Loading...
HomeMy WebLinkAboutNCG030255_MONITORING INFO_20190109 (2)STORMWATER DIVISION CODING SHEET NCG PERMITS PERMIT NO. DOC TYPE ❑HISTORICAL FILE MONITORING REPORTS DOC DATE ❑ rX I � D r (94 YYYYMMDD Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 1/9/2019 CERTIFICATE OF COVERAGE No. NCG030 2 S 5 FACILITY NAME J. C. Steele & Sons, Inc. COUNTY Iredell PERSON COLLECTING SAMPLES _Curtis Daniels. Jock Davis LABORATORY— Lab Cert. it— 440 Comments on sample collection or analysis: No storm event for collection of samples during time period Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD ❑ Jan -June July -Dec X or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply []SA [:]Other Fourth Creek (Class C) PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 ❑ No discharge this period?2 24-hour Non -Polar O&G/ Date Sample pH, Total Toxic Outfall No. rainfall Total Suspended Solids Copper Lead Zinc - Total Petroleum Collected' Standard units Organics (mo/dd/yr) amount, Hydrocarbons Inches3 Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 12/20/18 2.22 S.846 7.6 .007 <0.0025 .063 20 * 2 Representative outfall On R/R Tracks See outfall 1 See outfall 1 See outfall 1 See outfall 1 See outfall 1 n/a 3 12/20/18 1 2.22 9.286 1 7.6 .006 1 .0026 1 .079 <5.0 * 3a Representative outfall See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. "See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 10/25/2012 Page 1 of 3 0. Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =_-> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: * A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES 1N A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE. CONTACT NAME: Mail an original and one copy of this DMR, Including an "No Discharge" reports. within 30 days of receipt of the lab results for at end -of monitoring period in the case of "No Discharge" reports] to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware hat there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of OZ- (Date) Permit Date: 11/1/2018-05/31/2021 SWU-245, last revised 10/25/2012 Page 3 of 3 WAW. ST V-. FLE if S]nce 1a89 January 9, 2019 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Stormwater Enforcement Group: Please find enclosed the Stormwater Discharge Outfall Monitoring Report for permit numbers NCG030255 and NCS000018 for the J. C. Steele & Sons, Inc., facility in Statesville. For permit NCG030255 the Zinc levels in outfall 3 are above the benchmarks however; a letter of relief for Copper and Zinc was sent to us by Zahid S. Khan on January 7, 2015. The Non — Polar O & G at out -fall # 1 results were 20 mg/I compared to a benchmark of 15 mg/I. We will start Tier One compliance for Outfall #1 for permit NCG030255, If you have any questions please feel free to contact Curtis Daniels of J. C. Steele & Sons, Inc. at (704) 768-3230 or (704) 872-3681 Ext. 151. Sincerely, 6�Llvl' 4a David Steele President J. C. Steele & Sons, Inc. J.C. STEELE & SONS, INC • 710 S. Mulberry Street • Statesville, NC 28677 • P.O. Box 1834 (28687) +1.704.872.3661 • 800.278.3353 • www.jcsteele.com lz__� Semi-annual Stormwater Discharee MonitoringReDort for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted March 27, 2018 CERTIFICATE OF COVERAGE No. NCG030 2 5 5 FACILITY NAME _J._C. Steele & Sons, Inc. _ COUNTY Iredell PERSON COLLECTING SAMPLES Curtis Daniels LABORATORY Statesville Analytical Lab Cert. # NC Cert #440 Comments on sample collection or analysis: Year 1 period 1 Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2018 SAMPLE PERIOD X❑ Jan -June July -Dec f or ❑ Monthly(_ . (month) DISCFiA'@ TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA APR ❑Zero -flow ❑Water Supply []SA C 4 2018 x❑Other Fourth Creek (Class C) OWR ACFILe, tiOPLEASE REMEMBER `O SIGN ON PAGES 2 AND/OR 3 4 No discharge this period?' 24-hour Non -Polar O&G/ Outfall No. Date Sample rainfall Total Suspended Solids pH, Copper Lead Zinc Total Petroleum Total Toxic Collected( Standard units Organics5 (mo/dd/Yr) amount, Hydrocarbons Inches3 Benchmarks ===s - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 3/6/2018 .65 <2.941 9.2 .0039 <.0025 .056 <5.1 ** * 2 Representative outfall on RJR Tracks See outfall 1 See outfall 1 See outfall 1 See outfall 1 See outfall 1 n/a 3 3/6/2018 1 .65 3.412 8.0 .0056 .0026 .117 <5.15 *• * 3a Representative outfall See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 n/a . I __ ___ - - --------- I d 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported In the format. "<XX mu/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO X❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Marl an original and one copy of this DMR lnrludina all "No DisEhprae" L ,parts. -within 30 days of receipt of the lab results for at end of monitoring period in the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU -.- IU'ST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that thgre_are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 SoNK INCORPORATE ❑ SINCE 1889 SHIPPING E TELEPHONE MANUFACTURERS OF 710 S. MULBERRY (704) $72-3681 THE GLOBAL LEADER IN STIFF EXTRUSION FAX NUMBER P. O. BOX 1834 TOLL FREE (704) S78-0789 STATESVILLE, N. C. 28687 (800) 278-3353 March 27, 2018 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Stormwater Enforcement Group: Please find enclosed the Stormwater Discharge Outfall Monitoring Report for permit numbers NCG030255 and NCS000018 for the J. C. Steele & Sons, Inc., facility in Statesville. For permit NCG030255 the Zinc levels in outfall 3 are above the benchmarks however; a letter of relief for Copper and Zinc was sent to us by Zahid S. Khan on January 7, 2015. The Iron levels for Permit NCS000018 at outfall 6 were above the limit. According to the permit this does not require tier 2 monitoring. If you have any questions please feel free to contact Curtis Daniels of J. C. Steele & Sons, Inc. at (704) 768-3230 or (704) 872-3681 Ext. 151. David Steele President J. C. Steele & Sons, Inc. End: 1- (5Do) NCG030000 Monitoring Report (3 sheets) 1—(5DO) Copy NCG030000 Monitoring Report (3 sheets) 1— (5DO) NCS000018 Monitoring Report (2 sheet) 1— (5DO) Copy NCS000018 Monitoring Report (2 sheet) Zdrive/drab/stormwater/rover letters/2018/FDRY AND SHOP COVER LETTER Mar 2018/drab RJECSf 11 ',r) APR 0 4 2018 DVVR SAC lLjss T1p.�t Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted September 22, 2017 CERTIFICATE OF COVERAGE NO. NCG030 2 5 5 FACILITY NAME J. C. Steele & Sons. Inc. COUNTY Iredell PERSON COLLECTING SAMPLES Curtis Daniels LABORATORY Statesville Analytical Lab Cert. # NC Cert #440 Comments on sample collection or analysis: No storm event for collection of samples during time period Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD ❑ Jan -June X July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW [—]Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA X❑Other Fourth Creek (Class C) PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 No discharge this period Date Sample 24-hour pH, Non -Polar O&G/ Total Toxic Outfall No. Collected' rainfall Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics5 (mo/dd/yr� amount, . Hydrocarbons inches3 Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 8/31/17 .29 <2.857 6.9 .006 <.0025 .058 <5.18 ** * 2 Representative outfall On R/R Tracks See outfall 1 See outfall 1 See outfall 1 See outfall 1 See outfall 1 n/a 3 8/31/17 1 .29 6.353 7.1 .019 .0047 .133.1 <5.10 1•" * 3a Representative outfall See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 Is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX ma/L where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. . Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 1� Note: if you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS, SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one cony of this DMR, includina all "No Discharae" reports, within 30 days of recelot of the lab results or at end of monitoring period in the case o "No Discha e" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date:11/1/2012-10/31/2017 2z Z®f-7 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 FiL S4E!EIE SONS INCORPORATED SINCE IB89 TELEPHONE MANUFACTURERS OF SHIPPING ADD. (704) 872-3681 710 S. MULBERRY THE GLOBAL LEADER IN STIFF EXTRUSION FAx NUMBER P. p. E30X 1834 TOLL FREE (704) 878-0769 STATESVILLE, N. C. 284387 (600) 279-3353 September 21, 2017 Division of Water Quality DECEIVED Attn: DWQCentral Files SEP 2 9 2017 1617 Mail Service Center CENTRAL FILES Raleigh, NC 27699-1617 DWR SECTION Dear Stormwater Enforcement Group: Please find enclosed the Stormwater Discharge Outfall Monitoring Report for permit numbers NCG030255 a'nd NCS000018 for the J. C. Steele & Sons, Inc., facility in Statesville. For permit NCG030255 a Copper and Zinc levels in outfall 3 are above the benchmarks however; a letter of relief for Copper and Zinc was sent to us by Zahid S. Khan on January 7, 2015. If you have any questions please feel free to contact Curtis Daniels of J. C. Steele & Sons, Inc. at (704) 768-3230 or (704) 872-3681 Ext. 151. Sincerely, a - 114t David Steele President J. C. Steele & Sons, Inc. End 1- (SDO) NCG030000 Monitoring Report (3 sheets) 1—(SDO) Copy NCG030000 Monitoring Report (3 sheets) i — (SDO) NCSDD0018 Monitoring Report (2 sheet) 1— (SDO) Copy NCSDD0018 Monitoring Report (2 sheet) Zdrive/dmb/stormwater/cover letters/2016/FDRY AND SHOP COVER LETTER Feb. 2016/dmb � 2 J,. G� Srvml� INCOR PORATEO SINCE 1889 TELEPHONE MANUFACTURERS OF SHIPPING ADD. (704) 872-3681 710 S. MULBERRY THE GLOBAL LEADER IN STIFF EXTRUSION FAx NumaER P.O,BOX1834 TOLL FREE (704) 878-0789 STATE SVMLE, N. C. 28687 (800) 278-3353 July 17, 2017 Division of Water Quality RECEIVED Attn: DWQ Central Files 1617 Mail Service Center JUL 2 4 2011 Raleigh, NC 27699-1617 CENTRAL FILES DWR SECTION Dear Stormwater Enforcement Group: J.C. Steele & Sons, Inc. is committed to following the requirements set forth in our stormwater permits by the Division of Water Quality. This letter is to inform you that for our Permit NCS000018 Year 1 Period 