanent Seeding Recommendations - Piedmont Region Pereentageof Optimal Planting Soil Drainage Sthade Common Napa Scienlitk Nam i cullivas Type' Nix Dates Adaptation Toleranm Heigh SATikhgrass Panicum,igalun 8A*"-- Well dairw Sheller'- Well diained waml 1015% Dec.1-Apr 1 CWMr Poor 8 Ka�or_- Se D "andert Catlgge - AAddTflCd 9wilehgrass Parlictxrr uirgatlm 10.15% Dec. 1- May 1 � � Poor 6 Alamo - poorly � Swett Indtangrass Sorghastrum wane M114raired to 10 30% Dec.t • Apr. t Poor 8 rulans RwwW.0sxAChrpm Season Droughty llQlangrass Sorghaseum Warts well-drainedb 1030% Dec.1-Mayt Poor 8 nubns Lomb Season Droughty Deerbngue Diichaaelium Warm Pood"rainedb 5.25% Dec. 1-Aprt Moderate 2 clandestnum Troga Season Don Big Buestem Andropogon Warts V*1l dr=Ldta 10 30% Dec.1-Apr.1 Poor 8 erardi Rondlrse, Kw. fed Season DA ou LilkMoslem Set"aechymni Warm Wag-dtairedb ' 430% Dec 1-Apr 1 Poor 4 sco Pa rium chmm" Season Droa warm db t -70% Dec. 1 - Apr t Moderate 5 SweetWoodreed Clans srund'nsces Season d� Yllann 5.25% Dec. t - Apr.1 Poodydrained Poor 5 Rice Cu4rass Leersia ay®ides Season warm 10-20% Dec. t - Apr. t Well -drained Poor 3.5 Redlop Pankgrass Paricum Nidulum Season Warm 10-20% Me. 1-Apr.1 Poodydr ned Moderate 3.5 Beaked Pankgrass Pmktan anceps Season VIhm edb 510% Dec. 1-Apr.1 � Poor 25 Pwpletop Tridenstaws Season Eastern Tripsecum wamr YIk1•drailedto 'des 5-10% Dec.1-Apr1 Poor 4.5 Gammagrass do Season Poo"ined Qlasmanirum Cold Feb.15-Apr1, Merl-drairedto 110% Moderate 4 Indian Woodoets latilolum Season Aug. 15- Oct 15 Droughty cold Feb. 15-Apr.1, Vhf-dratledb 5-25% Moderate 3 LlrginisWiWrye Bymuseirginkus Season Aug. 15.Oct 15 DroughtV FastemBot/o- Colo Feb. 15-Apr.1, Wel-drairedto 5 70% Moderate 3 brush Grass aftnus horit Season Vg.15 - Oct 15 Droughty cow Feb. 15-Apr 1. 10.20% Poody fined Poor 25 Rough Bentgraa Agrods scabra Season Aa415 - Oct 15 Cold Feb. 15-Apr 1, 2 5% Wet drained Moderate 3 5 Writer 8entgrass Agrostis try is Season Aug.5 - Oct 15 Dec. 1- May 1, Wetland 110% Pm drabed Poor 4 SohRluh 1111cuseNsus sepi-Novi Dec.1- May 1, Welland 1-10% Poodydraired Poor 3 shallow Sedge CaTex gdda Sep.1- Not 1 Dec. 1- May 1, WeWnd 110% PoM Poor 3 Fox Sled Canal olden .1- Not / Wetland 2-5% Dec-t Mayt, Pbokgka , ed Poor 2 LeaftryRush Jtncus corisceus Sep.1- Not 1 * Pick at least four species, including one from each type. 6.24.6 Rev. Sn3 Temp Drive: 15 X 20 with angles at front 2-3" coarse aggregate Figure C06a Gravel entranmilexit keeps sedmwd from leaving the consrucrion site (modified from Ve SWCG). STONE CONSTRUCTION ENTRANCE NTS table 6.10a temporary seeding Recommendations for 1 ate winter and early spring FROM CATCH RAM Ncu-uoml / NBDE THEBAG DEPTH = D e � wum =w LENGTH = L d a a 4 " STANDARD INSTALLATION DETAIL SOIL PREPARATION Proper soil preparation is necessary for successful seed germination and root establishment. It is also necessary for establishment of rooted sprigs, sod and woody plants. Heavily compacted soils prevent air, nutrients and moisture from reaching roots thereby retarding or preventing plant growth The success of site stabilization and reduction of future maintenance are dependent on an adequately prepared soil bed. Following are the requirements for preparation of areas to be vegetated by grassing, sprigging, sodding, and/or planting of woody plants: General Requirements: • Preparation for primary/permanent stabilization shall not begin until all construction and utility work within the preparation area is complete. However, it may be necessary to prepare for nurse crops prior to completion of construction and installation of utilities. • A North Carolina Department of Agriculture Soils Test (or equal) shall be obtained for all areas to he seeded, sprigged, sodded or planted. Recommended fertilizer and pH adjusting products shall be incorporated into the prepared areas and