Loading...
HomeMy WebLinkAbout19961181 Ver 1_COMPLETE FILE_19971207 . St&te of North Carolina Department of Environment, Health and Natural Resources Wilmington Regional Office Division of Coastal Management 1/,/1 fl ,J;~ ~!.,~ ~ - --- - - - DEHNR /fL. IJ!31/', James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director December 30, 1996 MEMORANDUM: TO: Mr. A. Preston Howard, P.E., Director Division of Water Quality FROM: John R. Parker Major Permits Processing Coordinator ~, ~ t ~ ~ ,~ 'Y- 1 "" -b ~\ '2:0) ~, ,~r> ~ ~ ~ 0 ~ ~ -4 ~ ~ ~ SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: T. Vance Chamberlin (Riverwood) Project Location: Various sites in the Northeast Cape Fear River Proposed Project: To recover saw-logs from the bottom of the Northeast Cape Fear River and possibly other rivers in order to utilize them in a specialty wood product enterprise Please indicate below your agency's position or viewpoint on the proposed project and return this form by Jan 21, 1997. If you have any questions regarding the proposed project, please contact Bob Stroud at extension 251. When appropriate, in-depth comments with supporting data is requested. /~ ~ This agency has no objection to the project as proposed. REPLY: _ This agency has no comment on the proposed project. - This agency approves of the project only if the recommended changes are incorporated. See attached. - This agency objects to the project for reasons described in the attached comments. c ~ '. .,J1t"" bor,gy lA,r, ~ () 1=< I e ~ SIGNED Q~' C'L- <) ~ ('v"\...r DATE \.-2l-Gt-) 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845. Telephone 910-395-3900 . Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer ,/,J. DMSION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT I. APPLICANT'S NAME: T. Vance Chamberlin (Riverwood) 2. LOCATION OF PROJECT SITE: Various sites in Northeast C. F. River Photo Index -l9E2: nJa l.284: nJa State Plane Coordinates - X: nJa Y: n/a 3. INVESTIGATION TYPE: CAMA & potentially D&F 4. INVESTIGA TIVE PROCEDURE: Dates of Site Visit - nJa Was Applicant Present - n/a 5. PROCESSING PROCEDURE: Application Received - cc: 12/2/96 Office - Wilmington 6. SITE DESCRIPTION: (A) Local Land Use PIan - New Hanover; Pender; Brunswick Land Classification From LUP - Conservation (B) AEC(s) Involved: PT A, EW (C) Water Dependent: Yes (D) Intended Use: Recovery of saw-logs for use in speciality lumber enterprise (E) Wastewater Treatment: Existing - nJa Planned - nla (F) Type of Structures: Existing - existing logs on river bottom Planned - use of mechanical devices(chains and grapples) (G) Estimated Annual Rate of Erosion:nla Source - nla 7. HABITAT DESCRIPTION: [AREA] DREDGED FTT T FD OTHER (A) Vegetated Wetlands (B) Non-Vegetated Wetlands (C) Other unable to River bottom determine (D) Total Area Disturbed: Unable to determine (potentially several acres) (E) Primary Nursery Area: yes (F) "Vater Classification: SC and SC Sw Open: No shellfish resources in project area 8. PROJECT SUMMARY: The applicant proposes to recover sa\v-Iogs from the bottom of the Northeast Cape Fear and possibly other rivers in order to utilize them in a speciality wood product enrerpnse. Form DCM-MP-l APPLICATION (To be completed by all applicants) } 1. APPLICANT a. Landowner: Name -rJ~ ~ Address 307 ~ -r~ S-t City vJ~ State-n..(!. Zip Z '6'10 ( Day Phone 9 (() ~ /5 () / / / Fax 9/0 ~/5" 0 100 b. Authorized Agent: Name Address City State Zip Day Phone Fax c. Project name (if any) P .lA~ Rpvi....rt 01/1)1; b. City~w.n, community or landmark ~~S~ c. Street ad~S or secondary road number - /\? d. Is proposed work within city rts or planning jurisdiction? Yes No 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a borne, motel, marina, bulkhead, pier, and excavation y,fling activities. b. Is the proposed activity maintenan~~f an existing project, new work, or both? ~ c. Will the project ~e. for p}lblic, private or commercial use? fJ ~ " Form DCM-MP-l site. Include highway or secondary road (SR) numbers, landmarks, and the like. · A Stormwater Certification, if one is necessary. ) · A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. ~ Name Address Phone Name Address Phone Name Address Phone · A list of previous state or federal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. fJ~~ · A check for $250 made payable to the Department of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. · A signed AEC hazard notice for projects in oceanfront and inlet areas. · A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. D........:....