Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
NCG030006_COMPLETE FILE - HISTORICAL_20100615
STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. /v �,3 fl a DOC TYPE I HISTORICAL FILE ❑ MONITORING REPORTS DOC DATE ❑ L) i YYYYM M DD I A 1110 P%1919 Thursday, June 10, 2010 Raleigh Regional Office 1628 Mail Service Center Raleigh, NC 27699-1628 Certified Mail: 7006 2150 0002 8613 7996 (Return Receipt Requested) Subject: NOTICE OF VIOLATION Case No. NOV-2010-PC-0606 Stormwater Compliance Evaluation Inspection NPDES Permit No. NCG030006 Edgecombe County Attention: Myrl Nisely, Environmental Chemist (NCDENR — Division of Water Quality) Response to Inspection Points: Z00,9 From the end of 2008 until August 2009, the Enviro en 1, Health and Safety Position at the ABB Pinetops facility was vacant. In August o 201C Jennifer Dively was hired to fill the position of overseeing the Pinetops' environmenta and safety issues. During the vacant period, stormwater testing and planning was not properly addressed and updated per permit standards. After assessing the state of the environmental issues at the plant during the last few months of 2009, it became obvious that several changes and updates were necessary. Primarily the tracking and recordkeeping involving stormwater testing, inspection, training, and planning were found to be in serious need of updating. 1) Stormwater Pollution Prevention Plan Following an inspection by Mr. Ron Boone of this (NCDENR) on January 16, 2006, the requirement of NCGO30006 were spelled out in great detail. Apparently a Storm water Pollution Prevention Plan (SP3) was created by about May 2006 soon after Mr. Boone's inspection. This is the version I was provided. No further updates were known, even though a review and update of the SP3 is an annual requirement. I was not on -site during the 2006 inspection, but the outdated state of the SP3 was noted during the review of the various programs I undertook when I signed on for the EHS position at Pinetops. The permit payments were brought up to date in August of 2009, and I began the process of contracting regular quarterly testing to meet our permit protocols. As no testing had been performed in 2008 or the 1" quarter of 2009 (per permit standards), I felt it was imperative that this gap be closed. The lack of prior data from 2006 to the second half of 2009 made revising our stormwater plan difficult. Additionally, the facility was preparing for a large expansion that would completely alter the current set-up and 2006 SP3 plan. I made the decision at the beginning of 2010 to compile testing data to get a better understanding of the stormwater conditions and potential protection issues that needed to be addressed. The goal was to get a clearer picture of the current stormwater Jennifer Dively ABB Inc. Tel: 252-827-3267 Environmental, Health and Safety Manager Sensor Plant Fax: 252-827-3244 jennifer,dively@us.abb.com 3022 NC 43 North Cell: 252-481-3009 Pinetops, NC 27864 A 1! M! P%1/111 conditions and the new layout implications that would require a completely new SP3 instead of a simple revision of an old prTam that would not be adequate. The timeline for completion of a new SP3 was to be 3 quarter of 2010, after the construction period was complete and a new feasibility study of the stormwater methods could be completed with substantial data. 2) Employee Stormwater Training The earlier inspection also pointed out that annual storm water awareness training is required by the permit. Mr. Hansen was unable to locate any records of training specific to storm water. I include the principles of stormwater pollution prevention in my annual hazardous awareness safety training. In addition to discussing the chemicals and potential pollutants that exist at the ABB Pinctops facility, the training also addresses spill prevention and proper clean-up procedures and reporting, chemical and substance disposal requirements and limitations, along with good housekeeping for any potential hazardous exposure activities. This training was first given in September of 2009 to the entire plant population; it will be repeated again in the fall of 2010. I will incorporate an additionally training section into the July Safety Training meeting. Copies of the September presentation and the employee sign -in sheets are included with this response. Environmental issues including stormwater requirements are addressed in the Site Contractor Safety Training Program and Site Safety Rules for Contractors (attached). Additionally, regular Planned Maintenance inspections are performed (this is a result of the 2006 audit findings). Weekly inspections of the Polyurethane Storage Area and Oil and Lube Storage Area are completed by Jennifer Dively. Monthly inspections of the Fuel Storage Area are conducted by Plant Maintenance (samples attached). Records are kept on file at the facility. 3) Semi-annual Outfall Observations No records were located to document semi-annual qualitative observations of the outfalG The semi-annual outfall observation is incorporated into our analytical testing process with Cathy Baines of Eastern Environmental Management. Copies of the 2009 2" Quarter Report and the 2010 1" Quarter Report is included with the analytical test results (attached). 4) Analytical Testing Analytical test results were provided for the most recent round of storm water sampling on March 22, 2010. Some of the values were non -compliant, pH and Total Suspended Solids in particular. With the large area of construction underway at this time, a communication memo to ABB from Cathy Baines of Eastern Environmental Jennifer Dively A88 Inc. Tel: 252-827-3267 Environmental, Health and Safety Manager Sensor Plant Fax: 252-827-3244 jennifer.dively@us.abb,com 3022 NC 43 North Cell: 252-481-3009 Pinetops, NC 27864 A 1111 P%IPIP Management disclosed that ABB is doing monthly sampling during construction, but no data was located other than the most recenit DWQ wishes to obtain the historical records of sampling form 2008 to the present, with a description of the sample location and how the samples were obtained. This can be faxed to 919-788-7159 or mailed to the address in the footer of this letter. You are urged to become familiar with the Tier 1, Tier 2 discussion in the latest version of the permit, issues to ABB in February 2008. I came on board with ABB Pinetops in August of 2009. Upon reviewing the existing plans and documentation, it became obvious that the stormwater pollution prevention plan was in need of updating per the permit requirements. The analytical testing requirements had also lapsed during the transition of the person who held the office before me. In September of 2009, 1 began seeking a new testing agency. I contracted with Eastern Environmental Management, LLC in October of 2009. Our testing agent with EEM is Cathy C. Baines. Cathy performed the 2009 second quarter test samples on December 2, 2009 (a copy of which was sent to the Division of Water Quality, ATTN: DWQ Central Files, 1617 Mail Service Center, Raleigh, NC 27699-1617). The test results required a Tier One response (attached). The 2010 first quarter testing on March 22, 2010 (a copy of which was sent to the Division of Water Quality, ATTN: DWQ Central Files, 1617 Mail Service Center, Raleigh, NC 27699-1617). The test results required a Tier One and Tier Two response (attached), this included this instigation of monthly analytical testing. Copies of the analytical testing results are attached along with a history of test results. ABB may wish to review the requirements for a Total Toxic Organics (TTO) Management Plan discussed in footnote 5. under Table I in the permit, in light of any changes in manufacturing practices at the plant If management of TTO is required as determined from the definitions in the footnote, having a plan may be preferable to sampling. We have contracted Eastern Environmental Resources and Appian Engineering (http://www.appianen�),ineers.com/civi1.phi)) to assist us in updating our SP3 and will make sure this recommendation is included in that process. (Footnote 5 - Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes.) Jennifer Dively ABB Inc. Tel; 252-827-3267 Environmental, Health and Safety Manager Sensor Plant Fax: 252-827-3244 jennifer.dively@us.abb.com 3022 NC 43 North Cell: 252-481-3009 Pinetops, NC 27864 A 1111 P%I/I/ In summary, this inspection revealed that the permit had still not been followed during the years since the 2006 inspection, even though a reply to Mr. Boone's inspection acknowledged shortcomings and corrective actions to be taken at that time. There have been significant gaps noted in the past regarding the site's stormwater permit requirements. I cannot personally respond to those instances as it was prior to my on - boarding to the site in August of 2009, but I can address the steps we are taking to ensure that these issues are not repeated: 1. Re -instituted site analytical and outfall testing as of December 2009 per our permit requirements. 2. Contracted in assistance to revise and expand our outdated Stormwater Pollution Prevention Plan through Eastern Environmental Management and Appian Engineering. 3. Re -instituted annual employee training as of September 2009 and will re- emphasize this information in the July 2010 training session. 4. We have met with the general contractor (Nashco Inc.) and the soil and erosion control / stormwater retention pond design sub -contractor (Mack Gay Associates) to address deficiencies in their site erosion and sediment control plan and the issues related to their initial stormwater pond plan to the NCDENR. They are required to immediately correct all deficiencies and provide regular documentation that they are meeting all the Construction Sediment and Erosion Control permit requirements. Also, Mack Gay Associates has been instructed to meet with Jennifer Jones, NCDENR Environmental Engineer, to address and correct all issues related to the proposal for the site's new stormwater retention pond. Failure for these groups to meet our conditions will result in their removal from the site and financial consequences. 5. We would like to invite and encourage inspections and assistance from the NCDENR to help us meet and exceed our Stormwater Permit requirements. My goal is to make our site an example of how an industrial stormwater program should be run as we move forward in implementing our corrective action items and improving our overall program in the future. If you have any questions regarding this response or its associated attachments, please do not hesitate to contact me. Thank you, nifer M. ively V6 Enclosed: Training Presentation & Signature Sheets, Contractor Site Safety Information, Stormwater PM Inspection Sheets, Analytical and Outfall Test Reports & Tier I and 2 Responses, Site Stormwater Testing History Chart, New Stormwater Retention Pond Layout Jennifer Dively ABB Inc. Tel: 252-827-3267 Environmental, Health and Safety Manager Sensor Plant Fax: 252-827-3244 jennifer.dively@us.abb.com 3022 NC 43 North Cell: 252-481-3009 Pinetops, NC 27864 liiA NCDE !WR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary May 20, 2010 CERTIFIED MAIL 7009 0080 0000 9764 8204 RETURN RECEIPT REQUESTED ABB, Inc. Ms. Jennifer Dively 3022 NC Hwy 43 North P.O. Box 687 Pinetops, NC 27864 Subject: NOTICE OF VIOLATION Case No. NOV-2010-PC-0606 Stormwater Compliance Evaluation Inspection NPDES Permit No. NCG030006 Edgecombe County Dear Ms. Dively: Mr. Myrl Nisely conducted a stormwater inspection at the ABB Pinetops facility on May 11, 2010 with the help of Tom Hansen in your absence. Mr. Hansen was most helpful in searching for data and providing a tour around the plant. In spite of his best efforts, however, some of the topics covered by the inspection checklist could not be answered satisfactorily. A great deal of construction was occurring at this time, including earth moving to build a stormwater pond, enlarge the parking area, and erect a new building. A stepped up schedule of stormwater sampling is apparently being carried out during this construction, to the company's credit, although only the most recent data could be located. All in all, numerous deficiencies in following the permit requirements were noted. 1) Stormwater Pollution Prevention Plan Following an inspection by Mr. Ron Boone of this office on January 19, 2006, the requirements of NCG030006 were spelled out in great detail. Apparently a Stormwater Pollution Prevention Plan (SP3) was created by about May 2006 soon after Mr. Boone's inspection. This is the version I was provided. No further updates were known, even though a review and update of the SP3 is an annual requirement. 2) Employee Stormwater Training The earlier inspection also pointed out that annual stormwater awareness training is required by the permit. Mr. Hansen was unable to locate any records of training specific to stormwater. 3) Semi-annual Outfall Observations No records were located to document semi-annual qualitative observation of the outfall. NturV11Y ehCarolina North Carolina Qivision of Water Quality Raleigh Regional Office Surface Water Protection Phone (919) 791.4200 Customer Service Internet; www.ncwaterquallty.org 1628 Mail Service Center Raleigh, NC 27699-1628 FAX (919) 788-7159 877-823.6748 An Equal Opportunity/Affirmative Action Employer — 50% Recyclerl110% Post Consumer Paper 4 ABB Storrnwater Inspection, May 2010 Page 2 of 2 r 4) Analytical Testing =- Analytical test results were provided for the most recent round of stormwater sampling on March 22, 2010. Some of the values were non -compliant, pH and Total Suspended Solids in particular. With the large area of construction underway at this time, a communication memo to ABB from Cathy Baines of Eastern Environmental Management disclosed that ABB is doing monthly sampling during construction, but no data was located other than the most recent. DWQ wishes to obtain the historical records for sampling from 2008 to the present, with a description of the sample location and how the samples were obtained. This can be faxed to 919-788-7159 or mailed to the address in the footer of this letter. You are urged to become familiar with the Tier 1, Tier 2 discussion in the latest version of the permit, issued to ABB in February 2008. ABB may wish to review the requirements for a Total Toxic Organics (TTO) Management Plan discussed in footnote 5. under Table I in the permit, in light of any changes in manufacturing practices at the plant. If management of TTO is required as determined from the definitions in the footnote, having a plan may be preferable to sampling. In summary, this inspection revealed that the permit had still not been followed during the years since the 2006 inspection, even though a reply to Mr. Boone's inspection acknowledged shortcomings and corrective actions to be taken at that time. Within 30 days of receipt of this letter, please respond in writing addressing items 1 — 4. Please note it is the intention of this office to make another inspection in a few months. If there is a noncompliant program at that time, this office will consider sending a recommendation for enforcement regarding these matters to the Director of the Division of Water Quality. Failure to implement this permit is subject to a civil penalty assessment of up to $25,000.00 per day. If you have any questions or comments, please tact Myrl Nisely at the Raleigh egional Office at 919-791-4200. ince ely, anny S h Water Q ality Regional Supervisor Raleigh Regional Office cc: -RRO/SWP files Point Source Compliance w/ attachments Enforcement File w/ attachments Central Files Permit: NCG030006 SOC: County: Edgecornbe Region: Raleigh Compliance Inspection Report Effective: 02/14/08 Expiration: 10/31112 Owner: ABB Inc Effective: Expiration: Facility: ABB Inc-Edgecornbe Hwy 43 N Contact Person: Tom Stallings Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): On -Site Re prose ntative(s): Related Permits: Inspection Date: 05/06/2010 Primary Inspector: Myrl Nisely Secondary Inspector(s): Title: Director Certification: Pinetops NC 27864 Phone:252-827-3232 Entry Time: 09:45 AM Exit Time: 12:10 PM Phone: Phone: 919-791-4200 Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: ❑ Compliant ■ Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 ti Permit; NCG030006 Owner • Facility: ABB Inc Inspection Date: 05/06/2010 Inspection Type: Compliance Evaluation Reason for Visit; Routine Inspection Summary; This inspection gave the appearance of a disjointed, incompletely implemented stormwater program. On the other hand, proactive steps are being taken to install a stormwater retention pond for runoff from part of the site. Runoff from the other side of the facility will not be captured by the pond, but will exit directly as it always has. See the cover letter for a full discussion of the findings. A follow-up inspection in a few months is recommended. Page: 2 Permit: NCG030006 Owner - Facility: ABB Inc Inspection Date: 05/06/2010 Inspection Type: Compliance Evaluation Reason for VlsIt: Routine Stormwater Pollution Prevention Plan Yea No NA NE Does the site have a Stormwater Pollution Prevention Plan? ■ ❑ ❑ ❑ # Does the Plan include a General Location (t.ISGS) map? ■ ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ■ ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ■ ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ■ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ■ ❑ ❑ # Does the facility provide all necessary secondary containment? ■ ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ ■ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ ■ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ ■ # Does the facility provide and document Employee Training? ❑ ■ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ ■ # Is the Plan reviewed and updated annually? ❑ ■ ❑ Cl # Does the Plan include a Stormwater Facility Inspection Program? ❑ ■ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ■ ❑ ❑ Comment: The SP3 provided was from May 2006. Many questions above are marked NE (not evaluated) because documentation was not available for recent activities. Construction of an additional building, a parking lot, and a large stormwater pond is currently taking place. Extra stormwater monitoring is apparently being proatively done quarterly. This observation is based upon a memo from the contract lab. Only the most recent March 2010 test results were provided, however. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ■ ❑ ❑ Comment: No semi-annual documents were available for review in the 2006 SP3 binder. Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0000 # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ■ ❑ ❑ Comment: Incomplete data set was provided, not enough history to judge whether semi-annual monitoring had been done. Permit and Outfalis Yes No NA NE # Is a copy of the permit and the Certificate of Coverage available at the site? ■ ❑ ❑ ❑ Page: 3 Permit: NCGO30006 Owner - Facility: ABB Inc Inspection Date: M06?2010 Inspection Type: Compliance Evaluatlon Reason for Visit: Routine # Were all outfalls observed during the inspection? # if the facility has representative outfall status. is it properly documented by the Division? # Has the facility evaluated all illicit (non stormwater) discharges? Comment: There was much information missing or incomplete during this inspection. DWQ concludes that the stormwater program has not had the attention requested in the previous inspection report in January 2006. A follow-up inspection is recommended once the construction is completed and disturbed soil is stabilized. Page: 4 C f February 15, 2006 CERTIFIED MAIL RETURN RECEIPT REQUESTED Kenneth Schuster, P.E. Raleigh Regional Surface Water Quality Supervisor North Carolina Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 Response to Inspection on 01/19/2006 NPDES Stormwater NCG030006 ABB Inc. Pinetops Edgecombe County Dear Mr. Schuster: ABB received a courteous and professional inspection by Mr. Ron Boone on January 19", 2006 concerning the above referenced permit. RESPONSE TO INSPECTION FINDINGS ABB intends to comply with all appropriate regulations in our permit. There will be an internal review and update of both the Stormwater Pollution Prevention Plan and the Spill Prevention, Control, and Countermeasures Plan. I have listed the findings with the ABB response and the estimated completion date as requested. References to the ABB Stormwater Pollution Prevention Plan, Revised May 2002 will be. referred to as ABBSP3. The ABB Spill Prevention, Control, and Countermeasures Plan, revised May 2002 will be referred to as ABBSPCC. 