backfill material per the test • All areas to be seeded or planted shall be tilled or ripped to a depth specified on the approved plans, construction sequence and/or construction bid. list. Ripping consists of creating fissures in a criss-cross pattern over the entire surface area, utilizing an implement that will not glaze the side walls of the fissures. Site preparation that does not comply with these documents shall not be acceptable. The depth of soil preparation may be established as a range based on the approval of the reviewing state or local agency. Once tilled or ripped according to the approved plan, all areas are to be returned to the approved final grade. pH modifiers and/or other soil amendments specified in the soil tests can be added during the soil preparation procedure or as described below. • All stones larger than three (3) inches on any side, sticks, roots, and other extraneous materials that surface during the bed preparation shall be removed. Areas to be Seeded: • Till or disc the prepared areas to be seeded to a minimum depth of four (4) inches. Remove stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface. If not incorporated during the soil preparation process, add pH modifier and fertilizers at the rate specified in the soil test report. • Re -compact the area utilizing a cultipacker roller. The finished grade shall be a smooth even soil surface with a loose, uniformly fine texture. All ridges and depressions shall be removed and filled to provide the approved surface drainage. Seeding of graded areas is to be done immediately after finished grades are obtained and seedbed preparation is completed. Areas to be Sprigged, Sodded, and/or Planted: • At the time of planting till or disc the prepared areas to a depth of four (4) to six (6) inches below the approved finished grade. Remove all stones larger than three (3) inches on any side, sticks, roots and other extraneous materials that surface. If not incorporated in the ripping process, add pH modifier, fertilizer, and other recommended soil amendments. • Re -compact the area utilizing a cultipacker roller and prepare final grades as described above. Install sprigs, sod and plants as directed immediately after fine grading is complete. Mulch, mat and/or tack as specified. pH AND NUTRIENT AMENDMENTS Determining the nutrients that enable seed and container plants to grow, flourish, and become established after planting are critical elements of the design and stabilization process. The soils tests previously described will provide a recipe for amendments based on particular plants and particular soils. The test results will recommend the amounts of base elements (nitrogen, phosphorous, potassium), pH modifiers and other trace elements that should to be added to the soil for selected species of seeds and plants. The acid/base characteristic of the soil is a primary component of soil fertility. If the soil acidity is not in the proper range, other nutrients will be ineffective, resulting in less productive plant growth. Most plants grow best in a pH range of 6.5 - 7.0 (slightly acidic to neutral). The soil tests will recommend the specific amendments and application rates required to achieve this range. These amendments must be incorporated into the soil (not applied on the surface) to be effective. (See the General Requirements for soil preparation specifications and timing for incorporation of soil amendments.) The base elements are easily found in bulk quantities. Lime can also be obtained in large quantities. They all must be thoroughly incorporated into the soil through appropriate mechanical means. Ground surface applications without proper soil mixing will result in poor results. In addition to the base fertilizers, other trace elements are needed to produce healthy and vigorous growth. These include but may not be limited to sulfur, manganese, zinc, boron, chlorine and molybdenum. If not already included with bulk mixes of the base elements, they can be obtained from commercial suppliers. Provisions for soils test during and/or after initial grading is complete shall be included on the approved plan, in the approved construction sequence, and on the bid item list utilize for the project If you did not obtain a soil test: Follow these recommendations for all grasses except centipedegrass. 