Loading...
HomeMy WebLinkAbout20090107 Ver 2_Stormwater Plans_20090922LETTER OF TRANSMITTAL DEVELOPMENT CONSULTING SERVICES, INC. 1401 Aversboro Road, Suite 206 Garner, North Carolina 27529 (919) 329-0051 phone (919) 772-3437 fax OR - oi o 7 1@3@95W [a S E P $ 2 2009 DENR - WATER WALITY WETLANDS AND STORMWAM BRANCH To: Annette Lucas Company: DWQ Address: From: Dexter Howell Date: Tuesday, September 22, 2009 RE: Coates Asphalt Plant URGENT F-] Reply ASAP r - ] Please Comment F]Please Review A For Your Information COPIES DATE NO. DESCRIPTION 1 09/22/09 Set of Stormwater plans 1 09/22/09 Stormwater approval letter 1 09/22/09 Wet Detention Pond Calculations 1 09/22/09 Nitrogen Calculations 1 09/22/09 Drainage Calculations Comments: fandkn le""Wff DEPARTMENT OF PUBLIC UTILITIES POST OFFICE BOX 2263 SMITHFIELD, N.C. 27577 July 17, 2009 (919) 989-5075 Crossroads Development Corporation Attn: Mike Coates 12400 NC 50 N Willow Springs, NC 27592 Re: Coates Corporation Asphalt Plant Permit # 08-068 Stormwater Management Plan Dear Mr. Coates: We have reviewed the revised Stormwater Management Plan and calculations submitted for the proposed Coates Corporation Asphalt Plant. Based upon the information submitted, the stormwater management plan has been approved with the following stipulations: 1. Please provide our office a copy of the approval letter from NCDENR Land Quality for the Sedimentation and Erosion Control Plan. 2. Please provide our office a copy of the 401/404 Permit Approval for impacts associated with the stream crossing. 3. Once construction of the stormwater management facilities is complete, please provide a stormwater certification stating that all stormwater facilities were constructed in accordance with the approved stormwater management plan, 4. Please indicate all drainage easements, riparian buffers, jurisdictional wetlands, and flood hazard areas on the Final Plat. A 12' wide access easement shall be recorded from the public right-of-way to the pond. A 20' shall be recorded around the high water surface elevation of the pond. The easement shall extend around all edges of the pond including the pond forebay and outlet structure. 5. Please provide a copy of the recorded operation and maintenance agreement for the wet detention pond and the level spreader. A copy of this letter will be forwarded to the Planning Office for their files. If you have any questions or need additional information, please contact me at (919) 209-8333 or by email at jai-nic.guerrero(@-ioiijistojine.com. Since ely, amie Guerrero, PE Stormwater Administrator Cc: Berry Gray - Planner Chandra C. Coats, PE --- Utilities and Environmental Engineer Keith Roberts, PE - Development Consulting Services Printed on recycled paper co WET DETENTION POND COATES GRADING AND HAULING JOHNSTON COUNTY, NORTH CAROLINA JOHNSTON COUNTY PO BOX 2263 SMITHFIELD, NC 27577 SUBMITTED BY: DEVELOPMENT CONSULTING SERVICES, INC. 1401 AVERSBORO ROAD, SUITE 206 GARNER, NC 27529 (919) 329-0051 N e•""" ? BAR '`y SEAL 1 • 023728 .