1, and Permit NCG030000 Certificate of coverage NCG030255 year 5 Period 1, We experienced no Storm event during working hours to collect our stormwater samples. I have enclosed copies of our rain gauge observation sheets for the months in question. Although we did receive a substantial amount of rainfall the majority of rainfall occurred on weekends and extended into the work week. This did not provide the 72 hours of separation needed to perform sampling. Please be advised that we are continually striving to abide by all conditions of our Stormwater Permits. If you have any questions please feel free to contact Curtis Daniels of J. C. Steele & Sons, Inc. at (704) 768-3230 or (704) 872-3681 Ext. 151. Sincerely, David Steele President J. C. Steele & Sons, Inc. End: 1- (5DO) NCG030000 Monitoring Report (3 sheets) 1—(5DO) Copy NCG030000 Monitoring Report 13 sheets) 1—(SDO) NCS000018 Monitoring Report (2 sheet) 1—(SDO) Copy NCS000018 Monitoring Report (2 sheet) 2—Copy Rainfall observation logs Zdrive/dmb/stormwater/cover letters/2017/FDRY AND SHOP COVER LETTER Feb. 2017/dmb Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted July 17 2017 CERTIFICATE OF COVERAGE No. NCG030 2 5 5 FACILITY NAME J. C. Steele & Sons. Inc. COUNTY Iredell PERSON COLLECTING SAMPLES Curtis Daniels LABORATORY, Lab Cert. # _ Comments on sample collection or analysis: No storm event for collection of samples during time period Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2017 SAMPLE PERIOD X❑ Jan -June July -Dec or ❑ Monthly' month DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA ❑Other Fourth Creek (Class C) PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 X❑ No discharge this period?2 Date Sample 24-hour pH, Non -Polar O&G/ Total Toxic Outfall No. rainfall Total Suspended Solids Copper Lead Zinc Total Petroleum Collected' Standard units Organics' (mo/dd/yr) amount, Hydrocarbons Inches Benchmarks =__> _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.067 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 No Sample * 2 Representative outfall On R/R Tracks See outfall 1 See outfall 1 See outfall 1 See outfall 1 See outfall 1 n/a 3 No Sample * 3a Representative outfall See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 see outfall 3 n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that Incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the rr quirements setforthin the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print tit, /7 (Signature) (g te) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mgjL", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inche53 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L" 6.0 — 4.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, 'Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART it SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER PIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR,_includina_all "No Discharge" reports, within 30 days of receipt of the lab results (or at end of monitoring period in the case o "No Discharge" reports) to, Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware th4t-there are significant penaltigfi for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 11/1/2012-10/31/2017 /7 t-ol 7 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 RAIN GAUGE OBSERVATION LOG SHEET Month: December Year: 2016 Sample Y N Pay Observation Time Rain Amount finches Observer's Name Remarks (severe weather, plant closed, etc.) 1 2 Friday - Shop closed N 3 Plant closed - weekend N 4 0.54 C.Daniels Plant closed - weekend N 5 7 am Mon 0.11 C.Daniels Continuation of weekend storm N 6 0.35 C.Daniels N 7 8 9 Friday - Shop closed N 1© Plant closed - weekend N 11 ' Plant closed - weekend N 12 13 14 15 16 Friday - Shop closed N Plant closed - weekend N ffiLi 0.18 Plant closed - weekend N 19 20 21 22 23 Friday - Shop & Foundry closed N 24 PLANT CLOSED - HOLIDAY I N 25 0.15 PLANT CLOSED - HOLIDAY I N 26 27 28 29 30 Friday - Shop closed N 31 Plant closed - weekend Total inches of rain: 1.33 = Weekends,,, plant is closed on weekends. i = Holidays, 1/2 day Fridays, Fridays or weeks that the plant was closed. _ 1. �ITry to record precipitation each day at the same time. _ 2. 1 Record precipitation to the nearest 1/100 of an inch. 3. if precipitation is less that .01 inches, record "T" for trace. 4 h; remarks column to indicate unusual circumstances and why observation was not taken. S. I Indicate if a sample was taken. drab/stormwater/RAIN GAUGE OBSERVATION LOG SHEET 2010/dmb/dec 2008 Month: January Year: 2017 Rain Amount Observer's Remarks Day Observation Time inches Name (severe weather, plant closed, etc.) 1 0.11 PLANT CLOSED -Weekend 2 0.83 Plant closed - Holiday 3 0.49 continuation of weekend storm 4 5 k-7 Snow- did not show up in gauge PLANT CLOSED -Weekend PLANT CLOSED -Weekend 9 10 11 12 13 PLANT CLOSED -Weekend 15. PLANT CLOSED -Weekend 16 17 18 19 r-- 20 0.28 Rain started during the evening 21P, 0.23 PLANT CLOSED -Weekend 2-2-, 0.49 PLANT CLOSED -Weekend 23 0.07 continuation of weekend storm 24 25 26 27 28 Plant closed - weekend 29 Plant closed - weekend 30 31 Total inches of rain: 2.5 Weekends,,, plant is closed on weekends. Holidays, 1/2 day Fridays, Fridays or weeks that the plant was closed. 1. Try to record precipitation each day at the same time. 2. Record precipitation to the nearest 1/100 of an inch. 3. If precipitation is less that .01 inches, record "T" for trace. 4. Use remarks column to indicate unusual circumstances and why observation was not taken. S. Indicate if a sample was taken. Sample Y N N N N N N N N N Month: February Year: 2017 Rain Amount Observer's Remarks Sample Day Observation Time inches Name [severe weather, plant closed, etc.) Y N 1 2 T N T N J Plant closed - weekend Plant closed - weekend 6 0.05 N 7 T N 8 T N 9 101 1xlq Plant closed - weekend 12 Plant closed - weekend 13 14 is 0.11 Curtis Daniels Rain occurred over entire day produced no discharge N 16 17 18 Plant closed - weekend 19:` Plant closed - weekend 20 21 22 0.08 Curtis Daniels Slow rain no discharge N 23 Ll' 0.1 Plant closed - weekend Plant closed - weekend 27 28 0.04 N Total inches of rain: 0.38 = Weekends,,, plant is closed on weekends. = Holidays, 1/2 day Fridays, Fridays or weeks that the plant was closed. 1. Try to record precipitation each day at the same time. 2. Record precipitation to the nearest 1/100 of an inch. 3. If precipitation is less that .01 inches, record "T" for trace. 4. Use remarks column to indicate unusual circumstances and why observation was not taken. S. Indicate if a sample was taken. Month: March Year: 2017 Rain Amount Observer's Remarks Day Observation Time inches Name (severe weather, plant closed, etc.) 1 7:00 am Curtis Daniels 0.38 Curtis Rain occurred early morning hours 2 a 4 Plant closed - weekend 5 Plant closed - weekend 6 7 T 8 9 101 0.12 Rain occurred after hours L-Ij 7AM Mon. Mar 13th Plant closed - weekend Plant closed - weekend 13 Curtis 14 loam 0.05 Curtis 15 16 17 0.12 '18'0.20 Plant closed - weekend '�, Plant closed - weekend 20 7 am Mon Mar.20th Curtis 21 22 7:00 AM 0.19 Curtis Early morning rain while plant was closed 23 24 , 25 Plant closed -weekend 26 0.4 Plant closed - weekend 27 7 am Mon Mar.27th 0.06 Rain was continued from weekend storm 28 0.17 Rain was continued from weekend storm 29 30 0.48 Not enough time between rain events 31 0.4 Total inches of rain: 2.57 = Weekends,,, plant is closed on weekends. Holidays, 1/2 day Fridays, Fridays or weeks that the plant was closed. 1. Try to record precipitation each day at the same time. 2. Record precipitation to the nearest 11100 of an inch. Sample YN N I N N N L N N N N N N N 3. If precipitation is less that .01 inches, record "T" for trace. 4. Use remarks column to indicate unusual circumstances and why observation was not taken. S. Indicate if a sample was taken. Month: April Year: 2017 Rain Amount Observer's Day Observation Time inches Name 1 --' 2 ' 0.2 3 7:00 am {Mon. Apr. 3 0.4 Cu rtis 4 5 7 am Wednesday 0.26 Curtis 6 7am Thursday 0.24 Curtis 7 8 9 10 11 12 13 14 r16 17 0.02 Curtis 18 19 7am Thursday 0.17 Curtis 20 21 22 8.00am (Mon. Apr. 25) 0.3 Curtis 23: 2 Curtis 24 0.55 25 0.03 26 0.16 27 28 zs 30 . 7:00 AM (Mon. May 1) 0.15 Remarks Sample (severe weather, plant closed, etc.) YLN Plant closed - weekend Plant closed - weekend N Rain started Sunday night and continued into early Monday N continuation of weekend rain N continuation of weekend rain N Plant closed - weekend Plant closed - weekend Plant closed - weekend Plant closed - weekend T Rain occurred after leaving for the day N Plant closed - weekend N Plant closed - weekend N continuation of weekend rain N continuation of weekend rain N continuation of weekend rain N Plant closed - weekend Plant closed - weekend N Total inches of rain: 4.48 r-- I = Weekends,,, plant is closed on weekends. = Holidays, 1/2 day Fridays, Fridays or weeks that the plant was closed. 1. Try to record precipitation each day at the same time. 2. Record precipitation to the nearest 1/100 of an inch. 3. If precipitation is less that .01 inches, record "T" for trace. 4. Use remarks column to indicate unusual circumstances and why observation was not taken. 5. indicate if a sample was taken. Month: May Year: 2017 Rain Amount Observer's Day Observation Time inches Name 1 0.47 Curtis 2 3 4 0.25 Curtis 5 7AM 0.3 Curtis 7 7 9 0.05 Curtis 10 11 12 0.07 curtis FI-31 0.03 24J 15 16 17 18 19 20 H22� 0.62 23 Curtis 7am Monday 0.08 Curtis 24 0.61 Curtis 25 0.39 Curtis 26 0.05 Curtis -27.. 