HomeMy WebLinkAbout20041810 Ver 1_Staff Comments_20090325Re: Review of Mitigation Projects 0C 0 C 1 3
?L ?U eC k- 0 2 G G(4 1 l G
Subject: Re: Review of Mitigation Projects
From: "Carolyn Prinz" <cprinzl@earthlink.net>
Date: Tue, 10 Mar 2009 11:16:53 -0400
To: "Tammy.L.Hill" <Tammy.L.Hill@ncmail.net>
Tammy, the 25th of March at your time convenience is fine for us for the site
visit. With regards to the monitoring reports, each report was sent by the
Engineer, The LPA Group, to both the NCDWQ and the US Army Corps of Engineers in
the Washington, NC offices. I would assume you can obtain the copies you need from
your Washington NC office. The engineer has completed the five years on the first
mitigation site, Rwy 2 Safety Area and the third of the five-year requirment on the
Taxiway realignment project.
I look forward to seeing you on the 25th!
Carolyn
----- Original Message ----- From: "Tammy.L.Hill" <Tammy.L.Hill@ncmail.net>
To: "Carolyn Prinz" <cprinzl@earthlink.net>
Sent: Tuesday, March 10, 2009 10:44 AM
Subject: Re: Review of Mitigation Projects
Hello, Carolyn! Thank you for working with me to coordinate a site visit at the
Pitt-Greenville Airport.
Our files contain mitigation plans and permitting documents for the two areas of
interest, which provided mitigation for impacts related to Runway 2 safety
improvements and Taxiway A realignment. If any monitoring was done after the
mitigation projects were permitted and implemented, I would appreciate receiving
copies of results if they are available.
I am looking at the afternoon of Wednesday March 25 for a site visit. Since both
areas are relatively small, I think that 3 hours (1:30 to 4:30pm) should provide
us with plenty of time to see them. Please let me know if this works for you.
If not, I would be glad to schedule another time that is more convenient for you.
Thanks again, and have a great day!
Warm regards,
Tammy
Tammy Hill
Environmental Senior Specialist
NC Division of Water Quality - Wetlands
2321 Crabtree Blvd., Suite 250
Raleigh, NC 27604
(919) 715-9052 - voice
(919) 733-6893 - fax
Tammy.L.Hill@ncmail.net
E-mail correspondence to and from this address may be subject to the North
Carolina Public Records Law and may be disclosed to third parties.
Carolyn Prinz wrote:
Good Afternoon.
Pursuant to correspondence dated 2/19/09 referencing DWQ's site visit, I was
wondering if you had some sort of time line for this visit. Additionally, as
these projects have been closed and archived, I will need to retrieve what
ever information the evaluators will need.
Can you provide me with a prospective date of their visit? We do have
several meetings scheduled for March and wanted to pencil in your schedule so
1 of 2 3/10/2009 12:08 PM
Re: Review of Mitigation Projects
as to have the required personnel on hand to assist the evaluators.
Thank you for your assistance in this matter.
Carolyn Prinz
Office Manager
252-758-4707 ext 24
2 of2 3/10/2009 12:08 PM