% 41- cLQ;.J ?. .x R #fee ASPHALT PLANT STORMWATER DETENTION POND DESIGN DRAINAGE AREA: 20-00 AC EXIST. IMP AREA: 0.00 AC 0.0% PROP. IMP. AREA: 9.00 AC 45.0% RUNOFF COEFFICIENT ( C ) Cpre= 20.00 AC x 0.25 + 0.00 AC x 1.0 = 0.25 20.00 AC Cpost= 11.00 AC x 0.25 + 9.00 AC x 1.0 = 0.59 20.00 AC STORM DATA STORM EVENT INTENSITY (I) PRECIPITATION DEPTH P 2 YEAR 5.76 in/hr 37" 10 YEAR 7.22 in/hr 5.8" 100 YEAR 10.00 in/hr 8.4" 2 YEAR STORM 10 YEAR STORM 100 YEAR STORM Qpre=CIA= 0.25 x 5.76 x 20.00 = 28.80 cfs Qpost=CIA= 0.59 x 5.76 x 20.00 = 67.68 cfs Qpre=CIA= 0.25 x 7.22 x 20.00 = 36.10 cfs Qpost=CIA= 0.59 x 7.22 x 20.00 = 84.84 cfs Qpre=CIA= 0.25 x 10.0 x 20.00 = 50.00 cfs Qpost=CIA= 0.59 x 10.0 x 20.00 = 117.50 cfs DETERMINE SOIL STORAGE CN= 98 x 0.50 + 55 x 0.10 + 61 x 0.40 = 79 S= 1000 -10 = 1000 -10 = 2 67" CN 78.9 . RUNOFF DEPTH Q* _ (P-0.2*S)2 (Q*) (P+0.8*S) Q* x DA x 43560 SF/AC TIME TO PEAK (Tp) Tp= 12 in/ft 1.39 x Qpost 2 YEAR STORM Q* _ (3.7 - 0.2 x 2.7 )^2 = 1 72 in (3.7 + 0.8 x 2.67) . . 1.72 in. x 20.00 AC x 43560 SF/AC Tp= 12 in/ft = 22.1 min. 1.39 x 67.68 cfs ? PEAK 67.68 cfs @ 22.1 min. 10 YEAR STORM Q* _ (5.8 - 0.2 x 2.7 )^2 = 3.49 in (5.8 + 0.8 x 2.67) . 3.49 in. x 20.00 AC x 43560 SF/AC _ Tp 12 in/ft = 35.8 min. 1.39 x 84 .84 cfs ? PEAK 84.84 cfs @ 35.8 min. 100 YEAR STORM Q* _ (8.4 - 0.2 x 2.7 )^2 = 5.87 in (8.4 + 0.8 x 2.67) . 5.87 in. x 20.00 AC x 43560 SF/AC _ Tp 12 in/ft 43.5 min. 1.39 x 11 7.50 cfs ? PEAK 117.50 cfs @ 43.5 min. ESTIMATE POND SIZE FOR 10 YEAR STORM Vpond = (Qpost-Qpre) x Tp + 40% Vpond =( 84.84 - 36.10) x 35.8 min. + 40% Vpond = 146,672 CF EMERGENCY SPILLWAY (SIZE FOR 100 YEAR STORM) Q100=CIA= 0.59 x 10.0 x 20.00 = 117.50 cfs WEIR EQUATION: Q=Cw*L*H^3/2 Cw= 3.0 Q= 117.50 cfs H= 1.00 L= Q = 117.50 cfs = 39.2' Cw*H^3/2 3.0 x 1^3/2 USE 40' EMERGENCY SPILLWAY TO CARRY 100 YEAR STORM SIZE ORIFICE Q10=CA?2GH Q10 = 36.10 cfs C = 0.93 G = 32.2 ft/s H = 2.5' A= Q100 C?2GH A=Pi*r2 r = 36.10 cfs = 3.06 S.F. 0.93 2*32.2*3 3.06 S.F. )= 11.84 in. 3.14 USE 12" DIAMETER ORIFICE ?raµ?dew rk baud o?1 Q= CA J 9? Q $ ( ?)? 4 a4) t?a2.z''CZ? .161 CPS vD?uoj- C? Z' dip 71, 7q4 ?F 21J?141946 +kia 32. y In,rS ai 1.ys ?j e A Z 9 k (` o n?li'ce ?la (.? ?ru l Q = 18 cFs . 18 cFS + . (ol e-FS , 3RS cfs 7- 2 t) 'L44 cF = 3006 way 2. a dau(S . 