28 0.34 29 Curtis 7am Monday 0.24 Curtis 30 31 0.12 Curtis Total inches of rain: 3.62 Remarks (severe weather, plant closed, etc.) Continuation of weekend storm Did not have 72 hours between rainfall Plant closed - weekend Plant closed - weekend Not enough Not enough to produce discharge Plant closed - weekend Plant closed - weekend Plant closed - weekend Plant closed - weekend Rain started on weekend while plant closed Rain started on weekend while plant closed Rain started on weekend while plant closed Rain started on weekend while plant closed Plant closed - weekend Plant closed - weekend Rain started on weekend while plant closed Not enough time seperating storm events Sample L N m N N N N N N N N N N N N W P Month: June Year: 2017 Rain Amount Observer's Day Observation Time inches) Name 1 2 0.67 5 7 am Mon 0.46 Curtis 6 7 a 9 12 13 0.59 14 7AM Wed. Morn 15 16 19 7 am Mon 0.32 Curtis 20 21 22 23 0.68 Ij 1.07 26 27 28 29 30 0.4 Curtis Total inches of rain: 4.19 Sample Y/N Remarks (severe weather, plant closed, etc.) Rain started on weekend when plant was closed N continuation of weekend storm N Plant closed - weekend Plant closed - weekend N Evening thunderstorm Plant closed - weekend N Plant closed - weekend N Early morning rain plant not opened yet N late night, early morning rain. Plant closed N Plant closed - weekend N Plant closed - weekend N Rain occurred after hours N .Q Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 n Date submitted ! 1 d V: I M ; 4W4 CERTIFICATE OF COVERAGE NO. NCG030 2 5 5 FACILITY NAME J. C. Steele & Sons Inc. COUNTY Iredell PERSON COLLECTING SAMPLES Mark Beaver LABORATORY Statesville Analytical Lab Cert. # NC Cert #440 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD ❑ Jan -June x July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA []Zero -flow []Water Supply [:]SADECEIVED ®Other Fourth Creek (Class Q NOV 10 2416 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES IDWR SECTION ❑ No discharge this period?Z 24-hour Non -Polar O&G/ Outfall No. Date Sample rainfall Total Suspended Solids pH, Copper Lead Zinc Total Petroleum Total Toxic Collected' Standard units Organicss (mo/dd/yr) amount, Hydrocarbons Inches Benchmarks =__> - - 100 mg/L or 50 mg/1. 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 10/7/16 .20 5.714 7.9 0.0055 <0.0025 0.07 <5.10 ** * 2 Representative outfall On R/R Tracks See outfall i see outfall 1 see outfall 1 See outfall 1 See outfall 1 n/a 3 10/7/16 1 .20 84.667 1 8.1 0.0099 0.0074 0.19 <5.05 ** * 3a Representative outfall See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 G Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I furtlier certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." * * Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period ?2 Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inchee Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWLI-245, last revised 10/25/2012 Page 2 of 3 4 Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES ❑ NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Zahid Khad letter Note: Copper and Zinc benchmarks were exceeded for outfalls l & 3 but a letter of relief dated January 7, 2015 was received from Mr. Khad letting us go back to semi-annual sampling. Mail an ordinal and one cony of this DMR, including all "No Discharge" reports, within 30 days of receipt of the lab results for of end of monitorina_period In the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete am aware that the are significant penalties f submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 .lr = S41F:T:LSONs INCORPORATED SINCE 1889 TELEPHONE MANUFACTURERS OF SHIPPING ADD. (704) 872-3681 710 S. MuLaERRY THE GLOBAL LEADER IN STIFF EXTRUSION FAx NuMeER P. O. BOX 1834 TOW- FREE (704) 878-0789 STATESVII,LE, N. C. 28687 (800) 278-3353 November 7, 2016 Division of Water Quality RECEIVED Attn: DWQ Central Files NOV 10 W6 1617 Mail Service Center Raleigh, NC 27699-1617 DWR S FILES 111�R SECTION Dear Stormwater Enforcement Group: Please find enclosed the Stormwater Discharge Outfall Monitoring Report for permit numbers NCG030255 and NCS000018 for the J. C. Steele & Sons, Inc., facility in Statesville. For permit NCG030255 the Copper and Zinc levels in outfalls 1 and 3 are above the benchmarks however, a letter of relief for Copper and Zinc was sent to us by Zahid S. Khan on January 7, 2015. If you have any questions please feel free to contact Curtis Daniels of J. C. Steele & Sons, Inc. at (704) 768-3230 or (704) 872-3681 Ext. 151. Sincerely, a-,'Al David Steele President J. C. Steele & Sons, Inc. End: 1- (SDO) NCGO30000 Monitoring Report (3 sheets) 1— (00) Copy NCG0300DO Monitoring Report (3 sheets) 1— (500) NCS000018 Monitoring Report (2 sheet) 1— (00) Copy NC5000018 Monitoring Report (2 sheet) Zdrive/dmb/stormwater/cover letters/2016/FDRY AND SHOP COVER LETTER Feb. 2016/dmb 4 Semi-annual Stormwater Discharge Monitorlhig Re ort for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 3 - I - / �p CERTIFICATE OF COVERAGE NO. NCG030 2 5 5 FACILITY NAME J. C. Steele & Sons, Inc. COUNTY Iredell PERSON COLLECTING SAMPLES Jock Davis & Linda Lippard LABORATORY Statesville Analytical Lab Cert. # NC Cert #440 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2016 SAMPLE PERIOD gJan-June ❑ July -Dec or []Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA ❑Zero -flow ❑Water Supply ❑SA Cr'+ ,1 Mher Fourth Creek (Class C) RGv� V PLEASE REMEMBER TO SIGN ON PAGES 2 ANn/nR q 4 GEN� — r.YypN ❑ No discharge this period 24-!lour Non -Polar O&G/ Outfall No. Date Sample rainfall Total Suspended Solids pH, Copper Lead Zinc Total Petroleum Total Toxic Collected' Standard units Organicss (mo/dd/yr) amount, Hydrocarbons Inches3 Benchmarks ===> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 2/3/16 1.02 104.38 7.9 0.012 <0.0025 0.123 <5 ** * 2 Representative outfall on R/R Tracks See outfall 1 See outfall 1 See outfall 1 See outfall 1 See outfall 1 n/a 3 2/3/16 1 1.02 116.67 8.5 0.02 0.0053 0.31 <5.4 ** * 3a Representative outfall see outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Alan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. Part 8: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period? Outfall No.Date Sample Collected: (mo/dd/yr) 24-hour rainfall amount, Inche? `{ Non-polar08,G/TPH by EPA 1664 (SGT-HEM) '+` Total Suspended Solids pH Benchmarks ===> _ - 15 mg/L- 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Fo?tnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 i . 19111-.. I Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENC S FOR THE SAME PARAMETER AT ANY ONE OUTFACE? YESNO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES MNO ❑ REGIONAL OFFICE CONTACT NAME: Zahid Khad (letter) Nate: Copper and Zinc benchmarks were exceeded for outfalls 1 & 3 but a letter of relief dated January 7, 2015 was received from Mr. Khad letting us go back to semi-annual sampling. Mall an orlainal and one coov of this DMR Includlna all "No Discharae" reports, within 30 days of receipt of the lab results for at end of monitorina period In the case of "No Discharae" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) Permit Date: 11/1/2012-10/31/2017 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 INCORPORATED SINCE 1889 TELEPHONE MANUFACTURERS OF (704) 872-3681 THE GLOBAL LEADER IN STIFF EXTRUSION FAx NUMBER P. O. BOX IE334 (704) 878-0789 STATESVILLE, N. C. 28687 March 4, 2016 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Stormwater Enforcement Group: 1 01 SHIPPING ADD. 710 S. MULBERRY TOLL FREE (BOO) 278-3353 Please find enclosed the Stormwater Discharge Outfall Monitoring Report for permit numbers NCG030255 and NCS000018 for the J. C. Steele & Sons, Inc., facility in Statesville. For permit NCG030255 the Copper and Zinc levels in outfalls 1 and 3 are above the benchmarks however; a letter of relief for Copper and Zinc was sent to us by Zahid S. Khan on January 7, 2015. If you have any questions please feel free to contact Mark Beaver of J. C. Steele & Sons, Inc. at (704) 768-3220 or (704) 872-3681 Ext. 155. Sincerely David Steele President J. C. Steele & Sons, Inc. End: 1- (00) NCGO3000D Monitoring Report (2 sheets) 1— (5130) Copy NCGO30DOO Monitoring Report (2 sheets) . 1— (5DO) NC5000018 Monitoring Report (1 sheet) 1— (00) Copy NCSOOD018 Monitoring Report (1 sheet) Zdrive/dmb/stormwater/cover letters/2016/FDRY AND SHOP COVER LETTER Feb. 2016/dmb Semi-annual Stormwater Discharge Monitoring Report C for North Carolina Division of Water Quality General Permit No. NCG030000 C J �� 6U�� Date submitted CERTIFICATE OF COVERAGE NO. NCG030 2 5 5 SAMPLE COLLECTION YEAR 2015 (� FACILITY NAME J. C. Steele & Sons. Inc. _ SAMPLE PERIOD ❑ Jan -June RrJuly-Dec f� COUNTY Iredell or ❑ Monthly' (month PERSON COLLECTING SAMPLES Jock Davis & Linda Lippard DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PN LABORATORY Stateville Analytical Lab Cert. # NC Cert #440 []zero -flow []water supply ❑SA Comments on sample collection or analysis: RECEIVED giother_ Fourth Creek (Class C) NOV 2 3 2015 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 CENTRAL FILES Part A: Stormwater Benchmarks and Monitoring Results DWR SECTION ❑ No discharge this period ? Date Sample 24=hour `Total pH, � , Nan -Polar O&G/ Total Toxic Outfall No. ' rainfall Suspended Solids.. Copper Lead Zinc Total Petroleum Collected' Standard units Organics (mo/dd/yr) • amount, 4 ` Hydrocarbons Inches Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 10/27/15 1.85 2.857 7.0 <0.002 <0.0025 0.1176 <5.1 ** * 2 Representative outfall On R/R Tracks See outfall ! See outfall 1 See autfall 1 see outfall i See outfall 1 n/a 3 '10/27/15 1 1.85 19 7.0 0.