1) The site plan component of the SP3 was inadequate as follows: a) The site map did not show directions of flow and areas served by each outfall. Additionally, it did not show the percent of impervious surface on the site. Finally, the site map does not list the specific potential pollutants Power Technology Products P. 1 of 5 ABB Inc. 3022 NC 43 North Pinetops, NC 27864 (U.S.A) Telephone (252) 827-2121 it Fax (252) 827-4286 ,.. 2/17/2006 ';, I .__.,.' F that could be expected to be present in the stormwater discharge at each outfall. If no pollutants are expected to be present at a particular outfali, this should be noted on the site plan (Part 11, Section A, Paragraph 1 c). ABB Response: ABBSP3 Appendix A "Site Map" shows direction of stormwater flow. Section 2 par. 2.2 lists the impervious area as 37%. Pollutants (if any) expected in the outfall will be noted as requested. Estimated completion date: April 15, 2006. b) The site plan did not list significant spills or leaks of pollutants occurring at the facility during the previous three years and any corrective actions taken to mitigate spill impacts. Note that if no such spills or leaks occurred in the past three years, a signed certification attesting that should be inserted in place of the list (Part 11, Section A, Paragraph 1 d). ABB Response: No significant spills or leaks of pollutants have occurred in the previous three years. A signed certification will be added to the ABBSP3. Estimated completion date: April 15, 2006 2) The stormwater management plan component of the SP3 was inadequate as follows: a) No review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater (Part 11, Section A, Paragraph 2a). ABB Response: ABBSP3 Appendix B, Worksheet #5 " Non- Stormwater Discharge Assessment and Certification" form summarizes previous evaluation of the type cited. This form will be reviewed and updated as a part of the ABBSP3 update. Estimated completion date: April 15, 2006 ABB Inc. Power Technology Products 3022 NC 43 North Telephone (252) 827-2121 Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 P. 2 of 5 2/17/2006 b) No Spill Prevention and Response Plan (SPRP) has been developed as required in Part II, Section A, Paragraph 3. It is noted that you do have a Spill Prevention, Control and Countermeasure Plan (SPCC) as required by the Environmental Protection Agency (EPA), however the SPRP must be site specific and therefore the SPCC may not be sufficient to address the stormwater aspects of the SPRP. Furthermore, those responsible for implementing the SPRP shall be identified and a responsible person shall be on -site at all times during facility operations that could potentially contaminate stormwater runoff through spills or exposure of materials associated with facility operations. Not all personnel that you have identified as responsible for your spill program still work at your facility. ABB Response: Appendix 1= in the ABBSPCC is specific as to type and location of spill potential discharge and is hereby incorporated into the ABBSP3 by reference. Cross-referencing between the two plans will be more definitive in the update. Responsible personnel identification will be by job positions in lieu of names. Estimated completion date: April 15, 2006 3) No preventative maintenance and good housekeeping program has been developed as required in Part II, Section A, Paragraph 4. It is noted that you do have an electronic based maintenance program for your plant and that some of the requirements of the SP3 are accomplished through this program. However, this program by itself is not meeting all the maintenance and good housekeeping requirements of your SP3. a ABB Response: A preventative and good housekeeping program was implemented in 1993. This program will be expanded in Section 5.0 of the update. Estimated completion date: April 15, 2006 4) No employee -training program has been developed as required in Part II, Section A, Paragraph 5. It is noted that you do have a training program but again, not all of the training requirements of the SP3 are being met. ABB Response: The employee training program will be expanded and documented in the future. Estimated completion date:.Training program — April 15, 2006 Training — next all -employee meeting ABB Inc. Power Technology Products 3022 NC 43 North Telephone (252) 827-2121 Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 R 3 of 5 2/17/2006 5) Those responsible for the coordination, development, implementation, and revision of the SP3 have not been identified by position as required in Part Il, Section A, Paragraph 6. ABB Response: Personnel identification will be by job positions in lieu of names in the update. Estimated completion date: April 15, 2006 6) The SP3 has not been reviewed and appropriately updated on an annual basis as required in Part Il, Section A, Paragraph 7. ABB Response: A review is taking place now and will be performed annually in the future. Estimated completion date: April 15, 2006 7) Your SP3 has not been fully implemented. Although it is well organized, many components of your SP3 are missing or inadequate as noted above. Some of those items that are inadequate, such as the preventative maintenance and good housekeeping program, illustrate that your SP3 has not been fully implemented as required in Part II, Section A, Paragraph 9. ABB Response: Implementation of the SP3 will be enhanced via training subsequent to completing the SP3 update. Estimated completion date: April 15, 2006 8) Quantitative monitoring is being accomplished, however not all records of the required monitoring and reporting were available for inspection. Additionally, all pH readings that were available were below the allowable range of 6.0 to 9.0 standard units. You should take immediate action to determine and eliminate the cause of the low pH, or attenuate the pH before it is discharged at your outfall (Part Il, Section B). ABB Response: Record keeping for quantitative monitoring will be more comprehensive in the future. We have conducted another facility review and have not identified any acidity contributing materials exposed to stormwater, leading to the conclusion that the consistently low pH readings are attributed to naturally occurring acidic runoff from the adjacent, upgrade pine forest. Estimated completion date: on -going ABB Inc. Power Technology Products 3022 NC 43 North Telephone (252) 827-2121 Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 P. 4 of 5 2/17/2006 Qualitative monitoring of your stormwater discharge is not being accomplished according to permit requirements (Part II, Section C). ABB Response. The "Recording Form" has been located and qualitative monitoring will resume according to the schedule in the ABBSP3. Estimated completion date: on -going Please contact me with questions or comments concerning this response. Sincerely, '1a;d6;(011-11jaeo�- Thomas L. Stallings, CMfgE Senior Manufacturing Engineer Local Sustainability Officer Office-2521827.3232 Cell - 252/363.4232 Fax - 252/827.3280 tom.stallings@us.abb.com ABB Inc. Power Technology Products 3022 NC 43 North Telephone (252) 827-2121 Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 P. 5 of 5 2/17/2006 STICKFF1 ATTOP OF ENVELOPE TO THE RIGHT OF I HE RETURN ADDRESS. FOLD AT POT-TED LINE ! MAIL Az:,,zz ^/c- 4 a Z7�T Maui■ RopwCm 'T Delivery Putni 7001 1940 0007 0054 4884 1G28 T 02/22/06 Raleigh Regional Off 11:18:12 PO# Sdr 70011940000700544884 1111111111111111111111111111111111111111111111 x�✓/✓� T� G ryuST� *62 1}11�M ti! AML� 40Dr.4G W12T00BSLK I r Jru�2��c-E AJft'1a2 5 u r'iet/rsa� 00E /SIG.. r ✓ 5 r a.v a F" LCI� i` . 7-K arw�. AIt It February 15, 2006 CERTIFIED MAIL RETURN RECEIPT REQUESTED Kenneth Schuster, P.E. Raleigh Regional Surface Water Quality Supervisor North Carolina Division of Water Quality 1628 Mail Service Center Raleigh, NC 27699-1628 Response to Inspection on 01/19/2006 NPDES Stormwater NCG030006 ABB Inc. Pinetops Edgecombe County Dear Mr. Schuster: ABB received a courteous and professional inspection by Mr. Ron Boone on January 19th, 2006 concerning the above referenced permit. RESPONSE TO INSPECTION FINDINGS ABB intends to comply with all appropriate regulations in our permit. There will be an internal review and update of both the Stormwater Pollution Prevention Plan and the Spill Prevention, Control, and Countermeasures Plan. I have listed the findings with the ABB response and the estimated completion date as requested. References to the ABB Stormwater Pollution Prevention Plan, Revised May 2002 will be referred to as ABBSP3. The ABB Spill Prevention, Control, and Countermeasures Plan, revised May 2002 will be referred to as ABBSPCC. 1) The site plan component of the SP3 was inadequate as follows: a) The site map did not show directions of flow and areas served by each Z outfall. Additionally, it did not show the percent of impervious surface on G N C= the site. Finally, the site map does not list the specific potential pollutants j[i cV j ABB Inc.LL 00 Power Technology Products 3022 NC 43 North Telephone (252) 827-2121�� Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 1((��.-�, P. i of 5 211712006�tl that could be expected to be present in the stormwater discharge at each outfall. If no pollutants are expected to be present at a particular outfall, this should be noted on the site plan (Part 11, Section A, Paragraph 1 c). ABB Response: ABBSP3 Appendix A "Site Map" shows direction of stormwater flow. Section 2 par. 2.2 lists the impervious area as 37%. Pollutants (if any) expected in the outfall will be noted as requested. Estimated completion date: April 15, 2006. b) The site plan did not list significant spills or leaks of pollutants occurring at the facility during the previous three years and any corrective actions taken to mitigate spill impacts. Note that if no such spills or leaks occurred in the past three years, a signed certification attesting that should be inserted in place of the list (Part II, Section A, Paragraph 1d). ABB Response: No significant spills or leaks of pollutants have occurred in the previous three years. A signed certification will be added to the ABBSP3. Estimated completion date: April 15, 2006 2) The stormwater management plan component of the SP3 was inadequate as follows: a) No review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater (Part Il, Section A, Paragraph 2a). ABB Response: ABBSP3 Appendix B, Worksheet #5 " Non- Stormwater Discharge Assessment and Certification" form summarizes previous evaluation of the type cited. This form will be reviewed and updated as a part of the ABBSP3 update. Estimated completion date: April 15, 2006 ABB Inc. Power Technology Products 3022 NC 43 North Telephone (252) 827-2121 Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 P. 2 of 5 2/17/2006 b) No Spill Prevention and Response Plan (SPRP) has been developed as required in Part II, Section A, Paragraph 3. It is noted that you do have a Spill Prevention, Control and Countermeasure Plan (SPCC) as required by the Environmental Protection Agency (EPA), however the SPRP must be site specific and therefore the SPCC may not be sufficient to address the stormwater aspects of the SPRP, Furthermore, those responsible for implementing the SPRP shall be identified and a responsible person shall be on -site at all times during facility operations that could potentially contaminate stormwater runoff through spills or exposure of materials associated with facility operations. Not all personnel that you have identified as responsible for your spill program still work at your facility. ABB Response: Appendix F in the ABBSPCC is specific as to,type and location of spill potential discharge and is hereby incorporated into the ABBSP3 by reference. Cross-referencing between the two plans will be more definitive in the update. Responsible personnel identification will be by job positions in lieu of names. Estimated completion date: April 15, 2006 3) No preventative maintenance and good housekeeping program has been developed as required in Part II, Section A, Paragraph 4. It is noted that you do have an electronic based maintenance program for your plant and that some of the requirements of the SP3 are accomplished through this program. However, this program by itself is not meeting all the maintenance and good housekeeping requirements of your SP3. ABB Response: A preventative and good housekeeping program was implemented in 1993. This program will be expanded in Section 5.0 of the update. Estimated completion date: April 15, 2006 4) No employee -training program has been developed as required in Part II, Section A, Paragraph 5. It is noted that you do have a training program but again, not all of the training requirements of the SP3 are being met. ABB Response: The employee training program will be expanded and documented in the future. Estimated completion date: Training program — April 15, 2006 Training — next all -employee meeting ABB Inc. Power Technology Products 3022 NC 43 North Telephone (252) 827-2121 Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 P. 3 of 5 2/17/2006 5) Those responsible for the coordination, development, implementation, and revision of the SP3 have not been identified by position as required in Part 11, Section A, Paragraph 6. ABB Response: Personnel identification will be by job positions in lieu of names in the update. Estimated completion date: April 15, 2006 6) The SP3 has not been reviewed and appropriately updated on an annual basis as required in Part 11, Section A, Paragraph 7. ABB Response: A review is taking place now and will be performed annually in the future. Estimated completion date: April 15, 2006 7) Your SP3 has not been fully implemented. Although it is well organized, many components of your SP3 are missing or inadequate as noted above. Some of those items that are inadequate, such as the preventative maintenance and good housekeeping program, illustrate that your SP3 has not been fully implemented as required in Part II, Section A, Paragraph 9. ABB Response: Implementation of the SP3 will be enhanced via training subsequent to completing the SP3 update. Estimated completion date: April 15, 2006 8) Quantitative monitoring is being accomplished, however not all records of the required monitoring and reporting were available for inspection. Additionally, all pH readings that were available were below the allowable range of 6.0 to 9.0 standard units. You should take immediate action to determine and eliminate the cause of the low pH, or attenuate the pH before it is discharged at your outfall (Part 11, Section B). ABB Response: Record keeping for quantitative monitoring will be more comprehensive in the future. We have conducted another facility review and have not identified any acidity contributing materials exposed to stormwater, leading to the conclusion that the consistently low pH readings are attributed to naturally occurring acidic runoff from the adjacent, upgrade pine forest. Estimated completion date: on -going ABB Inc. Power Technology Products 3022 NC 43 North Telephone (252) 827-2121 Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 P. 4 of 5 211 V2008 Qualitative monitoring of your stormwater discharge is not being accomplished according to permit requirements (Part Il, Section C). ABB Response: The "Recording Form" has been located and qualitative monitoring will resume according to the schedule in the ABBSP3. Estimated completion date: on -going Please contact me with questions or comments concerning this response. Sincerely, Thomas L. Stallings, CMfgE Senior Manufacturing Engineer Local Sustainability Officer Office-252i827.3232 Cell - 252/363.4232 Fax - 252/827.3280 tom.stallings@us.abb.com ABB Inc. Power Technology Products 3022 NC 43 North Telephone (252) 827-2121 Pinetops, NC 27864 (U.S.A) Fax (252) 827-4286 P. 5 of 5 2/17/2006 �11 February 1, 2006 Mr. Thomas Stallings Senior Manufacturing Engineer ABB Inc. Highway 43 North P.O. Box 687 Pinetops, NC 27864 Michael F. Easley, Governor William G. Ross, Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality CERTIFIED MAIL RETURN RECEIPT REQUESTED Subject; NOV-2006-PC-0029 Notice of Violation Resulting from Compliance Evaluation Inspection on 01/19/2006 NPDES Stormwater NCG030006 ABB Inc. Pinetops Edgecombe County Dear Mr. Stallings: The January 19th, 2006 tour that you provided to Ron Boone during his annual inspection of your facility located at Highway 43 North in Pinetops was greatly appreciated. This inspection was conducted to determine ABB's compliance with its NPDES stormwater permit, NCS030006. This permit, issued 31 August 2002 by authority of North Carolina General Statute (NCGS) 143-215.1, is intended to prevent pollution of state waters that receive stormwater discharges from your facility. Please use the permit references listed in this report for further explanation and compliance details of each item cited. SITE SUMMARY • Your site is an electrical component manufacturing facility. Some chemicals are used on site for component fabrication and equipment maintenance, however no vehicle maintenance activities occur on site. All stormwater generated at your site is collected via a system of in -ground drains that convey the stormwater to receiving waters designated as an unnamed tributary to Town Creek in the Tar - Pamlico River Basin, a class C, nutrient sensitive water (NSW). INSPECTION FINDINGS Your site appeared to be clean and well maintained. The list below shows numerous conditions observed during the interview portion of the inspection. • The stormwater pollution prevention plan (SP3) was inadequate as follows: l`Ane Caro ina Naturally North Carolina Division of Water Quality Raleigh Regional Office Surface Water Protection Internet: h2o.enr.state.ne.us 1628 Mail Service Center Raleigh, NC 27699-1628 An Equal Opportunity/Affirmative Action Employer— 50% Recycled110% Post Consumer Paper Phone (919) 791-4200 Customer Service FAX (919) 791-4718 1-877-623-6748 Braswell Foods, Compliance Evaluation Inspection, January 12, 2006, NCS000302 Page 2 of 3 • The site plan component of the SP3 was inadequate as follows: • The site map did not show directions of flow and areas served by each outfall. Additionally, it did not show the percent of impervious surface on the site. Finally, the site map does not list the specific potential pollutants that could be expected to be present in the stormwater discharge at each outfall. If no pollutants are expected to be present at a particular outfall, this should be noted on the site plan (Part U, Section A, Paragraph 1 c). • The site plan did not list significant spills or leaks of pollutants occurring at the facility during the previous three years and any corrective actions taken to mitigate spill impacts. Note that if no such spills or leaks occurred in the past three years, a signed certification attesting that should be inserted in place of the list (Part II, Section A, Paragraph Id). • The stormwater management plan component of the SP3 was inadequate as follows: • No review of the technical and economic feasibility of changing the methods of operations and/or storage practices to eliminate or reduce exposure of materials and processes to stormwater (Part II, Section A, Paragraph 2a). • No Spill Prevention and Response Plan (SPRP) has been developed as required in Part II, Section A, Paragraph 3. It is noted that you do have a Spill Prevention, Control and Countermeasure Plan (SPCC) as required by the Environmental Protection Agency (EPA), however the SPRP must be site specific and therefore the SPCC may not be sufficient to address the stormwater aspects of the SPRP. Furthermore, those responsible for implementing the SPRP shall be identified and a responsible person shall be on -site at all times during facility operations that could potentially contaminate stormwater runoff through spills or exposure of materials associated with facility operations. Not all personnel that you have identified as responsible for your spill program still work at your facility. • No preventative maintenance and good housekeeping program has been developed as required in Part II, Section A, Paragraph 4. It is noted that you do have an electronic based maintenance program for your plant and that some of the requirements of the SP3 are accomplished through this program. However, this program by itself is not meeting all the maintenance and good housekeeping requirements of your SP3. • No employee -training program has been developed as required in Part II, Section A, Paragraph 5. It is noted that you do have a training program but again, not all of the training requirements of the SP3 are being met. • Those responsible for the coordination, development, implementation, and revision of the SP3 have not been identified by position as required in Part II, Section A, Paragraph 6. • The SP3 has not been reviewed and appropriately updated on an annual basis as required in Part II, Section A, Paragraph 7. • Your SP3 has not been fully implemented. Although it is well organized, many components of your SP3 are missing or inadequate as noted above. Some of those items that are inadequate, such as the preventative maintenance and good housekeeping program, illustrate that your SP3 has not been fully implemented as required in Part II, Section A, Paragraph 9. • Quantitative monitoring is being accomplished, however not all records of the required monitoring and reporting were available for inspection. Additionally, all pH readings that were available were below the allowable range of 6.0 to 9.0 standard units. You should take immediate action to determine and eliminate the cause of the low pH, or attenuate the pH before it is discharged at your outfall (Part II, Section B). • Qualitative monitoring of your stormwater discharge is not being accomplished according to permit requirements (Part II, Section Q. r1raswell Foods, Compliance Evaluation Inspection, January 12, 2006, NCS000302 Page 3 of 3 In general, many of the above mentioned conditions and/or practices demonstrate mismanagement of your stormwater program and/or a misunderstanding of the requirements as stated in your permit. The most serious findings are as follows: • The overall inadequacy of your SP3 and SPRP. • The inadequacy of both quantitative and qualitative discharge monitoring. • The low pH stormwater consistently being discharged from your outfall. Please be aware that these violations could result in the assessment of civil penalties in an amount not to exceed $25,000 per day per violation. Please reply within 30 days of your receipt of this letter with a narrative and your planned schedule to achieve compliance with all permit requirements. If you have any questions, comments or need assistance with understanding any aspect of your discharge permit, please do not hesitate to contact Mr. Ron Boone at 919-791-4200. Sincerely, Kenneth Schuster, P.E. Raleigh Regional Surface Water Quality Supervisor cc: Stormwater Permitting Unit Central Files Non -Point Source Compliance Enforcement Unit .