HomeMy WebLinkAboutSW3190505_SIGNED SUPPLEMENT_9/24/2019SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name COURTYARDS ON LAWYERS ROAD 2 Project Area (ac) 50.337 3 {Coastal Wetland Area (ac) _ 4 !Surface Water Area (ac) _ 0 1.041 5 GIs this protect High or Low Density? 6 Does this project use an off site SCM? High No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) 100 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 0 12 Bioretention Cell 0 13 _ Wet Pond 2 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) __ 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Ba filter 0 26 1 Filterra 0 FORMS LOADED 12DESIGNER CERTIFICATION 27 Name and Title: VINCENT G. KEENE, PE 29 IStreet address: 30 ICitv, State, Ziq: 32 JEmail: PO BOX 1198 PINEVILLE, NC, 28134 WH.COM Certification Statement: i certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. %%$If 4i rrt CA_ROt PAS D� �o •••C �0• ®9 ''s f � 1� 637 a'Y„ ir•� �i i R'.•R• � Signatur .o ,..f D sig Date WET POND 1'Drainage area number 1 2 2Design volume of SCM (cu ft) GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? 124277 of 43037 cf Yes Yes 4 Is the SCM located away from contaminated soils? What are the side slopes of the SCM (H:V)? Does the SCM have retaining walls, gabion walls or other engineered side slopes? Yes Yes 5 3:1 3:1 6 No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? Yes Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes Yes 14 r15 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes Is there an O&M Plan that complies with General MDC (12)? Yes Yes 161 Does the SCM follow the device specific MDC? Yes Yes _ 17 Was the SCM designed by an NC licensed professional? WET POND MDC FROM 02H .1053 18 Method used Yes SA/DA Yes SA/DA 19 Has a stage/storage table been provided in the calculations? Yes Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 651.50 648.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 652.50 649.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 660.00 662.00 23 Elevation of the permanent pool (fmsl) 660.50 662.50 24 Elevation of the top of the vegetated shelf (fmsl) 661.00 663.00 25 Elevation of the temporary pool (fmsl) 667.97 669.87 26 Surface area of the main permanent pool (square feet) 21500 7600 27 Volume of the main permanent pool (cubic feet) 115025 of 47925 of 28 Average depth of the main pool (feet) 6.08 ft 7.12 ft 29 Average depth equation used Equation 3 Equation 3 301 If using equation 3, main pool perimeter (feet) 610.0 ft 336.0 ft 311 If using equation 3, width of submerged veg. shelf (feet) 5.0 ft 3.0 ft 32 Volume of the forebay (cubic feet) 22175 of 7350 of 33 Is this 15-20% of the volume in the main pool? Yes Yes 34 Clean -out depth for forebay (inches) 33 in 39 in 35 Design volume of SCM (cu ft) 124277 of 43037 of 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice, orifice diameter (inches) 18 in 24 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2 2 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes Yes 42 Are berms or baffles provided to improve the flow path? No No 43 Depth of forebay at entrance (inches) 86 in 98 in 44 Depth of forebay at exit (inches) 66 in 78 in 45 Does water flow out of the forebay in a non -erosive manner? Yes Yes 46 Width of the vegetated shelf (feet) loft 6 ft 47 Slope of vegetated shelf (H: V) 10:1 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No No 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non -clumping turf grass? - -- 53,Species of turf that will be used on the dam and embankment 54; Hasa planting plan been provided for the vegetated shelf? ADDITIONAL INFORMATION Please use this space to provide any additional information about the 55 wet pond(s): Yes Yes BERMUDA BERMUDA Yes Yes Wet Pond 1 6:57 AM 8/28/2019