<0.002 0.0046 1 0.2502 1 <5.4 ** * 3a Representative outfall See outfall 3 See outfali 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 n/a Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." * * Note; J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, „<XX mglV where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new all per month. No discharge this period?z OutfaH No. Date Sample' Collected) (mo/dd/yr} 2"bur rainfall amount, i Inches , Non -polar O&G/TPH by; EPA 1664-(SGT HEM} ` Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* &0 — 9.0 SU Footnotes from Part A also apply to this Part B:�� * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies., .O ,A 'bi MO Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012;A Page 2 of 3 Semi-annual Stormwatelr Discharge Monitoring Resort -A for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted CERTIFICATE OF COVERAGE NO. NCG030 2 5 5 SAMPLE COLLECTION YEAR 2015 FACILITY NAME J. C. Steele & Sons, Inc. SAMPLE PERIOD gJan-June ❑ July -Dec :� -� COUNTY Iredell or ❑ Monthly' (month) PERSON COLLECTING SAMPLES Jack Davis & Linda Lippard DISCHARGING TO CLASS ❑ORW ❑HQW []Trout [:]RNA - LABORATORY Stateville Analytical Lab Cert. #i NC Cert ##440 RECEIVED ❑Zero -flow ❑Water Supply ❑SA _ - Comments on sample collection or analysis: APR 0 S 2015 [00ther_Fourth Creek (Class C) CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 i DWR SECTION Part A: Stormwater Benchmarks and Monitoring Results ❑ No discharge this period?z 24-hour Non -Polar O&G/ Outfall No. Date Sample rainfall Total Suspended Solids pH, Copper Lead Zinc Total Petroleum Total Toxic Collected' Standard units Organicss (mo/dd/yr} amount, Hydrocarbons Inches Benchmarks 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 3/5/15 1.46 33.333 8.8 0.007 <0.0025 0.1818 <5.05 *• * 2 Representative outfall On R/R Tracks see outfall 1 see outfall 1 See outfall 1 see outfall 1 see outfall 1 n/a 3 3/5/15 1 1.46 27.152 8.0 0.013 0.0049 0.2803 <5.6 ** * 3a Representative outfall See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 See outfall 3 n/a ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. A See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample Is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<XX me/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharge this period?z Outfall No. Date Sample 1 Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks ===> _ - 15 mg/L 100 mg/L or So mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value In excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART Fl SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES gNO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES gffNO ❑ REGIONAL OFFICE CONTACT NAME: Zahid Khad (letter) Note: Copper and Zinc benchmarks were exceeded for outfalls 1 & 3 but a letter of relief dated January 7, 2015 was received from Mr. Khad letting us go back to semi-annual sampling. Mall an original and one copy of this DMR includin all "No Discharge' re orts within 30 days a recei t o the lob results ar at end o monitorin eriod In the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 SODS: INCORPORATED SINGE 1889 TELEPHONE MANUFACTURERS OF (704) 872-3681 THE GLOBAL LEADER IN STIFF EXTRUSION FAx NUMBER P. O. BOX 1834 (704) 878-0789 STATESVILLE, N. C. 28687 March 31, 2015 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Stormwater Enforcement Group: a SHIPPING Am). 710 S. MULBERRY TOLL FREE (800) 278-3353 Please find enclosed the Stormwater Discharge Outfali Monitoring Report for permit numbers NCG030255 and NCS000018 for the J. C. Steele & Sons, Inc., facility in Statesville. For permit NCG030255 the Copper and Zinc levels in outfalls 1 and 3 are above the benchmarks however; a letter of relief for Copper and Zinc was sent to us by Zahid S. Khan on January 7, 2015. Also please note the pH level for permit NCS000018 was below the benchmark. The pH reading for Outfall #6 was 5.6. A sample containing just rain water was also taken at the time of the rain event and the pH reading of the rain was 5.3. If you have any questions please feel free to contact Mark Beaver of J. C. Steele & Sons, Inc. at (704) 768-3220 or (704) 872-3681 Ext. 155. Sincerely David Steele President J. C. Steele & Sons, Inc. End: 1- (SDO) NCGO30000 Monitoring Report 12 sheets) 1—(SDO) Copy NCG030000 Monitoring Report (2 sheets) 1— (00) NCS000018 Monitoring Report (1 sheet) 1— (SDO) Copy NCS000018 Monitoring Report (1 sheet) Zdrive/dmb/stormwater/cover letters/2015/FDRY AND SHOP COVER LETTER MAR. 2015/dmb Outfall #3 Summary Tier One Tier Two Feb.2014 No Flow No Flow Mar.2014 No Flow No Flow Apr.2014 No Flow No Flow May 2014 5/15/14 0.017 <0.0025 �Jun. 2014 No Flow No Flow Tier Three -Spring �Oi3 2/26/13 0.018 <0.0025 Fall2013 20'14 112114 0.009 <0.0025 July 20f 7/15/14 0.038 <0.0025 Copper (Cap) No Flow Lead (Pb) No Flow Oil S Grease 5.8 No Flow <5.7 No Flow No Flow No Flow <5.1 No Flow <5.7 TSS 14 No Flow 5 No Flow No Flow No Flow 7 No Flow 22.3 Zinc (Zn) 0.44 No Flow 0.098 No Flow No Flow No Flow 0.059 No Flow 0.22 PH 7.8 No Flow 8 No Flow No Flow No Flow 7.9 No Flow 7.6 Water sample from the roof at outfall #3 area 512112014 Copper (Cu) 0.026 Lead (Pb) <0.0025 Zinc (Zn) 0.41 ` �• Avl*lulu ui L ANO REMIRCES a PY I AND WAM WMN Semi-annual Stormwater Discharge Monitoring Report rtr-r�l11FT� for North Carolina Division of Water Quality General Permit No. NCG030000 DEC 22 2014 Date submitted IQ,14 ci,,, � ,* , b. NCG030 2 5 5 FACILITY NAME J. C. Steele & Sons, Inc. COUNTY Iredel) PERSON COLLECTING SAMPLES lock Davis & Linda Uppard _ LABORATORY Stateville Analytical Lab Cert. # NC Cert#440 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan June ❑ July -Dec or VMonthlyl November (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA []Zero -flow [:]Watersupply ❑SA `Other Fourth Creek Mass C PLEASE REMEMBER TO SIGN OIL PAGES Z AND/OR 3 4 n No dischome this period ?2 Outfall No. Date Sample Callededl (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxli Organics Berfchmarks ===s _ - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 11/17/2014 .79 18 8.2 0.004 <0.0025 0.079 <6.9 • 2 Representative outfall On R/R Tracks see outfall 1 see outfall 1 see outfall 1 See outfall 1 see outfall 1 n/a 3 11/17/2014 .79 22 8.6 1 0.011 1 0.0028 1 0.185 <5.1 * " " 3a Representative outfall See outfall 3 See outfall 3 See outfall 3 see outfall-3 see outfall 9 See outfall 3 n/a Monthly samnllns (instead of semi-annuall must beein with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample Is taken at outfall 1) and outfall 3 Is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." * * Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, ihey must be reported in the format "<XX mtdV where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. No discharge this period Outfall No. Date Sample Collected (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (5GT-HEM) Total Suspended Solids pH Benchmarks ===> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU •5f'J7�'r r Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/2S/2012 . . .' , .: '+1 Page 2 of 3 r Note. If you report a sample value in excess of the benchmark, you must implement Tier 1, Tler 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SE TION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDEN S FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES YNO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES Rff NO ❑ REGIONAL OFFICE CONTACT NAME: Zahid Khad (letter)_ T T Mail an original and one My of this DMR including all "No Discharge" re orts within 30 days of recei t o the !a6 results or at end o monitorin erlod in the case of "No Discharge" reoortsl to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFhRMA71QN REP. ORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are signiflcant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) ! /4 Zc7 (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 'r . ._ . Semi-annual Stormwater Dig ar a Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 11- L& - rg014 CERTIFICATE OF COVERAGE No. NCG030 2 5 5 FACILITY NAME J. C. Steele & Sons, Inc. COUNTY Iredell PERSON COLLECTING SAMPLES _ Jock Davis & Linda Lip ap rd — LABORATORY Stateville Analytical Lab Cert. # NC Cert #440 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2014 SAMPLE PERIOD ❑ Jan -June ❑ July -Dec or OffMonthlyi November !month) DISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA RECEIVED ❑Zero -flow ❑Water Supply ❑SA DEC 2 3 2014 ®`Other_Fourth Creek (Class C) CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 DWR SECTION ❑ No discharge this period Outfall No. Date Sample Collected1 (mo/dd/yr) 24-hour rainfall amount, Inches3 Total Suspended Solids pH, Standard units Copper Lead Zinc Non -Polar O&G/ Total Petroleum Hydrocarbons Total Toxi, Organics' Benchmarks 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L. 15 mg/L i mg/L 1 11/17/2014 .79 18 8.2 0.004 <0.0025 0.079 <6.9 02 Representative outfall On R/R Tracks See outfall i see outfall 1 See outfall 1 see outfall 1 see outfall 1 n/a 3 11/17/2014 1 .79 22 8.6 1 0.011 1 0.0028 1 0.185 1 <5.1 I** * 3a Representative outfall See outfall 3 see outfall 3 see outfall 3 see outfall 3 see outfall 3 See outfall 3 n/a Monthly samnline (instead of semi-annual) must belzin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in,the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * outfall 1 Is representative of Outfall 2 (sample Is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page Iof3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics Into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth In the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mg/L" where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inche? Non -polar O&G/TPH by EPA 1664 (5GT-HEM) Total Suspended solids pH Benchmarks =__> - - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 5U Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. .Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: If you report a sample value in excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART 11 SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDEN S FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES gNO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES @ff NO REGIONAL OFFICE CONTACT NAME: Zahid Khad (letter) Mail an original and one copy of this DMR, includina all "No Discharge" reports, within 30 days of receipt of the lab results for at end oI monitoring period In the case of "No Discharge" reports to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false Information, Including the possibility of fines and imprisonment for knowing violations." (Signature of iPermi+ttee; i /G Z ) (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 S4EVEIE- && sox.