• --. o�oF W,7,rFRpG 4 `C TOM BOYLAN ABB INC-EDGECOMBE PO BOX 687 PINE TOPS, NC 27864 Dear Permittee: Michael F. Easley, Governor William G. Ross Jr„ Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P,E., Director Division of Water Quality August 23, 2002 Subject: NPDES Stormwater Permit Renewal ABB INC-EDGECOMBE COC Number NCG030006 Edgecombe County In response to your renewal application for continued coverage under general permit NCG030000, the Division of Water Quality (DWQ) is forwarding herewith the reissued stormwater general permit. This permit is reissued pursuant to the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement between the state of North Carolina and the U.S. Environmental Protection Agency, dated December 6, 1983. The following information is included with your permit package: A new Certificate of Coverage * A copy of General Stormwater Permit NCG030000 * A copy of the Analytical Monitoring Form (DMR) * A copy of a Technical Bulletin for the general permit Your coverage under this general permit is not transferable except after notice to DWQ. The Division may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirements to obtain other permits which may be required by DENR or relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law, rule, standard, ordinance, order, judgment, or decree. If you have any questions regarding this permit package please contact Sill Mills of the Central Office Stormwater and General Permits Unit at (919) 733-5083, ext. 548 Sincerely, Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Stormwater & General Permits Unit Files Raleigh Regional Office t TA NCDENR N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 Customer Service 1-800.623.7748 Q.oF wAr�9pG Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources 0 N c TOM BOYLAN ABB POWER T&D CO INC-EDGECOMBE PO BOX 687 PINE TOPS, NC 27864 Dear Permittee: Gregory J. Thorpe, Ph.D. Acting Director Division of Water Quality December 27, 2001 Subject: NPDES Stormwater Permit Renewal ABB POWER T&D CO INC-EDGECOMBE COC Number NCG030006 Edgecombe County Your facility is currently covered for stormwater discharge under General Permit NCG030000. This permit expires on August 31, 2002. The Division staff is currently in the process of rewriting this permit and is scheduled to have the permit reissued by late summer of 2002. Once the permit is reissued, your facility would be eligible for continued coverage under the reissued permit. In order to assure your continued coverage under the general permit, you must apply to the Division of Water Quality (DWQ) I'or renewal of your permit coverage. To make this renewal process easier, we are informing you in advance that your permit will be expiring. Enclosed you will find a General Permit Coverage Renewal Application Form. The application must be completed and returned by March 4, 2602 in order to assure continued coverage under the general permit. Failure to request renewal within this time period may result in a civil assessment of at least $250.00. Larger penalties may be assessed depending on the delinquency of the request. Discharge of stormwater from your facility without coverage under a valid stormwater NPDES permit would constitute a violation of NCGS 143-215.1 and could result in assessments of civil penalties of up to $10,000 per day. Please note that recent federal legislation has extended the "no exposure exclusion" to all operators of industrial facilities in any of the I I categories of "storm water discharges associated with industrial activity," (except construction activities). If you feel your facility can certify a condition of "no exposure", i.e. the facilty industrial materials and operations are not exposed to stormwater, you can apply for the no exposure exclusion. For additional information contact the Central Office Stormwater Staff member listed below or check the Stormwater & General Permits Unit Web Site at http:Hh2o.enr.state.nc.us/sulstormwater.html If the subject stormwater discharge to waters of the state has been terminated, please complete the enclosed Rescission Request Form. Mailing instructions are listed on the bottom of the form. You will be notified when the rescission process has been completed. If you have any questions regarding the permit renewal procedures please contact Joe Albiston of the Raleigh Regional Office at 919-571-4700 or Bill Mills of the Central Office Stormwater Unit at (919) 733-5083, ext. 548 Sincerely, � V v Bradley Bennett, Supervisor Stormwater and General Permits Unit cc: Central Files Raleigh Regional Office N. C. Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 (919) 733-7015 ��A NCDENR Customer Service 1- 800.623-7748 RFCr/VIED State of North Carolina APR 1.9 1993 Department of Environment, Health and Natural Resources �IENI Division of Environmental Management �AL �� 512 North Salisbury Street • Raleigh, North Carolina 27604 James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary April 16, 1993 Wayne D. Nock ABB Power T&D Company, Inc. 630 Sentry Park Blue Bell, PA 19422 A. Preston Howard, Jr., P. E. Director Subject: General Permit No. NCG030000 ABB Power T&D Company, Inc. COC NCG030006 Edgecombe County Dear Mr. Nock: In accordance with your application for discharge permit received on September S, 1992, we are forwarding herewith the subject certificate of coverage to discharge under the subject state - NPDES general permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215 .1 and the Memorandum of Agreement between North Carolina and the US Environmental Protection agency dated December 6, 1983. If any parts, measurement frequencies or sampling- requirements contained in this permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit application. Unless such demand is made, this certificate of coverage shall be final and binding. Please take notice that this certificate of coverage is not transferable except after notice to the Division of Environmental Management. The Division of Environmental Management may require modification or revocation and reissuance of the certificate of coverage. This permit does not affect the legal requirements to obtain other permits which may be required by the Division of Environmental Management or permits required by the Division of Land Resources, Coastal Area Management Act or any other Federal or Local governmental permit that may be required. If you have any questions concerning this permit, please contact Mr. Bill Mills at telephone number 919j733- 5083. cc: SinNigivAl Signed By Coleen H. Sullins A. Preston Howard, Jr., P.E. Raleigh Regional Office Pollution Prevention Pays P.O_ Box 29535, Raleigh, North Carolina 27626-0535 Telephone 9I9-733-7015 An Equal Opportunity Affirmative Action Employer STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT, HEALTH, AND NATURAL RESOURCES DIVISION OF ENVIRONMENTAL MANAGEMENT STORMWATER DISCHARGES In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, ABB Power T & D Company, Inc. is hereby authorized to discharge stormwater from a facility located at ABB Power T & D Company, Inc. NC Hwy 43 N, approx. one mile north Pinetops Edgecombe County to receiving waters designated as an unnamed tributary to Town Creek in the Tar -Pamlico River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV of General Permit No. NCG030000 as attached. This certificate of coverage shall become effective April 16, 1993 This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day April 16, 1993. 0fi & al Signed By Coieen H. Sullins A. Preston Howard, Jr., P.E., Director. Division of Environmental Management By Authority of the Environmental Management Commission ITTIM bra as � ssrs a • wx es rle+vas CIO �� ''� ^ �f•`•��`� } tau ���'t - /F, ^;• ', �, , ' ~\��� �'-�`Y p + `y 70 "`\ � �` \ i•� ir� a � - ._�$ L' , , � pie !� ��L?/ -'7 '*• I � 1\� f ���''`'' ter'-� i • / l'"- •� '`�_ , •. \ - �`•_ 'tea I' ' �1 y '�I'- •�� � �� �'\� � �. rr `'I \ u : 1 �•L� I � 'S•. .-,ate` , �_ crv' STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT GENERAL. PERMIT NO. NCG030000 SAMPLES COLLECTED DURING CALENDAR YEAR: 1 CERTIFICATE OF COVERAGE NO. NCG03 t:Z� (This monitoring report is due at the Division no later than 30 days from the date the facility receives the sampiin results from the laboratory.) FACILITY NAME COUNTY G PERSON COLLECTING SAMPLES PHONE NO. (,;2 CERTIFIED LABORATORY — S Lab # Lab # PLEASE SIGN ON THE REVERSE 4 Part A: Specific Monitoring Requirements Outfall No. Date Sample Collected, mo/dd! 00530 00400 01051 00556 78141 Total Suspended Solids, IL PH, Standard units Lead, mg/L Oil and Grease, ET&/L Total Toxic Organics', Benchmark - 100 Within 6.0 — 9.0 0.033 30 1 Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier I or Tier 2 responses. See General Permit text. Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? _ yes I —no (if yes, complete Part B) Part B. Vehicle Maintenance Activvity onitoriaZ Requirements Outfall No. Date Sample Collected, mo/dd/ r 005% 00530 00400 Oil and Grease, W91L Total Suspended Solids, m , pH, Standard units New Motor Oil Usage, Annual averse ai/mo Benchmark - 30 100 6.0 — 9.0 - Note: If you report a sampled value in excess of the benchmark value, or outside the benchmark range for pH, you must implement Tier I or Tier 2 responses. See General Permit text. STORM EVENT CHARACTERISTICS: Date ai kfirst event sampled) Total Event Precipitation (inches): _ _ 2k \12 Mail Original and one copy to. Division of Water Quality Alin. DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 r ��---_ Date (list each additional event sampled this reporting period, and rainfall amot �,� , '�F�; -- -F Total Event Precipitation (inches): k; f ��f JUN 1 5 ?pin -I-J ) I _. -'AL OFFICE J SWU-245-03 t 308 Pane I of 2 I Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. C further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." Name (Print name) Title (Print title) (Signature) (Date) "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted Is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) S WU-245-031308 Page 2 of 2 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report For guidance on filling out this form, please visit: httt2://h2o.enr.state.nc; ustsu/porms Doc uments.htm#miwforms Permit No.: NIC1-L)-/_5 bl v1061 LP! or Certificate of Coverage No.: NICIGI_I_I_ITI 1_1 Facility Name; a 1 County: `- C Phone No. c?':�P- -n Inspector: S Date of Inspection: z;t Time of Inspection: Total Event Precipitation (inches): _ \ Was this a Representative Storm Event? (See information below) M Yes ❑ No Please check your permit to verify if Qualitative Monitoring must be performed during a representative storm event (requirements vary)_ A "Representative Storm Event" is a storm event that measures greater than 0.1 inches of rainfall and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than 0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no precipitation. By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Dutfall Description: Outfall No. -/;- Structure (pipe, ditch, etc.) C� Receiving Stream: cLE C �C Describe the industrial activities, that,pccur within the outfall drainage area. n� �+ 1 r r. CA t + r-t .r t �r'� - .� r'7t<'t ; ' �7 tr • , 7 t (it 2. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: 3, Odor: Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.): _ iA � CNI Page 1 of 2 swtt.242-11 zoos 4. Clarity: Choose the number which best describes the clarity of the discharge, where l is clear and 5 is very cloudy: 1 2 4 5 5. Floating Solids: Choose the number which best describes the amount of floating solids in the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids: r •. 1 2 3 4 5 6. Suspended Solids: Choose the number which best describes the amount of suspended solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy: 1 2 C3�4 5 7. Is there any foam in the stormwater discharge? Yes � S. Is there an oil sheen in the stormwater discharge? Yes-l-Sgq. ) 9. is there evidence of erosion or deposition at the outfalI? Yes No 10. Other Obvious Indicators of Stormwater Pollution: Note: Low clarity, high solids, and/or the presence of foam, oil sheen, or erosion/deposition maybe indicative of pollutant exposure, These conditions warrant further investigation. Page 2 of 2 SWU-242-112608 Cathy Baines Eastern Environmental Management PC Box 4030 Rocky Mt, NC 27803 Report Number: G876-115 Ckent Project ABB Q45W Dear Cathy Baines, Enclosed are the results of the analytical services performed under the referenced project for the received samples and associated QC as applicable. The samples are certified to meet the requirements of the National Environmental Laboratory Accreditation Conference Standards. Copies of this report and supporting data will be retained in our files for a period of five years in the event they are required for future reference. Any samples submitted to our laboratory will be retained for a maximum of thirty (30) days from the date of this report unless other arrangements are requested. If there are any questions about the report or services performed during this project, please call Barbara Hager at (910) 350-1903. We wilt be happy to answer any questions or concerns which you may have. Thank you for using SGS North America, Inc. for your analytical services. We look forward to working with you again on any additional analytical needs. Sincerely, SGS North America, trc. J H Di91talty signed by Barbara A. Hager ON: CN - Barbara A. Hager, C - US, O - SGS Qp Vlfilmington, NC, DU =Project Manager Date: 2009.12.21 14:28:20 -05'00' Project Manager Date Barbara Hager SGS North America,DO Business Drive, Wimington, NC 28405 _ r10.350.1903 f 910,350,1557, wwry us.ggsoo!P Memtmr of SGS List of Reporting Abbreviations and Data Qualifiers B = Compound also detected in batch blank BOIL = Below Quantitation Limit (RL or MDL) DF = Dilution Factor Dup = Duplicate D = Detected, but RPD is > 40°% between results in dual column method. E Q Estimated concentration, exceeds calibration range. J = Estimated concentration, below calibration range and above MDL LCS(D) = Laboratory Control Spike (Duplicate) MDL = Method Detection Limit MS(D) = Matrix Spike (Duplicate) POL = Practical Quantitation Limit RL/CL = Reporting Limit / Control Limit RPD = Relative Percent Difference mg/kg = milligram per kilogram, ppm, parts per million ug/kg = micrograms per kilogram, ppb, parts per billion mg1L = milligram per liter, ppm, parts per million ug/L = micrograms per liter, ppb, parts per billion % Rec = Percent Recovery °% soilds = Percent Solids Special Notes: 1) Metals and mercury samples are digested with a hot block, see the standard operating procedure document for details. 