39S CFS M-111 Hydraflow Hydrographs by Intelisolve Wednesday, Jul 8 2009, 1:9 PM Pond No. 1 - Asphalt Plant Pond Data Pond storage is based on known contour areas. Average end area m ethod used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 260.00 8,443 0 0 1.00 261.00 8,585 8,514 8,514 2.00 262.00 8,976 8,781 17,295 3.00 263.00 9,568 9,272 26,567 4.00 264.00 10,205 9,887 36,453 5.00 265.00 11,375 10,790 47,243 6.00 266.00 12,307 11,841 59,084 7.00 267.00 12,739 12,523 71,607 8.00 268.00 14,284 13,512 85,119 Culvert / Orifice Structures Weir Structures [A] IBl [C] [D] [A] [B] [C] [D] Rise (in) = 48.00 4.00 0.00 0.00 Crest Len (ft) = 24.00 0.00 0.00 0.00 Span (in) = 48.00 4.00 0.00 0.00 Crest El. (ft) = 266.00 0.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 260.00 260.00 0.00 0.00 Weir Type = Riser --- --- --- Length (ft) = 60.00 0.00 0.00 0.00 Multi-Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif. Coeff. = 0.60 0.60 0.00 0.00 Multi-Stage = n/a Yes No No Exfiltration = 0.000 in/hr (Co ntour) Tailwater Elev. = 0.00 It Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Weir riser checked for orifice conditions. Stage (ft) Stage / Storage Stage (ft) 8.00 6.00 4.00 2.00 0 00 8.00 6.00 4.00 2.00 0 00 0 9,000 18,000 27,000 36,000 45,000 54,000 63,000 72,000 81,000 90,000 Storage Storage (cuft) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Wednesday, Jul 8 2009,11:17 PM Hyd. No. 4 Asphalt Plant Hydrograph type = Reservoir Peak discharge = 50.39 cfs Storm frequency = 100 yrs Time interval = 1 min Inflow hyd. No. = 3 Max. Elevation = 266.73 ft Reservoir name = Asphalt Plant Max. Storage = 68,187 cuft Storage Indication method used. Q (cfs) 100.00 80.00 60.00 40.00 20.00 Hydrograph Volume = 95,594 cult 0.00 0.0 Q (cfs) 100.00 80.00 60.00 40.00 20.00 n M 1.7 3.3 5.0 6.7 8.3 10.0 11.7 13.3 15.0 16.7 18.3vvv Time (hrs) Hyd No. 4 Hyd No. 3 [111..1.1..1.IH Req. Stor = 68,187 cuft NITROGEN CALCULATIONS COATES GRADING AND HAULING-ASPHALT PLANT JOHNSTON COUNTY, NORTH CAROLINA JOHNSTON COUNTY PO BOX 2263 SMITHFIELD, NC 27577 SUBMITTED BY: DEVELOPMENT CONSULTING SERVICES, INC. 1401 AVERSBORO ROAD, SUITE 206 GARNER, NC 27529 (919) 329-0051 eA?e,?eeeeeeeee®? .?? Gq,? ?' ??dgc Wiplf??i ®Aa1 y-AL coq n ?J o"-s%1 C ? b th r tea' e ? ! e' ? o.?;4A 'f ,,'''+++ 1 ?O•'Y'v,','y Method 2 is for residential, commercial and industrial developments when the entire footprint of the roads, parking lots, buildings and any other built-upon area is shown on the site plans. This method is simpler and more accurate since it does not require estimating the impervious surface. Method 2 is shown in Exhibit 3-2. Exhibit 3-2 Method 2 for Quantifying TN Export from Residential / Industrial / Commercial Developments when Footprints of all Impervious Surfaces are Shown Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2). Step 3: Multiply the areas in Column-(2) by the TN export coefficients in Column (3) and enter in Column (4). Step 4: Total the TN exports for each type of land use and enter at the bottom of Column (4). Step 5: Determine the export coefficient for site by dividing the total TN export from uses at the bottom of Column (4) by the total area at the bottom of Column (2) and enter the result at the bottom of Column (5). 