-S, INCORPORATED SINCE 1889 TELEPHONE MANUFACTURERS OF SHIPPING ADD. (704) 872-3681 710 S. MULBERRY THE GLOBAL LEADER IN STIFF EXTRUSION FAX NumaER P. O. BOX 1834 TOLL FREE (704) 878-0789 STATESVILLE, N. C. 28687 (800) 278-3353 December 16, 2014 Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, NC 27699-1617 Dear Stormwater Enforcement Group: Please find enclosed the Stormwater Discharge Outfall Monitoring Report for permit number NCG030255 for the J. C. Steele & Sons, Inc., facility in Statesville. Previous testing for out -falls; #1 and #3 resulted in Tier Two monthly sampling. The results from this stormwater event will again put outfall #3 above the benchmark for copper and per the November results, zinc is also above the benchmark thus triggering Tier Three actions. The November results also put copper at the Tier Three level for the first time at outfall #1. As stated in our letter dated August 25, 2014; J. C. Steele & Sons, Inc. operates metal finishing processes at our location. The facility instituted Tier One and Tier Two actions as a result of previous benchmark exceedances. J. C. Steele & Sons, Inc. has implemented the following best management practices in an effort to reduce the metals discharged to the stormwater. • Implemented a stronger good housekeeping program including more frequent sweeping. • Changed several of our dust collector stacks from horizontal to vertical discharge and extended the height of the stacks. • Replaced broken asphalt and concrete so these areas can be better swept. • Had consultants on site to review and comment on our stormwater issues. • Cleaned around storm drains and installed filter barrier material in some areas. • installed curbs around stormwater drains to help settle the solids. • Curbing was installed at outfall #5 to redirect the water flow to a pit filled with rip -rap in an effort to slow down the water flow and help settle solids before reaching the outfall. This has resulted in No -Flows for each rain event. • After speaking with Mr. Michael Parker (NCDENR) the flow at outfall #4 was redirected to outfall #6. This was accomplished by installing a trench to redirect the water flow through a ditch filled with rip -rap material and then through a grassy area a before reaching outfall #6. • Before reaching.T'ier Three status a roof was installed over a dumpster and wash area. Also a trench was installed to redirect water flow to a ditch filled with rip -rap material in an effort to slow down water flow and help settle solids. The costs just for these two installations were over $42,000. • So far J. C. Steele has spent an additional $57,000 on the other improvements listed above. • J. C. Steele has also collected rain samples from the machine shop roof in May 2014. These samples were collected in the outfall #3 area before the water hit the ground. The copper level was 0.026 and the zinc level was 0.41 both of which exceed the benchmarks set forth in our permit. After notifying the Mr. Zahid Khad with the Regional Office back in August of this year, Mr. James Moore and Mr. Samar Bou-Ghazale with the regional office came by to see our site. Both Mr. Moore and Mr. Bou-Ghazale made suggestions for improvement which have been completed -by J. C. Steele. Our permit requires notification to the DWQ Regional Office Supervisor in writing when Tier Three status is reached. Mark Beaver with J. C. Steele has sent notification to Zahid Khad with NCDENR in Mooresville by letter. If you have any questions please feel free to contact Mark Beaver, of J. C. Steele & Sons, Inc., at (704) 768-3220 or (7041 872-3681 Ext. 155. Sincerely, David S. Steele President J. C. Steele & Sons, Inc. Semi-annual Stormwater Discharge Monitoring Re ort for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 9 oZ 5 - a 0 Iq CERTIFICATE OF COVERAGE NO. NCG030 2 5 5 FACILITY NAME J. C. Steele & Sons. Inc. COUNTY Iredell PERSON COLLECTING SAMPLES Jock Davis & Linda Lippard LABORATORY Statevilie Analytical Lab Cert. # NC Cert #440 Comments on sample collection or analysis: Part A: Stormwater Benchmarks and Monitoring Results SAMPLE COLLECTION YEAR 2014 pp n ��tSAMPLE PERIOD ❑ Jan -June - ❑ July -Dec or ,E WGING TO CLASS t ❑❑❑ ORW July T out h REC❑PNA AUG 2 9 2014 [_]Zero -flow [:]WaterSupply ❑SA Vther_Fourth Creek (Class CI - CENTRAL FILES DWQIBQG PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 No discharge this period?' Date Sample 24-hour pH, Non -Polar oAG/ Total Toxlt Outfall No. Collected' rainfall Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organics5 {mo/dd/yr) amount, Hydrocarbons Inches3 Benchmarks - - 100 mg/L or 50 mg/L 6.0 — 9.0 0.007 mg/L 0.03 mg/L 0.067 mg/L 15 mg/L 1 mg/L 1 7/15/2015 .43 8.33 7.9 0.0085 <0.0025 0.13 5.5 ** * 2 Representative outfall On R/R Tracks see outfall 1 see outfall 1 see outfall 1 See outfall 1 See outfall 1 n/a 3 7/15/2014 1 .43 22.3 7.6 0.038 <0.0025 0.22 <5.7 ** * 3a Representative outfall see outfall 3 see outfall 3 see outfall 3 See outfall 3 see outfall 3 See outfall 3 n/a Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 2 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. "See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433:11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they -must be reRorted_in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier Z, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?' Ctutfall No. Date Sample Collected' lmo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G/TPH by EPA 1664 (SGT HEM) Total Suspended Solids pH Benchmarks ===> _ - 15 mg/L 100 mg/L or So mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 44/'~ 1 Page 2 of 3 Semi-annual Stormwate� Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 9- A 5- 40 I q CERTIFICATE OF COVERAGE NO. NCG030 15 5 r 9. ? v SAMLE COLLECTION YEAR 2014 FACILITY NAME J. C. Steele & Sons. Inc. -^� R 3> S 0 2M PERIOD ❑Jan June ❑ July -Dec COUNTY Iredell fl o or VMonthlyl Jul month PERSON COLLECTING SAMPLES Jock Davis & Linda Llppard DISCHARGING TO CLASS ❑ORW ❑HQW [:]Trout❑PNA LABORATORY Stateville Analytical Lab Cert. # NC Cert #440 ❑Zero -flow ❑Water Supply []SA Comments on sample collection or analysis: 27 - Fourth Creek (Class ? therC) rn _+ o rn Z 0 PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 Cn Part A: Stormwater Benchmarks and Monitoring Results EJ No discharge this period?? Outfall No. Date Sample Collected � (mo/dd/yr) 24-hour rainfall amount, Inches Total Suspended Solids pH, Standard units Copper Lead Zinc .. Non -Polar O&Q/ Total Petroleum Hydrocarbons Total Toxic Orgaftlts .Benchmats a=> _ - 100 mg/L or 50 mg/L 6.0—9.Q_.1, .. , 0.007.,mg/L .• ; 0.03 mg/L -:0.067, mg/I,. 15 mg/L 1 nWL 1 7/15/201S .43 833 7.9 0.0085 <0.0025 0.13 5.5 *' *2 Representative outfall On R/R Tmdcs see outfall 1 see oudall 1 see outfall 1. see outfall 1 sea outfall i n/a 3 7/15/2014 1 .43 22.3 7.6 0.038 <0.0025 0.22 <5.7 *" " 3a Representative outfall See outfail 3 see oudall 3 see outfall 3 Sea outfall 3 See outfail 3 See outfall 3 n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. " See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 43111; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469:31). * Outfall 1 is representative of Outfall 2 (sample Is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my Inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included -in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported In numerical.format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format. "<XX mgjV where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note. if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tler 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. n No discharge this period ;12 Outfall No. Date Sample Collected Imo/dd/yr) 24-hour rainfall amount, Inche93 Non -polar 0&6/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks a=z> _ - 15 mg/L 100 mg/L or SO mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, Identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: if you report a sample value In excess of the benchmark, you must Implement Tier 1, Tier 2, or Tier 3 responses. See Genera! Permit text. FOR PMj A AN E6f TP— MOI�ORING RESULT • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION S. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SE ION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDEN S FOR THE SAME PARAMETER AT ANYONE OUTFALL? YES �NO 0 IF YES, HAVE YOU CONTACTED THE DWIQ REGIONAL OFFICE YES [�NO ❑ REGIONAL OFFICE CONTACT NAME: Z a h i ct K h er d U f �A.� f' _ 1� drit4 K -- - -(ph 0 ne, Mail Qn orialnal and one co�L+ of his DMR. including all "No Dischara"rmoorts, within 30 days of receipt of the lab results for at end of monitodna period In the case of "No Discharae" renarts) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMgTION REPORTED_ "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons wha manage the system, or those persons directly responsible for gathering the Information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 COPY STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000018 SAMPLES COLLECTED DURING CALENDAR YEAR: 2014 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling resitlts from the laboratory.) FACILITY NAME J. G. St le & Song,Inc PERSON COLLECTING SAMPLE(S) See"*" below CERTIFIED LABORATORY(S) ,Statesville Analytical Lab # NC #440 StatquMe Analvdcal Lab # _ NC DW #37755 Part A: Specific Monitoring Requirements COUNTY Iredeil PHONE NO. (704) 872-3681 . &M4j_jh" !& (SKINATURE, MFFERJWI7TEE OR DESIGNEE) By this signature, I certify that this report Is accurate complete to the best of my knowledge. Ontiail Date 50050 - No. -Sample Total -< '. Total Total- COD Iron Chromium .. ' pH CoIlectel „ Flow +Oapp.} :,; ) Rainfall .Suspended , ,,, Total-,. ._ ti " ; Solids •'' { F °Recoveratlle, mWL 'I MWL mix mold MG inches : 100 120. 2. 1 6.0 -- 9.0' ,. 14 7/15/2014 As of February 2013 this outfatl has been diverted to Outfall No. 6 per our letter dated Feb. 8, 2013 #5 7/15/2014 No FIow — due to improvements at this outfall. * Mark Beaver #6 7/15/2014 .43 1 3.29 <25 0.37 <0.0025 6.3 * John En and Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? yea X no (if yea, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. . PK :Date ~; : Sample•" ; - ollected , . 