2) Uncertainty for all reported data is less than or equal to 30 percent. M 134.021208.4 _ k$ Client Sample ID: 04SW Client Project ID: ABB 04SW Lab Sample ID: G876-115-1 Lab Project ID: G876-115 Results by 6010E Dormer Lead Batch Information Print Date 12/21/2009 Collection Date: 02-Deo-09 13:15 Received Date: 03-De4>09 Matrix: WATER Result BILU ILaj§ 2E 0.0133 0.0100 MG/L 1 An*tical Batch: 120409a.csv Prep Batch: 15655 Analytical Method: 6010E Prep Method: 3010 Instrument: 1CP Prep OafePrime: 03-Oeo-09 11:45 Analyst: CRN initial Prep Wl.IVol.: 50.00 Prep Extract Vol 50 QW0 6191Yzag 04-Dec-09 0:00 Print Date: 12/2112009 Client Sample ID: 04SW Collection Date: 02-Dec-09 13-15 Client Project ID: ABB 04SW Received Date: 03-Deo-09 Lab Sample ID: G876-115-1E Matrix: WATER Lab Project ID: 0876.115 Results by 8260 Parameter Result -DE Date Analyzed Acetone BQL 25.0 UGIL 1 14-Dec-0913:59 Benzene BQL 1.00 UGIL 1 14-Dec4)913:59 8romobenzene BQL 1.00 UGIL 1 14-Dec-0913:59 Bromochloromethane BQL 1.00 UGIL 1 14-Dec 09 13:59 Bromodlohlorornethene t3QL 1.00 UGIL 1 14-Dec-0913:59 Bromotorm SOL 1.00 UGIL 1 14-Dec-0913:59 Bromomethane BQL 1.00 UGIL 1 14-Dec-0913:59 2-Bulanone BQL 25.0 UGIL 1 14-Dec-0913:59 n-Buylbenzene BQL 1.00 UG/L 1 14-Dec-0913:59 soGBuylbenzene BQL 1.00 UGIL 1 14-Dec-0913:59 ten-Butylbenzene SOL 1.00 UGIL 1 14-Dec-M 13:59 Carbon disulfide BQL 1.00 UGIL i 14-Dec-09 13:59 Carbon tetrachloride BQL 1.00 UGIL 1 14-Dec-09 13:59 Chlorobenzene BQL 1,00 UGIL 1 14-Dec-0913:59 Chlomethane BQL 1.00 UGIL 1 14-Deo-0913:59 Chloroform BQL 1.GD UGIL 1 14-Dec-0913:59 Chloromethane BQL 1.00 UGIL 1 14-Dec-0913:59 2-Chlorotoluene SQL 1.00 UG/L 1 14-Deo-0913:59 4-Chlorotoluene BQL 1.00 UGIL 1 14-Dee-0913:59 Dkbromachloromethane BQL 1.00 UGIL 1 14-De -09 13:59 1,2-Dibromo-3-chloropropane BQL 5.00 UGIL 1 14-DeC-0913:59 Dihromomethane BQL 1.00 UGIL 1 14-DeG0913:59 1,2-Dibromoethane (EDS) SQL 1.00 UGIL 1 14-Dec-09 13:59 1,2-Dlchlorobenzene BQL 1.00 UGIL 1 14-Dec-0913.59 1,3-❑ichforobenzeno SOL 100 UGIL 1 14-Deo-0913:59 1,4-Dlchlarobenzone BQL 1.00 UGIL 1 14-Dec-0913:59 trans-1,4-Dichloro-2-butane BQL 5.00 UGIL 1 14-Dec-0913:59 1,1-Dichloroethane SOL 1.00 UGIL 1 14-Dec-0913:59 1,1-Dichloroethene SOL 1.00 UGIL 1 14-Dec-0913:59 1,2-Dir-Noroethane BQL 1.00 UGIL 1 14-Deo-0913:59 cis-1,2-Dichioroethene BQL 1,00 UGIL 1 14-Dec-0913:59 trans-1,2-dichloroethene SOL 1.00 UGIL 1 14-Dec-0913:59 1.2-Dichloropropane BQL 1.00 UGIL 1 14-Dec-0913:59 1,3-01chloropropane BQL 1.00 UGIL 1 14-Dec-0913:59 2,2-Dichloropropane BQL 1.00 UGIL 1 14-Dec-D913:59 1,1-13€chloropropene BQL 1.00 UG/L 1 14-Dec-0913:59 cis-1,3-Dichloropropene BQL 1.00 UGIL 1 14-Dec-0913:59 trans-1,3-Dichloropropene BQL 1,00 UGIL 1 14-Deo-0913:59 Dlchlorodltluoromethane BQL 5.00 UGIL 1 14-Deo-0913:59 Dllsopropyl ether (RIPE) BQL 1.00 UGIL 1 14-Deo-09 13:59 Ethylbenzene BQL 1co UG/L 1 14-0ec-0913:59 Hexachlorobutadlene BQL 1.00 UGIL 1 14-Deo-09 13759 2-Hexanone BQL 5.00 UGIL 1 14-Dec-0913:59 lodomethane BQL 1,00 UGIL 1 14-Dec-0913:59 loopropylbenzene BQL 1,00 UGIL 1 14-Dec-0913:59 4-Isopropyltoluene BQL i00 UGIL 1 14-Deo-0913:59 Client Sample ID: 04SW Client Project 10: ABB 04SW Lab Sample ID: G876-115-1E Lab Project ID: G876-115 Print Date: 12121/2009 Collection Date: 02-Dec-09 13:15 Received mats: 03-Dec-09 Matrix: WATER Results by 8260 Parameter Result RUCRUCL PF QatA Analyzed Methylene chloride BQL 5.00 UGIL 1 14-Dec-09 13:59 4-Methyl-2-pentanone BQL 5.00 UGIL 1 14-Deo-0913:59 Methyl -tort -butyl ether (MTBE) BQL 1.00 UGIL 1 14-DOC-0913:59 Naphthalene BQL 1.00 UGIL 1 14-Deo-0913:59 n-Propyl benzene BQL 1.00 UGIL 1 14-Dec-0913:59 Styrene BQL 1.00 UGIL 1 14-Dec-0913:59 1,1,1,2-Tetmchloroethane BQL 1.00 UGIL 1 14-Dec-0913:59 1,1,2,2-Tetrachloroethane BQL 1.00 UGIL 1 14-Dec-0913:59 Tetrachloroethene BQL 1.00 UGIL 1 14-Deo-0913:59 Toluene BQL 1.00 UGIL 1 14-Dec-0913:59 1,2,3-Trichlorobenzene BQL 1.00 UGIL 1 14-Dec-0913:59 1,2,4-Trichlorobenzene BQL 1.00 UGIL 1 14-Dec-0913:59 Trichloroethene BQL 1.00 UGIL 1 14-Dec-0913:59 1,1,1-Trichloroethane BQL 1.00 UGIL 1 14-Dec-0913:59 1,1,2-Trichlomethane BQL 1.00 UGIL 1 14-Dec-0913:59 Trichlorofluoromethane BQL 1.00 UGIL 1 14-Dec-0913:59 1,2,3-Trichioropropene BQL 1.00 UGJL 1 14-Dec-0913:50 1,2,4-Trimethylbenzene BQL 1,00 UGIL 1 14-Dec-0913:59 1,3,5-Trimethylbenzene BQL 1.00 UGIL 1 14-Dec-0913:59 Vinyl chloride BQL 1.00 UG/L 1 14-De -09 13:59 m ,p-Xylene BQL 2.00 UGIL 1 14-Deo-09 13,59 o-Xylene BQL 1.00 UGIL 1 14-Dea0913:59 Surrogates 1,2-Dichloroethane-d4 110 64-140 % 1 14-Dec-0913:59 Toluene-d8 99 82-117 % 1 14-Dec-09 13:59 4-Bromofluorobenzene 93 85-115 % 1 14-Deo-0913:59 Batch Information Analytical Batch: 3121409 Prep Batch: Analytical Method: 8260 Prep Method: Instrument: MSD3 Prep DateMme: Analyst: DVO Initial Prep Wt.Nol.: 5 Prep Extract Vol: 5 Print Date: 12/21/2009 Client Sample ID: 04SW Collection Date: 02-Dec-09 13:15 O ieni Project ID: ASS 04SW Received Date: 03-Dec09 Lab Sample ID: G876-115-11 Matrix: WATER Lab Project ID: G876-115 Results by 8270 Parameter Result RUCK UrIlts PF Date Analyzed Acenaphthene SOL 5.89 UG/L 1 10-Dec -09 19:36 Acenaphthylene SOL 5.89 UGIL 1 10-Dec-0919:36 Anthracene SOL 5.89 UG/L I 10-Dec-0919:36 Benzo[a)anthraoene SOL 5.89 UGIL 1 10-DK-0919:36 Benzoja]pyrene SOL 5.89 UGIL 1 10-Dec-0919:36 Benzo[b]tluoranthene SQL 5.89 UGIL 1 10-Dec 09 19:36 Benzo[g,hJ)perylene BQL 5.69 UGIL 1 10-Dec-0919:36 S3enzo[k]fluoranthene SOL 5,89 UG/L 1 10-Dec-09 19.36 benzoic Acid SOL 29A UG/L 1 10-Dec-N 19 36 Bis(2-chiorcethoxy)methane SOL 5.89 UGIL 1 10-Deo-0919:36 Sis(2-chloroethyt)ether SOL 5.89 UGIL 1 10-Deo-0919'36 Bis(2-chloroisopropyl)ether SOL 5.89 UGIL 1 10-Dec-0919:36 BIS(2-e1hylhexyQphthalate SOL 5.89 UGIL 1 10-0ec-09 %36 4-bromophenyf phenyl ether BQL 5.80 UG/L 1 10-Dec-09 19:38 Butykbenzylphthalate SOL 5.69 UGIL 1 10-Dec-09 %36 2-Chlaronaphthalene SOL 5.89 UGIL 1 10-Dec-0919:36 2-Chlorophencl SOL 5.09 UGIL 1 10-Dec-0919:36 4-Chloro-3-methylphenol SOL 5.89 UGI(. 1 10-Deo-0919:36 4-Chlorcai-One SQL 29.4 UG/L 1 10-Deo-0919:36 a-Chlorophenytpherto ether SOL 5,69 UG/L 1 10-Dec-09laW Chrysene SOL 5.89 UG/L 1 10-Dec-0919:36 Dibenzo[a,h]anthraoene SOL 5.89 UGIL 1 10-Dec-0919:36 Dibenzofuran SOL 5.89 UGIL 1 i0-t0ec-09I"G Di-n-Butytphthalate t3OL 5.89 UGIL 1 10-Dec-0919:38 1,24)Ichlorobenzene BQL 5.89 UG/L 1 10-0ec-0919:36 1,3-Dlchlorobenzene BQL 5.89 UGfL 1 10-Dec-0919:36 1,4-Dlchlorobenzene SOL 5.89 UGIL 1 10-Deo-0919:36 3J-Dichlorobenzldine SOL 11.8 UGIL 1 10-Dec-0919:36 2,4-Dichloropheno4 SOL 5.89 UGIL 1 10-Dec-0919:36 Diethylphthalate SOL 5.89 UGIL 1 10-Dec-0919:36 Dimethylphthalate SOL 5,89 UG/L 1 10-Dec-0919:38 2,4-Dlmethy4phenol SOL 5.89 UGIL 1 10-Dec-0919:36 DI-n-oclylphthatate SOL 5.89 UGIL 1 10-Dec-0919:36 4,6-Dinitro-2-methylphenol BQL 29.4 UGIL 1 10-Dec-0919:36 2,4-Dinftrophenol SOL 294 UG/L 1 10-Dec-09 19 36 2,4-DlnitrotOuene SOL 5.69 UG/L 1 10-Dec-09 19 36 2,6-Dinitrolaluene SOL 5.89 UGIL 1 10-Dec-0919:36 Dlphenylamine BQL 5.89 UGIL 1 10-Dec-0919:36 Fluoranthene BQL 6A9 UG/L t 10-Dec-0919:36 Fluorene SOL 5.89 UG/L 1 10-Dec-0919:36 Hexachlorobenzene BQL 5.89 UG/L 1 10-Dec-0919:36 Hexechlorobuladiene, SOL 5.89 UGIL 1 10-Dec-0919:36 Hexachlorocyclopentadfene SOL 11.8 UGIL 1 10-Dec-0919:36 Hexachlorcethane SOL 5.89 UG/L 1 10-Dec-0919.36 Indeno(1,2,3-c,d)pyrene SOL 5.89 UG/L 1 10-Deo-0919.36 Isophorone SOL 5.89 UGIL 1 10-0ec-0919:38 Print Date: 12/21/2009 Client Sample 1D: 04SW Collection Date: 02-Dec-09 13:15 Client Project ID: ABB 04SW Received Oats: 03-Dec-09 Lab Sample ID: G876-115-11 Matrix: WATER Lab Project ID 0876-115 Results by 8270 Parameter aUttlt RUCL ii gF gjil Analyzed 2-Methyinaphthalene SOL 5.89 UG/L 1 10-Dec-0919:36 2-Methylphenol SOL 6.89 UG/L 1 10-De"919:36 3- & 4-Methylphenot SOL 5.89 UGIL 1 10-0ec-iD9 19:36 Naphthalene BOL 5.69 UGIL 1 10-Dec-0919:36 2-Nitroaniline SOL 5.89 UG/L 1 10-Dec-0919:36 3-Nitroaniline SOL 29A UGIL 1 10-Dec-0919:36 4-Nitroaniline SOL 29.4 UGIL 1 10-Dec-0919:36 Nitrobenzene SOL 5.89 UG/L 1 10-Dec-0919:36 2-Nitrophenol BQL 5.89 UG/L 1 10-Dea0910:36 4-Nitrophenol BOIL 29.4 UGIL 1 10-Dec,0919:36 N-Nltrosodl-n-propylamine SOL 5.89 UGIL 1 10-Dec-0919:36 Pent schloropheno I SOL 29.4 UGIL 1 10-Dec-0919:36 Phenenthrene 80L 5.89 UGlL 1 10-Dec-0919:36 Phenol SOL 5.99 UGIL 1 10-Dec-0919:36 Pyrene SOL 5.89 UG/L 1 10-Dec-0919:36 1,2,4-Triehlowbenzene, SOL 5.89 UG/L 1 10-Dec-0919:36 2,4,5-Trichlorophenol SOL 5.89 UG/L 1 10-Dec-0919:38 2,4,6-Tdchlorophenol SOL 5.89 UG/L 1 10-Dec-0919:36 Surrogates 2-Flucrabiphonyi 84 50.107 % 1 10-Dec-0919:36 2-Fluorophenci 76 33.118 % 1 10-Dec-0919:36 Nitrobenzene-d5 82 48.118 % 1 10-Dec-0919:36 Phenol-0 83 49-120 % 1 10-Dec-0919:36 2,4,6-Tribromophenol 106 29-152 % 1 10-Dec-0919:36 4-Terpheayl-d14 82 22-142 % 1 10-Deo-0919:36 Batch Information Analytical Batch: 7121009 Prep Batch: 15654 Analytical Method: 8270 Prep Method: 3520 Instrument: MSD7 Prep DateMme: 08-Dec-09 11:45 Analyst: DCS Initial Prep Wt,Nol.: 849 Prep Extract Vol, 5 Client Sample ID- Q4SW Client Project ID: ASS 04SW Lab Sample ID: G876-115-1 Lab Project ID: G876-115 Results by EPA1664 Parameter Oil and Grease Batch Information Result RUCL BOL 5.0 Print Date' 12/21/2009 Collection Date: 02-Dec-09 13:15 Received Date; 03-Dec-OP Matrix: WATER Units MGIL Analytical Batch: SUB Prep Batch: Analytical Method: EPAt 664 Prep Mettlaci; Instrument: Prep Datefl-lme: Analyst: Initial Prep Wt.Nol.: Prep Extract Vol: p� Date Analyzed 1 10-Dec-09 0:00 N Client Sample ID: 04SW Client Project ID: ASB 04SW Lab Sample ID: G876-115-1 Lab Project 1D: G876-115 Results by SM2540D Parameter Total Suspended Solids Batch Information Result RLICL 202 2.0 Print Date: 12121/2009 Collection Date: 02-Dec-09 13:15 Received Date: 03-Dec-09 Matrix: WATER Q£ MGIL Analytical Batch: SUB Prep Batch: Analytical Method: SM2540D Prep Method: Instrument: Prep DaterTme: Analyst: Initial Prep Wt.Nol.: Prep Extract Vol: pf Date Analyzed 1 08-Dec-09 0:00 CHAIN OF CUSTODY RECORD SOS Environmental Services Inc. Locations Nationwide •Alaska •Havau • OW • Marysen4 New Jersey • North Cma m �mm 088818 0 200 W Paeu 0*G Attdm age Alt IMM11 Tat Mn 5W z M Far: (9U1) saes o 12706mat lot S"m Chuh2t^ wv 2u1s ToP (M) MG4725 Far: (Joq 3WW61 YMrb • Rebr,ra:R.Lab U SS00 qurkvm Drive VWilmfrgtnrr, WC 2MM Tal:1910j 39a07 19Far: (01 q scat 557 Ydaw- Raeaoed vAh pod' vet - Rvtmkrd by Sam(4r IL -1111 p9LIPIP Stormwater Pollution Prevention Plan — Tier One Response Monitor Date: Wednesday, December 2.2009 Tier One Report: 1. Conduct a stormwater management inspection of the facility within two weeks of receiving sampling results. Permit -required testing was re -instated after a 3 year gap in the second quarter of 2009. The first stormwater test set was done on 121212009. Qualitative data was not available for benchmarking for the current permit period prior to this test set. Set-up was reviewed with testing agent, Cathy Baines, who concluded that the current soil disruption from the ground breaking for the construction activities caused the spike in TSS in our samples. This facility has consistently maintained a pH of 5.24 (average over 11 sample reports) since 1994. The 518 pH reading was below the threshold standards, but was not much of a dip from the historical readings done at the site due to soil type. (Implemented January 2010 — Cathy Baines with Eastern Environmental Management per Jen Dively, EHS Manager for ABB Pinetops) 2. Identify and evaluate possible causes of the benchmark excecdence. SDO Monitoring Report & Qualitative Monitoring Results: Date 1212109 (Wednesday) — Total Event Precipitation 1.26 inches TSS, mg1L pH Lead, mglL Oil and Grease TTO 202 (over 100) 5.18 (under 6.0) 0.0133 BQL BQL TSS — soil movement from recent construction activity to prep site for new 90-Day Storage Building and addition to the rear of the facility. (See photos) IL 11 ID P%1919 Stormwater Pollution Prevention Plan — Tier One Response 3. Identify potential, and select the specific: source controls, operational controls, or physical improvements to reduce concentrations of the parameters of concern, or to bring concentrations to within the benchmark range. Construction stormwater permit initially approved on November 11, 2009 with note to provide 1 hard copy of drawings and calculations sent in 111412009 email to this office by 1111512009. Construction sediment and erosion control plan was approved by NCDENR on February 24, 2010 with note to revise temporary slope drain outlet locations and/or provide note on the drawings to indicate the outlet locations to be maintained in a ditch or channel throughout the construction process. Maintain inlet and outlet protection for the temporary slope drains Provide 1 copy of drawings revised as a result of requested changes to this office by 3115110. Completion of the Construction Sediment and Erosion Control Plan gaps as noted in the permit replies along with maintaining all control and audit requirements listed in the NCDENR permit guidelines. (Implemented January 2010 — NASHCO Inc. per Jen Dively, EHS Manager for ABB Pinetops) 4. Implement the selected actions within two months of the inspection. Issues with the erosion and sediment control plan were found by the lack of proper protection applications (silt fences, etc.). Review the erosion and sediment control plan for construction project and ensure it is being properly implemented (silt fences, etc.). (Implemented January 2010 — NASHCO Inc. per Jen Dively, EHS Manager for ABB Pinetops) 5. Record each instance of a Tier One response in the Stormwater Pollution Prevention Plan. Include the date and value of the benchmark exceedence, the inspection date, the personnel conducting the inspection, the selected actions, and the date the selected actions were implemented. Plan is currently being completely revised for new layout applications and stormwater changes due to construction of two additions to the existing properly, a new roof drainage collection system, and a stormwater retention pond system. This report is the interim Tier One response while the program is being revised. 6/412010 4:51:56 AM A88 Pine#ops PAGE: 1 WORK ORDER - Inspections Work Order ID: 46957 Description: Inspection of polyurethane storage area Asset/Equip ID: DRUM STORAGE AREA Sch Date: 6/11/2010 I Asset/Equip: Polyurethane storage area Priority: 80 Procedure: Inspection of polyurethane storage area Model: Requested By: Serial# : Telephone: Skill: Location: Urethane processing area Shift: Building: Floor: ' Asset ShutDown: FV� Facility ShutDown: ❑ Status: Open Room: Warranty: UnExp. Warr I Labor: Craft Description Labor Description Est Hrs Reg Over Double Other Date Health and safety Jinnifer Dively 0 1 1 Task: 0 D: DRUM STORAGE AREA Description: Inspection of polyurethane storage area Safety: �ej Text: 1. Drums stacked no more than 2 high. 2. No visible damage to drums. 3. Containment dikes secure and no visible damage. 4. Spill kit in proper location. I 5. No signs of leakage from drums. F--- _ — Completion Information: Date: Shut: Supervisor: Down Time: �^1 Time On: ! Time Off: �_— Due Count/Meter Current Count: 0 Current Meter: 0 FFM 6!4l2010 4:52:10 AM ABB PinetOPS PAGE: 1 WORK ORDER - Inspections Work Order ID: 45965 Descriiition: Inspection of oil and cube storage area Asset/Equip ID: OIL STORAGE AREA Sch Date: 6111/2010 — AssetlEquip: Oil and lube storage area Priority: 80 Procedure: Inspection of oil and lube storage area Model: I i Requested By: Serial# : i i Telephone: Skill: ' Location: Outside maintenance, storage and engineering Bam Shift: i Building: Floor: Asset ShutDown: �� Facility ShutDown: ❑ Status: Open Room: i Warranty: UnExp. Warr l-- ----- ----- — - — --� _ I Labor: _Craft Description Labor Description Est Hrs _Reg Over Double Other Date Health and safety Jinnifer Dively 0/— Task: 0 D: OIL STORAGE AREA Description: Inspection of oil and lube storage area Safety: ❑ Text: 1. Drums stacked no more than 2 high. 2. No visible damage to drums. 3. No signs of leakage from drums. Completion Information: Date: Shift: i Supervisor: .--------J Down Time: F Time On: Time Oft: �—Due Count/Meter � Current Count: I — ^ 0 0 Current Meter. l 819/2010 3:38:26 PM ABB Pinetops PAGE: 1 WORK ORDER - Inspections Work Order ID: 4556B Description: Inspection 130days) of fuel storage area AsseVEquip ID: GROUNDS Sch Date: 5/13/2010 Asset/Equip: Plant grounds .Priority: 8 Procedure: Inspection of fuel storage area ;.'::Model: Requested By: Serial# Telephone. Skill: Location: Outside yard and grounds Shift: Building: Floor. Asset ShutDown: Wj Facility ShutDown: ❑ Status: Completed Room: Warranty: UnExp. Warr E Labor: Craft Description Labor_ DescriptionEst Firs Reg Over Double Other _ Date Mechanic Richard Culifer 25018 Task: 0 D: FUEL STORAGE INSP Description: Inspect fuel storage area Safety: V Text: 1. Check amount of fuel in tank 2. Exterior surface show signs of leakage. 3. External coating are bubbled, cracked, or damaged. 4. Tanks are rusted, pitted, or deterioated. 5. Bolts, rivets, or seams damaged cracked or rusted. 6. Welds are cracked or non uniform. 7. Tank foundation has eroded or settled. 8. Tank supports are deteriorated or buckled. 9. Tank containment cracked or collected debris. 10. Valves are leaking, deteriorated, or damaged. 11. Vents and pressure relief devices are obstructed. 12. Piping is damaged, corroded leaky Pipe supports are damaged or corroded. 13. Tank bottom have accumulated rust, scale microorganisms, or foreign material. 14. Pump out water in containment 15. KEEP A RECORD OF AMOUNT OF WATER PUMPED OUT -------------- Comments: Retain hard copy Completion Information: Due Count/Meter Date: Down Time: Current Count: ! 0 Shift: Time On: F� Current Meter:0 Supervisor: I Time Off: �� 312312 121212 811612 811612 712512 1011112 911812 11 i211 11/8/1 101411 512611 ABB Pinetops' Stormwater Analytical Testing History 5.70 1DI , ' m 1 5M �U DENR Fn F i RDIGIN L OFFIC acetone #1 Outfall #2NC43 #1 Outfall #1 Outfall #1 Outfall #1 Outfall #1 Outfall #1 Outfall #1 Outfall ,:e. fix-• - '""' - �..�r•-` '�+.. `_,.•-„ `*_-�wk _ :..... •e•...Apr, .'^. - - - - - - _�.« . _Y :. _=� ' _� =,.- �irwwlstYJ'L;;.. .,i�• m>-iA��i. s _ ,r; s t . 4 f,. i i �,. - . ,_ - -"�� � .�-���~ +`..-+i ,: r.a .t.J;-�.'_TT.+-r�,r�•.�v�•_ �.�.� •. *J1 T._._...�,t�•'<_ _�-y..-....r-•'tea• .': •-�-�r�Yw��37A.. �ts� -. _ - _- �r •;.;,�: ,�•ae� - _ - ' _ � '_;--•�- r ��;-- �iF�'�-� .., . > - - • � ..a�-�,- Fa�' :"�i' 1r��K,Q.ia_' _ �t - '�..�.•r'.�i��-`����s ' �� rytO�. _ r - y F s •.! ' ti „•G _ =f!` .' .s �J�'�y - - . •� ��� - -.r - Jai ., � - _-�.. -� - _ y �. S Jen Direly, EHS Manager FI'MUffs�tops lLuuHdJng Add'�t'mn 1. Nothing we do at ABB is worth getting hurt for Every injury and work related illness could have been prevented Safety can be managed Safety is everyone's responsibility Site Safety Rules • All local, state, federal, and ABB Corporate Safety standards, protocols, and regulations are to be followed by visitors to the site • Visitors must be accompanied by their host at all times when entering the plant floor • Enclosed shoes with backs and without heels of any type are required inside the yellow lines in the plant itself. Safety footwear (enclosed steel -toed with heel) must be worn outside the yellow walkways. • Eye protection must be worn at all times when on the plant floor (must meet ANSI Z87 standards) • Hearing protection must be worn in the designated areas in the facility. See posted signs or ask your host to identify these areas during your visit. • Stay within the yellow designated aisles as much as possible when touring the plant floor. Do not leave the designated aisles without permission from your host to enter a production area. • Horseplay of any kind is not allowed in the facility. • This is a smoke -free facility. Do not smoke inside the facility — only in the designated exterior areas, • The Pinetops site has a ZERO TOLERANCE policy for weapons, workplace violence, drug and alcohol abuse. • Willful violation of company policies will result in removal from the site and potential disciplinary and legal consequences. ® ABB Group November 18. 2009 1 SGde 3 Site -Specific Safety Hazards This facility has fork truck and other PIV traffic. Maintain the "2 Foot Rule" at all times when on the plant floor. Keep two feet from yourself and any vehicle. Ensure the operator has a clear visual of you in proximity to the vehicle when it is in operation. NEVER attempt to operate a vehicle at the facility that you have not been trained and licensed to operate by the local EHS Manager. Due to the variety of industrial processes and equipment in this facility, it is important that our visitors never enter an area or attempt to operate a vehicle or piece of equipment without clearance and approval from local management. The hazards and safety requirements vary from plant -to -plant and process -to - process. It is for the safety of our visitors and our employees that equipment and vehicles are not accessed, tampered with, adjusted, or have any of their safety devices disabled during your visit. Group N A;15 November 18, 2009 1 Slide 4 Introduction • It is the goal of ABB Pinetops to provide a safe and productive environment for all those working on the premises — be they contractor, vendor, or manufacturing personnel • The policies contained in this training are designed to maintain such an environment and must be followed by all contract personnel • Contractors working at the ABB Pinetops site may be exposed to hazardous conditions at the facility and may additionally expose ABB Pinetops' employees and the local community to hazardous conditions • All contractors are required to perform their individual and joint tasks in a safe and environmentally -responsible manner • This training is only meant to act as a supplement to the Safety Program that each employer is required to develop per OSHA Standards • A contractor's safety performance at the site will be used to determine whether a contractor remains on the site and/or be eligible for future or extended contract work at the site. CABS Group November 18, 2009 1 Slide 5 -A IM HAP" Main Contacts for the Site • Jennifer Dively — Environmental, Health, and Safety Director • Office (252) 827-3267 • Cell (252) 481-3009 • Tom Hansen — Project Coordinator • Office (252) 827-3208 • Cell (252) 414-5342 • Dennis Hackett — Production Manager • Office (252) 827-3248 • Cell (252) 375-5471 • Terry Swindell — Administrative Assistant • Office (252) 827-3128 • Mary Ann Webb — Operations Coordinator • Office (252) 827-3214 ® ABB Group A 110' November 18, 2009 1 Slide 6 MON Contractor Responsibilities • Each contractor will provide a copy of their Safety Program to ABB Pinetops PRIOR to commencing work at the site • Each contractor will partake of the Contractor Safety Training for the site • Each contractor will ensure all individuals working at the site are: • Properly trained to OSHA Construction Standards • Properly licensed and certified for all powered vehicles and permit -required tasks operated or performed on the site • Aware of the site safety requirements for compliance • Designate an on -site safety person • Maintain full responsibility and liability for all health and safety programs for their employees • Take prompt action for safety issues, incidents, and violations that occur at the site November 18, 20a9 i Slide 7 ANN Contractor Safety Requirements • Contractors will provide documentation of training competency