HomeMy WebLinkAboutNCC192012_ESC Approval Submitted_20190924It is a direct violation of your approved plan to initiate
any land disturbing activities PRIOR to holding
scheduled Pre -Construction Conference (Pre -Con). To
prepare for this Pre -Coy follow these steps:
1.. Complete and submit an electronic Notice of Intent
(1' OI) form requesting a. Certificate of Coverage
(COC under the NCG010000 Construction
Storer water General Permit. See attached approval
letter for link to apply.
2. Receive your COC within 3 business days from.
DEMLR. (Email a copy of the COC to Danielle
Rudisill; drudisill lincolncoun .or )
3. Contact our office at 704-736-8501 to schedule your
Pre -Construction Conference prior to any land
disturbance. (A pre -con cannot be scheduled
without first obtaining a. COC from DEMLR) Your
copy of the approved plan and grading certificate
will be delivered to you and/or your grader onsite
at the meeting.
��U� ����U�� ����U���� N���������
��n�'u�� ��r�v�'��xn�'x� ������ SEDIMENTATION mn�'n� CONTROL
u�/�*��
Lincoln Natural Resources Department
115West Main Street, Linco|nNon.NC 28OQ27&4-736-B5O1 Fex:7Q4-73G-85O4
Project Name: Rivercross Offsitc Roadway Improvements
Submitted By: Arnerican Engineering Associates
Location: NC 16 Bus, Irlwy, Triangle Circle, Optimist Club Rd.
Watershed: CataNvba River Basin
Plan Type: Roadway I rnprovem e tits ....... ..... .......
Acres Approved: 7.31 acres . . .... . ..
Contact Office to Schedule Pre -Construction Conference Prior to Aily and
Disturbance
Date: 9/3/19
Hawthorne at Westport Apartments, LLC
c/o Phillip
806Green Valley Road, Suite 311
Greensboro, NC274O8
Dear Mr. Phillip Payonk,
This office has reviewed the subject Soil Erosion and Sedimentation Control Plan. We find the plan to be acceptable
and hereby issue this Letter of Plan Approval. If any modifications, performance reservations, or recommendations are
applicable, a list is enclosed and incorporated as a part of this letter of approval. If any modifications are not
incorporated into the plan and implemented in the field, the site will beinviolation of the Soil Erosion and Sedimentation
Control Ordinance of Lincoln County. This plan approval shall expire two (2) years following the date of approval, if no
land -disturbing activity has been undertaken, as is required by Lincoln County Soil Erosion and Sedimentation Control
0*dimam*a Section Q(b).
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCG011 0000 Construction Stormwater General
Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named
project. The NOhfonm may beaccessed ot . Please direct questions about the N0 form tmAnnette
Lucas orPaul Clark mi After you submit ocomplete and correct
ND| Form, mCOCwill beemmilwd iuyou within three business days, Initially, DEKHLRwiM not charge u fee for
coverage under the NCG81 permit. However, on or after August 1, 2019, a $100 fee will be charged annually. This fee
imtobosent tothe DEMLRStonnwaterCentral Office staff inRaleigh.
Title 1OANCAC4BD118(m)and the NCGO1 permit require that the following documentation, bekept omfile atthe
job site:
1.The approved E&SCplan mwwell anany approved deviation.
2. The NCGU1 permit and the COC, omum it is received.
3. Records otinspections made during the previous 3Qdays.
Also, this letter gives the notice required byG.S. 113A'611(x)and Lincoln County Soil Erosion and Sedimentation
Control Ordinance Section 11 (f) of our right of periodic inspection to insure compliance with the approved plan.
Lincoln County's Soil Erosion and Sedimentation Control Ordinance is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the Soil Erosion and
Sedimentation Control Plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51thmmQhGG)sndLinow|nCountySoi|Emaionand3edimantmdionContml
Ordinance Section 9Nl,thhs office may require revisions to the plan and implementation ofthe revisions ioinsure
compliance with the Act.
Acceptance and approval ofthis plan iuconditioned upon your compliancewith Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity, This approval does not supersede any other permit orapproval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the
information included onthe form.
Your cooperation is appreciated and we look forward to working with you on this project. If there are any questions,
please do not hesitate to contact this office at the above number.
le T. Rudisill, CPESC
' Erosion and Sedimentation Control Administrator
Lincoln County Soil and Water Conservation District