Loading...
HomeMy WebLinkAboutWQ0024569_Staff Report_20190919 '4o ROY COOPER Governor 2 MICHAEL S.REGAN a Secretary LINDA CULPEPPER NORTH CAROLINA Direcrar Environmental Quality To: ❑ NPDES Unit® Non-Discharge Unit Application No.: WQ0024569 Attn: Poonam Giri Facility name: 7050 Sparrow Run Lane SFR County: Orange From: Jane R.Bernard Raleigh Regional Office Note: This form has been adapted from the non-discharge facility staff report to document the review of bath non- discharge and NPDES permit applications and/or renewals. Please complete all sections as they are applicable. I. GENERAL AND SITE VISIT INFORMATION 1. Was a site visit conducted?®Yes or❑ No a. Date of site visit:Member 17, 2019 b. Site visit conducted by: Jane Bernard c. Inspection report attached? ❑Yes or® No d. Person contacted: Brantley and Sons and their contact information: ( 919) 369 - 3S80 ext. e. Driving directions: 2t Discharge Point(s): Latitude: Longitude: Latitude: Longitude: 3. Receiving stream or affected surface waters: Classification: River Basin and Sub-basin No. Describe receiving stream features and pertinent downstream uses: H. PROPOSED FACILITIES: NEW APPLICATIONS 1. Facility Classification: (Please attach completed rating sheet to be attached to issued permit) Proposed flow: Current permitted flow: 2. Are the new treatment facilities adequate for the type of waste and disposal system?❑Yes or❑ No If no, explain: 3. Are site conditions (soils,depth to water table,etc.) consistent with the submitted reports? ❑Yes❑ No ❑ N/A If no,please explain: 4. Do the plans and site map represent the actual site (property lines,wells, etc.)? ❑Yes❑ No❑ N/A If no,please explain: 5. Is the proposed residuals management plan adequate? ❑Yes❑ No ❑ N/A If no,please explain: — � North Carolina Department of Environmental Quality I Division of Water Resources rRaleigh Regional Office 1 38008amtt Drive I Raleigh.North Carolina 27609 6m+swaw: aams\ �� 919.791.4200 6. Are the proposed application rates (e.g.,hydraulic,nutrient) acceptable? ❑Yes❑ No ❑ N/A If no,please explain: 7. Are there any setback conflicts for proposed treatment,storage and disposal sites? ❑Yes or❑ No If yes,attach a map showing conflict areas. 8. Is the proposed or existing groundwater monitoring program adequate? ❑Yes ❑ No ❑ N/A If no, explain and recommend any changes to the groundwater monitoring program: 9. For residuals,will seasonal or other restrictions be required? ❑Yes❑ No ❑ N/A If yes,attach list of sites with restrictions (Certification B) Describe the residuals handling and utilization scheme: 10. Possible toxic impacts to surface waters: 11. Pretreatment Program (POTWs only): III.EXISTING FACILITIES: MODIFICATION AND RENEWAL APPLICATIONS 1. Are there appropriately certified Operators in Charge (ORCs) for the facility?❑Yes❑ No ® N/A ORC: Certificate#: Backup ORC: Certificate#: 2. Are the design,maintenance and operation of the treatment facilities adequate for the type of waste and ❑ disposal system? ®Yes or No If no,please explain: Description of existing facilities: Proposed flow: Current permitted flow: Explain anything observed during the site visit that needs to be addressed by the permit,or that may be" important for the permit writer to know(i.e., equipment condition,function,maintenance,a change in facility ownership, etc.) Property setbacks and waivers are in question. 3. Are the site conditions (e.g.,soils,topography, depth to water table,etc.) maintained appropriately and adequately assimilating the waste? ®Yes or❑ No If no,please explain: 4. Has the site changed in any way that may affect the permit(e.g.,drainage added,new wells inside the compliance boundary,new development, etc.)