50050 00556 00530. 00400 ,.. =T&4171ow, ; : ,(lfoppllcable), r Total Rainfall Oil,and Grease Non -polar O&WIPH (Method,1664 SGT HFM, U appl. Total Suspended Solids pH New Motor Offuiage mo/ ,' MG inches unit mo Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 7115/1014 _ Total Event Precipitation (inches): .43 Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify; under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge -and belief, true, -accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Page 2 of 2 Analytical Results JC Steele & Sons, Inc. PO Box 1834 Statesville NC 28687 Entered 7/15/2014 Reported: 8/18/2014 For: Stormwater Sample ID Parameter Cust ID Result Units Method Date Analyzed Analyst 140715-24.1 Copper-Flame/liquid OF#] 0.0085 mg/L SM31I113- 8/1/14 MD 140715-24.1 Lead-Fur/liquid OF#1 <0.0025 mg/L SM311313- 7/28/14 MD 140715-24.1 Oil & Grease OF#] 5.5 mg/L EPA1664Rev 7122/14 MD 140715-24.1 TSS OF#] 8.33 mg/L SM2540D- 7/16/14 HM 140715-24.1 Zinc-Flame/liquid 0F#1 0.13 mg/L SM3111 B- 7123/14 MD 140715-24.2 Copper-Flame/liquid OF#3 0.038 mg/L SM3111B- 8/1/14 MD \ 140715-24.2 Lead-Fur/liquid OF#3 <0.0025 mg/L SM31136- 7/28114 MD 140715-24.2 Oil & Grease OF#3 <5.7 mg/L EPA1664Rev 7/22114 MD 140715-24.2 TSS OF#3 22.3 mg/L SM2540D- 7116/14 HM 140715-24.2 Zinc-Flame(liquid OF#3 0.22 mg/L SM3111 B- 7/23/14 MD 140715-24.3 Chromium-Fur/liquid OF#6 <0.0025 mg/L SM311313- 7/28/14 MD 140715-24.3 COD OF#6 <25 mg/L HACH8000 7/17/14 CL 140715-24.3 Iran-Flame/liquid OF#6 0.37 mg/L SM311113- 7/24/14 MD 140715-24.3 TSS OF#6 3.29 mg/L SM2540D- 7116114 HM Respectfully submitted, v`• Dena Myers NC Cert #440, NCDW Cert #37755, EPA NCO0909 P.O. Box 228 * Statesville, North Carolina 28687 * 7041872/4697 _ Semi-annual Stormwater Discharge_ Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted _ !a 3 - A 6 / q m � CERTIFICATE OF COVERAGE NO. NCG030_ 2 5 5 ? ;AMPLE COLLECTION YEAR 2014 z AMPLE PERIOD [] Jan -June ❑ Juiy-Dec FACILITY NAME J. C. Steele & Sons Inc. _ v� COUNTY Iredell c�f rev or ©,Monthly)_ fmonthl PERSON COLLECTING SAMPLES Linda Li _pard ' nM ISCHARGING TO CLASS ❑ORW ❑HQW []Trout ❑PNA LABORATORY St to illg A a! ical Lab CerL # NC Cert #440 ° a ❑Zeroflow ❑Water Supply [:]SA Comments on sample collection or analysis: 0. 1 m Cn m QOther Fourth Creek (Class C� m �CJ PLEASE REMEMBER TO SiGN ON PAGES 2 AND/OR 3 4 z M Part A: Stormwater Benchmarks and Monitoring Results No discharge this period?z i Date Sample' 24=hour pH, Non -Polar O&G/ Total Toxl Outfall No. Collected-. rainfall Total Suspended Sollds, . "Standard units; Copper Lead Zinc Total Petroleum I organics' (mo/dd/yr) amount, Hydrocarbons lecher , seichmorks � - - 100.mg/L7or 50 mg/L , : s - ' "6.0'-- 9:0' 0.007 mg/L.. 0.03 mg/L ° :0.087;mg/L 35 mg/L 1 mg/L 1 5/15/2015 1.42 Not 2quired during thisperiod. »» *2 Representative outfall on R/R ors see WWI 1 n/a 3 5/15/2014 1A2 7 7.9 0.017 c0.0025 0.059 <5.1 »* * 32 Representative oudall see outfall 3 see outfall 3 see outfall 3 See auftl 3 See outfail 3 See outfell 3 n/a Monthly samnline (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same narameter at the same nutfall. 2 For sampling periods with no discharge at any single outfall, you must still submit ,this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the'rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of thispermit the -definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the, definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found In 40 CFR,469.12; for electronic crystal manufacture'use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found In 40 CFR 469:31). * Outfall 1 Is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample Is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 - (_Gey- Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (70), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included In the Stormwater Pollution Prevention Plan_" * * Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported In the format. "<XX• mx/L". where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value In excess of the benchmark, you must. Implement Tier 1, Tler 2, or Tier 3 responses. See General Permit text. Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. 0 No discharge this period?? outfall No. Date Sample Collected' (ma/dd/yr) 24-hour rainfall amount, Inches3 ..,Non -polar O&G/TPH by., 'EPAA664'(SGT-HEM)1 ". Total Suspended: Solids pH Benchmarks 15' mg/L 100 mg/L or. So mWL* 6.0 r 9.0 SU Footnotes from Part A also apply to this Part 8 * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 =L.ley = 'kite: if you report a sample value in excess of the benchmark, you must implement Tier .1, Tler 2, or Tler 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II -SECTION B. TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE'OUTFALL? YES ❑ NO-{ r IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO REGIONAL OFFICE CONTACT NAME: Mail an arlainal and one cony of this DMR. Includina all "No -Discharge" arge" repor#s� with)» 30 days of reseI t of the lab results or at end cf monitoring riod In the case of No Dischame_" reports) to: Division of Water Quality - Attn: DWQ Central Files 1617 Mall Service Center I Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision In accprdance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and Imprisonment for knowing violations." (Signature of Permittee) Permit Date:11/1/2012-10/31/2017 Z! 2s /<� (Date) --: SWU-245, last revised 10/2S/2012 Page 3 of 3 a C ca�y - STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 000018 SAMPLES COLLECTED DURING CALENDAR YEAR: 2014 (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME J. C. Steele &Sons. Inc. PERSON COLLECTING SAMPLE(S) _ See "*" below CERTIFIED LABORATORY(S) _ Statesville Analytical Lab # NC #440 Statesville Analytical Lab # NC DW #37755 Part A: Specific Monitoring Requirements COUNTY Ir-edell PHONE NO. 872-3 81 (SIGNATURE OF PERMITTEE OR DESIGNEE) By this signature, I certify that this report is accurate complete to the best of my knowledge. Outfall Date 030 Total. :.: Tatar Total COD :Iron Chronifinm ;.. pH ; No. Sample Collected Flow.:(ff app ); : Rainfall Snspended Total .Solids Recoverable .nof- - maid MG Inches 100 1•.-` 60=9.0 #4 5/15/2014 As or February 2013 this outfall has been diverted to Outfall No. 6 per our.letter dated Feb. 8, 2013 #5 5/15/2014 No Flow -- due to' rovements at this ouW. * Marls Beaver #6 5/15/2014 1.42 1 27.3 <25 1 1.48 0.008 7.6 * John f2lland Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? yes _ X� no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date Sample Collected :00556 _ 00530: 00400 ' TotatL'I41ow (lf aPPlicsble) T©ta1 hZalnfall £ , ' Oursnd`Grease `' ;�Nbn polar 08�G1'Y`PS (YWethed'1f184 Total r Sup" pended Solids, pH New Motor Off-Unge aid MG -inches- '.MOWII 2.17z; ' unit a1Fmo Form SWU-247-062310 Page 1 of 2 STORM EVENT CHARACTERISTICS: Date 5/15/2014 Total Event Precipitation (inches): 1.42 Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation. (inches): Event Duration (hours): (only if applicable — see permit) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "1 certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the Information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted -is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Form SWU-247-062310 Page 2 of 2 - 6 D' /} i / 71 Analytical Results JC Steele & Sons, Inc. PO Box 1834 Statesville NC 28687 Entered 5/15/2014 Reported: 5/22/2014 For: Stormwater Sample ID Parameter Cust ID Result Units Method Date Analyzed Analyst 140515-14.1 Copper-Flame/liquid Outfa113 0.017 mg/L SM3111B-1999 5/20/14 MD 140515-14.1 Lead-Fur/liquid Outfa113 <0.0025 mg/L SM3113B-2004 5/19/14 MD 140515-14.1 Oil & Grease Outfa113 <5.1 mg/L EPA1664RevA 5/21/14 MD 140515-14.1 TSS OutfaI13 7 mg/L SM254OD-1997 5/16114 WL 140515-14.1 Zinc-Flamelliquid Outfa113 0.059 mg/L SM3111B-1999 5/20114 MD 140515-14.2 Chromium-Furniquid CWW6 0,008 mg/L SM3113B-2004 5/21/14 MD 140515-14.2 COD Outfa116 <25 mg/L HACH8000 5/15/14 CL 140515-14.2 Iron-Flameniquid Outfa116 1.48 mglL SM3111B-1999 5120/14 MD 140515-14.2 TSS OutW16 27.3 mg/L SM2540D-1997 5/16/14 WL Respectfully submitted, Dena Myers NC Cert #440, NCDW Cert #37755, EPA N CO0909 P.O. Box 228 • Statesville, North Carolina 28687 + 704/872/4697 Analytical Results JC Steele & .Sons, Inc. PO Box 1834 Statesville NC 28687 Entered 5/1512014 Reported: 5/21/2014 For: Storrmwater Date Sample ID Parameter 'Cost ID Result Units Method Analyzed Analyst 140515-16.1 Copper-Flame4iquid Outfall LD 0.026 mg/L SM3111B-1999 5/21/14 MD t40515-16.1 Lead-FuMquid Out ] LD <0.0025 mg/L SM31138-2004 5/19/14 MD 140515-16A Zinc-Flamelliquid Outfall LD 0.41 mg/L SM3111B-1999 5/20/14 MD 140515-15.2 Copper-Flameniquid OutfalI BS <0.0025 mg/1-5M3111B-1999 5/21114 MD i40515-16.2 Lead-Fur/iiquid Outfall BS <0.0025 mgA- SM31133-2004 5/19/14 MD 140515-16.2 bnc-Flameftuid OutfalI BS <0.05 mg/L SM3111B-1999 5/20/14 MD Respectfully submitted, Dena Myers NC Cert #440, LO _ Load,:, j 1joC'k NCDW Cert #37755, gQ� of S Igo EPA NC00900 1 P 0. Box 228 • Statesville, North Carolina. 2M7.70"72/469 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 2/19/2014 CERTIFICATE OF COVERAGE No. NCG030 2 5 5 SAMPLE COLLECTION YEAR 2014 FACILITY NAME J. C. Steele & Sons. Inc. SAMPLE PERIOD [gJan-June ❑ July -Dec COUNTY Iredell or ❑ Monthly) (month) PERSON COLLECTING SAMPLES — Linda LIRRard_ _ DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Stateville Analytical_ Lab Cert. # NC Cert #440 RECEIVED �herl w [] Creek r Supply [:]SA Comments on sample collection or analysis: FEB 2 4 2014 CENTRAL FILES PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 Part A: Stormwater Benchmarks and Monitoring Results DWQ/80G ❑ No discharge this period?' Date Sample 24-hour pH, Non -Polar O&G/ Total Toxic Outfall No. Collected) rainfall Total Suspended Solids Standard units Copper Lead Zinc Total Petroleum Organicss (mo/dd/yr} amount, Hydrocarbons Inches Benchmarks =__> - - 100 mg/L or 50 mg/L 6.0 - 9.0 0.007 mg/L 0.03 mg/L 0.061 mg/L 15 mg/L 1 mg/L 1 1/2/2014 .57 He Fl* v - due to improveT.