HomeMy WebLinkAboutNCC191998_ESC Approval Submitted_20190923ROY COOPER
covemor
MICHAEL S, REGAN
Secrerary
S. DANIEL SMITH
Director
NOFMI CAFROI[ MA
Environmental Quality
Letter of Approval
BayWar.e. Solar Projects, LLC
ATTN: Dave Sanders, COO of BayWar.e. Solar Projects, LLC
17901 Von Karman Ave, Ste 1050
Irvine, CA 92614
RE: Project Name: Fern Solar
Project ID: EDGEC-2019-014
Acres Approved: 970
County: Edgecombe, City: Battleboro, Address: SR 1407,1415/1409
River Basin: Tar -Pamlico, Stream Classification: Other
Submitted By: The Timmons Group
Date Received by LQS- September 9, 2019
Plan Type: Revised
IN M101", 11' 111 ill, W'2' " 'Fn!
of any land disturbing activity on the above named project, The NOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at
AnnttLe.Iugaa@ngJLnr.Zpv or Paul Clark at ". a rkL .Q Of4Q-y. After you submit a complete and correct NOI form, a CPOC will be emailed to you within three business days. Initially, DEMLR will
not char,,,-Ae a fee for the coverage under the NLM-yxermit. However on or after 1—un-e-E,-M
fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in
Raleigh.
Ncwrih Cardina Department ofEnWronmemal Quality li DloslonofEnergy Mineral and Land Resources
UUgh Px9ionA Office l628Nfai1ServlceCcmcr 138001batirettDrNe 11 Udgh NomhCarolinaT7609
Letter of Approval
Bay Wa R.E. Solar Projects, LLC
September 16, 2019
Page 2 of 2
Title 1 SA NCAC 4B.011.8(a) and the NCGO1 peirimit require that the following documentation be kept
on file at the job sitter
1. The approved EMC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
1 Records of inspection rnade during the previous 30 days.
Also, this letteir gives the notice irequuired by G.S. 113A.-61.1(a) of our right of periodic inspection to
insuire compliance with the appiroved plain.
North Carolina's Sedimentation Pollution Control Act is per forma irice-ori ented, requiring protection of
existing natural resources and adjoining properties., If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute I 13A.-51 through 66), this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State -water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity, This approval does inot supersede any other perrnit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. You are requested to file an amended form if
there is any chainge in the information in on the form,, In additioin, [it would be helpful if you
notify this office of the proposed starting date for this project. Please notif .y us if you plain to have a
pireconstruction conference.
Your coopeiration is appreciated.
Sincerely,
i�
Saniiy Castle, El
Region,.:d Engineering Associate
DEMLPI',
Enclosures-, Certificate of Approval
NCGO I Fact Sheet
cc'' Daniel larnison, IPE (_d_Lt_n_grR Electronic Copy
DEIMI..,R — Raleigh Regional Office File