? ❑Yes or® No If yes, please explain: S. Is the residuals management plan adequate? ®Yes or❑ No If no,please explain: 6. Are the existing application rates (e.g.,hydraulic, nutrient) still acceptable?®Yes or❑ No If no,please explain: 7. Is the existing groundwater monitoring program adequate? ❑Yes❑ No® N/A If no,explain and recommend any changes to the groundwater monitoring program: 8. Are there any setback conflicts for existing treatment,storage and disposal sites? ❑Yes or® No If yes,attach a map showing conflict areas. 9. Is the description of the facilities as written in the existing permit correct? ®Yes or❑ No If no,please explain: 10. Were monitoring wells properly constructed and located? ❑Yes❑ No® N/A If no,please explain: 11. Are the monitoring well coordinates correct in BIMS? ❑Yes❑ No ® N/A If no,please complete the following (expand table if necessary): Monitoring Well Latitude Longitude O , „ O , 11 O 1 „ O , II O , „ O , 11 O , II O , 11 O , „ O , 11 12. Has a review of all self-monitoring data been conducted (e.g., DMR, NDMR,NDAR, GW)? ❑Yes or® No Please summarize any findings resulting from this review: Provide input to help the permit writer evaluate any requests for reduced monitoring,if applicable. 13. Are there any permit changes needed in order to address ongoing BIMS violations? ❑Yes or® No If yes, please explain: 14. Check all that apply: ®No compliance issues ❑ Current enforcement action(s) ❑ Currently under JOC ❑Notice(s) of violation ❑ Currently under SOC ❑ Currently under moratorium Please explain and attach any documents that may help clarify answer/comments (i.e., NOV, NOD,etc.) If the facility has had compliance problems during the permit cycle,please explain the status. Has the RO been working with the Permittee? Is a solution underway or in place? Have all compliance dates/conditions in the existing permit been satisfied? ®Yes ❑ No❑ N/A If no,please explain: 15. Are there any issues related to compliance/enforcement that should be resolved before issuing this permit? ❑Yes® No ❑ N/A If yes,please explain: 16. Possible toxic impacts to surface waters: - 17. Pretreatment Program (POTWs only): IV. REGIONAL OFFICE RECOMMENDATIONS 1. Do you foresee any problems with issuance/renewal of this permit? ❑Yes or® No If yes,please explain: 2. List any items that you would like the NPDES Unit or Non-Discharge Unit Central Office to obtain through an additional information request: Item Reason 3. List specific permit conditions recommended to be removed from the permit when issued: Condition Reason 4. List specific special conditions or compliance schedules recommended to be included in the permit when issued: Condition Reason 5. Recommendation: ❑ Hold, pending receipt and review of additional information by regional office ❑ Hold,pending review of draft permit by regional office ❑ Issue upon receipt of needed additional information ® Issue ❑ Deny(Please state reasons: ) 6. Signature of reportpreparer: 9' Signature of regional supervisor: Date: V. ADDITIONAL REGIONAL STAFF REVIEW ITEMS Please see the attached man and drawings. 7050 Sparrow Run Lane Orange County t, `k 41 i c Z i n Yy i i } ra Yf3� y§ n _ tl, nn t 105 Centerville Court Wake County, NC-DWR Project # AA A A . , CM m i. %� c5 g 3 a � a �� � Wiz• Feature , . a ` ,.i+14fC kF Y48 p y�y NRCS Soil Survey Sheet 46 Wake Co., NC 1970 f {. �•'' y ::Locations are approximate t Legend: ,{` . ; and are provided for refer- y1 / �• a f1f7 ence only:: IWv -project boundary •��.gd 0 rid 26 171 67` //�, 35 .. ."`6_'✓"'.- ::r '.= a f S�' i rye` .I G.O yy G t Z 3 CA. G:o NOM6t'rE van t � f J sv �.FNCSXH40CM`TM¢4§"§ i. �` �� � CEYfER CFItV'KP� �d� 4ASEE ORw,yECIIAN OT.tdJ f t t I}y �1 1. � F. r ' PTYPJFR M waiENR FIELD, pER.NCO x -