Loading...
HomeMy WebLinkAboutNCC191914_ESC Approval Submitted_20190917ROY COOPER Governor Secretary S. DANIEL SMITH Director AvenuePine Gate Renewables, LLC 45 Banks Asheville, NC 28801 NOR,1HCR01...1tlk virorpmenta l Quaafit'y Letter of Approval RE- Project Name: ESA Four Oaks 2 NC, LLC Project ICI: JOHNS-2020-001 Acres Approved: 1 County: JOHNSTON, City: Four Oaks, Address: River Basin: Neuse, Stream Classification: Other Submitted By: Civil Design Concepts, P Date Received by L S: August 20, 2019 Plan Type: New Dear Ms.Wright: NC highway 96 S This office has reviewed the subject erosion and sedimentation control plan. We find the plan to acceptable and hereby issue this Letter of Approval. „ posted at the job site, This plan approval shall expire three (3) years following the date of approv if no land -disturbing activity has been undertaken, as is required by Title 15A NCAC 413 .0129. s of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (CO ) under the NCGO10 00 Construction Stormwater General Permit. This forty MUST be submitted prior to the commencement of any land disturbing activity on the above named project, The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the NOI form to Annette Lucas at Anrtette Micas r1crl rlr or Paul Clark at lu„ii,i„l<.. .t.. :. ,,;i;, After you submit a complete and correct 01 form, a C OC will be emailed to you within three business days. Initially, CIE It will not charge a fee for the coverage under the NCGO1 permit, However, on or after June 1, 201 , a 10 fee will be charged annually. This fee is to be sent to the CIE Lit Stormwater Central Office staff in Raleigh. Norwh Carolina Department of Environmental Quaa112y V Malsiayn of Eneu'gy, 9v neral and Land Resources Ralclgh Regional Ofnce -162S Mail Servke Center J 3800 Barrett Drive I Raleigh, North Carolina 27609 Letter of Approval Pine Gate Renewables, LLC September 1.2, 201.9 Page 2 of 2 Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on fl Ile at the job site: L The approved E&SC plan as well as any approved deviation, 2. The NCGO1 permi,t and the COC, once it is received. 3. Records of inspection made during the previous 30 day& Also, this letter gives the notice required by G.S. 113A..-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and ad.joining properties, If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 1. 13A....51 through, 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water qualit-y laws, reguan d nd run a rules. Iddition, to city or county ordinances or rules may also apply to this land -disturbing activity, This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided.. You are requested to file an arnended form if there is any change in the information [included on the forn-D. In addition, it -would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference, 'Your cooperation is appreciated. Sincerely, Sally Cas4, El Regional Engineering Associate DEMLR Enclosures: Certificate of Approval NCGO I Fact Sheet CC: Gregory R. Hoffman, PE i )- Electronic Copy Josh Houde OLiDLiLi Lac uWWA1 orn Electronic Copy -_) DEMLR - Raleigh Regional Office Iffle