-snis et tHs eve-0. •• * 2 Representative outfall On R/R Tracks see outfall 1 n/a 3 1/2/2014 1 .57 5.0 8.0 .009 <0.0025 .098 <5.7 ** * 3a Representative outfall See outfall 3 See outfall 3 see outfall 3 See outfall 3 See outfall 3 see outfall 3 n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. Z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3 The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. "See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. s Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), 1 certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the Stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported in the format, "<Xx mg/L", where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches; Non -polar O&G/TPH by EPA 1664 (SGT-HEM) Total Suspended Solids pH Benchmarks =__> _ - 15 mg/L 100 mg/L or 50 mg/L* 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 4 _ Page 2 of 3 V,. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO bV IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR Includina all "No Discharae" reports, within 30 days of receipt of the lab results for at end of monitorina period In the case of "No Discharge" reports) to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." {Signature of Permittee) Permit Date:11/1/2012-10/31/2017 4 (Date) SWU-245, last revised 10/25/2012 Page 3 of 3 Semi-annual Stormwater Discharge Monitoring Report for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 2 19 2014 v 5 CERTIFICATE OF COVERAGE NO. NCG030 2 5 5 3 %AMPLE COLLECTION YEAR 2014 FACILITY NAME J. C. Steele &Sons Inc. y Qv%MPLE PERIOD [ Jan June ❑ July -Dec COUNTY IredCli v or ❑ MonthW (month) PERSON COLLECTING SAMPLES Linda LlaaaM _ _ _ `pISCHARGING TO CLASS ❑ORW ❑HQW []Trout❑PNA ❑Zero -flow ❑Wa#er Su LABORATORY S&atgville Anabdical Lab Cert. # NC Cert #440 s, cn (Class ❑SA Comments on sample collection or analysis: [ther_Faurth Creek (Class CL_ Q o rn PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 � U7 �t Part A: Stormwater Benchmarks and Monitoring Results M No dischorae this period?" Date Sample 24-hour pH, Non -Polar O&G/ Total Toxic Outfall No. : collected rainfall Total Suspended. Solids,, . Standard units Copper Lead Zinc Total Petroleum (mo/dd/yr) amount 3, HHydrocarbonsOrganicss Inches 9enchm9rk9 _ - 100 mg(L=or 50.:mg/L W" 6.0 794. : • .0,007, mg/L- ;:0A3;rng/L ; ; 0:067.mg/L., : 15 m1VL 1.mg/L 1 1/2/2014 .57 No Flow — due to Improvements at this outfall. ** * 2 Representative outfall On R/R ham see ou" t n/a 3 1/2/2014 .57 S.0 8.0 .009 <0.0025 .098 <5.7 ** * 3a Representative outfall See Dalian 3 See outfan 3 see outhn 3 see OMNI 3 see ouftn 3 see outkil 3 n/a 1 Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. z For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. • Unattended sites may be eligible for a waiver of the rain gauge requirement. 4 See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 5 Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469,22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 is representative of Outfall 2 (sample is taken at outfall 1) and Outfall 3 is representative of Outfall 3a (sample is taken at outfall 3). Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Palm 1 of :1 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TTO monitoring may be waived. The solvent management.plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (WO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic'organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since;f€lingthe last discharge monitoring report. I further certlfy that this facility is implementing'the all the provisions of the solvent management plan included in.the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported in numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -numerical format. When results are below the applicable limits, they must be reported_In the format. "<XX ma/LA, where XX is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: If you report a sample value In excess of the benchmark, you must Implement 77er 1, Tler 2, or Tler 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new all per month. I ' D No discharge this period ?z Outfall No. Date Sample Collected" (mo/dd/yr) 24-hour rainfall amount, Inchee Non -polar O&G/TPH by EPA 16k (SU-MEM) Total Suspended:Sollds; pH Benchmarks ' 15 mg/L 100 mg/L or So rno " 6.0 — 9.0 SU Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date:. 11/1/2012-10/31/2017 SWU-245, last revised 1V 712012 Page'2 of 3 Note: If you report a sample value In excess of the benchmark, you must Implement Tler 1, Tier 2, or Tler 3 responses. See General Permit text FOR P6RT A AND E611T B NdONITOR! GG BEESULU: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART If SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART 11 SECTION'B • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME: Mall an orlafnal and one may of this DMR, Including all "No Dlscharae" reraortsswithin 30 dog f receipt o f the lab results for at end of monitoring oerlod 1n Me case of "No Discharge" reAortsl to: Division of Water Quality Attn: DWQ Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance wlth a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my Inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, Including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) (Date) Permit Date:11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Paon '2 of � Cor STORMWATER DISCHARGE OUTFALL (SDO) MONITORING REPORT Permit Number NCS 9DO018 SAMPLES COLLECTED DURING CALENDAR YEAR: 2014 - (This monitoring report shall be received by the Division no later than 30 days from the date the facility receives the sampling results from the laboratory.) FACILITY NAME J. C fig, & Sous In_c. PERSON COLLECTING SAMPLE(S) __ "*" below CERTW= LABORATORY(S) _ StatesyMe Analytical Lab # ,^ NC #440 Statesyille Andy" - Lab # NC•DW #37755 Part A: Specifle Monitoring Requirements COUNTY lredell PHONE NO. 0 2-368 'C", ZA��_ (SIGNATURE OF PERMI'1TEE OR DESIGNEE) By this signature, I cerdfy that this report is accurate complete to the best of my knowledge. Outfall No. , Date Sample•, Can ted '50050 Total ` Flow, (UOpp ' : Total;. Rainfall Total Suspended . Sands m COD- m Iron , Chi�omiium _ Total:. . .Recoverable pH'; :unit. mo/ MG :.,inches ;. .100 1Z0-:.. Z , ..,' 1 ..: ,;: <; ,6.0-,9:0' #4 1 /2/2014 An of February 2013 tbia outfall has been diverted to Outlgll No. 6 per our letter dated Feb.8, 2013 #5 1/2/2014 No Flow — due to ' rovements at this outfall. * Mark Beaver #6 1/2/20I4 .57 16.4 1 <25 1 2.4 1 0.0068 7.8 * RickyFucker & Cody Brown Does this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? yes no (if yes, complete Part B) Part B: Vehicle Maintenance Activity Monitoring Requirements Outfall No. Date • Sample, a Cone+ t d' . 5M., ., ... :° • 00556 00530 -00400 ; Total;;l iow (li sppli�cable) ; ; ;To*`Rainfall ; ' 0il:aud',Greast '" : - ,-Nori'Apolar : QB Cfi'PH (Mi"od1664 SGT :HEM), if 4PPL Total ' ' Su9pentied,, Stiiitig _. ":pH: Ne'w-Motor on Usage molddf ` MG - luches M91Lm upit aUmo Form SWU-2 7-062310 Page I of 2 STORM EVENT CHARACTERISTICS: Date 1/2/2014 Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit.) (if more that► one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit) Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and -evaluate the information submitted. Based on may inquiry of the person or persons who manage the system, or those persons directly, responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of lines and imprisonment for knowing violations." �a (Signature of Permittee) 2--119 r (Date) Fong SWU-247-06''310 Page 2 of 2 Analytical Results JC Steele & Sons, Inc. PO Box 1834 Statesville NC 28687 Entered 1/2/2014 Reported'. 2/3/2014 For: Storm Water Sample ID Parameter Cust ID Result Units Method Date Analyzed Analyst 14012-20.1 Copper-Flame/liquid Outfall #3 0.009 mg/L SM311113- 1/17/14 MD 14012-20.1 Lead-Fur/liquid Outfall #3 <0.0025 mg/L SM311313- 1/13/14 MD 14012-20.1 Oil & Grease Outfall #3 <5.7 mg/L EPA1664Rev 119/14 MD 14012-20.1 TSS Outfall #3 5.0 mg/L SM254013- 1/3/14 HIM 14012-20.1 Zinc-Flame/liquid Outfall #3 0.098 mg/L SM311113- 1/17/14 MD 14012-20.2 Chromium-Fur/liquid Outfall #6 0.0068 mg/L SM311313- 1/23/14 MD 14012-20.2 COD Outfall #6 <25 mg/L HACH8000 1/2/14 CL 14012-20.2 Iran-Flarneliquid Outfall #6 2.4 mg/L SM311113- 1/22/14 MD 14012-20.2 TSS Outfall #6 16.4 mg/L SM2540D- 1/3/14 HM Respectfully submitted, Dena Myers NC Cert #440, NCDW Cert #37755, EPA NCO0909 P.O. Box 228 * Statesville, North Carolina 28687 * 704/872/4697 A `'" Y Y - J sr/A'r" -ro m -eft S dill t for North Carolina Division of Water Quality General Permit No. NCG030000 Date submitted 0- CERTIFICATE OF COVERAGE NO. NCG030 2 5 5 O `2�2 SAMPLE COLLECTION YEAR 2g13 _ FACILITY NAME J. C. Steele &Sons, Inc. 1 Q�-n SAMPLE PERIOD Jan June ❑July -Dec COUNTY Iredell -EGG, • ��20 or ❑ Monthly' _ fmonth� PERSON COLLECTING SAMPLES Zinda �; ,�0rd . Jock Aar,,, A a :; ��ISCHARGING TO CLASS QORW ❑HQW []Trout ❑PNA LABORATORY Stateville Analytical Lab Cert. if ,NC Cert I1440 `g `"��'o Zero -flow []Water Supply []SA Comments on sample collection or analysis: x �p LOther Fou h Creek Class C PLEASE REMEMBER TO SIGN ON PAGES 2 AND/OR 3 4 , �2 Part A: Stormwater Benchmarks and Monitoring Results No discharge this period?1 ► O"I liln: B 9+Iln+plaH � Ni1i4��1 15►ir�rlid� Sellid�; F =° '� : �e+�p{�hi�4 }r� s ids � � : �fnc ��il;ti�ifi� 'i �� ,■p� 1HM��+'. y J=- y` oIIilk _ 5 4 ; � � (������ll �.I�iWI�� F � 5 t�.✓e < � � 3 ' ' .'M�nh y.Y -. N. r5 .y. �R111 ,y {V]1li MIN 1�'IS y - ._ 67i0 **..,.. a79 J. .Qr% <0,OVA5' <CJ— ' 2 Representative outfall see outfall 1 see MOOR 1 see WON 1 sae Outten 1 see Oatfall i see outran 1 n/a 3 -�7-� ' S" 19.5 0, . 619 <0,tva.5 o�HK 5.d '• • 3a Representative outfall see outran 3 see outran 3 see Outten 3 see outran 3 see outran 3 see outran 3 n/a Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. 