'Pond (I) (2) (3) (4) (5) Type of Land Cover Site TN Export TN Export TN Export Area Coeff. by Land Use From Site Acres Ibs/ac/ r Ibs/ r Ibs/ac/ r Permanently preserved undisturbed 6 t t, open sace forest unmown meadow Permanently preserved managed c -1 sv 1.2 p open sa e (grass, landscaping, etc. Impervious surfaces (roads, parking 21 2 lots, driveways, roofs, paved storage 3 , 9 Z . 83, / areas, etc. Total Ig, 3 4 96.25 Average for Site S• 26 Method 2 is for residential, commercial and industrial developments when the entire footprint of the roads, parking lots, buildings and any other built-upon area is shown on the site plans. This method is simpler and more accurate since it does not require estimating the impervious surface. Method 2 is shown in Exhibit 3-2. Exhibit 3-2 Method 2 for Quantifying TN Export from Residential / Industrial / Commercial Developments when Footprints of all Impervious Surfaces are Shown Step 1: Determine area for each type of land use and enter in Column (2). Step 2: Total the areas for each type of land use and enter at the bottom of Column (2). Step 3: Multiply the areas in Column-(2) by the TN export coefficients in Column (3) and enter in Column (4). Step 4: Total the TN exports for each type of land use and enter at the bottom of Column (4). Step 5: Determine the export coefficient for site by dividing the total TN export from uses at the bottom of Column (4) by the total area at the bottom of Column (2) and enter the result at the bottom of Column (5): (?) (2) (3) (4) (5) Type of Land Cover Site TN Export TN Export TN Export Area Coeff. by Land Use From Site Acres Ibs/ac/ r Ibs/ r Ibslac/ r Permanently preserved undisturbed f fo ?? 0.6 3 g8 open sace orest unmown meadow . Permanently preserved managed % open space (grass, landscaping, etc. - 1'2 t Impervious surfaces (roads, parking 21 2 lots, driveways, roofs, paved storage t : ?Z . g 8 areas, e c ., Total . ' 2.1 E3 Average for Site ?? c? 5 GraaL? Ag aLAJ ?inq - A-s-phxcul+ p (aA)t 'V i T(ro qe n l.Q,t Ct? ? c?'?tia-wS S 1 o rnn y VYY?,I rt i t c? Tb De?-,ev, I >o r., o( l?Cre 5 ?. 3l4 TkJ 6y?pr?' 1 awd use w? 3S% ?ed,«?? - (02-.-56 7+ 5?-ormwo?? ?Qa ?; H g -}-a 3v sr ?'w kcr+es - (o . 88 I "Z . 