~ n'1/nL 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained i'l the permit. I certify that to the best of my knowledge, the proPosed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal . review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. _ I further certify that the information provided in this application is truthful to the best of my knowledge. This is the -f3- day of N~ V. ,19!1..fa. Print Name ,--- Jaw f' C kn w.. ~ ~x- {I ~ Signature~J~~ ~r or Au.rhorized Agml Pl~e indica~e a chments pertaining to your proposed proJect. M/4 _ DeM -2 Excavation and Fill Information _ DCM MP-3 Upland Development _ DCM MP-4 Structures Information _ DCM MP-5 Bridges and Culverts _ DCM MP~ Marina Development NOTE: Please sign and date each attachment in the spa~e-}J.roxi1ied,at the bottom of each jonn. , . - - .~... - ~ . j " -- I ! I' :....~~ \ _:1 :\JO'j I' iSSG ~~ i_.' '.. '. cn/~ ~-- .. -' .,"- I - ~ ,'''1...4. \~ ,~.C: :'=\1 E:\{T Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. Average Fl.D.lI..I Emling Project Length Width Depth Depth Access channel (ML W) or (NWL) , Canal Boat basin Boat ramp Rock groin Rock breakwater .. ~ (Excluding shoreline stabilization) R,,\'i.~~d OJ!9S ~o \ ~ r-r',:i ~, i I 7\ i, y,rl < ". ,->\ \ 0~"~'<'~~~ Ii ~: ',j \ -, : I \ \ \ : ' c0:U NOV 1 3 1996 ~ DIVIS~(-)~j 'Jr f. AG""~ AC I,~T COAST AL MP.,I~ - CI\li ~ 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards A-' /.4- / b. Type of material to be excavated -.L1/JAfk ~ U;9~ c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAYs) or other wetlands? _ Yes__ ~~o d. Highground excavation in cubic yards A /1 A ' 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area ~IA b. Dimensions of disposal area 0 c. po you claim title to disposal area? 1: _ Yes _ No M /1 If no, attach a letter granting permi ion from the owner. d. Will a disposal area be available for future maintenance? Yes No If yes, where? ~/~' 1- j~ J .~.1J ~ ~ r!) (V- -0 <1.: ~ ~J (}- l~ 1 ~ ~ ~ ~ ~ ~ "- ~ ~~c ~ (f ~\- ~ "'l 8" t: ( Jl ~ , c! u.J <:: W ,~ -- en. '.1l en ':',.:.9 .- '00.::( C"'C --;-_ -- ~ '.:'~ -.. > Zh:;:: C :::-.....J Z :;; <t: :"":r- (f) - ~~ ..:{ -"---.' 0 -~~~~:~, ' " , ( J I i " LOllllIlUU UII f dYU 'U , ~./ _,' .r<. ~~~~.~' '\', ,- - -' ' . \\ \ :", v..~ _"/. _~. ;::._ ~v1"~ .--:~-': -.-:'- ~- I .:,~::j/~',:::~,\\:~, I>,. ,. . '\:::;:' :;-:>:~:':t I' ~~;~:R~~\'."\ .,; :::~(/f5{\ \ '\. . ).;: :~-l-~\{~YtE:N ~~j.~ ;': ,:<.:;:,( {/ i\ 1\ ~ 0.'. ,:=.." , .;=~~: ~-, ,,,,'"'.' =:: ," : . .' \- _ u _ _ _. ...' - - ~ -- . .'.' . .' . -' '.r.':".. , .' \ - ~ .....:: + ..~p~ ,~/'J.. . ;1/ ~ .OM-u-~' J2..''L-7b ... Pennit Number 96NERS91 STATE OF NORTH CAROLINA Department of Cultural Resources PERMIT for I[5iI J TZ~ G: ~ ~.? I 8-' ill)ur. I F:.( ~- ~_.C <-"0 ~ Jl~ NOV 1 3 1996 DIVISIO;\l OF COASTAL MAr~AGEMENT x X Exploration Recovery Salvage Issued to VANCE THOMAS CHAMBERLIN 307 South 3rd Street Wilmington, North Carolina 28401 Pender authorizing activities affecting submerged cultural resources in New Hanover/BrunswiclCounty at as requested in the Pennittee's application dated February 14, 1996 . This pennit, issued on March 1, 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these tenns may cause the pennit to be null and void. SEE SPECIAL CONDITIONS A through H Any project modification not covered hereunder requires further Departmental approval. Signed by the authority of the Secretary of the Department of Cultural Resources All work must cease when the pennit expires on March 1, 1997 s~ h,~ R LI:::1 ~/~ State Archaeologist, OfficetJ of State Archaeology, State and Historic Preservation Office. This permit and its conditions are hereby accepted. ~t/Mv- ~ Signature of Pennitlce F. G. H. SPECIAL CONDITIONS FOR PERMIT NUMBER 96NERS91 A. This permit is limited to the recovery of submerged logs and other non- structural wood. The presence of any cultural material that is encountered during the course or the project shall be reported to the UndeIWater Archaeology Unit