1. Apply 75 pounds of ground limestone per 1,000 sq. ft. 2. Apply a starter type fertilizer (one that is high in phosphorus) based on the type of grass and planting method. Fertilizer bags have a three -number system indicating the primar nutrients, such as 8-8-8 or 5-10-10. These numbers denote the N-P-K ratio -the percentage of each nutrient in a fertilizer The percentages are always noted in the following order: N Nitrogen for green color and growth. P O Phosphorus for good establishment and rooting. K O Potassium to enhance pest and environmental stress tolerance. Some common examples of starter type fertilizers required for a 1,000 sq. ft. area include 40 pounds of 5-10-10, 20 pounds of 10-20-20, or 16 pounds of 18-24-6. For sandy soil: typical to coastal plain and sandhills of North Carolina, fertilizer rates should be increased by 20 percent. Where available, it is recommended that the design professional specify organic compounds that meet the fertilization requirements, pH and other element requirements. Initu studies have indicated that these compounds have a more positive effect on the environment than some of the synthetic compounds used to manufacture inorganic fertilizers. Theti materials are readily available in the commercial trade as well as found in recycled yard waste debris, sewerage sludge, lime -stabilized sludge and animal manures. Materials propose for use must be industry certified and/or privately tested and certified to be acceptable for proposed areas of use and application prior to approval. seeding mixture species Rate (lb/acre) Rye (grain) 120 Annual lespedeza (Kobe in Piedmont and Coastal Plain, Korean in Mountains) 50 Omit annual lespedeza when duration of temporary cover is not to extend beyond June. seeding dates Mountains -Above 2500 feet: Feb. 15 - May 15 Below 2500 feet: Feb. 1- May 1 Piedmont -Jan. 1 - May 1 Coastal Plain -Dec. 1 -Apr. 15 soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. table 6.10b temporary seeding Recommendations for summer 1•F69AR N®® � CURB ToReaomew OP�xi FROaArx MINAaN STf'"• •,•,•_• NCLtlOH» `'` WIRE FENCWG (lF APPUCA13L DEPTH = D NBDE THE taAG wum =w LENGTH = L a a e CURB OPENING INSTALLATION DETAIL INSTALLATION AND USE GUIDELINES *M 1WA"MM OF nE WET 8ACKal A CATCH SABN PULL 7HE GRATE FROM RE CATCH MM NO PLACETHE EM OW N THE CPEWML 4aREP "ICiES OF THE 00 AWW THE FRAW OF THE LAW -FW"M THE ORATE ON 71E BASH TO KEEP TM BAG N PLACE 4F 8mpB1r rs DOWELING 7W0RANGE REM01r OOMn M IT 6TOE TO BWff TIE NtErWA To F03KNE THE MET BAG 118Brf InNo PESrF8 OF P MAAE R FNMM1Hsi011GH THEe rt M LOOPS ON EMN SW OF TM BAG {FT THE BAG NO GRATE FROM THE CATCH 11AW -ToelvTrlHEsaFrBAc 4NACE 1NE BAo WH6E Ir a 70 BE BPrI® 4NOMA RERAR THROUGH THE 80TW11 STRAPS AND UFF j -7HiE BAGWLLI.FrfR01A 7HE BOr1OY NO POtat 017F 11E 881aEH1r CLEM our THE rHAG NO RNBE .RETURNTHEaw TOnS0RWft8{MPE NOFIACEnBNXBROTHEOOM BASH -THE NET 11W 6 A REUSABLE PFUXXJCF. WFM THE PROECr E 0019I.EnED. RBANETHE NLEr BAG FROM THE CATW 610015 NO CLERK STORE 7HE aa.ET BAGS OUT OF DIRECT SUNLAG T tWrL THE NEXT PRM)Wr WTMSCSiLL91001WA48THEPROVIO ,NBTALLNRWWAWAMD i®AOVNG THE aaET PRD sE0pIB1F BAG PRGotrCr ABNSIRIG7EDBY THE PRo rEcr BaralraalaeAa a+GrsN oN THE PRovrG®taTE oRAFralsa MUM senva aw PRODUCTS AREMNaFACIUR®GOP 2-17-2014 WC FM SHEET 1 OF 1 " » " HAKES GEO COMPONENTS Pit easase4sw- FAX 316747-lean eHANES',�­E--=l