for the employees they have on site • Copies of licenses and any specialized training for permit - required tasks shall be made available for individuals performing such tasks • Regular safety audits shall be performed by each contractor and copies are to be provided to the ABB Pinetops EHS Manager (these audits will be performed at a MINIMUM of 1 per month — the schedule may be increased based on the site activities per the EHS Manager) • Contractors will provide regular Toolbox Training to their employees on site to document safety training • Pre -Task Analysis are to be completed for site construction activities PRIOR to work commencing at the site 0 ABB Group Q ,�' November 18, 20M 1 Slide 8 A,.9- JSA / Pre -Task Analysis 3 Job ISA File #. in Date: Review Date: a l et Supersedes: 4-1 Analysis AMB: - Date: t�arrerat o� Task etar>t tune: Pre-t�at� 4 m nEzoamas tmarrm a cfpnatxua)_ rva n as rm m1 0"q Ltie r� ar rSe t�1c arA Kfi �fce tra �ooe� oc��f meaw� TaSIE durethm: fame: Signature: Location of Work. Flame: Signature: Shift name: Signature, supervisor: Marne: Signature: 9163tatilfB= Marne: Signature: Berson reappnewis oc answeving sWetV re uae a: Does trio a involve one or more of the ro Does the es=x roWre tire use of naaardoue materials? E PPE NONE Detail: MARK NECESSARY PPE W TH AN "X" Chec s Me MSOS to Lmmrstena the rwowtnt : Rank 1-4 0 Conitned WM entry 10-1 Fie, 0 Une breamg © r pe at ftEkkpk5 wave 6 fi. rtana Rd HM L E" VIM% Hand jrac . ro"ll 10 Electrleal: HDgh eoltarp per= 0 Other ACV= FaS PraL Fbon rime Oe.ct irmst REACTIVITY anacpw TyW* ZE19 Other' it you markso any of Ins above, you requtre a spectaI SPECIAL. (PPE) nnft rare each lafYI ftFYOURCES Tootn Ecimpment craft a nee rtata -Are Ira: id toils In qMd ccm f kn? win amng cc tteaW triJreets be reed? RD I G yrsct rn2a1 a]dilang sr far; D oeb the ama needs to tie bmeit? No Ar etecniv to= are urea, is 114.E THE CORRE-C I BODY POSTURE Does the team regw-e an"n==? IO grcLm tacit F=Bcum in p=e? Wo speaiv =ng eglpnW t be neeOMP No Does the taA re4-VE leaver tnspeca=7 No -EIewi ai maw owu wmpemew MSPEGT FJ GGMG BEFORE USE Dcxs the U" neea a=Orlai eg -Fib Ell OW toats W 136 MMML ChaMtafI i CaMe Rier:g? Does the tasa ? No simp f cnak£rs? t7anR? VM U1e tares Ge PEN rOr1tV t GMff oomacmrs? I)" tba mater191a to be uaem AM pinctl paM Dolt per? tf yam. pe fwm a Risk Asses$merd Accident / Incident Reporting • All incidents/accidents, including Near Miss Incidents, are to be properly documented and reported to the EHS Manager at the time of the occurrence • Contractors are required to follow all local, state, and federal requirements for reporting and treating injured employees • In the event of a severe incident or illness, Emergency Support to the site is available through the local Emergency Response Agencies by calling 911 • Contractors must notify ABB of a safety incident/accident with a preliminary written report within 24 hours of the incident occurring — verbal notification must be provided as soon as possible and no later than the end of the work shift on the day of the incident • For Lost Time Incidents and Recordable Incidents, a comprehensive investigation and written report must be provided to the ABB EHS Manager within (5) working days of the original incident 0 ABB Group November 18, 2009 1 Slide 10 7. Site Access & Parking • Contractors at the site will park in designated areas at the facility • All site traffic flow, speed limit requirements, and safety regulations are to be met • A Contractor Park Pass must be displayed on the dash of all contractor / contract employee vehicles • Only those individuals with valid driver's licenses may operate a motor vehicle on the site • Those individuals that violate site parking requirements are subject to fines, towing, and permanent removal from the site C ABB Group ,A M M November 18. 2100131 Slide 11 PUMP Emergency Procedures • Contractors are required to provide to ABB Pinetops a list of key personnel and their emergency contact information • Local emergency contact information for the site can be obtained by dialing — 911 • In the event of a fire on the site, safety protocols are to be maintained: a Evacuation Procedure activated — pulling of fire alarm handles • Contact of local fire fighting agencies • Proper handling of minor fires with the required fire -fighting equipment (i.e. ABC Fire Extinguisher, etc.) • In the event of a severe weather event, contract employees will gather in the designated shelter areas inside the main building • All chemical spills are to be reported IMMEDIATELY to ABB Pinetops personnel for documentation and insurance of proper clean-up and abatement ABB Group A;: November 18, 201i9 1 Slide 12 B H1iRN PARKING 'V,�Ec1,1V11brc PARKING SEVERE WEATHER AREAS WALKWAYS DIVIDING WALL EXITS MEET -UP POINT ® ABB Group November 18, 2009 1 Slide 13 Hazard Reporting • Construction management must investigate and abate hazards reported by construction workers • Workers have the right to stop work and report hazards immediately in the event of imminent danger to life or health • ABB Pinetops EHS will work with management and labor to resolve hazard issues 0 ABB Group �.,�tQ November 18, 20091 Slide 14 MIM Housekeeping • The work area is to be kept clean and organized at all times • Walkways and roadways are to be kept clear and in good condition • Mud, slush, or other slippery substances mus be kept off walkways and roadways • Compressed air shall not be used for cleaninc surfaces • All materials stored in tiers shall be secured ti prevent sliding, falling, or collapse — particula in those areas where tiering creates blind corners or intersection and those where heav vehicle traffic exists ® ABB Group A ■! November 18, 2009 1 Slide 15 IMPO Environmental Considerations • No chemical substances are to be brought onto the site without the MSDS being provided to ABB Pinetops for review and approval • All OSHA, EPA, and DOT regulations are to be met when transporting, utilizing, and disposing of chemical substances • All hazardous or irritating materials must be controlled to reduce exposure issues • Dusts, fumes, mists, gases, and vapors shall be eliminated, isolated, or captured • Contractors are required to provide a list of chemicals to be used on site, their storage locations, and the approximate quantities that will bE located in their work areas Contractors are required to provide spill kits to handle minor spill incidents for chemicals used on site • Hazardous chemicals (flammable, combustible, reactive, etc.) are to have proper containment and/or isolation as is indicated by their MSDS requirements • ABB Pinetops reserves the right to deny usage of any substance at the site if it is found to be hazardous to the site or personnel 0 ABB Group -A W November 18, 20091 Slide 16 j,.IP Environmental Permit Impacts • Air quality requirements shall include as necessary: • Isolation of construction areas in occupied buildings • Negative pressure ventilation of construction areas • Exhaust of airborne materials outside of occupied buildings — exhaust must not affect individuals in the same building or adjacent buildings • Limit use of hazardous/irritating substances to times when th( building is less occupied Permits for solvent -based materials must be approved by the EHO Manager prior to being used • Safer, low -emitting, and non -solvent materials should be used whenever possible • Proper disposal of chemical substances is to be followed so as not to impact site Storm water, Air, or Refuse Permits and Policies ® ABB Group November 18, 2009 1 Slide 17 Site Environmental Information • ABB Pinetops has been certified as free of the followin substances: • Asbestos • Lead • Mold • PCBs ® ABB Group November 18, 2009 1 Slide 18 Demolition Tasks • The contractor will be responsible for all necessary utility demarcation and shutdowns All lines are to be considered "hot" until properly tested and certified as isolated and de -energized • Combustible materials are to be separated from those activities that may create a flame or spark • Fire extinguishers and other necessary fire fighting equipment are to be on hand prior to staring demolition activities • Areas where demolition is occurring near heavy traffic 1 access areas are to be properly isolated 1 fenced off - 10 feet of distance at a minimum must be kept from powered lines at ALL TIMES C ABB Group November 18, 2009 1 Slide 19 Excavation Areas • Only those properly trained and licensed to operate heavy equipment shall perform trenching and excavating tasks at the site • All excavations greater than (5) feet deep must be: • Evaluated and constructed under the supervision of a competent person as defined by OSHA • Sloped or shored • Provided with a safe means of access 1 egress within 25 feet of the work area • All excavations must be barricaded • Trench boxes are recommended • Working in an unprotected trench or excavation is a violation of OSHA standards 0 ABB Group .A. 11 Q November 18, 2009 1 Slide 20 Hlpu Lockout / Tagout • Only those personnel trained in Lockout 1 Tagout procedures are to perform such tasks • Proper locks and ID tags are to be used by those personnel performing Lockout 1 Tagout activities • All energy sources are to be isolated, de -energized and verified as dissipated prior to engaging in work on those areas 1 equipment 1 systems • Those accessing equipment that have not been properly trained to OSHA standards, those that violate OSHA standards despite training, or those that create an unsafe condition with improper or lack of Lockout 1 Tagout will be immediately and permanently removed from the site and may face criminal charges • Electrical cords are to be equipped with GFCI protectors on -site Hove Group it B Amp Novamher 1B, 2009 � Slide 2i Shutdown of Primary Services • Shutdown of important 1 primary services must be approved and scheduled with the Project Coordinator and EHS Manager PRIOR to the service being interrupted • Examples include: • Fire alarm systems and components • Sprinkler systems, standpipes, fire pumps • Special suppression systems • Access to buildings • Any obstruction of exits • Emergency lighting/exit lighting • Water mains • Portable fire equipment • Street/Parking lots A minimum of 72 notification must be provided to ABB Pinetops for these requests 0 ABB Group -� .,Q. November 18, 2009 � Slide 22 H, p Hot Work When performing Hot Work, a comprehensive permit system and fire watch must be in place and only those personnel trained and certified to perform such tasks may be allowed to do so on site. • Basic steps for performing Hot Work include: • Obtaining a Hot Work Permit • Providing proper fire fighting equipment for the material being worked on • Proper protection / removal of combustible materials within a 35 foot radius • Proper protection 1 shut down of potential spark carrying equipment (conveyors, ventilation fans, etc.) within a 35 foot radius • Fire watches shall be put in place based on the material on hand — a minimum watch of 1 hour is to be in followed — more for specialized materials / areas as needed ®A98 Group n IVU November 18, 20091 Slide 23 AMP" Welding • Welding cables and connectors shall be insulated, flexible type, and capable of handling maximum current requirements of the work • Only cable free from repair or splices for a minimum distance of 10 feet from the electrode holder shall be used • Pipelines containing gases or flammable liquids or conduits containing electrical circuits shall not be used as a ground return Remove electrodes from holders when holders are unattended • Suitable eye protection 1 barrier protection for pedestrians shall be used • All flammable gas canisters will be properly stored 1 isolated as required by OSHA standards 0 ABB Group November 18, 2009 1 Slide 24 MIS Scaffolding, Ladders, and Mobile Platforms • Scaffolding shall be designed, erected, used, and dismantled in accordance with OSHA standards under the supervision of a qualified and competent person (s) as defined by OSHA • Ladders are to be individually labeled and on a regular inspection process to ensure they are in good working conditions — No wooden ladders are allowed on site • Mobile Platforms (Scissor lifts, JLG boom extending basket lifts, etc.) must have certified anchorage points capable of meeting the tie -off requirement of 5,000 pounds. • Mobile Platforms must have a daily Pre -Operation Inspection sheet that reviews the controls, safety devices, and overall safety of the equipment, etc. — Copies of these Pre - Operation Checklists must be available upon request • All work over 6 feet requires the use of Fall Protection Systems and/or equipment; including, but not limited to, a certified fall harness and lanyard. C ABB Group A I Q November 18, 2009 1 Slide 25 �,.UP Equipment Inspection • All equipment including: Powered Industrial Vehicles, Mobile Platforms, Hand Tools, Powered Tools, Rigging Equipment, Fall Protection Gear, Fire -Fighting Equipment, Confined Space Entry Gear and Test Equipment, etc. are to be inspected regularly to ensure they are maintained in safe working condition • No damaged or faulty equipment is to be used on the site — it is to be properly tagged and removed from service for repair or disposal Group ABB November 18, 2009 1 Slide 26 Summary • Contractors are to maintain all local, state, and federal code requirements including OSHA, DOT, and EPA standards • Contractors are to meet all ABB Corporate and Site - Specific Safety Regulations • ABB reserves the right to remove a contract employee or contractor as a whole for safety violations at the site • ABB's goal is to ensure that all employees contractor and manufacturing — go home safely at the end of each working day. ® ABB Group November 18, 2009 1 Slide 27 Hup co cz O O an ABB Site Health and Safety Rules For Contractor & Vendors Vehicles On Site: a) Vehicle parking is permitted in designated spaces only unless other arrangements are made with the contractor coordinator. Parking permits will be distributed by the Crew Supervisor. Permits can be obtained from the Project Coordinator, Safety Manager, or Administrative Assistant. b) All site speed limits and driving rules shall be followed at all times c) Contractors may not use any ABB vehicle on site. This includes fork lift and other similar trucks. d) Contractors and subcontractors must conform to local, state, and federal safety and environmental regulations per OSHA and EPA standards. Contractors most also meet all ABB local, divisional, and corporate safety and environmental standards per the structure of their contract for all work performed on ABB properties. Entrance to Site e) No alcoholic beverages or illegal drugs are ailowed on the premises and no person under the influence of alcohol or illegal drugs will be permitted on the premises f) Any individual who has to take prescription medications which may affect his/her ability to perform on the job must report this medication to the Medical/Safety office. (Example: Pain pills or narcotic medication) g) Entrance to the facility shall be through the Visitor Lobby unless other arrangements are made with the appointed contract coordinator. h) Visitor badges/ID shall be worn at all times inside the facility and can be obtained from the Visitor Lobby or appointed contract coordinator. Any contractor/vendor injured while on ABB premises must report the injury to the medical/safety department. Even though vendors/contractors are responsible for their own workers' compensation, injuries must be reported for record keeping purposes only. Personal Protective Equipment j) Approved safety glasses are required at all workplaces accentuated "eye protection mandatory", at all times when working within the manufacturing facility. Glasses shall be equipped with ANSI Z87side shields. k) Approved safety welding glasses are required when working around welding operations. Side shields for these glasses are also required. 1) Approved safety shoes are required when working within the manufacturing facility or when walking outside the marked footways is necessary. Approved safety shoes are also required for construction -related work tasks. m) Approved full body harnesses and 100% tie -off lanyards must be used when working above 6 feet working height unless fixed or temporary scaffolds are provided. They must be fitted with guard rails and toe boards. This includes work performed on aerial lifts — scissor and extending basket types, and ladders when working height is over 6 feet. Fire a) Smoking is not permitted in any ABB site except is special designated areas. b) Hot work may not be carried out except with a hot work permit which shall be obtained from the appointed contractor coordinator. DATE Vendor / Contractor Representative's Signature PRINT NAME OF VENDOR / CONTRACTOR October 21, 2009 Aft ABB H&S CONTRACT CONDITIONS Sub Contractor Facing These health and safety (H&S) contract conditions form part of ABB's contract requirements and shall apply to all sub contractors throughout the duration of the contract to ensure that the work is com- pleted with minimum risk to ABB, its client and any other person who may be affected by the works. 1. It is ABB's policy to conduct its undertaking in a safe manner and without risk to health to both ABB employees and any other persons who may be affected by ABB's work, or to the environ- ment. To this end ABB and its suppliers will operate to either the H&S requirements prescribed by the client, or local regulatory requirements or OSHA standards whichever standard is deemed to be the higher. 2. In respect of projects where there is construction work involved ABB and its sub contractors shall as a minimum operate to the OSHA code Safety and Health in Construction unless higher stan- dards are prescribed by the client, or by ABB. 3. ABB shall communicate its specific H&S requirements through the outline H&S plan that will be produced at the pretender stage which shall form part of the invitation to tender (ITT) documenta- tion. 4. The supplier shall price his works based on compliance with all the H&S requirements specified in the ABB outline H&S plan so that all such requirements are properly resourced, coasted and com- plied with throughout the duration of the work. 5. As part of his tender submission the supplier shall provide his proposed H&S plan which shall set out how he will manage his works in compliance with ABB's H&S requirements. He shall also submit examples of risk assessments and method statements (or their equivalents). 6. After contract award, but before starting work on site, the supplier shall prepare a detailed con- struction H&S plan that shall set out how the supplier will manage the work safely, and without risk to health to persons who may be affected by his work or to the environment and in accordance with the H&S requirements set down by ABB in the outline H&S plan. 7. The construction phase H&S plan shall contain details as to how the work will be managed in ac- cordance with ABB's H&S requirements and shall be amended as appropriate to reflect the risk profile of the work being carried out. 8. The supplier shall not be able to start work on site unless he has submitted his detailed construc- tion, H&S plan to the ABB designated responsible person at least 21 days prior to the scheduled start date on site. 9. The supplier shall also submit his method statement or its equivalent, based on a risk assessment at least 7 days prior to the planned start of the relevant work activity. The method statement shall be approved by the ABB designated responsible person for the work on site. 10. The supplier shall ensure that all his workers are briefed on the ABB site H&S requirements and the consequences of non compliance. This shall be through the site induction after which they will be issued with a site ID. 11. The site manager appointed by ABB shall be in control of the ABB work site. In this context the site shall constitute the specific work area(s) where ABB is undertaking the work on behalf of the client. 12. The ABB Site Manager or his designated representative shall have the power to exclude any per- son from the ABB "site", after reasonable warning, if that person is deemed to be non compliant with any of the site H&S rules laid down, or is working in a manner that is deemed to be unsafe. There shall be no cost to ABB as a consequence. 