immediately. This permit authorizes the Permittee the rildtt to conduct initial remote sensing survey activities within the area defined as: those portions of the Northeast Cape Fear River from the Hilton Railroad Bridge upstream to the head of navigation. Upon completion of the remote sensing survey, the Permittee shall inform the UndeIWater Archaeology Unit (UAU) of any areas of the river bottom containing a sufficient concentration of submerged logs to warrant recovery operations. If the UAU determines that recovery of submerged logs from a specific area will not jeopardize significant cultural resources, the Permittee shall be given exclusive rights to recover logs from that .area. The Permittee shall have exclusive recovery ri~ts to no more than six well-defined areas at any time. If the UAU feels iliat recovery operations in a specific area may jeopardize si~ficant cultural resources, the Permittee shall not undertake recovery operations in that area. The Permittee agrees to notify the office of the UndeIWater Archaeology Unit, P.O. Box 58, Kure Beac~ North Carolina 28449, phone 910-458- 9042, at least 48 hours prior to inItiating field activities. . The Permittee shall submit a monthly report detail~g project activities and listing all artifacts recovered and their status. Monthly report are due by the 10th day of the following month. All logs and timbers recovered under the conditions of this permit shall become property of the Permittee. The period of this permit shall be one year. The permit may be renewed yearly, subject to any changes in the permit the Department deems appropriate, providing the Permittee has satIsfactorily met an the terms and conditions of this permit. . B. c. D. E. m" I :"~ ,-- ~ ~~"'7'iTI1\' , , I ......-=- '~.-p ~_ ~ ...:..- I, I L../' -~I. ,< !' ,! j I I ' , ; ) : \ \" I ,: I ~'J NOV 1 3 1996 J J/ DIVISIC;.J OF COASTAL Mf..;'~AGEVIENT i(cv~ 1..-1l{-'1f j(LVL APPLICATION FOR PERMIT Exploration, Recovery and Salvage of Submerged Cultural Resources State of North Carolina Department of Cultural Resources 1. ApplicantbUonnation A. Name: Chamberlin, Thomas Vance B. Address: 307 S. 3rd St. Wilmington, NC 28401 C. Institutional or other affiliation: (910) 251-9105 (1-1-) ~\~ -01\1 (wJ n. Location of Proposed Project A. County: New Hanover, Pender, Duplin B. City, town, community or landmark: Wilmington, Albertston C. Creek, river, sound, bay or ocean beach in or near which project is located: Northeast Cape Fear River. . III. Description of Proposed Project A. Provide a statement of the purpose or objectives of the project: The objective of this project will be to recover submerged logs that are of sufficient quality to be milled into lumber. The project will be in two stages: 1. Map the N.E. Cape Fear Riwr from north of the shipping lane (railroad bridge) to as far north as the concentration of logs or river depth will pennit economic recovery. 2. Once the concentration and location of logs hac; been established, . the river project will be divided into sections. Each section will be reviewed by the Underwater Archeology Unit as to location of shipwrecks or other archeological artifacts that are not to be disturbed. Once this criterion has been establic;hed, pennission to proceed in a specific section will be given. -... -:-7":: B. Provide a description of the exact nature and scope of the proposed project, include the methods, techniques, and equipment to be used: The survey will be done using an Echoscope 1600 by Ornnitech or Kline System 2000 by Kline Associates or other similar sonar system. These systems provide a 3D target picture. The target can be positioned, zoomed. and scaled to length, 3rea, and volume. The sonar unit, in conjunction ""ith GPS, will give exact locations to be salvaged. The salvage equipment will consist of a crane of approximately 10 ton capacity mounted on a barge of approximately 60 feet. The crane will be fitted with a hydraulic or mechanical grapple. Using the sonar picture, the grapple can be guided to specific logs for salvage. The logs will be loaded n I \i lei n \; C F 1_'1 . "_ ,. I r' IT onto the barge, and taken to an appropriate sight to be oIT.loaded. The logs COASTAL r',iA(~AG ~;vkt\ willlht:n be transported to a sight to be manufactured into lumber. , : " . . , n,;~:7 '~~~~ ": '\>\ I \; , i ,') NO\} 1 3 1996 ~/ , . '- ..i -'~ >, c. Provide the schedule for the proposed project including beginning and completion dates of all phases: The survey will be started in April and take approximately one month. The salvage operation will begin when sufficient logs have been identified to warrant salvaging. The entire project could take up to three years. IV. Project Personnel A. Project Director: S A.