INLET PRO SEDIMENT BAG WIN,�r WQVEN FILTER FABRIC seeding mixture species German millet Rate (Ib/acre) 40 In the Piedmont and Mountains, a small -stemmed Sudangrass may be substituted at a rate of 50 lb/acre. seeding dates Mountains -May 15 -Aug. 15 Piedmont -May 1 -Aug. 15 Coastal Plain -Apr. 15 -Aug. 15 soil amendments Follow recommendations of soil tests or apply 2,000 lb/acre ground agricultural limestone and 750 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Refertilize if growth is not fully adequate. Reseed, refertilize and mulch immediately following erosion or other damage. SEEDING SPECS GENERAL NOTES: I. SEDMAENT FILTER OUTLET SWILL BE 16 INCHES HIGH BUT No TALLER THAN 18 INCHES. 2. CLASS 1 OR 2 RIP -RAP SHALL BE USED AND COVERED WITH 66 NCNES OF NCDOT #5 OR #57 WASHED STONE ON THE UPSLOPE SIDE. J. POSTS SWILL BE NO MORE THAN 4 FEET APART. 4. SITE OUTLETS AT ANY POW SMALL CONCEWRATED FLOWS ARE ANTICIPATED AND AT THE DIRECTiom OF THE INSPECTOR. 5. ONE ACRE MAXIMUM DRAINAGE AREA PER OUTLET. CLASS 1 OR 2 RIP -RAP Material organic Mulches Straw Wood chips Wood fiber Bark Corn stalks Sericea lespedeza seed -bearing stems nets and Mats' Jute net Fiberglass net Excelsior (wood fiber) mat Fiberglass roving Table 6.14a Mulching Materials and Application Rates Rate Per Acre Quality notes 1-2 tons Dry, unchopped, Should come from wheat or oats; unweathered; avoid spread by hand or machine; must weeds. be tacked down. 5-6 tons Air dry Treat with 12 Ibs nitrogen/ton. Apply with mulch blower, chip handler, or by hand. Not for use in fine turf. 0.5-1 tons Also referred to as wood cellulose. May be hydroseeded. Do not use in hot, dry weather. 35 cubic yards Air dry, shredded or Apply with mulch blower, chip hammer -milled, or chips. handler, or by hand. Do not use asphalt tack. 4-6 tons Cut or shredded in 4-6 Apply with mulch blower or by hand. in. lengths. Not for use in fine turf. 1-3 tons Green or dry; should contain mature seed. Cover area Heavy, uniform; woven Withstands waterflow. Best when of single jute yarn. used with organic mulch. Cover area Withstands waterflow. Best when used with organic mulch. Cover area Withstands waterflow. 0.5-1 tons Continuous fibers of Apply with a compressed air ejector. drawn glass bound Tack with emulsified asphalt at a together with a non -toxic rate of 25-35 gal/1,000 sq ft. agent. Chemical stabilizers2 Aquatain follow Aerospray manufacturer's Curasol AK specifications Petroset SB Terra Tack Crust 500 Genaqua 743 M-145 'Refer to Practice No. 6.30, Grass Lined Channels. 2Use of trade names does not imply endorsement of product. table 6.10c temporary seeding Recommendations for fall TONE 5 oa #57) MAINTENANCE NOTES: 1. FILTER OUTLETS SHALL BE INSPECTED BY THE nNANCALLY RESPONSIBLE PARTY OR HIS AGENT WMIEDtATELY AFTER EACH RAINFALL ANO AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE *AMEDMTELY. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED OR REMOVED iI. 3 SEDIMENT DtEPOSrrs SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE RAMER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SH.T FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE. PREPARED AND SEEDED. STONE WEIR OUTLET DETAIL NTS Not beneficial to plant growth. seeding mixture species Rate (lb/acre) Rye (grain) 120 seeding dates Mountains -Aug. 15 - Dec. 15 Coastal Plain and Piedmont -Aug. 15 - Dec. 30 soil amendments Follow soil tests or apply 2,000 lb/acre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. mulch Apply 4,000 lb/acre straw. Anchor straw by tacking with asphalt, netting, or a mulch anchoring tool. A disk with blades set nearly straight can be used as a mulch anchoring tool. maintenance Repair and refertilize damaged areas immediately. Topdress with 50 lb/acre of nitrogen in March. If it is necessary to extent temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal Plain) or Korean (Mountains) lespedeza in late February or early March. PROJECT TITLE: CONRAD FARMS PHASE 1 CON4AD FARM ROAD FORSM COMITY PFAFFrOWN, NORTH CAROLNA OWNER/DEVELOPER: D.R. HORTON, INC. 4006 OAKS PARKWAY, SUM IM HUI PONr, NC 27265 J1ESSCA MEYER 9ID-440•-290 -- vans 'neerin ,,,���'���`�`,,,�A„R0�'�--,,, 20 "'." gj g, Inc. ' _ Q� �e 6'�r' -Since 1974- SEAL - 18914 - - I Engineers Surveyors Planners 70 > ,= 4609 Dundas Drive Greensboro, NC 27407 Phone 336.854-8877 Fax 336-854-M76 INE°#� �IQ', °"" FIRM LICENSE #C-0168 PROJECT: 125-308 DESIGN BY: TTS DRAWN BY- TTS DWG: H:\DRAWINGS\D R HORTON\CONRAD FARMS\PH 1 LOT EROSION CONTROL XO.dwg SHEET DESCRIPTION: LOT EROSION CONTROL SCALE: 1"=60' DATE: JANUARY 31, 2017 REVISIONS: SHEET No.: 08/26/2019:ADD LOTS: 1-3. 10-12, 16-19, 46-47, 49-50, 52, 185 & 194-197 G 3 NCGOI SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01/19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING NCGO I GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE: 04/01/19 SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Anytime when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must Include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved by the Division. (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time of the inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event > 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event > 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event > 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (6) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a e Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses 140 CFR • Within 7 calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. (40 CFR 122.41(1)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase of grading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1,14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilintion Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). S. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. S. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. S. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. 1 tA r> NOn"�r"`�YMMDMK`o, EVIMXWW NOTING DancE (1R1Df NN.) ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER 1. ACTUAL LOCATION DETERMINED N RHD 2 TTE CONCRETE TVAS"OUr STRUCTURES SHALL SE WAKARIED WEN THE LIQUID ARDDII SOLD TEACWS TSN OF THE STRUCTURESCAPACITY. S.00NCRETE VAW40UT STRUCTME NEEDS TO BE ClF WY TWUfED WM SISIMUE HOISTS pE1110E. BELOW GRADE WASHOUT STRUCTURE ro (rYP) ORSTAPIES OWL HIGH PLASTIC LTNNG 1 SDE SLOPE LwWFLTRATION SOILSESUN IMP.) b sccTx,N ea (TTP.) OR STAPLES IIMMY DEVICE NOTRD DEVICE UC1DrL�I-) ,T 1. ACTUAL LOCATION DETEA1MED N FELD 2 THE CONCRETE W WIOUrsTRUCRRUEB ONALL I E WIDTANED WENTIE LIQND ANDOR SOLD REACHES PIA OF TM 9MUCTURES CAPACITY To PROVIDE ADEQUATE HQIBROCAPACITYWTHA ABOVE GRADE WASHOUT STRUCTURE NOTTOSCNE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. S. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlet(s) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. PROJECT TITLE: CONRAD FARMS PHASE 1 Cot~ FARM ROAD FORSYTH COMITY PFAFFrOWK NOM CAROLINA OWNER/DEVELOPER: D.R. HORTON, INC. 4= ME DEWiAl1 OAKS PAFMAY, SUTE 1D1 HIGH PorTlr, NC 272M JEBSICA bEYM 90-460-2M '1�► CARD vans ��� ,�� o� ...,I,I I,,,Z,, -% = -a gineering, Inc. -Since 1974 - _ s ".CIA - - - I Engineers Surveyors Planners A 18914 4W9 Dun" Drive Grembom NC 27407 # ""' Phase 336.854-8877 Fax 336.854-8876 Ili n, "° 0 �j IQr FIRM LICENSE #C-0168 PROJECT. 125-MB DESIGN BY: TTS DRAWN BY: TTS DWG: H:\DRAVANGS\D R HORTON\CONRAD FARMS\PH 1 LOT EROSION CONTROL 5.O.d SHEET DESCRIPTION: EROSION CONTROL DETAIL SHEET SCALE: 1"=60' DATE: JANUARY 31, 2017 REVISIONS: SHEET NO.: 02/27/2019: ADD LOT 88 08/26/2019-ADD LOTS: 1-3, 10-14 16-19, 46-47, 49-50. 52. 185 dL 194-197 3