13. The ABB Site Manager shall have the power to stop work at any time if he is of the opinion that the supplier is working unsafely, or where there is a significant risk to health to persons who may be affected by the work or to the environment, or where the supplier is in direct contravention of ABB's H&S requirements. In such circumstances the supplier shall bear any costs that may arise as a result of not being able to complete the work at the time. Subcontractor Safety Requirements August 25, 2008 AL MW ii 3SA File #; ��� Origin Date: �' ■� § Review Date: Safety Supersedes. -- -_ . Authorized by: Analysis Authorized Date: General Descri tian: Task start time: Pre -Meeting Job Attendees (name & signature): IYe read and understood the risk of the task and will take the proper control measures. Task duration: Name: Signature: Location of work: Name: Signature: Shift Name: Signature: Supervisor: Name: Signature: Signature: Name: Signature: Person responsible of answering safety relatedquestions: Does the activity involve one or more of the following: Does the activity require the use of hazardous materials? P P E NONE Detail: MARK NECESSARY PPE WITH AN "X" Check the MSDS to understand the following: Rank 1-4 0 Hot work r , 0 Confined space entry i 0 Line breaking 0 Work performed at heights above B ft. Hard Hat Hearing Eye Foul Hand (scaffolds, roof, etc.) 0 Electrical: High voltage permit Q Other: n Fall Prot. Face Shield Res , Dust Mask REACTIVITY ® ia SCBA HazMat Goggles Tyvek Suit Welding Other: H you marked any of the above, you require a special SPECIAL (PPE) permit for each 'ob! Tools Equipment Craft support Materials -Are hand tools in good condition? Will lifting of heavy objects be required? No Detail if you need additional support Does the area needs to be barricaded? No -If electrical tools are used, is USE THE CORRECT BODY POSTURE Does the task require an air monitor? No ground fault protection in place? Will special lifting equipment be needed? No Does the task require leader inspection? No -Electrical tools/ cords inspected? INSPECT RIGGING BEFORE USE Does the task need additional light? No List the tools to be used: Chainfall I Come Along? Does the task require welding screens? No Will the task be performed with other contractors? If yes, perform a Risk Assessment Slings I Chokers? Crane? Are pinch points protected? Detail: Detail the materials to be used: UEMERGENCY RESPONSE MAIN HAZARDS TO BE CONSIDERED: Where is the nearest eye wash station located? Battery system Firelexplosion Noise /hearing damage Site access & security Chemicals (MSDS) Flammable materials Other work crews in the area Temporary supplies Cold temperatures Flying objects Pinch points Uneven surfaces Compressed air Gas leaks Pollution Vehicle traffic Construction/demolition work Hand held power tools (11OV) Moor housekeeping Vehicles in movement Cuts & abrasions Heat stress Poor lighting Weather Dust installation Hot surfaces Poor work position Welding arc Electrocution/shock Lead PainVHex Chromium Pressudzedloompressed or vacuum systems Welding fume Evacuations Lifting: manual Railway traffic Work overhead Eye injury Lifting: mechanical Restricted access Fall from heights Machinery: rotatelmoving Rough/sharp material Falling objects Noise Silica dust/asbestos Where is nearest safety shower located? Where is the nearest extinguisher located? Where is the nearest meeting point located? Where is the nearest first aid kit located? EMERGENCY RESPONSE NUMBER: General recommendations: Final meeting attendees (name and signature). I did my job safe) - Look out for equipment and vehicles in motion. -Clean up the area during the shift. Do not wait until the task is complete. -Obey the focal safety rules. At the end of the service check the following: 0 All tools and equip. are stored properly U The work area has been cleaned up LockoutlTagout has been removed after safe re-energization of equipment ❑ The welding screens has been stored 13 Barriers have been removed E3 Additional light sources removed !OB SAFETY ANALYSIS tSTEP BY STEPd STEP # POTENTIAL HAZARDS SAFETY PROCEDURES and CONTROL MEASURES Q;nUde Con#en9ent es) i z 3 4 r� �y �r^i�..e�-�'�� 3«w -t _ � 1n++ --. spa- •+,"T.F}`:Sc w � � "�_ 1-0 t+; �-:...��. +p�iwttc' er". �� �r T"� � fi' ^ F L�r`� �•���_;.cy f - _ '; •� .r .y.s! ra_ '•-:.�'�"6.+..'^: ,+, r•• � i..���•:Y �• ��+w.: �- i� r.� y-i.- � -�v; • � - + � � A^ _ � i �..s"~.�.Sc._ _.. � -� i- -.a � • - ^ % {' - �"t�',�'.+..•�-"� �Y� = �'-'��-�.� f'�--�+-.-� yam: '�•� a _ • �/ v `- -i� . �� :.s �.n,;��..r�r... . "- _ �: • � �1�� - - -- c�! �'r ' -�.. ��j_".,�:�_ �"���- � - T '� ! �' ^ + 3�sr"'�" 7i+�,�GF''r•K •v:ii'_. a4 •r.,� • �"r..1N.:,�-r _lay+_„; • _� .+� � � ! �r . r� ��.*-'=�i - - - ^1f� .Lr••w^ js _ �ti. �L.��?�ti.��a.f - •�.? .d+��• 'Y � i+!'' . -- ,: _ -•. ^•-.;s'" �9 J�. �`' •-`��� . ~;: . + .� r � . _ +'. 3' tip_+•r�.�:::.:5�""+��'^'..-�:-^+.u3�+.+�-,tom . ..,.. •'�^ ^ 'i ce d6-: Jen Dively, EHS Manager (Pinetops, Tarboro, and Greensboro, NC) Se=.,.,pt.rB-mbEa.,.r 2009 OSHA Regulation 1910 Subpart Z and 1910.1200 .r This occupational safety and health standard is intended to address comprehensively the issue of evaluating the potential hazards of chemicals, and communicating information concerning hazards and appropriate protective measures to employees, and to preempt any legal requirements of a state, or political subdivision of a state, pertaining to this subject. Evaluating the potential hazards of chemicals, and communicating information concerning hazards and appropriate protective measures to employees, may include, for example, but is not limited to, provisions for: developing and maintaining a written hazard communication program for the workplace, including lists of hazardous chemicals present; labeling of containers of chemicals in the workplace, as well as of containers of chemicals being shipped to other workplaces; preparation and distribution of material safety data sheets to employees and downstream employers; and development and implementation of employee training programs regarding hazards of chemicals and protective measures. Under section 18 of the Act, no state or political subdivision of a state may adopt or enforce, through any court or agency, any requirement relating to the issue addressed by this Federal standard, except pursuant to a Federally -approved state plan. eH No 6, A,.O Novemberer O D 6, 2009 1 Slide 2 Standards in English If you work somewhere that uses chemical substances that the standards defined as "hazardous," your employer needs to give you information about the following: 1. What makes something hazardous vs. non -hazardous? 2. What information must be provided about hazardous materials and where is it located for your review? 3. What to do if you work with or are exposed to a hazardous substance? 4. How are hazardous materials properly handled, stored, labeled, and disposed of at your site? 5. What do you do in the case of a hazardous material spill or emergency? This is part of the "Right to Know" requirements for all workers in the United States. CASS Group �;1111 November 6, 2009 1 Slide 3 What makes something "hazardous"? • Any substance which can cause harm as a result of its chemical properties, physical properties or both. What does this definition include? • Carcinogens Toxic agents Irritants • Corrosives • Sensitizers • Agents which act on the hematopoietic system • Agents which damage the lungs, skin, eyes, or mucous membrane; • Chemicals which are combustible, explosive, flammable, oxidizers, pyrophorics, unstable -reactive or water -reactive • Chemicals which in the course of normal handling, use, or storage may produce or release dusts, gases, fumes; vapors, mists or smoke which may have any of the previously mentioned characteristics ® ABB Group .A D W November 6, 2009 1 Slide 4 J%,.a Hazard Definitions • Carcinogens - any substances that can cause or aggravate cancer in humans. • Toxic Agents - substances that have been shown to cause death in lab rats that receive relatively high dosages. • Irritants - substances that can cause irritation of the skin, eyes, or respiratory system. Effects may be acute from a single high level exposure, or chronic from repeated low-level exposures to such compounds as chlorine, nitrogen dioxide, and nitric acid. • Corrosives - highly reactive substance that causes obvious damage to living tissue. Corrosives act either directly, by chemically destroying the part (oxidation), or indirectly by causing inflammation. Acids and bases are common corrosive materials. Corrosives such as these are also sometimes referred to as caustics. Typical examples of acidic corrosives are hydrochloric (muriatic) acid and sulfuric acid. Typical examples of basic corrosives are sodium hydroxide and lye. • Sensitizers - chemical that causes a substantial proportion of exposed people or animals to develop an allergic reaction in normal tissue after repeated exposure to the chemical -A IWO 0 ABB Group ; A lit a November 6, 2W9 I Slide 5 Hematopoietic System • The bodily system of organs and tissues, primarily the bone marrow, spleen, tonsils, and lymph nodes, involved in the production of blood. • Leukemia is a good example of a disease that attacks the hematopoietic system ®ABB Group A IQ M, . November 6, 2009 1 Slide 6 , a Health Hazards There are two main types of health hazards: Acute health effects are characterized by sudden and severe exposure and rapid: absorption of the substance. Normally, a single large exposure is involved. Acute health effects are often reversible. Examples: carbon monoxide or cyanide poisoning. Chronic health effects are characterized by prolonged or repeated exposures over many days, months or years. Symptoms may not be immediately apparent. Chronic health effects are often irreversible. Examples: lead or mercury poisoning, cancer. ®ABB Group November 6, 200q f Slide 7 ;v �. `,�` .�; �/ r r l �= [lam i/ � � �"M1 ' �� �/'i %'�� � . Inhalation • Chemicals in the form of gases, mists, fumes and dusts entering through the nose of mouth can be absorbed through the mucous membranes of the nose, trachea, bronchi and lungs • Unlike the skin, lung tissue is not a very protective barrier against the access of chemicals into the body • Using proper ventilation and respiratory protection is important to help reduce the chances of inhalation hazards 0 ABB Group November 6. 2009 1 Slide 9 11 Q IPO Ingestion • Ingestion involves chemicals entering the body through the mouth. Chemical dusts, particles and mists may be inhaled through the mouth and swallowed. They may also enter through contaminated objects, such as hand or food that come in contact with the mouth • This sort of exposure is generally accidental • Washing up thoroughly before breaks and meals is key to reducing the chances of ingesting a chemical from the workplace ® ABB Group November 6, 2009 1 Slide 10 Skin Absorption • Although skin is an effective barrier for many chemicals, it is a common route of exposure • The toxicity of a chemical depends on the degree of absorption that occurs once it penetrates the skin. • Once the skin is penetrated, the chemical enters the blood stream and is carried to all parts of the body. • Proper PPE can reduce the chance of skin absorption when working with chemicals Q ABB Group � IPB November 6, 2009 1 Slide 11 j"7 Combustible vs. Explosive vs. Flammable — The Ultimate Blow Up! • Flash Point - the lowest temperature at which a liquid can form an ignitable mixture in air near the surface of the liquid. The lower the flash point, the easier it is to ignite the material. • Combustible (solid or liquids) - any liquid having a flash point at or above 100°F, but below 200°F, except any mixture having components with flashpoints of 200°F, or higher, the total volume of which make up 99 percent or more of the total volume of the mixture." • Flammable (solid, liquid, or gas) - any material having a flash point below 100°F except any mixture having components with flash points of 100°F or higher, the total of which make up 99 percent or more of the total volume of the mixture. Flammable liquids shall be known as Class I liquids. • Explosive (solids or liquids) - a class of materials that can undergo a rapid chemical decomposition when subject to an external force (shock, friction, sparks, etc.). The rate of decomposition across the explosive material travels faster than the speed of sound, and produces large amount of heat and gas. CABB Group November 6, 2009 1 Slide 12 -A IDs Q' MIPM Extreme Physical Hazards Oxidizers - a chemical reaction of a substance with oxygen (2) or an oxygen -containing material which adds oxygen atom(s) to the compound being oxidized. Oxidation reactions are usually very exothermic (producing heat). Therefore, if a compound says "OXIDIZER", this means that it can cause other materials to combust more readily (or upon contact!) or make fires burn more fiercely. Always store oxidizers away from flammable or combustible materials as well as sources of heat, flame or sparks. Be sure to examine the MSDS and label carefully to determine which materials are incompatible. P ro horics - material can spontaneously ignite in air. The word is derived from Greek for "fire -bearing". Many pyrophoric materials are also water reactive, reacting vigorously with water or high humidity, often igniting upon contact. Unstable -Reactive - Substances that will react with their container, air, or moisture, self -polymerize, or become self - reactive under normal conditions of handling and storage. Water -reactive - substances are dangerous when wet because they undergo a chemical reaction with water. This reaction may release a gas that is either flammable or presents a toxic health hazard. In addition, the heat generated when water contacts such materials is often enough for the item to spontaneously combust or explode. In simpler terms, water reactive materials are incompatible with water. 0 A@8 [group November &, 2009 1 Slide 13 -A 11M IMP" Other Physical Hazards • Extreme Heat or Cold Radiation — Ultraviolet and Ionizing • Ergonomic -Related Issues • Vibration 1 Powered Processes 0 ABB Group November 6, 2009 1 Slide 14 -A 110 AIPD Primary Identification • Primary Container Labeling Manufacturer or Shipper Original Containment -A WIN ® A66 Group �,7 p IPB November B, 20091 Slide 15 Secondary Labels • Secondary Container Labeling Transfer Containers L LABELED ® ABB Group _A. W November 6, 2009 1 Slide 16 A,.p Identification of Hazards There are two standard labeling systems used in North America for identifying materials and their potential hazards: • HMIS — Hazardous Material Identification System . • NFPA — National Fire Protection Association These systems are designed to identify the hazards associated with chemicals or materials through a labeling system using color codes and numerical values. Methyl Ethyl Death 0A k 0 Personal Protection OC Corrosive Reactivity O ABB Group November 6, 2009 1 Slide 17 1 3 Minimal/None — No residual injury Slight - Irritation or minor residual injury Moderate — Intense exposure could cause temporary incapacitation High - Short-term exposure could cause serious temporary or residual injury Extreme - Limited exposure could cause death or major residual injury Red - Flammability None —Won't burn at 15100° F Slight —[POEMpoint above Mr IF Moderate —Flash point 100° - MrIp High — Flash point below TQVI IF �E b@Hng point above 100° or IROPO above 73° IF & 12F below Nr Extreme — Flammable gases or liquids with flash points below 73° F & boiling Point below 100° [Class I, Div q CABS croup �Q'•�j''�;'"�. November 0, 2009 1 Slide 19 Yellow - Reactivity 0 Stable material 1 Material can become unstable at elevated temperatures and pressures 2 Readily undergoes violent chemical change but will not detonate 3 Requires a strong initiating source for detonation 4 Readily capable of detonation under ambient conditions ® ABB Group 8 WO November 6, 20091 Slide 20 MIP" C. he, -m-...-name H6,9Ith Olutl) 4 e-ad!'y 1- extrerrie dander; 2 h (dous, 1 -----sl.jOhtlV ifit, Ha'ard z hz=ar.dous.e OXY'm ox''idizAr' 0 - normalm. r.1 al. ACID:-- Acid, :AL.K- Al kal -ci R.,7 *-..�-orrbsive: 'use::no- rater; R--A D radiation Maz Fl re 1- Ha''zard (te:d) Flash-. Po i Ot - T,e'm' P, fl4mm 0 4 bel' vac731F -7 3--- 7-3 =to-IGO flalm�-m Z..- '[91 to� 2 ' 00 ' F,'--:co I ov-Or' '200F -slightly combustible 0 - v"rill .not.- urn - Reactivity (yeuow.� 4 -may deto- n""Att. -Z"'he.: 4t s"ho" d kbi"' r 'm'AY d'e"t-6 In' A t el. * '2-- V-idlehtthem reaction I'--.6h-st-a"bl'6Af 'b-696.d' 0, e& White — PPE / Special Precautions F Hazardous Medals HAZAHQ INDEX � PIERSONAL P410TEECTIOrd iTiDEX ; t ' 5 zr *An ram.:= anmlMlM� �� � 3 •i .. ........ . -w� E A B E late F I Ask your supervisor for specie! handling instructions Group A,PB November mber 6, 2009 1 Slide 22 f - �� - �1 -. �• -,er �_-� ^' 'r �`: �,�}:i" rr'r ;r,L ��t -a-�i y �_.i yid ���I =� `r �- _ - � I�_ •-e•z. ; r � 6 ! ..w{~����.5 ' r � ,'`' r '.' -_ s;�m. ,�: r. ^ci �I '•' -1:F 1 z. ._ i • 4 f ny • V }J{ _ ;�� _ _;.; ;,... tee► .. .. .... ... Hazard Monitoring • N+ - Annual Hearing Tests Create a baseline hearing test sample a Audiometer Readings a Area Reviews as needed for new or borderline equipment and processes Storm Water Sampli - Run-off concentrations into the storm water drains (bi-annual) Air Sampling — as needed in areas where inhalation hazards are high or ventilation needs to be analyzed `Always for Confined Space Entry CABB Group November 6, 2009 1 Slide 24 Occupational Exposure Limits Refer to the maximum airborne concentrations of contaminants to which it is believed that workers may be exposed repeatedly without experiencing adverse health effects • TWA (Time WeightedAvera- The maximum concentration of a substance to which most workers can be exposed for 8 hours a day, 40 hours a week, without suffering adverse health effects • STEL (Short -Term Exposure Limit) - The maximum concentration to which a worker may be exposed for up to 15 minutes, four times a day with at least an hour between exposures Ceiling - The concentration of a substance to which no worker may be exposed for any part of the working day w IDLH (Immediately Dangerous to Life or Health) - Maximum airborne concentration from which a worker could escape without respiratory protection without experiencing escape -impairing irreversible health effects 0 A69 Group -n. 1WD November6, 2009 1 Slide 25 HI/q The Mysteries of the MSDS • What is an MSDS? • Where can I find an MSDS for a product in the plant? • How the heck am I supposed to figure out what hazards are present by looking at the MSDS? O RSB Group .o'R November 6, 2009 1 Slide 26 AMP'", MSDS Decoded Material Safety Data Sheet Isopropyl alcohol MSDS Section 1. Chemical Product,and�Compan Identification Product Name: Isopropyl alcohol Contact Information: Catalog Codes: SLI1153, SLI1579, SL11906, SL11246, SLI1432 CAS#: 67-63-0 RTECS: NT8050000 TSCA: TSCA 8(b) inventory: Isopropyl alcohol CI#: Not available. Synonym: 2-Propanol Chemical Name: isopropanol Chemical Formula: C3-HS-O C ASS Group November 6, 2009 1 Slide 27 Sciencelab.com, Inc. 14025 Smith Rd, Houston, Texas 77396 US Sales: 1-800-901-7247 Intemational Sales: 1-281-4414=0 Order Online: ScienceLab_com CHEMTREC (24HR Emergency Telephone), call: 1-800424-9300 International CHEMTREC, call: 1-703-527-3887 For non -emergency assistance, call: 1-281-441-4400 Section 2: Composition and Information on Ingredients Composition: Name CAS # % by Weight Isopropyl alcohol 67-63-0 100 Toxicological Data on Ingredients: Isopropyl alcohol: ORAL (LD50): Acute: 5045 mgtkg [Rat]_ 3600 mg/kg [Mouse]. 