\JE B. Archaeologist: N/ A C. Approximate number of people to be involved in the proposed project: Ten V. Disposition of Artifacts A. Will the proposed project result in the removal displacement, or destruction of submerged cultural resources? YES B. Is the objective of the proposed project the salvage of submerged cultural resources for conunercial purposes? YES If yes, provide the name and location of the facility where the salvaged materials will be stored until final disposition as set forth in the required salvage contract: The purpose is to manufacture the logs into lumber. Whether an independent sa\vmill operator will be contracted or the machinery will be purchased will be detennined. The location of this operation will be detennined by the above decision, and the off-loading site for the barge. The best off-loading sites will be detennined during the prelirnirw"y survey according to log concentration. C. Is the objective of the project the recovery of material for archaeological research pwposes? NO. D. Does the applicant wish to obtain possession of the artifacts on a loan basis from the Department of Cultural resources? NO. VI. In addition to the complete application fOlm the following items must be provided: A. A 1 :24,000 or larger scale map clearly depicting the location of the proposed project. B. A resume for the project director: Thomas Vance Chamberlin 1993 to present Owner - T Vance Chamberlin Woodworking, Custom furniture, millwork, lumber. 1619 1/2 Castle Hayne Rd. - ---- ;,," ~~~: ._ ~.j = \;7-T_;_,': -j : - '-' NO'l 1 3 1996 L, DiVIS;l't!..,; OF :Cf~S: AL tv1fi,r,JAG Etvl f': Wilmington, NC 28401 (910) 815-0111 1989 to 1993 Independent contractor Boat building Histol'icall'estoration Wilmington, NC 1975 to 1989 T. Vance Chamberlin Lumber and I\1iUwork Hennikee, J\i1-1 03424 Retail, wholesale cabinet and boat building lumber custom millwork 1966 to 1975 Independent logger and sawmill operator, Wholesale and retail lumber. Northbrook, P A }(enned)~e, ~ My partner in this project is Frank Taylor of Lexington, NC. Frank has many years experience in undenvater salvage in the Pacific and Caribbean. He also has a working knowledge of, and access to, the electronic equipment needed for this project. ~ . -,... ...-----. "7 or_~ =-:=:-'\ :\)Ol} 1 :3 1996 =-= O!\:rc:.;C"-.l \~'F :OAS7 Al I\I/: j''1AG EM E~\lT q ('I I g / DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS po, BOX 1890 WilMINGTON, NORTH CAROLINA 28402-1890 January 21, 1997 RECEIVED JAN 2 3 IYYlj IN REPLY REFER TO Regulatory Branch ENVIRONMENTAL SCIENCES nQ ^ ~I0.H Action ID No. 199704063 Mr. John Dorney Division of Water Quality North Carolina Department of Environment, Health, and Natural Resources 4401 Reedy Creek Road Raleigh, North Carolina 27611-7687 ~ Dear Mr. Dorney: Enclosed is the application of T. Vance Chamberlin for Department of the Army authorization and a State Water Quality Certification to remove sunken logs located on the bottom of the Cape Fear River, for the purpose of lumber production, near Wilmington, New Hanover County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b) (ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. According to our administrative regulations, 60 days is reasonable for State action. Therefore, if you have not acted on the request, or asked for an extension of time, by March 21, 1997, the District Engineer will deem that waiver has occurred. Questions or comments may be addressed to the undersigned at telephone (910) 251-4636. Sincerely, ~cU~ Jeffrey H. Richter Project Manager Wilmington Regulatory Field Office Enclosure Copy Furnished (without enclosure) Mr. John Parker Division of Coastal Management North Carolina Depart,ment of Environment, Health and Natural Resources Post Office Box 27687 Raleigh, North Carolina 27611-7687 Sta'te of North Carolina . - Department of Environment, Health and Natural Resources Wilmington Regional Office Division of Coastal Management , - -~. ',,,- James B. Hunt, Jr., Governor Jonathan B. Howes, Secretary Roger N. Schecter, Director 4.