Loading...
HomeMy WebLinkAboutSW6190901_Application_20190920DEMLR USE ONLY Date Received Fee Paid Permit Number Applicable Rules: ❑ Coastal SW -1995 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Energy, Mineral and Land Resources STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans specifications, letters, operation and maintenance agreements, etc.): Hoke Landing Phase 2 2. Location of Project (street address): Corner of Club Pond Road and US 401 (Fayetteville NC) City:Raeford County:Raeford Zip: 28376 3. Directions to project (from nearest major intersection): 4. Latitude:35° 0' 20.76" N Longitude:791 10' 22.77" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ®New Modification ❑ Renewal w/ Modificationt tReneu)als with modifications also requires Sl VU-102 - Renezual Application Form b.If this application is being submitted as the result of a modification to an existing permit, list the existing permit number , its issue date (if known)_ and the status of construction: Not Started Partially Completed* ❑ Completed* *provide a designer's certification 2. Specify the type of project (check one): ❑Low Density ®High Density Drains to an Offsite Stormwater System Other 3. If this application is being submitted as the result of a previously returned application or a letter from DEMLR requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major ®Sedimentation/Erosion Control: ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit: Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ®No 0Yes If yes, see S.L. 2012-200, Part VI: httl2://12ortal.ncden.r.org/weMr/rules-and-regglation.-, Form SWU-101 Version Oct. 31, 2013 Page 1 of 6 III. CONTACT INFORMATION 1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the roject): Applicant/Organization: Hoke Landing 3 LLC Signing Official & Title:Trina Thompson Riddle Member Manager b. Contact information for person listed in item 1a above: Street Address:4200 Morganton Road Suite 150 City:Fayetteville State:NC Zip:28314 Mailing Address (if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email:riddlecommercial@aol.com Please check the appropriate box. The applicant listed above is: ❑ The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ® Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization:Trina T. Riddle joined by her husband Toseph P. Riddle III and Teri Henderson, Trusteee of the The Joseph P. Riddle III Descendants Trust U/A dated December 20 2012 Signing Official & Title:Trina T. Riddle; Teri Henderson Trustee b. Contact information for person listed in item 2a above: Street Address:4200 Morganton Road Suite 150 City:Fayetteville State:NC Zip:28314 Mailing Address (if applicable City: Phone: (910 ) 878-1266 Email:riddlecommercial@aol.com State: Zip: Fax: ( 1 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Or Signing Official & Title:_ b. Contact information for person listed in item 3a above: Mailing Address: City: Phone: ( 1 Email: State: Fax: Zip: 4. Local jurisdiction for building permits: Hoke County Point of Contact:Andy Connor Phone #: (910 ) 878-1266 Form SWU-101 Version Oct. 31, 2013 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. Site runoff will be collected in a pipe system and drained into a new stormwater wet detention basin The basin will collect runoff _from the new development as well as a portion from the existing development to offset areas of new development the cannot be drained to the new basin 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b. If claiming vested rights, identify the regulation(s) the project has been designed in accordance with. ❑ Coastal SW -1995 ® Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 8.23 acres 5. Total Coastal Wetlands Area: 0 acres 6. Total Surface Water Area: 0 acres 7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+: 8.23 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHM line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 73.34 % 9. How many drainage areas does the project have?l (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use I for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area Drainage Area Receiving Stream Name Beaver Creek _ _ Stream Class * C Stream Index Number * 18-31-19-5 Total Drainage Area (so 290,955 On -site Drainage Area (so 290,955 Off -site Drainage Area (so 0 Proposed Impervious Area** s 262,921 % Impervious Area** (total) 90.36 Impervious— Surface Area Drainage Area 1 Drainage Area _ Draina e Area _ Draina�;c Area On -site Buildings/Lots (sf) 25,714 On -site Streets (sf) On -site Parking (sf) 96,081 On -site Sidewalks (sf) 3028 Other on -site (sf) Future (sf) 138,101 Off -site (so Existing BUA*** (sf) Total (sf): 262,921 Stream Class and Index Number can be determined at: littportal.n/w cdetir.or g eb/wq/ps/csu/classi 'cations Impervi.a ous area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. Form SWU-101 Version Oct. 31, 2013 Page 3 of 6