Loading...
HomeMy WebLinkAboutNCS000514_Inspection Report with Letter_20190920ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality September 20, 2019 Georgia Pacific Attention: Earl Dingess, EHS Coordinator & Bryce German Environmental Leader 100 Buckeye Drive Mt. Holly, North Carolina 28120 Subject: Compliance Evaluation Inspection Stormwater Certicate of Coverage - NCS000514 Gaston County, North Carolina Dear Mr. Dingess & Mr. German: Enclosed please find a copy of the Compliance Evaluation Inspection Reports for the inspection conducted at Georgia Pacific. The reports should be self-explanatory; however, should you have any questions concerning these reports, please do not hesitate to contact me at (704) 235-2147 or by email at christopher.graybeal@ncdenr.gov. Sincerely, qvv► ' J es Moore Assistant Regional Engineer Land Quality Section Enclosure c: Stormwater Permitting Program D_E North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources �� Mooresville Regional Office 1 610 East Center Avenue, Suite 301 1 Mooresville, North Carolina 28115 NQRTH CARQUNA MY /'�� 704.663.1699 Compliance Inspection Report Permit: NCS000514 Effective: 08/01/09 Expiration: 07/31/14 Owner: Georgia-Pacific Mt Holly LLC SOC: Effective: Expiration: Facility: Georgia Pacific Mt. Holly, LLC County: Gaston 100 Buckeye Dr Region: Mooresville Mount Holly NC 28120 Contact Person: Earl Gregory Dingess Title: Phone: 704-812-2234 Directions to Facility: System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 09/18/2019 Entry Time: 09:15AM Exit Time: 11:30AM Primary Inspector: Christopher Graybeal Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Complaint Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000514 Owner - Facility: Georgia-Pacific Mt Holly LLC Inspection Date: 09/18/2019 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Inspection Summary: There were no siginficant changes to facility operations since the last permit was issued. Georgia Pacific staff were professional and helpful. It is recommended that a new permit be issued with no changes in requirements as presented in the current expired permit. Page 2 of 3 Permit: NCS000514 Owner - Facility: Georgia-Pacific Mt Holly LLC Inspection Date: 09/18/2019 Inspection Type : Compliance Evaluation Reason for Visit: Complaint Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? 0 ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0. ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: All required documentation was available and reviewed Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? E ❑ ❑ ❑ Comment: Qualitative Monitorinq data was reviewed and current. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Analytical Monitoring data was reviewed and current. Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? 0 ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: All outfalls were observed and required documentation was available and reviewed. Page 3 of 3