~A 19ir10LjO(,3 .M..~" - - ~J~ DEHNR. December 30, 1996 RECEIVED JAN 4 WI.J/ ~D jTORY RRANrJI T. Vance Chamberlin 307 S. Third Street Wilmington, NC 284-01 Dear Mr. Chamberlin: The Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of your property located at various sites within the Northeast Cape Fear River. It was received in its' final form on December 2, 1996 ,and appears to be adequate for processing at this time. The projected deadline for making a decision is February 15, 1997. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. NCGS I13A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed. you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. A field repon has been prepared and is in the process of being circulated to the various state and federal review agencies for their comments. If additional information is required based on this review, the agencies may contact you directly. Sincerely, Q<~~2J C. Roben Stroud, Jr District Manager Enclosure cc: John Parker, DCM Pres Pate, DCM Ann Hines, LPO; Tommy Garriss, LPO; Becky King, LPO Ernie Jahnke, COE RECEIVED JAN 2 3 1~7'T-;;,1 , . ,...1 ENVIRON~NTAL s&i~~r ~ ~ 'IrlU 1,"", ~.. >; ~.,. ~,,' ": ... , \ 'I ~ .:... - j ~ 127 Cardinal Drive Extension, Wilmington, N.C. 28405-3845. Telephone 910-395-3900 . Fax 910-350-2004 An Equal Opportunity Affirmative Action Employer DMSION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT RECt;.l ~ I;. \..- IJAN f; \\,p1 ISUllTOR't RRAN/,l 1. APPLICANT'S NAME: T. Vance Chamberlin (Riverwood) 2. LOCATION OF PROJECT SITE: Various sites in Northeast C. F. River Photo Index -1289: nla 128.4: nla State Plane Coordinates - X: nla Y: nla 3. INVESTIGATION TYPE: CAMA & potentially D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - nla Was Applicant Present - nla 5. PROCESSING PROCEDURE: Application Received - cc: 12/2/96 Office - Wilmington 6. ,SITE DESCRIPTION: (A) Local Land Use Plan - New Hanover; Pender; Brunswick Land Classification From LUP - Conservation (B) AEC(s) Involved: PT A, EW (C) Water Dependent: Yes (D) Intended Use: .Recovery of saw-logs for use in speciality lumber enterprise (E) Wastewater Treatment: Existing - nla Planned - nla (F) Type of StnIctures: Existing - existing logs on river bottom Planned - use ofmechanica1 devices(cbains and grapples) (G) Estimated Annual Rate of Erosion:nla Source - nla 7. HABITAT DESCRIPTION: [AREA] DREDGED FTT r FD OTHER ~ ~ (A) Vegetated Wetlands (B) Non-Vegetated Wetlands (C) Other unable to River bottom determine (D) Total Area Disturbed: Unable to determine (potentially several acres) (E) Primary Nursery Area: yes (F) Water Classification: SC and SC Sw Open: No shellfish resources in project area 8. PROJECT SlJMl\.fARY: The applicant proposes to recover saw-logs from the bottom of the Northeast Cape Fear and possibly other rivers in order to utilize them in a speciality wood product enterprise. T. Vanee Chamberlin Page 2 ., i ....., 9. PRClJ'RCT DR'iCRIPTTON - The applicant proposes to recover saw-timber logs that have sunk to the bottom of the Northeast Cape Fear River in various locations within the river. Most of these sites are associated with historic saw mill locations which are no longer in operation. According to the applicant there are several sites where these log resources can be found. The logs are situated above or slightly imbedded within the bottom substrate. The applicant has received a permit from the NC Department of Cultural Resources approving the activity. As a requirement of the permit the applicant must provide infomiation pertaining to the location of areas containing sufficient quantities of logs to s'upport a recovery operation. The logs will be located and mapped by means of remote sensing equipment consisting of side scan sonar and GPS technology. Upon locating the logs will be recovered by means of wrapped chain or by the utilization of an orange peel grapple mounted on a barge. The logs will be taken to a high ground site and off loaded and then milled into lumber. 