6410 mglkg [Rabbit]_ DERMAL (LD50)_ Acute: 12800 mgtkg [Rabbit]. Section 3: Hazards Identification Potential Acute Health Effects: Hazardous in case of eye contact (irritant), of ingestion, of inhalation. Slightly hazardous in case of skin contact (irritant, sensitizer, permeator). Potential Chronic Health Effects: Slightly hazardous in case of skin contact (sensitizer). CARCINOGENIC EFFECTS: A4 (Not classifiable for human or animal.) by ACGIH, 3 (Not classifiable for human_) by IARC. MUTAGENIC EFFECTS: Not available_ TERATOGENIC EFFECTS: Not available. DEVELOPMENTAL TOXICITY: Classified Reproductive system/toxin/female, Development toxin [POSSIBLE]_ The substance may be toxic to kidneys, liver, skin, central nervous system (CNS). Repeated or prolonged exposure to the substance can produce target organs damage. I Section 4: first Aid Measures Eye Contact: Check for and remove any contact lenses. In case of contact, immediately flush eyes with plenty of water for at least 15 minutes. Cold water may be used. Get medical attention. Skin Contact: Wash with soap and water_ Cover the irritated skin with an emollient_ Get medical attention if irritation develops. Cold water may be used. Serious Skin Contact: Not available_ Inhalation: If inhaled, remove to fresh air. If not breathing, give artificial respiration_ If breathing is difficult, give oxygen_ Get medical attention if symptoms appear_ Serious Inhalation: Evacuate the victim to a safe area as soon as possible. Loosen tight clothing such as a collar, tie, belt or waistband. If breathing is difficult, administer oxygen. If the victim is not breathing, perform mouth-to-mouth resuscitation. Seek medical attention. Ingestion: Do NOT induce vomiting unless directed to do so by medical personnel. Never give anything by mouth to an unconscious person_ Loosen tight clothing such as a collar, be, belt or waistband. Get medical attention if symptoms appear_ Serious Ingestion: Not available. Section 5: Fire and -Explosion Data Flammability of the Product: Flammable. Auto -Ignition Temperature: 3990C (750_2"F) Flash Points: CLOSED CUP: 11.667'C (53°F) - 12.778 deg. C (55 deg_ F) (TAG) Flammable Limits: LOWER- 2% UPPER. 12.7% Products of Combustion: These products are carbon oxides (CO, CO2)_ Fire Hazards in Presence of Various Substances: Highly flammable in presence of open flames and sparks, of heat. Flammable in presence of oxidizing materials. Non-flammable in presence of shocks. Explosion Hazards in Presence of Various Substances: Risks of explosion of the product in presence of mechanical impact: Not available_ Explosive in presence of open flames and sparks, of heat. Fire Fighting Media and Instructions: Flammable liquid, soluble or dispersed in water. SMALL FIRE: Use DRY chemical powder. LARGE FIRE: Use alcohol foam, water spray or fog_ Special Remarks on Fire Hazards: Vapor may travel considerable distance to source of ignition and flash back. CAUTION: MAY BURN WITH NEAR INVISIBLE FLAME. Hydrogen peroxide sharply reduces the autoignition temperature of Isopropyl alcohol_ After a delay, lsopropyl alcohol ignites on contact with dioxgenyl tetrafluorborate, chromium trioxide, and potassium tert-butoxide. When heated to decomposition it emits acrid smoke and fumes. November Group November 6, 2009 I Slide 14 Special Remarks on Explosion Hazards: Secondary alcohols are readily autooxidized in contact with oxygen or air, forming ketones and hydrogen peroxide_ It can become potentially explosive_ It reacts with oxygen to form dangerously unstable peroxides which can concentrate and explode during distillation or evaporation. The presence of 2-butanone increases the reaction rate for peroxide formation. Explosive in the form of vapor when exposed to heat or flame. May form explosive mixtures with air_ Isopropyl alcohol + phosgene forms isopropyl chloroforr ate and hydrogen chloride_ In the presence of iron salts, thermal decompositon can occur, whicn in some cases can become explosive_ A homogeneous mixture of concentrated peroxides + isopropyl alcohol are capable of detonation by shock or heat_ Barium Perchlorate + isopropyl alcohol gives the highly explosive alkyl perchlorates_ It forms explosive mixtures with trinitormethane and hydrogen peroxide. It produces a violent explosive reaction when heated with aluminum isopropoxide + crotonaldehyde_ Mixtures of isopropyl alcohol + nitroform are explosive_ I Section C: Accidental Release Measures { Small Spill: Dilute with water and mop up, or absorb with an inert dry material and place in an appropriate waste disposal container_ Large Spill: Flammable liquid_ Keep away from heat. Deep away from sources of ignition. Stop leak if without risk_ Absorb with DRY earth, sand or other non-combustible material. Do not touch spilled material_ Prevent entry into sewers, basements or confined areas; dike if needed. Be careful that the product is not present at a concentration level above TLV. Check TLV on the MSDS and with local authorities SeIStolrage, Precautions: Keep away from heat. Keep away from sources of ignition. Ground all equipment containing material. Do not ingest. Do not breathe gastfumes/ vapor/spray Avoid contact with eyes_ Wear suitable protective clothing. In case of insufficient ventilation, wear suitable respiratory equipment. If ingested, seek medical advice immediately and show the container or the label. Keep away from incompatibles such as oxidizing agents, acids. Storage: Store in a segregated and approved area_ Keep container in a cool, well -ventilated area_ Keep container tightly dosed and sealed until ready for use Avoid all possible sources of ignition (spark or flame). Section , n ExRosure.ContralslPe so;nal Protection y. Engineering Controls: Provide exhaust ventilation or other engineering controls to keep the airborne concentrations of vapors below their respective threshold limit value. Ensure that eyewash stations and safety showers are proximal to the work -station location. Personal Protection: Splash goggles- Lab coat_ Vapor respirator. Be sure to use an approved/certified respirator or equivalent. C-01 Gloves.w Personal Protection in Case of a Large Spill: Splash goggles. Full suit_ Vapor respirator_ Boots. Gloves. A self contained breathing apparatus should be used to avoid inhalation of the product_ Suggested protective clothing might not be sufficient, consult a specialist BEFORE handling this product_ Exposure Limits: TWA- 983 STEL_ 1230 (mg/m3) [Australia] TWA: 200 STEL: 400 (ppm) from ACGIH (TLV) (United States] [1999] TWA: 980 STEL 1225 (mg/m3) from NIOSH TWA: 400 STEL_ 500 (ppm) from NIOSH TWA: 400 STEL: 500 (ppm) [United Kingdom (UK)] TWA: 999 STEL. 1259 (mg1m3) [United Kingdom (UK)] TWA: 400 STEL. 500 (ppm) from OSHA (PEL) [United States] TWA. 980 STEL: 1225 (mg/m3) from OSHA (PEL) [United States]Consult local authorities for acceptable exposure limits. Section 9: Phvsical and Chemical Properties Physical state and appearance: Liquid. Odor: Pleasant_ Odor resembling that of a mixture of ethanol and acetone. Taste: Bitter. (Slight.) Molecular Weight: 60.1 g/mole Color: Colorless_ pH (1% soln/water): Not available. Boiling Point: 82.5QC (180_5`F) Melting Point:-88.50C (-127.3"F) Critical Temperature: 2350C (455'F) Specific Gravity: 0.78505 (Water = 1) Vapor Pressure: 4.4 kPa (aa 20'C) Vapor Density: 2.07 (Air = 1) Volatility: Not available_ Odor Threshold: 22 ppm (Sittig, 1991) 700 ppm for unadapted panelists (Verschuren, 1983)_ Water/Oil Dist. Coeff.: The product is equally soluble in oil and water, log(oil/water) = 0.1 lonicity (in Water): Not available_ Dispersion Properties: See solubility in water, methanol, diethyl ether, n-octanol, acetone Solubility: Easily soluble in cold water, hot water, methanol, diethyl ether, n-octanol, acetone. Insoluble in salt solution_ Soluble in benzene. Miscible with most organic solvents including alcohol, ethyl alcohol, chloroform. Section 10 Stability; and :Reactivity Data Stability: The product is stable. Instability Temperature: Not available_ Conditions of Instability: Heat, Ignition sources, incompatible materials H I H —C—H I H-- C O -- H I H —C—H I H Isopropyl alcohol C3H7OH Incompatibility with various substances: Reactive with oxidizing agents, acids, alkalis. Corrosivity: Non -corrosive in presence of glass. Special Remarks on Reactivity: Reacts violently with hydrogen + palladium combination, nitroform, oleum, CQCI2, aluminum triisopropoxide, oxidants Incompatible with acetaldehyde, chlorine, ethylene oxide, isocyanates, acids, alkaline earth, alkali metals, caustics, amines, crotonaldehyde, phosgene, ammonia. Isopropyl alcohol reacts with metallic aluminum at high temperatures. Isopropyl alcohol attacks some plastics, rubber, and coatings_ Vigorous reaction with sodium dichromate + sulfuric acid_ Special Remarks on Corrosivity: May attack some forms of plastic, rubber and coating Polymerization: IlVill not occur. Section 11: Toxicoloalcal Information Routes of Entry: Absorbed through skin. Dermal contact_ Eye contact. Inhalation. Toxicity to Animals: WARNING: THE LC50 VALUES HEREUNDER ARE ESTIMATED CAN THE BASIS OF A 4-HOUR EXPOSURE. Acute oral toxicity (LD50): 3600 mg/kg [Mouse]. Acute dermal toxicity (LD50)- 12800 mg/kg [Rabbit]_ Acute toxicity of the vapor (LC50): 16000 8 hours [Rat]_ Chronic Effects on Humans: CARCINOGENIC EFFECTS: A4 (Not classifiable for human or animal.) by ACGIH, 3 (Not classifiable for human.) by IARC. DEVELOPMENTAL TOXICITY: Classified Reproductive system/toxin/female, Development toxin [POSSIBLE]_ May cause damage to the following organs: kidneys, liver, skin, central nervous system (CNS), Other Toxic Effects on Humans: Hazardous in case of ingestion, of inhalation. Slightly hazardous in case of skin contact (irritant, sensitizer, permeator). Special Remarks on Toxicity to Animals: Not available_ Special Remarks on Chronic Effects on Humans: Maycauseadversereproductive/teratogen n t a I abnormalities(developmental toxin)) based on animal studies_ Detected in maternal milk in human. iceffects(fertiIity,fetoxicity,deveIopme Special Remarks on other Toxic Effects on Humans: Acute Potential Health Effects: Skin: May cause mild skin irritation, and sensitization_ Eyes: Can cause eye irritation. Inhalation: Breathing in small amounts of this material during normal handling is not likely to cause harmful effects_ However, breathing large amounts may be harmful and may affect the respiratory system and mucous membranes (irritation), behavior and brain (Central nervous system depression - headache, dizziness, drowsiness, stupor, incoordination, unconciousness, coma and possible death), peripheral nerve and senstation, blood, urinary system, and liver_ Ingestion: Swallowing small amouts during normal handling is not likely to cause harmful effects_ Swallowing large amounts may be harmful. Swallowing large amounts may cause gastrointestinal tract irritation with nausea, vomiting and diarrhea, abdominal pain_ It also may affect the urinary system, cardiovascular system, sense organs, behavior or central nervous system (somnolence, generally depressed activity, irritability, headache, dizziness, drowsiness), liver, and respiratory system (breathing difficulty). Chronic Potential Health Effects: May cause defatting of the skin and dermatitis and allergic reaction. May cause adverse reproductive effects based on animal data (studies). Ecotoxicity: Ecotoxicity in water (LC50):100000 mo 96 hours [Fathead Minnow]. 64000 moll 96 hours [Fathead Minnow]. BOD5 and COD: Not available. Products of Biodegradation: Possibly hazardous short term degradation products are not likely. arise. However, long term degradation products may Toxicity of the Products of Biodegradation: The product itself and its products of degradation are not toxic. Special Remarks on the Products of Biodegradation: Not available. Waste Disposal: Waste must be disposed of in accordance with federal, state and local environmental control regulations. DOT Classification: CLASS 3: Flammable liquid - Identification: - Isopropyl Alcohol UNNA:1219 PG: II Special Provisions for Transport: Not available. I Section 15: Other Reaulatory Information I Federal and State Regulations: Connecticut hazardous material survey.: Isopropyl alcohol Illinois toxic substances disclosure to employee act: Isopropyl alcohol Rhode Island RTK hazardous substances: Isopropyl alcohol Pennsylvania RTK: Isopropyl alcohol Florida: Isopropyl alcohol Minnesota: Isopropyl alcohol Massachusetts RTK: Isopropyl alcohol New Jersey: Isopropyl alcohol New Jersey spill list: Isopropyl alcohol Director's list of Hazardous Substances: Isopropyl alcohol Tennesee: Isopropyl alcohol TSCA 8(b) inventory: Isopropyl alcohol TSCA 4(a) final testing order: Isopropyl alcohol TSCA 8(a) IUR: Isopropyl alcohol TSCA 8(d) H and S data reporting: Isopropyl alcohol: Effective date TSCA 12(b) one time export: Isopropyl alcohol 12/15/86 Sunset Date:12/15/96 SARA 313 toxic chemical notification and release reporting: Isopropyl alcohol Other Regulations: OSHA: Hazardous by definition of Hazard Communication Standard (29 CFR 1910.1200)_ EINECS: This product is on the European Inventory of Existing Commercial Chemical Substances. Other Classifications: Q Age Gravp A N! November 6, 2009 1 Slide 37 J%, 1.0 WHMIS (Canada): CLASS B-2: Flammable liquid with a flash point lower than 37.8"C (100"F)_ CLASS D-2B. Material causing other toxic effects (TOXIC). DSCL (EEC): R11- Highly flammable_ R3C- Irritating to eyes. S7- Keep container tightly closed_ S1f- Keep away from sources of ignition - No smoking_ S24/25- Avoid contact with skin and eyes. S26- In case of contact with eyes, rinse immediately with plenty of water and seek medical advice_ HMIS (U.S.A.): Health Hazard: 2 Fire Hazard: 3 Reactivity: 0 Personal Protection: h National Fire Protection Association (U.S.A.): Health: 1 Flammability: 3 Reactivity: 0 Specific hazard: Protective Equipment: Gloves_ Lab coat_ Vapor respirator. Be sure to use an approved/certified respirator or equivalent. Wear appropriate respirator when ventilation is inadequate_ Splash goggles. Section 16: Other information I References: Not available_ Other Special Considerations: Not available. Created: 10/09/2005 05,53 PM Last Updated: 05/22/2009 09:11 AM The information above is believed to be accurate and represents the best information currently available to us_ However, we make no warranty of merchantability or any other warranty, express or implied, with respect to such information, and we assume no liability resulting from its use. Users should make their own investigations to determine the suitability of the information for their particular purposes. In no event shall ScienceLab. corn be liable for any claims, losses, or damages of any third party or for lost profits or any special, indirect, incidental, consequential or exemplary damages, howsoever arising, even if ScienceLab. com has been advised of the possibility of such damages_ ® ABB Group -A IW Q November 6, 2009 1 Slide 39 0%1P0 Site -Specific Chemical Hazards • Urethane and Resin • Pure and Waste • Oil • Pure and Used • SF6 Gas • Lead (soldering material) • Small quantity items like cleaners, solvents, etc. (Degreasers, lubricants, cleaners, etc.) • PIV Batteries (acid) • Miscellaneous items • Fluorescent light bulbs • Batteries • Dirty Rags ® ABB Group November 6, 2009 1 Slide 40 ir7 Ew. w a f f PPE and Protective Devices • Safety Glasses • Goggles • Face Shields • Aprons • Gloves • Sleeves • Respirators • Ventilation Systems • Fire Fighting Equipment CABS Group November B, 2009 1 Slide 42 -A OWN MOO Spills and Thrills • Spill Response • Minor (under 1 gallon) • Moderate (1-5 gallons) • Large (over 5 gallons) • HazCom Emergency (Contacts) • EHS Manager — Jen Dively • Area Supervisor • Maintenance Crew • Spill Kits — Supplies and Usage • Located in designated areas throughout the facility r - N SPILL CLEAN UP KIT • To be used for significant chemical spills; not daily clean-up • Monitored regularly to ensure they are adequately stocked Report all spills to your Supervisor for documentation. ® ABB Group 0 OR November B, 2009 1 Slido 43 IMPO OIL!- lw him At Disposal of Chemicals and Waste • Chemicals cannot just be thrown into the trash or poured down the sink. There are strict regulations by that determine how chemical substances are to be handled, shipped, treated, and disposed of to reduce their hazard levels and overall environmental impact. • We have several waste disposal set-ups and processes to ensure we meet these requirements -A MR, Group N J%, NIPa November 6, 2009 1 Slide 45 Asbestos, Lead, and Mold ... Oh My! • OSHA and the EPA require employers to inform their workforce of the presence of hazardous materials that ex as part of the structure • Asbestos — OSHA 1910.1001 • Lead — 1910.1025 • Mold—1910.141 (Sanitation) • PCBs — 1910.1200 • Pinetops was certified as completely abated in 2007 • Asbestos • Lead • Mold • PCBs • Tarboro — stated as fully abated; pending official documentation from KanBan • Greensboro - abated 0 ABB Group November 6, 2009 I Slide 46 Asbestos • Asbestos is the name given to a number of naturally occurring, fibrous silicate minerals mined for their useful properties such as thermal insulation, chemical and thermal stability, and high tensile strength. Asbestos is commonly used as an acoustic insulator, and in thermal insulation, fire proofing and other building materials. Many products in use today contain asbestos. Asbestos is made up of microscopic bundles of fibers that may become airborne when asbestos - containing materials are damaged or disturbed. When these fibers get into the air they may be inhaled into the lungs, where they can cause significant health problems. Exposure to airborne friable asbestos may result in a potential health risk because persons breathing the air may breathe in asbestos fibers. Continued exposure can increase the amount of fibers that remain in the lung. Fibers embedded in lung tissue over time may -cause serious lung diseases including: asbestosis, lung cancer, or mesothelioma. Smoking increases the risk of developing illness from asbestos exposure. Pipe Insulation 4 ABB Group .A November 6, 2009 1 Slide 47 ..BB Asbestos- Related Health Issues Three of the major health effects associated with asbestos exposure include: Asbestosis — Asbestosis is a serious, progressive, long-term non -cancer disease of the lungs. It is caused by inhaling asbestos fibers that irritate lung tissues and cause the tissues to scar. The scarring makes it hard for oxygen to get into the blood. Symptoms of asbestosis include shortness of breath and a dry, crackling sound in the lungs while inhaling. There is no effective treatment for asbestosis. Lung Cancer — Lung cancer causes the largest number of deaths related to asbestos exposure. People who work in the mining, milling, manufacturing of asbestos, and those who use asbestos and its products are more likely to develop lung cancer than the general population. The most common symptoms of lung cancer are coughing and a change in breathing. Other symptoms include shortness of breath, persistent chest pains, hoarseness, and anemia. Mesothelioma — Mesothelioma is a rare form of cancer that is found in the thin lining (membrane) of the lung, chest, abdomen, and heart and almost all cases are linked to exposure to asbestos. This disease may not show up until many years after asbestos exposure. This is why great efforts are being made to prevent school children from being exposed. Hove 1h7 Group MUD November 6, 29 1 Slide 48 Asbestos Labeling and Clean -Up CONTAINS ASBESTOS FIBERS AVOID CHEATING OUST BREATHING ASBESTOS DUST MAY CAUSE SERIOUS BODILY HARM urvey Ref: Do Not DiSturb Repoli accidental damage immediately to • Contact above number if access is requited h s, iCONTAI AMESTO� heERS 4MQ.C��t DU6r. DO NOT TOUCH IT! • Asbestos is the most hazardous when it is airborne! If you think you've come across asbestos -containing materials, do not disturb the area allowing the particles to enter the air. Contact the your Supervisor or EHS Manager immediately for review. The training, PPE, and disposal regulations are managed by extremely strict government regulations. All asbestos - exposure and removal is to be done by outside contractors. • Only trained and protected personnel can handle asbestos for testing, labeling or removal due to the health hazards associated with asbestos exposure. W, - � r, t:J • Bluish -gray metal • Low melting point • Pliable • Corrosive -resistant • Combines with other materials easily Was used in gasoline before restricted in 1980. Also prominent in smelting operations, batteries, solder, paint, printing, and automotive manufacturing. • Regulations restricting lead in industrial and residential settings were not put in place until 1978. Anything built prior to 1978 should be assumed to have high concentrations of lead -containing materials. New government regulations strictly control the levels and areas of usage for lead -containing materials. • Employer's who have lead -based materials on site must identify all locations, provide proper hazard labels, and notify employees of these exposure potentials. • Whenever possible, an employer should strive to have lead -based materials abated by professionals to eliminate the potential