Loading...
HomeMy WebLinkAboutNCC191934_NOI Application_20190919Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 9/16/2019 3:56:32 PM (NCG01 NOI Submission) Approve by Georgoulias, Bethany 9/17/2019 6:01:24 PM (Review- Construction NOI 15954) * Only the first page of the E&SC letter was uploaded with the application (contained all the info but did not have signed second page). Reviewer obtained revised scan of letter from applicant on 911712019 and will add it to the COC file upon issuance. • The task was assigned to Georgoulias, Bethany by round robin distribution 9/16/2019 3:56 PM The task was assigned to DEMLR NCG01 NOI Review Team. The due date is: September 18, 2019 5:00 PM. The priority is: High 9/16/2019 3:56 PM Submit by McCoy, Suzanne 9/19/2019 8:45:48 AM (Payment Verification for NCC191934) Scott Guess • McCoy, Suzanne assigned the task to McCoy, Suzanne 9/19/2019 8:45 AM • The task was assigned to DEMLR NCG01 Payment Team. The due date is: October 29, 2019 5:00 PM. The priority is: High 9/17/2019 6:01 PM STME NORTH CAROLINA Ernvlronmentol qualily A. Project Information Part A. Project Location and Waterbody Inforrration 1. Project Name * Custom Extrusion 2. County* Randolph 3. Highway or Street 2971 Taylor Dr Address * Street name only is acceptable if no address nurrtrer assigned yet 4. City or Township* Asheboro 5. State * NC !I"i)iTII1T7i)ilFill (-_TiIa1010 6. Zip Code* 27205 7. Latitude * Enter the latitude in decirral degrees 35.7796 8. Longitude * Enter the longitude in decirral degrees (MIST be negative) -79.8173 If you do not know the latitude and longitude coordinates for this project, you can search the location on this map of North Carolina. Look for the coordinates in the bottom left corner. 9. Date to Begin* 10/07/2019 Estimated Construction Project Start Date 10. Date to End* 04/24/2020 Estimated Construction Project End Date 11. SIC (Primary)* Commercial (1542) Standard Industrial aassification for Development 12. Acres to be 7.00 disturbed* (including off -site borrow and waste areas) 13. Total site area 12.00 (acres)* 14. Post- 3.50 construction (Estimated) impervious area (acres) * NCC Project NCC-RANDO-2019-Custom Extrusion Tracking ID Assigned autorratically Below you must enter waterbody information for surface waters affected by this project. Please consult DWR's Surface Water Classifications Map Viewer to find waterbody name and corresponding index number. Please enter only immediate receiving waterbodies - not waters downstream of those unless the project extends there. You may enter up to 3 waterbodies if needed. 15a. Receiving Back Creek Wate rbody* Barre of waterbody into which stormuater runoff will discharge 15b. Waterbody 13-2-3-3-(0.3) Index No.* NC Waterbody Index Nanber Stormwater W No discharges will flow F Yes to additional wate rs * 16a. Is this project F Yes subject to the NC r No, not subject to NC SPCA Sediment Pollution Control Act?* B. Permittee Information Part B. Perrrittee Information - Legally Responsible Entity and Individual ..................................................................................................................................................................... h Important: The person who signs the NOI Certification Form and signs the Certification in Section E of this application form should be the same person as listed in THIS SECTION, or an authorized responsible individual within the same organization. That person must be a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. 1. Organization Custom Extrusion, LLC Name * 2. First Name* Gralen ff Corporation, enter Registered Agent First l\b e 3. Last Name * Cranford ff Corporation, enter Registered Agent Last Barre 3b. Title Agent 4. Permitee E-mail jgc-customextrusion@northstate.net Address* 5. Permittee 3364604718 Telephone No.* 6. Permittee Mailing Street Address Address* 2971 Taylor Drive Address Line 2 City Asheboro Postal / Zip Code 27203-0554 Check box if the street address the same as mailing address 7. Permittee Street Address* fJ Yes Street Address 2971 Taylor Drive Address Line 2 City Asheboro Fbstal / Zip Code 27203-0554 State / Province / Region NC Country us State / Province / Region NC Country us C. Site Contact Information Part C. Froiect Site Contact hfornation 1. Type of Non -Government Ownership* 2. Primary Site Taylor Contact - First Name * 3. Primary Site Trogdon Contact - Last Name * 4. Title 5. Site Contact E- taylort@triadbiz.rr.com mail Address* 6. Site Contact 3363821660 Telephone No.* 7. Organization Name 8. Site Contact Street Address Mailing Address* 150 W Kivett St #6321 Address Line 2 city Asheboro Pbstal / Zip Code 27203 9. Consultant Name (optional) First and Last nane 10. Consultant E- This person will be copied on all correspondence. mail 11. Consultant Telephone No. State / Province / P egion NC Country United States D. E&SC Plan Part D. Erosion & Sediment Control (E&SC) Ran Approval Information ....................................................................................................................................................................................................................................... 1. Date E&SC Plan 09/04/2019 Approved * 2. E&SC Plan Project Rando-2020-003 Number/ID* Assigned by agency or local program 3. E&SC Plan f• State DEQ Office Approved by r Local Program 4. State DEQ Office * Winston-Salem (WSRO) Documentation of E&SC Plan approval and the signed Notice of Intent (NOI) Certification Form is required for a complete application. 5. E&SC Plan Approvl Letter.pdf 146.99KB Approval Mist be PCFfornat letter/documentation 6. NOI Certification Signed NOI.pdf 85.65KB Form Mist be RDFfornat This is an Express f No Review Project* r Yes E. Certification North Carolina General Statute 143-215.613 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowinglymakes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). Under penalty of law, I certify that: rJ I am the person responsible for the construction activities of this project, for satisfying the requirements of this permit, and for any civil or criminal penalties incurred due to violations of this permit. * rJ The information submitted in this NOI is, to the best of my knowledge and belief, true, accurate, and complete based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information. * I7 I will abide by all conditions of the NCG010000 General Permit and the approved Erosion and Sediment Control Plan. * rJ I hereby request coverage under the NCG010000 General Permit and understand that coverage under this permit will constitute the permit requirements for the discharge(s) and is enforceable in the same manner as an individual permit. Specify if you are:* r The Responsible Person named on this Notice of Intent r Authorized Responsible Person* Important: The person who electronically signs this Certification above must be the same person who signs the NOI Certification Form. If that person is signing on behalf of the Permittee, that individual must be an authorized responsible person within the same organization as the Permittee. *An authorized individual is a responsible corporate officer who owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name * Gralen Cranford Title Agent Organization Custom Extrusion, LLC Date * 09/16/2019 F. Tracking and COC Info NOI Tracking No. 15954 NC Reference No. NCG01-2019-1934 Uses 'count number variable (incremented by SP) Certificate of NCC191934 Coverage (COC) Uses 'count _nunber'variable (increrrented bySP) No. * Count Number 1934 Sequential nunber for subrrittal that is incremented by Stored Procedure COC Year 2019 Year of date reviewed (used to assign YY digits after "NGC' in OOCno.)