10. ANTICIPATED IMPACTS - The applicant has indicated that ~e initial phase of the proposed project will consist primarily of the recovery of logs that are now at or above the bottom of the river. Ultimately the recovery activity may also include logs that are partially or totally covered by bottom sediment. The mechanical removal of the initial logs appears to be borderline as to whether it can be dermed as development. We have exercised our authority to consider the potential aspects of the proposal on coastal resources, in that the action has the possibility of negative impacts through the elimination of bottom habitat as well as the generation of turbidities and the release of sediment into the water column. Our experience with other .activities of this magnitude indicate that any' disturbance will have a short term duration and will cause limited localized disruptions. We have also advised the applicant that any future expansion of the proposed recovery method will need to be reviewed prior to initiation of the change in operation. Submitted by: C. Robert Stroud, Jr Date: 12/30/1996 Office: Wilmington 'Form DCM-MP-l APPLICATION RECEIVED JAN 6 I~YI 8UlATOR't BRANC>> (To be completed by all applicants) d. Give a brief description of purpose, use, methods of ~ ~ .-,......,--, ~~~~~truction and daily operations of proposed .. .' L L__. . _~ .~ <~ 'I . .: ! :1~ Jl ,':/ Jll:proj~. If more.:3s a~ce is needed, lease attach NOTE: pe,.""tWlUbelll,"dUl1lQnteO/~..~ i), _lor ad' d ~'" naJ ~ . I -< I 0 pages. _ project 1IQnte. ; ~ I! L - ~~' NOV 1 3 1996 DI\lI,'SI(".", CF 2. LOCATION OF PROPOSEDCOASTAL ~.'l'AI:jAGE!\j~r-::--lT PROJECT a. County #...tur;/~ jJ~. ~/r-~ J 1. APPLICANT a. Landowner: Name -rJO/'M1J ~ Address 307 ~ -r~ S-t City vJ~ State/1.{!. Zip Z<t4o ( Day Phone 9/~ ~J.sO III Fax 9/0 ~/5' 0100 b. Authorized Agent: Name Address City State Zip Day Phone Fax c. Project name (if any) ~ ..LA~ Revised 03/95 b. City ~w.n, community or landmark ~~A~ c. Street ad~ or secondary road number -1'1; d. Is proposed work within city rts or planning jurisdiction? Yes No 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and ..covalioo ~J1IiDg activities. b. Is the proposed activity maintenan~~f an existing project, new work, or both? -A{LLf. c. Will the project be. for ppblic, private or commercial use? p~ 4. LAND AND WATER I " CHARACTERISTICS ~ a. Sizeofentiretract ::5~.....~ ~ D. b. Size of individual lot(s) ,-) 00. _ ~44./:-J... ~ c. ~Ximate N~on of tract above MHW or d. ~oil type(s) and texture(s) of tract . ~n.L~'" ~_ .A..aM-aLr- e. Vegetation on tract ~ ' Form DCM-MP-l . ..j i: ~. J f. Man-made features now on tract ~~ g. What is the CAMA Land Use Plan land classification of the site? (CoI'llJllt 1M IDeal land we pl4n.) _ Conservation _ Developed _ Rural _ Transitional ~ Community _ Other h. How is ~ tract zoned by local government? ~ i. Is the pro~ps roject consistent with the applicable zoning? Yes _ No (Allacla zorIi compliance c.rriJiC4U, if appllCDbIl) j. Has a' professional archL'Ogical assessment been done for the tract? V''''' Yes NQ If yes, by whom? ~.ba..;tL p (!.. k. Is the project located in a National Registered Historic District or does it involve a National 'Register listed or II1gible property? _Yes LNo m. Describe existing wastewater treatment facilities. ~ Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, -wash down.. ~Midential dlscbJrg...) . o. Describe existing drinking water supply source. Nj1 5. ADDITIONAL INFORMATION In addition to the completed application form,' the following items must be submitted: · A copy or the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is Dot claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner claims title, plus written permission from the owner to carry out the project. · An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 112- by 11- white paper. (Refer to Coastal Resources Cl'mmission Rule 7J .0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger platS are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of I Are there wetlands on the site? _ yes-=-- -=- No - .: .~ ~ ~.~~ regarding that agency's use of larger O Coastal (marsh) Other = ~". .,' , dia~~g~.) A site or location map is a part of plat N 'fA If yes, has a delineation been conduct~? req~if~~ents and it must be sufficiently detailed to (AltDcIa d.oClllM1lltJJion, if avaiJDb~) - ~I C! 1/ 1 :3 19~ide:agency personnel unf~~ the area to the QiIJir,IC,' OF JAN 2 3 I"J'J/, '~'').'