3The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement. See General Permit, Table 3 identifying the especially sensitive receiving water classifications where the more protective benchmark applies. 'Total Toxic Organics sampling is applicable only for those facilities which perform metal finishing operations, manufacture semiconductors, manufacture electronic crystals, or manufacture cathode ray tubes. For purposes of this permit the definition of Total Toxic Organics is that definition contained in the EPA Effluent Guidelines for the facility subject to the requirement to sample (for metal finishing use the definition as found in 40 CFR 433.11; for semiconductor manufacture use the definition as found in 40 CFR 469.12; for electronic crystal manufacture use the definition as found in 40 CFR 469.22; and for cathode ray tube manufacture use the definition found in 40 CFR 469.31). * Outfall 1 Is representative of Outfall 2 (sample Is taken at outfall 1) and outfall 3 is representative of Outfall 3a (sample Is taken at outfall 3). Permit Date:ii/1/2012-10/31/2017 SWO-245, last revised 10/25/2012 Page 1 of 3 Facilities that incorporate a solvent management plan into the Stormwater Pollution Prevention Plan may so certify, and the requirement for TrO monitoring may be waived. The solvent management plan shall include a list of the total toxic organic compounds used and the other elements listed in the General Permit. For those facilities electing to employ the TTO monitoring waiver, the discharger shall sign the following certification statement: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics (TTO), I certify that to the best of my knowledge and belief, no dumping of concentrated toxic organics into the stormwater or areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring report. I further certify that this facility is Implementing the all the provisions of the solvent management plan included in the Stormwater Pollution Prevention Plan." ** Note: J. C. Steele & Sons, Inc. does not meet the requirements set forth in the definitions on page 1 for the reporting of Total Toxic Organics. Name (Print name) Title (Print title) (Signature) (Date) Note: Results must be reported In numerical format. Do not report Below Detection Limit, BDL, <PQL, Non -detect, -ND, or other similar non -numerical format. When results are below the applicable limits, they trust be reported in the formaj. "<XX me/V, where XX Is the numerical value of the detection limit, reporting limit, etc. in mg/L. Note: if you report a sample value in excess of the benchmark, you must implement Tier 2, Tier 2, or Tier 3 responses. See General Permit text Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. I i ❑ No discharge this period?z Dutfiltll'Moallecfed' DattUrripie t4 ouw rBltif�ll amdant, F Y Lottzpoll�ir�O&iaikl ' Footnotes from Part A also apply to this Part B * See General Permit text, Table 5, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 2 of 3 Note: !f you report a sample value In excess of the benchmark, you must Implement Tier 1, Tler 2, or Tier 3 responses. See Genera! Permit text. FOR PART A AND PART B-MONITORINfiRESULTS; • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART.11 SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO Tr IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES ❑ NO ❑ REGIONAL OFFICE CONTACT NAME; Mail gn odft9l and one copy of f In&(Lim oVft QkdaracN e s w 1 30 &M of Eccefotlob Mults for at end otmonkoring In the case of "No Dlscharae'reoofts) to: Division of water Quality Attn: DWQ Central Flies 1617 Mail Service Center i Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORM-A-TION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the Information, the Information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penaltils for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of Permittee) 3 If 1 (Date) Permit Date: 11/1/2012-10/31/2017 SWU-245, last revised 10/25/2012 Page 3 of 3 ,i ar � }r„ 1 -„p •�.n3 t_y t �-. +err~: ..:cc+- ["P�•i, � irk it t+�rl�?. �Cw :., .� y4. f;+y �r iti.�.'.i _ Sq t; �. 4is%�=_ wf'1j ,Jlr�l i `jR3-•p �1 '�-3jr •r s .± syG.�'t '. ,d-r"-1,�?}••.. v:,r.,rl/,"'r.�Wrw'i�..:.�.V�.r*il r.c+:���'-..'�..���r'{�f.r 5''=1;$-e ..li ._`✓a�d�,-. �,:-'i.FP.,�. �Y, , E � iy�!4... ..t .♦�d .� bt.: r i�a"i.5r,,,y,..lS . L.?',.r.�i F;xri:.:.'♦:.ar;...:i I �a`:.4.�-'L�. iL,r,.,�s i }Ir�i�( ln.F l {. I ti 1 � • 5 ,� �. `! {'4s�lil'l6^rr+x�f� ;yL r eax ��' l+'r �' t, t1? } r; I��r r r"� r♦ � �rr Fi�,nl J�'li`,�fi'x, itr'ts[�,! �' 't •.il:l �Ix� [. .l wtnl r.. U r �o.' .}w�. ri F 4J _y l F II r r " a% 10..-t 4,,A Vµµµ^w;L X;•.1i�• 1} 4�•�i ��'iY4'V�l���?Si 1 F�i Sl �i r J 3a r• � r C + 3 I I t o �x:�`� E y1 �.'S 7 ta, rr2 3� rr R� ,�;t}}'aT cll .t!•_`°iti:.=.—.�.. ....'f 1 .. 4y 1.... ..-A,� r•. 1 �sI * ' ltil. `. hwr+- ��s ><W?"'�n �"f �'. �� �f' t" rF •S' U1 u.'.� J1 � �'} N f I �1~ ��. fu 3-'r}�Y I� � ily trs ur'�.S+.l..i t r r I •� Z r .,Ssw Y l r.�Jl, R i.4�� t+'. J - F � - ((33r r u1r •° ti N ��°�7r I+til rr `�Y'�.eT� I STORM -EVENT CHARACTERISTICS: Date 2/7/2013 Total Event Precipitation (inches): .78 Event Duration (hours): (only if applicable — see permit.) (if more than one storm event was sampled) Date Total Event Precipitation (inches): Event Duration (hours): (only if applicable — see permit) * "No -Flow" for Outfall 4. The water flow to Outfall 4 has been redirected to Outfall 6. Mail Original and one copy to: Division of Water Quality Attn: Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persona directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." (Signature of 3/6fL.3 _ (Date) Fonn SWU-247-062310 Page 2 of 2 Analytical Results J. C. Steele & Sons, Inc. 710 South Mulberry Stre Statesville NC 28677 Entered %`2/7/2013 Reported: 2/26/2013 For: Sample ID Parameter Cust ID Result Units Method Date Analyzed Analyst 130207-23.1 Copper49ame/liquid Out(an # 1 0.006 mg/L SM3111 B- 2/14/13 MD 130207-23.1 Lead-Fur/liquid Outran # 1 <0.0025 mg/L SM3113B- 2/13/13 MD 130207-23.1 Oil & Grease Outrall # 1 <5.2 mg/L EPA1664Rev 2/18/13 MD 130207-23.1 TSS Outm # l 3 mg/L SM2540D- 218/13 CL 130207-23.1 Zinc-Flame/l+quid outran # 1 0.09 mg/L SM3111 B- 2114/13 MD 130207-23.2 Capper-Flamelliquid Outfall # 3 0.018 mg/L SM3111 B- 2/14/13 MD 130207-23.2 Lead-Fur/liquid Outran # 3 <0.0025 mg/L SM3113B- 2114/13 MD 130207-23.2 Oil & Grease Outfan # 3 5.8 mg/L .EPA1664Rev 2118/13 MD 130207-23.2 TSS Outran # 3 19.5 mg/L SM2540D- 2/8/13 CL 130207-23.2 Zinc-Flame/liquid Outfall # 3 0.44 mg/L SM3111B- 2/14/13 MD Respectfully submitted, Dena Myers NC Cert #440, NCDW Cert #37755, EPA NCO0909 P.O_ Box 228 • Statesville, North Carolina 28687 • 704187214697 Analytical Results J. C. Steele & Sons, Inc. 710 South Mulberry Stre Statesville NC 28677 Entered 2/7/2013 Reported: 2/18/2013 For: Date Sample ID Parameter Cust ID Result Units Method Analyzed Analyst 130207-24.1 Chromium-Fur/liquid Outfall 415 0.013 mg/L SM3113B-2004 2118/13 MD 130207-24.1 COD outran # 5 <25 mg/L HACH8000 2/8/13 MD 130207-24.1 Iran-FlameJliquid Outfall # 5 3.66 mg/L SM3111B-1999 2/14/13 MD 130207-24.1 TSS Outfall # 5 35 mg/L SM254OD-1997 2/8/13 CL 130207-24.2 Chromium-FurAiquid Outfall # 6 0.006 mg/L SM3113B-2004 2/18113 MD 130207-24.2 COD Outfall # 6 <25 mg/L HACH8000 218/13 MD 130207-24.2 Iron-FlameAiquid Out&ll # 6 0.66 mg/L SM3111 B-1999 2/14/13 MD 130207-24.2 TSS Oatfall # 6 20.5 mg/L SM254OD-1997 218/13 CL Respectfully submitted, 41r1.. V\(Qr . Dena Myers NC Cert #440, NCDW Cert #37755, EPA NCO0909 P.O. Box 228 • Statesville, North Carolina 28687. 704/872/4697 . 11 V WATT 4 Stormwater Discharge Outfall (SDO) Qualitative Monitoring Report Permit No.: N/C/S I / I l I l l or Certificate of Coverage No.: N/C/G/ 0/3 /0 /2 /5 / 5/ Facility Name: _J. C. Steele & Sons. Inc. County: Iredell Phone No. _(704) 872-3681 Inspector: JeffBarnes /Mark Beaver -- -- Date of Inspection: 07/13/2009 By this signature, I certify that this report is accurate and complete to the best of my knowledge: (Signature of Permittee or Designee) 1. Outfall Description Outfall No. _2 BStructure (pipe, ditch, etc.) Pipe T Receiving Stream: Fourth Creek Describe the industrial activities that occur within the outfall drainage area: Machine Shop roof drains: brick making.Rmts storage area. _ 2. Color Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint (light, medium, dark) as descriptors: Clear — no color� _ 3.Odor Describe any distinct odors that the discharge may have (i.e., smells strongly of oil, weak chlorine odor, etc.) _ None_ 4. Clarity Choose the number which best describes the clarity of the discharge where 1 is clear and 10 is very cloudy: M 2 3 4 5 6 7 8 9 10 Page 1 5. Floating Solids Choose the number winch best describes the amount of floating solids in the stormwater discharge where 1 is no solids and 10 is the surface covered with floating solids: M 2 3 4 5 6 7 8 9 10 6. Suspended Solids Choose the number which best describes the amount of suspended solids in the stormwater discharge where 1 is no solids and 10 is extremely muddy: M 2 3 4 5 6 7 8 9 10 7. Foam is there any foam in the stormwater discharge? Yes 0 8. Oil Sheen Is there an oil sheen in the stormwater discharge? Yes 10 9. Deposition at Outfall Is there deposition of material (sediment, etc.) at or immediately below the outfall? Yes 10. Erosion at Outfall Is there erosion at or immediately below the o€ tfall? Yes 0 11. Other Obvious Indicators of Stormwater Pollution List and describe All of the water from this %aWl comes from the Machine Shgp building's roofs. The building roofs are made of metal. The DH at this outf H is 5.4 and aggin is from the roofs onl . A pH test of just the rain water was conducted during this storm event. The test revealed a pH level of 4.5. There isn't much we can do if the rain is already below the pH benchmark. Note: Low clarity, high solids, and/or the presence of foam, oil sheen, deposition or erosion may be indicative of conditions that warrant further investigation and corrective action. Page 2