7 8 ?y load use row VouCu?a??enS Srov. sire. Rcre"s - 25.22 TO 67,c po,} 3y by IOIAO( Use 11-TO bUXpor+ SnrovvA. Si -?5.3q / Z,46. -17- = 3.99 buy 'Do V-> A, 3.019 -- 3 . (Q 0.39 Ceso . s o?? 25.22-7 = t3,3&5.35 DRAINAGE CALCULATIONS COATES GRADING AND HAULING-ASPHALT PLANT JOHNSTON COUNTY, NORTH CAROLINA JOHNSTON COUNTY PO BOX 2263 SMITHFIELD, NC 27577 SUBMITTED BY: DEVELOPMENT CONSULTING SERVICES, INC. 1401 AVERSBORO ROAD, SUITE 206 GARNER, NC 27529 (919) 329-0051 ??p9q?gg1/1Q/1ff// peen ?,aR /ass 023728 r ? M Ra$ jIh/1111,,,,•1 ASPHALT PLANT Storm Drainage Pipe Inlet DA EDA C I (in/hr) Q (cfs) Size Length Hw H CB #1 1.65 1.65 0.8 8.5 11.2 24" 20' 0.9 0.1 CB #2 10.08 10.08 0.63 8.5 54.0 2-30" 16' 1.0 0.3 CB #3 0.38 0.38 0.8 8.5 2.6 24" 16' 1.3 0.4 CB #4 0.89 1.11 0.8 8.5 7.5 18" 64' 0.5 0.1 FES#1 4.44 4.44 0.41 8.5 15.5 24" 96' 0.3 0.1 FES#1A 0.3 4.74 0.8 8.5 32.2 36" 76' 0.4 0.1 FES#2 0.22 0.22 0.8 8.5 1.5 15" 88' 0.5 0.2 FES #3 0.38 1.49 0.8 8.5 10.1 24" 112' 0.5 0.1 HW #1 * 294.26 294.26 72" 44' 0.5 0.1 84" 44' HW #2* 56.19 56.19 54" 46' 0.5 0.2 *Pipe designed using NC Map of Hydrological Contours Dissipators Outlet @ Q (cfs) Pipe Size Slope Vel (fps) Dissipator D50 CB #1 11.2 24" 2.5% 4.5 4.5'x6'x18" 6" CB #2 54.0 2-30" 3.1% 2.7 4.5'x6'x18" 6" CB #3 2.6 24" 4.2% 10.0 4.5'x9'x24" 13" CB #4 7.5 18" 0.5% 10.1 4.5'x9'x24" 13" FES#1 15.5 24" 2.5% 7.5 9'x18'x18" 6" FES#1A 32.2 36" 2.5% 6.0 4.5'x6'x18" 6" FES#2 1.5 15" 2.7% 4.8 4.5'x6'x18" 6" HW #2* 98.73 54" 1.0% 14'x27'x30" 23" FES #3 10.1 24" 0.5% 12.0 4'x8'x24" 13" HW #1 * 423.1 72"&84" 1.0% 28'x65'x30" 23" Asphalt Plant - DITCH PROTECTION Street Name STA Da C I Q10(cfs) Slope Matting Type From To Commercial Offsets * LT 14+00 15+75 0.39 0.45 7.22 1.27 0.75% unreinforced RT 14+00 15+75 0.08 0.45 7.22 0.26 0.75% unreinforced * LT 15+75 17+25 0.33 0.45 7.22 1.07 3.50% C350-Staple E RT 15+75 17+25 0.08 0.7 7.22 0.40 3.50% C350-Staple E LT 17+25 19+50 0.12 0.7 7.22 0.61 5.75% C350-Staple E * RT 17+25 19+50 0.32 0.45 7.22 1.04 5.75% C350-Staple E LT 19+50 HW-2 0.06 0.7 7.22 0.30 0.50% unreinforced RT 19+50 HW-2 0.40 0.45 7.22 1.30 0.50% unreinforced LT HW-1 HW-2 0.08 0.7 7.22 0.40 0.50% unreinforced RT HW-1 HW-2 0.08 0.7 7.22 0.40 0.50% unreinfroced LT 28+00 HW-1 0.13 0.7 7.22 0.66 2.90% C125 RT 28+00 HW-1 2.23 0.4 7.22 6.44 2.90% C350-Staple E LT INT 28+00 0.14 0.7 7.22 0.71 1.50% C125 * RT INT 28+00 3.13 0.4 7.22 9.04 1.50% C350-Staple E * Analysis attached North American Green ECMOS Version 4.3 /21/2009 1Q46AM MPUTEDBY: JDH PROJECT NAME..:. Asphalt Plan(., ______ OJECT,NO. FROM STATION/REACH: INT TO STATIOWREACH: 26.00 DRAINAGE AREA: 3.13 ESIGN FREQUENCY: HYDRAULIC RESULTS Discharge ds Peak Flow Petiod hrs Velocity (fps) Area (s41Q Hydraulic Radiu It Normal Depth ft 9.0 0.1 1.48 6.09 0.68 1.42 C350 tn-0 3001 S-0.1500 1 golio I WidthOOft Not to Scale Reach Malting Type Stability Analysis