~::; ;';L i'.'lA f'~,~G EMENT ENVIRONMENTAL SCIENCES r"'".-J,If'L! Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. . A Stormwater Certification, if one is necessary. J . A list of the names and complete addresses or the adjacent waterfront (riparian) landowners and signed return receipts as proor that such owners have received a copy or the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. ~ Name' Address Phone . Name Address Phone Name Address Phone . A list or previous state or rederal permits issued for work on the project tract. Include permit numbers, permittee, and issuing dates. fJ~~ . A check ror $250 made payable to the Deparunent of Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the application. . A signed AEC hazard notice for projects in oceanfront and inlet areas. . A statement or compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. D."~..A n1/C)( 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained i'l the permit. I certify that to the best of my knowledge, the proPosed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal ' review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. , I further certify that the information provided in this application is truthful to the best of my knowledge. This is the..f3- day of ;Vt) r/. . 19!i.kJ. Print Name-rJaWp Ckn IM.h~r-(' ~ Sipture -rJ('1.u..t> L (J ~ lANlowrwr 0,. AIIlhoriz.ed Agml PI~e indicat~chments pertaining to your proposed proJect. M:4 . _ DCM -2 Excavation and Fill Information _ DCM MP-3 Upland Development _ DCM MP-4 Structures Information _ DCM MP-S Bridges and Culverts _ DeM MP~ Marina Development NOTE: Please sign and dare each altachment in the spaE!--1'{l!vide~ ar the bottom of each form. i ~) ~__r . . ~L 1 ~.'.:' j~ I .-,~\, I : I '; I i ! I 1 I] " , ~\.5 I I NO'} 1 .~ 1S96~' D i . 1-: ' '; ,_;- COA<::-j .', ".. ,- " '-' ''',L ;'''IA:'~AG :::ME\ T Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form ~o Joint Application for CAMA Major Permit, Form DCM-MP-l. Be sure to complete all other sections of the Joint Application that relate to this proposed project. Describe below the purpose of proposed excavation or till activities. All values to be given in feet. Ayerlp FtDaI EmdDa Project Length WIdth Depth Depth Access channel (ML W) or (NWL) : Canal Boat basin Boat ramp Rock groin Rock breakwater ~ (Excluding shoreline stabilization) Revised 03/95 - -..- ~ \\ i1~' 1D)D \ O)E'L' ~ 1 YJ llli \ \ \ II \ J ! iSU NOV 1 3 1996 DIVISION OF T COASTAL M,A.l~AGEMEN 1. EXCAVATION a. Amount of material to be excavated from below MHW or NWL in cubic yards A.2 / ..4- / b. Type of matetial to be excavated ".LV1Afk ~ &;9~ . c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic -:vegetation (SA Vs) or other wetlands? Yes V---No - ------- d. Higbground excavation in cubic yards .A }/ .A 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area ~ b. Dimensions of disposal area 0 c. 1;)0 you claim title to disposal area? ti _ Yes _No M 1'1 If no, attach a letter granting permi ion from th~ owner. d. Will a disposal area be available for future maintenance? Yes No If yes, where? IVI/~ Form DCM-MP-2 e. Does the disposal area include any coastal wetlands (marsh), SA Vs or other wetlands? _ Yes ~o If yes, , (1) Amount of material to be placed in the water (2) Dimensions of fill area f. Does the disposal incl]lde any area in the water? _Yes ~No (3) Purpose of fill ~ b. Will fill material be placed in coastal wetlands (marsh), SA~s or other Wetlands?~ _ Yes V'No. AI If yes, ,- :; - ,. I rl4 (t) Dimensions of fill area - 3. SHORELENESTABILIZATION a. Type of shoreline stabilization Bulkhead Riprap b. Len~ ~o/A \ ". r ~ . . _.~,. . .' ~ ... &'- -- c. _, Average dis ce waterward of MHW.or NWL (2) Purpose o~ fill ;_C~ ~L;~.~ d~1A~. uimu ~i~Walerward of MHW or NWL o\lf~" ,.~: '" , . _eB~';'iin~on during preceding 12 months (Source of' ormation) S. _ GENERAL ...~_...' .' ":: ,,'~ "'J a. How' will excavated or fill mate' be kept OD ~site and erosion controlled?; - -..... -"::~':":~ f. Type of bulkhead or_riprap mate~.i~. ., . - ...-.. , .;;,,'_.~l.'"'