for lead exposure. ® ABB Group November 6, 2009 1 Slide 50 21 �", Pipe solder, .i yf Paint chips -AOM MUD Lead -Related Health Problems • Lead gets absorbed into the bloodstream after an exposure event. If exposure is regular and above the Permissible Exposure Limits (PEL) determined by OSHA and the EPA, the body will stop expressing the substance. If the body cannot express the lead, it will begin to build up in tissues and organs. • A build-up of lead in the body can cause a variety of health issues: • Brain and kidney malfunction • Muscle and bone issues • Reproductive problems • Blood forming difficulties • Symptoms of an abundance of lead in the system are: • Flu -like symptoms • Anemia • Coma • Death ® ABB Group November 6, 2009 1 Slide 51 Digestive System • Nausea • Constlpzdon . Dlarrbea • iwck of appetite Fain io;at Skagath Small Inarpl•e Kidneys/Reproductive System . Higb blood pressure • Danmge occars without knowing it • Kidney faitore can , cause death - Men - Impotence, � decreased sex drive, sterility • Women - decreased sex drive, infertility a Blood -Forming System . Weaknem .,1r,edam IHftn S,,A Cktiduary Bona Matem uve Nervous System and'Brain •H • Tired all the time NWV= • Irritabiiity 5y' hloodiuest • Poor conceotratioo • Mewory loss -.Shag • Westkoess in arms and leas -A .1 0 MOO Lead Exposure • Paint — peeling and chipping in particular or activities that create paint dust • Solder on pipes — particularly old plumbing • Inhalation •Breathing in lead dust or particles is the most common form of lead exposure in the work environment • Digestion ,Eating lead pieces/chips that come from clothing or skin when working around lead -based materials is also • Batteries -- the most common use for lead in the US • Caulking or ceramic insulation • Scrap metal activities an INHALATION HAZARD 6 DO NOT TOUCH IT! exposure • Like asbestos, lead is the most hazardous when it is airborne! If you think you've come across lead -containing materials, do not disturb the area allowing the particles to enter the air. Contact the Safety and Environmental Coordinators immediately for review. • Only trained and protected personnel can handle lead for testing, labeling or removal ®ABBGroup due to the health hazards associated with lead exposure. ABU November 6, 2009 j Slide 52 PCBs (Polychlorinated Biphenyls) • Polychlorinated biphenyls are mixtures of up to 209 individual chlorinated compounds (known as congeners). There are no known natural sources of PCBs. PCBs are either oily liquids or solids that are colorless to light yellow. Some PCBs can exist as a vapor in air. PCBs have no known smell or taste. Many commercial PCB mixtures are known in the U.S. by the trade name Aroclor. • PCBs have been demonstrated to cause a variety of adverse health effects. PCBs have been shown to cause cancer in animals. PCBs have also been shown to cause a number of serious non -cancer health effects in animals, including effects on the immune system, reproductive system, nervous system, endocrine system and other health effects. • Although no longer commercially produced in the United States, PCBs may be present in products and materials produced before the 1979 PCB ban. Products that may contain PCBs include: - Transformers and capacitors Other electrical equipment including voltage regulators, switches, reclosers, bushings, and electromagnets - Oil used in motors and hydraulic systems • Old electrical devices or appliances containing PCB capacitors Fluorescent light ballasts - Cable insulation • Thermal insulation material including fiberglass, felt, foam, and cork • Adhesives and tapes • Oil -based paint - Caulking • Plastics - Carbonless copy paper • Floor finish @qgq Group November 6. 2009 1 Slide 53 -0 .BAD AIrn Bloodborne Pathogens Definition: Microorganisms that are carried in the blood that can cause disease in humans n Malaria Brucellosis w Syphilis • Hepatitis B (HBV) • Hepatitis C (HCV) • Human Immunodeficiency Virus (HIV) ® ABB Group R Q November 6, 2009 1 Slide 54 190 Common Three — The Breakdown Hepatitis B (HBV) • 1-1.25 million Americans are chronically infected • May lead to chronic liver disease, liver cancer, and death • Vaccination available since 1982 • HBV can survive for at least one week in dried blood • Symptoms can occur 1-9 months after exposure • Symptoms include: jaundice, fatigue, abdominal pain, loss of appetite, intermittent nausea , vomiting Hepatitis C (HCV) • Hepatitis C is the most common chronic bloodborne infection in the United States • Symptoms include: jaundice, fatigue, abdominal pain, loss of appetite, intermittent nausea, vomiting • May lead to chronic liver disease and death Human Immunodeficiency Virus (HIV) • HIV is the virus that leads to AIDS • HIV depletes the immune system • HIV does not survive well outside the body • No threat on contracting HIV through casual contact CABB Group November 6, 2009 1 Slide 55 ARM MOW Bloodborne Carriers & Exposure Paths a • Saliva • Vomit • Urine • Semen or vaginal secretions • Skin tissue, cell cultures • Any other bodily fluid O ABB Group November 6, 2009 1 Slide 56 • Contact with another person's blood or bodily fluid that may contain blood • Mucous membranes: eyes, mouth, nose • Non -intact skin • Contaminated sharps/needles • Industrial accident • Administering first aid • Post -accident cleanup • Handling of returned product • Janitorial or maintenance work • Handling of any waste products -A OR A►Npn How to Protect Yourself • Follow the Universal Precaution Rule -Treat all blood and bodily fluids as if they are contaminated by a blood borne pathogen • Practice proper cleanup and decontamination (trained personnel only) • Disposal of all contaminated material in the proper manner • Use of proper PPE • Latex or Nitrile gloves, goggles, CPR mouth barriers, aprons, respirators • Always check PPE for defects or tears before using • If PPE becomes torn or defective remove and get new • Remove PPE before leaving a contaminated area • Do not reuse disposable equipment O ABB Group November 6, 2009 1 Slide 57 �A It B AIP, Clean -Up & Decontamination • When cleaning up surfaces use authorized clean-up solution • Do an initial wipe up • Spray and allow it to stand for ten minutes then wipe up • Dispose of all wipes in biohazard containers • PPE should be removed and disposed of in biohazard containers • Wash hands immediately after removing PPE • Use a soft antibacterial soap • A hand sanitizer can be used but wash with soap and water as soon as possible Only those personnel who are trained and authorized should perform Bloodborne Pathogen ABB Group November 6, 2009 1 Slide 58 clean-up. Exposure Etiquette • Have you had a specific incident of contact with potentially infectious bodily fluid? • If there are no infiltrations of mucous membranes or open skin surfaces, it is not considered an occupational exposure • Report all accidents involving blood or bodily fluids • Post -exposure medical evaluations are offered • Confidential medical evaluation • Document route of exposure • Identify source individual • Test source individuals blood (with individuals consent) • Provide results to exposed employee CABB Croup November 6, 2009 1 Slide 59 -A 11M Hepatitis Vaccination Strongly endorsed by medical communities • Offered to all potentially exposed employees • Provided at no cost to employees • Offered at exposure incident as part of response process • Declination Form for those that are offered but choose to deny the series — all employers are required to offer the series to potentially exposed employees. 0ABBGroup .A I Q November 6, 2009 1 Slide 60 A,.n Disposal of Clean -Up Waste • Liquid or semi -liquid blood or other potentially infectious material (OPIM) • Contaminated items that would release blood or OPIM when compressed • Contaminated sharps • Pathological and microbiological waste containing blood or OPIM • Labels must Include the universal biohazard symbol, and the term "Biohazard" must be attached to: • Containers of regulated biohazard waste • Refrigerators or freezers containing blood or OPIM • Containers used to store, transport, or ship blood or OPIM 0 A138 Group November 6, 2W9 I Slide 61 n IM MOO How ABB Works to Protect You! • Training and Awareness • Response Plans E Emergency Response Plan • Business Continuity Plan { • Spill Prevention Control and Countermeasures Plan • Storm Water Plan • JSAs and Work Plans • Regular Safety observation Tours • Drills • Safety Committee Meetings • Near Miss Reporting AS& Job Safety Analysis r�r rNuetr.. Ttl. ■.11pv1.: da�ea �ira..�a MUM rrrs: .� M y.:iYl�.�.:I:.:rr r�.r YMrrr.Y r r e.��. 11�x f�wr ..r.Y�wprlY r r PPE a w..� a e..w....a.:� a wr ■Tw.tdaq rarswalr .:P/.. i.s hARK NECrUART PPE WrTH AK'R' ® Q Crw.: RE RE m+rees00� 4 RFAC7N[fY rnoessarr.. o EPEdAL fPPD NYrl.�..I /�Y�I.rr.Yrsi:IA -0d:�YMwd ITr./}N. ll:N.. M�MYwxM' Artr �N rN Y:.Yyi.r Y/p�.ptM acmes .clt.fral�lE �Wrp ip:wlb��rra Y! .IRFLT1Ri9ri9PElE r�1Yi�y �IdrY':iYR r4 .I:.���iry A �N ti:w�n.iMwl�YWf}N }.YIRrrMr r.wnrf �4.:�rrMr�}Y rli i OI�r14.1M Y1i 4.rdq mr}w a.rwrwYYYw..r. M rrrerr:..er }I...rYY.I.:YA�. hr: i :.}Yww 1Yrw� �M. �IgM1rl CABB Group November 6, 2009 1 Slide 62'.p Summary • Never handle, mix, or dispose of a chemical/chemical container unless you have been trained to do so. • If you have an exposure or reaction to a chemical or chemical process, report it immediately to your supervisor. • If you experience a chemical spill, follow the clean up and reporting protocol for ensuring it is handled safely and within environmental regulations. • Always wear the required PPE when handling chemicals. If aids such as ventilation systems or mechanical processes are required to handle a substance, make sure you use them the way they were intended and designed to be operated. • If you are ever unsure about working with a chemical or chemical process — STOP — ask for help! ® ABB Group .A 11 n November 6, 20091 Slide 63 MUN Safety Rules - Reminder We are evaluating the plant layout to establish work CAI and aisle ways. Once identified and labeled, work areas will require PPE be in place BEFORE crossing the � yellow identification lines that separate the aisle from production areas. We'll cover the updates at the next training session. • Work Areas are for Work and the Cafeteria is for breaks and meals • If you are on break and in a work area, PPE requirements still apply to you. • If you have food and drink (other than water), you should be in the Cafeteria — not the work area • The grounds and landscaping around the building are not cigarette butt disposal areas — if you can't put your cigarette butts in the designated containers — smoking privileges at the site may be revoked. • Report Near Miss and Injuries IMMEDIATELY — not the next day or a week later. O ABB Group November 6, 2009 1 SO& 64 -A 11M r. 00 Power and productivity for a better world"" JL 1111 P% Ip 19 And now for something completely different... r' Hazardous Communication Training 4 Why do we do this — OSHA standards What the standards mean in English What is the definition of a "hazardous" substance? Health Effects -Acute/Chronic illnesses -Paths of exposure (inhalation, ingestions, absorption) -Categories of health hazards (carcinogen, irritants, toxic, highly toxic, sensitizer, etc.) Physical Effects -Heat/Cold -Radiation -Ergonomics -Vibration Chemical Identification -MSDS Sheets (info provided/structure) -MSDS Location (outside safety office — moving to online system) How to take MSDS info and apply to chemical handling: -Labeling (HMIS/NFPA) -Label categories and definitions (Health, Reactivity, Flammability, other/PPE) -PPE for working with chemicals (site -specific) — right gloves for chemical -Transfer/Secondary Container Labeling (photos of labeled and unlabeled) -Safety Showers/Eyewashes Chemical Storage: -Clean and dirty rag bins -Flammable chemical cabinets (grounded) -Pure and waste urethane/resin/oil storage Site -Specific Chemicals and their hazards -Urethane/Resin -Waste Oils -SF6 -Small container chemicals How we protect our employees - Industrial Hygiene -Testing and monitoring (air/noise/water) -Exposure terms and definitions -Site-Specific How our employees can protect themselves: -Don't use a chemical that you aren't sure how to use safely? Im -If you are unsure how to address a spill or chemical reaction — get help? -Make sure you use the required PPE and aids (ventilations/shields, etc.) when �- working with chemicals — they are there to keep you safe. Spills -What to do if a chemical spill occurs: -Spill size — reaction -Who should clean up a spill? -What materials should be used? -Where are they located? -What to do in a serious chemical spill -related emergency (contacts, etc.) Site Exposure Control Plan and Process -JSAs, Work Plans, etc -Emergency Response Plan -Spill Prevention Control and Countermeasures Plan (SPCC) -Training -Drills Other Hazardous Materials common to industrial sites: -Lead -Asbestos -Mold Pinetops is a lead and asbestos -free facility — all materials have been properly abated. The site it cleaned and maintained to prevent mold issues from becoming a hazard. Bloodborne Pathogens — definition -Exposure paths -What can you do to protect yourself? -What to do in the case of an exposure at work? -Clean up kits, medical waste disposal, emergency response -Hepatitis Series — who should receive it -Needle and sharps disposal A1919Training Attendance Log Class Title: Hazardous Communication - Pineto s Date: 9/24/09 f: t _ Description of training: See attached curriculum (Attach curriculum if available) Length of class: I hour By signing this document, I acknowledge that I understand the training and have had the opportunity to ask questions. Print Name: h 44. n4 I. aT� �,IrGL��rn S Itl ,(A L Jz ilk our 4 h ....�:.Pa..ORALM y� l V .. 1 �+ 7ff i - T !,r i certify that the above individuals attended this training ession. L k - Facilitator Printed Name \ Fac' .tor Sign ure t O:LKM-PTMV-PuhiicWR Depi%Foams%Training Attendance Lap.xh Rev 2-1-02 1l 1 I: ASSTraining Attendance Log Class Title: Hazardous Communication - Pinetops _ Date; 9/24/09 , Description of training: See attached curriculum (Attach curriculum if available) Length of class: 1 hour By signing this document, I acknowledge that I understand the training and have had the opportunity to ask questions. MrA � A • � II r A' J;-1LAIwer4 f!✓!"i— ,r i i l certify that the above individuals J Facilitator Printed Name innatr ira- F itator nature G:LKM-PTMV-PubliclMR_Dept%FormslTminirre Attendance Log -As Rev 2-1-02 A19BTraining Attendance Log Class Title: Hazardous Communication - Pinetops Date: 9/24/09 i Description of training: See attached curriculum (Attach curriculum if available) Length of class: 1 hour By signing this document, 1 acknowledge that I understand the training and have had the opportunity to ask questions. Print Name: r �s Q= r' W I ty_ 1 w ;i-00j VAeIAWALJ ' '. �9 M Uran '� U t_i i 4 M-71f ARM I certify that the above individuals attended this training session. : l Fa I for Printed Name Facili or Sign ure G:LKM-PTNN-PubliclHR_Dept\Forms\Traininp Attendance Lop.xis Rev 2-1-02 ADSTraining Attendance Log Class Title: Hazardous Communication - Pinetops Date: 9/24/09 Description of training: See attached curriculum (Attach curriculum if available) Length of class: 1 hour By signing this document, I acknowledge that I understand the training and have had the opportunity to ask questions. Print Name: .' ;J wMT IV iL s s LTJ � 16� l VIV ` V L ON I certify that the above individuals attended this training session. Facilitator Printed Name Faci ' for Si ature 1 G:LKM-PTMV-PubiicWRiUephFormslTraininq Attendance Lop.xis Rev 2-1-02 ASSTraining Attendance Log Class Title: Hazardous Communication - Pinetops Date: 9/24ZO9 Description of training: See attached curriculum (Attach curriculum if available) Length of class: 1 hour By signing this document, I acknowledge that I understand the training and have had the opportunity to ask questions. Print Name. II y�: ICI*II I ��. LW L 7 J WMEW, o 7, w� r r'i I certify that the above individuals attended this training session. Facilitator Printed Name Facil' r Signa• re G.LKM-PTMV-Publlc%HR DepAFormslTraining Attendance Log.As Rev 2-1-02 ADSTraining Attendance Log Class Title: Hazardous Communication - Pinetops Dat% 9/24/09 .� iDescription of training: See attached curriculum (Attach curriculum if available) Length of class: 1 hour By signing this document, I acknowledge that I understand the training and have had the opportunity to ask questions. Tint Name: SE nature• r F^ I �� '�- I • 7�[Oli lee i�. I certify that the above individuals attended this training session. t Facilitator Printed Name FaI for Sign re G: LYK&PTMV-PubikW R_OeptlFortnSlTrainlnp Attendance Lop.xia Rev 2-1-02 AMB Training Attendance Log Class Title: Hazardous Communication - Pinetops Date: 9/24/09 Description of training: See attached curriculum (Attach curriculum if available) Length of class: 1 hour By signing this document, I acknowledge that I understand the training and have had the opportunity to ask questions. Print Name: r rna 5. Ica ani c� Weuv� t0 -jb me5 IA0-5 rri.3 i' . G✓h 1 icy 4M Q �� I certify that the above individuals attended this training session. Face itator Printed Na a Fa c tar Sign Lure G:LKM-PTMV-PuNic%HR—Dep(%FonnslTrWrdng McMance Log.xls Rev 2-1-02 ABBTraining Attendance Log Class Title: Hazardous Communication - Pineto s Date: 9124109 ( Oescription of training: See attached curriculum (Attach curriculum if available) Length of class: 1 hour By signing this document, I acknowledge that I understand the training and opportunity to ask questions. Print Names- 2. 'ff K k aY�-0 7. 8. 9. 10. 11 13. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. have had the I certify that the above individuals attended this training session. l _ Facilitator Printed Name Facili r Sign ture G-.LKM-PTMV-Public%HR DepgFonns{Traininp Attendance Lop.xis Rev 2-1-02 Erosion Control Legend Temporary Gravel OWN Construction Entrance Temporary Sediment Trap ,42, 1 Site Disturbed Area: 8.95 Acres y--�� Silt Fence .�4 a7G — Td — Temporary Diversion Ditch ® Berm Protection per NCOENR Bottom apron 0hnenslons - 10'40' Class S - 12' _ Min. Thic7mess - 22" Rack Check Dam Filter {abric -Medium Warght Npn Wov eat tiles ® Temporary Block Rip -Rap Outlet Protec " n 6 Apron Length - 23' and Gravel Inlet Doss B Stone - 12" .w .ter. var.wrk Min. Thickness - 22` Protection VAdlh - 6' Filter Fobric - Medium ' t NonWov G-twtile,s ® Rip -Rap Outlet Protection Ip•Rap Outlet Protection . S Apron Length - 30' GLMJ� Temporary Grass Liner .. ®CT s' 0 Stone - 22' Width - 12' -� Tsd-- Temporary Slope Drain -w Filter Fabric - Medium Weight NcnW—n Gente.tilea — ei Temporary Gravel Construction Entrance Silt Fence m Temporary Gravel r� Construction Entrance {` a s Temporary Diversion Ditch — (To be converted to Permanen Swale-2) r 1 Temporary Gravel - �+ a Construction Entrance ,.,Vf° R ,g�$ ,pCeli 14,Oa,pY6YN y s eg o R/W Sedimentation and Erosion Control Plan - - -- — - - -- - R/W GRAPHIC SCALE' re a w a r t Wet, • 0 n K A 4 Use Skimmer in B Water Quality Pond Until Site is stabilized. Rock Check Dam Skimmer Orifice-1.5" �v+ FRUAaL a L(X GW A7 END See CE10. °" • • 5"' or INSTURSM 1)a� ei� LEANNG THE STE �. Temporary Block 3 •� and Gravel Inlet e Protection $Cl]1<y lei r.aap g N.C. Highway 43 Ow p.m. Right-f-wi y) M.aatlad.N Site Disturbed Area: 0.53 Acres 14 Spill Iwa_V S";'- J�% 0 iC if r'a a� eTemporary Gravel 8 Construction Entrance e ® Rip -Rap Outlet Protection Apron Length - 5 Class A Stone - 6" Min. Thicknp - 1p- Filtrr Fabrc -- Metlium Weight / Non Woven Geatestiles —Silt Fence 6 - 9 Temp. Slope Drain tuo;ntoM ma rwdet tocetlm. Cfie rnnlltNct�faii eroem t •� r 5 Rock Check Dam, Typical A Addtional Clearing to install electrical service �~ Rerouted Ditch '-Swale-1----- -- NOT A TAR-PAM FEATURE PER USI QUAD SHE. f AND SOILS MANU, AIL 6 \ - Rip -Rap Outlet Protection Apron Length - 5' ®Cfoss A Stone - 6* Min. Thleknesy - 10" Filler Fattric - Medium Weight Nan Woven Geete.tles -.--..-.-.-..-..- R/1Y—.— REVISIONS oec. 15, 20W Feb. S. 21210 ® Feb. 24. 2010 ® May 21. 2010 ® J-e 4, 201G owd 11►i IL y°, n C n a t W IA 6 N a� aC4 � z \ C O p Of �J tl O Q a � Oair3'L� Cf� Cl) J 2 O Mi a " aL) lu Z J a to = CV a M c o v lT Y L.l Y 0_ Uy (l ) a U a - ... _ 022606 ryRerrl4inrres �`+, 6-04-10 SCALE: 1' - 60' BATE: Nay. 12. 2009 cILF•Faeores caoaLa SHEET: CE-