Vegetation Charactetislics Permissible Calculated Safety Factor Remarks Staple Pattern Phase Class Type Density Shear Stress (PSI) Shear Stress (psfl Straight C350 Vegetation 2 C Bunch 50.75% 10.00 13.34 0.75 UNSTABLE StapleE Sod Clay Loam 3.000 0.048 63.12 STABLE Eay io:lnput Scrmn Discharge Peck Flow Velocity (fps) Area (sq.lt) Hydraulic Normal cfs Period hrs R_adiuslltl. Depth (It) .1 0.1 1.20 0.92 0.26 0.55 C350 (n-0 3001 S-0.3500 1 to 3.01 Not to Scale Reach Malting Type Stability Analysis Vegetation Characteristics Permissble Calculated Usty Factor Remarks Staple Pattern Phase Class Type Densely Shear Stress (psi Shear Stress (psi) Straight C350 Vegetation 2 C Bunch 50.75% 10.00 12.07 0.83 UNSTABLE StapleE Sod Clay Loam 3.000 0.129 23.33 STABLE 2a?-t la LrFr/.`.unen... North American Green - ECMDS Version 4.3 V210009 J 1 D52 AM COMPUTED BY: JDH _ PROJECT NAME;. Asphalt Plan) . __ OJ.E..C..T.NO . FROM STATION/REACH: 17+25 ! TO STATION/REACH: 19+50 DRAINAGE AREA: ,32 ESIGN FREQUENCY: HYDRAULIC RESULTS Discharge ds Peak Flow Period Ms Vebeity(fps) Area(srl.01 Hydraulic Radu ft Namal ft Depth 1.0 0.1 1.41 0.71 0,23 0.49 (n-0 300) S -0+5750 Bottom JI 1L 'Width-0.00ft 301 Not to Scale Reach Matting Type Stability Analysis Vegetation Characteristics Permissible Calculated Safely Factor Remarks Staple Pattern Phase Class Type Density Shear Stress (Psf) Shear Stress (PSI) Straight C350 Vegetation 2 C Bunch 5075: 10.00 17.43 0.57 UNSTABLE Staple E Sod Clay Loam 3.000 0.195 15.36 STABLE Fait ra I??pt Srsern North American Green - ECMDS Version 4.3 4/21 /2009 1111 AM COMPUTED BY: JDH PROJECT NAME. As[Jmll Ptanl PROJECT NO.- FRQM STATIUN,REACH: 14+00 TU STATIONIREACH: 15.75 DRAINAGE AREA:.39 ESIGN FREQUENCi. HYDRAULIC RESULTS Urveinlorced Vegetation In-03001 Discharge Peak Flow Vebcily (Ips) Area (sq.ll) ic Normal cls Period hrs lal, Radius1tl De lh ft .3 0.1 0.70 1.85 0.37 0.79 S-0.0750 gotto 1I 'Width-(?.00II 1 Not to Scale Reach Matting Type Slability Analysis Vegetation Chataclerislics Permissible Calwlaled Safely Factor Remarks Staple Pattern Phase Class Type Density Shear Stress (psQ Shear Stress (PSI) Straight Unreittorced Vegetaon C Bunch 50.15%. 4.20 3.68 1.14 STABLE Sod Clay Loam 0.050 0.006 8.39 STABLE Back to lnpk S j ??S ? t?l YlS Q.Np? CiRMn.I KS i p + Scow. l(? 1 ?,SSCFs t3asc -S)( 2- 0' x ' ??? rah on SCow, ho??? 5 kJJ C bass (dso ` 8 ?/ SKIMMER DESIGN SEDIMENT BASIN # 1 SEDIMENT BASIN VOLUME: 14 .142.0 0.2: o. t 1000 --4 0.25 day -f- 0.5 day - I day 2 days -E- 3 days 7 days ---}-- 5days 10 days 10000 100000. 1000000 N SKIMMER ORIFICE DIAMETER:. ?' ZS SKIMMER DESIGN SEDIMENT BASIN # X31 4 SEDIMENT BASIN VOLUME: 1128 0.21 4 M SKIMMER ORIFICE DIAMETER:. - 7 5 o. 1000 10000 100000, 1000000