-- g. Amount of fill in ~cubic yards to be placed below water level' / ' (1) Riprap ~A (2) Bulkhead barrnll h. Type of fill material 4 i. Source of fill material ~ b. What type of construction equipment will be used .' (for ' example" dragline, backhoe, or hydraulic d~1 &. ..'~ ~~F:I ~-:',.;tcA c. Will wetlands be cnssed in transporting equipment to project site? _ Yes ~ No If yes, explain steps that will be taken to lessen environmental impacts. 4. OTHER FILL ACTMT~~~ 1E CD JE lIWIE 0 pplicaDt OJProjed Name (Excluding Shoreline Stabilizatio ~ Ii , ^ 0 ,J L,\ I I \_QJl.VI.I ~ I~U V 1 3 1996 Signature a. Will fill material ~ught tocsite? DIV/SIOi'J OF II . /3 - 9b RECEIVED _ Yes _ No OASTAL MANAGEMENT Date JAN 2 3 1"1'11. ENVIRONMENTAL SCIENCES " ~^~'rH Rni...d 01/9<:; wilmington, NC 28401 (910) 815-0111 1989 to 1993 Independent contractor Boat building Historical restoration Wilmington, NC 1975 to 1989 T. Vance Chamberlin Lumber and Millwork Hcnnikee, NH 03424 Retail, wholesale cabinet and boat building lumber custom millwork 1966 to 1975 Independent logger and sawmill operator. Wholesale and retail lumber. Northbrook, P A KennedyWle, MD My partner in this project is Frank Taylor of Lexington, NC. Frank has many years experience in underwater salvage in the Pacific and Caribbean. He also has a working knowledge ot; and access to, the electronic equipment needed for this project V"~ "~~,~~~ ~ ..' ,"', ".., I \' ,,~~ '""\ .! - ~._~. ~~ ~ '.j' )11] : ! \ , :::<:: ' I I , .. ./ t. , , I J L 'ry ,: 'I ~'~. NOV 1 3 1996 ~/ D/\iISI()\1 OF COASTAL MAf~AGEMENT ~. ~ .<) ~~ .~.~ ~ .~ r{) Q;- J~~c!. ~ .~ 1 j l\1 'J QJ ~ N ~ ~ v "" l ~~r ~ it ~\- (f ~ ffi u_ _ c.c ~ en . '.l1 en l._ i.,9 .- .).:{ ~ ':'.:-:- - ...-l ',:, 4: ~~ ~ :::::- Ii, "'- c:: :::-....J Z ~<1: ;::1i- CJ) - ""'" -<( 3C:?~ 3 .", f I Y ~ t i ~'-~ \ " " " .: ~ @J< ~~,:.,''': \\- - \ .<' 'l.'~ j B ~. , . ~ ..j~':~:f.i' :,~;. Z:':;::;";~";: >.:; . ~ +i'~1i"'~'~~c:};:..c... , . 1" :.',;~."..\.:-rr::,,' .....; + 'R~P~ '...R~~ -rv~~ )2..'2...-7b . .' Pennit Number 96NER591 STATE OF NORTH CAROLINA Department or Cultural Resources PERMIT for TQ) ~ <D ~ IIV~ ill) lID NOV 1 3 1996 DIVISION OF COASTAL MAr~AGEMENT x X Exploration Recovery Salvage Issued to VANCE THOMAS CHAMBERLIN 307 South 3rd Street Wilmington, North Carolina 28401 Pender authorizing activities affecting submerged cultural resources in New Hanover IBrunswiclCounty at as requested in the Permittee's application dated February 14, 1996 . This pennit, issued on March 1, 1996 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these tenns may cause the permit to be null and void. SEE SPECIAL CONDITIONS A through H Any project modification not covered hereunder requires further Departmental approval. Signed by the authority of the Secretary of the Department of Cultural Re~ources S~ ~ 1< Cl::; ~/~ State Archaeologist, OfficetJ of State Archaeology, State and Historic Preservation Office. All work must cease when the pennit expires on March 1, 1997 This pennit and its conditions are hereby accepted. .r7~~ Signature of Permittee '. F. G. H. SPECIAL CONDITIONS FOR PERMIT NUMBER 96NERS91 A. This permit is limited to the recovery of submerged logs and other non- structural wood. The j)resence of any cultural material that is encountered during the course ot the project shall be reported to the Underwater Archaeology Unit immediately. This permit authorizes the Permittee the riaht to conduct initial remote sens~ survey activities within the area defined as: those portions of the Northeast Cape Fear River from the Hilton Railroad Bridge upstream to the head of navigation. U~n completion of the remote sensing ~urvey, the Permittee shall inform the Underwater Archaeology Unit (uAu) of any areas of the river bottom containing a sufficient concentration of submerged logs to wmant recovery operations. If the UAU determines that recovery of submerged logs from a specific area will not jeopardize significant cultural resources, the Permittee shall be given exclUSive rights to recover logs from that ,area. The Permittee shall nave exclusive recovery riahts to no more than six well-defined areas at any time. If the UAU feels tTtat recovery o~rations in a ~ecific area ~ jeopardize si~cant cultural resources, the Permittee sh81l not undertake recovery operations in that area. The Pennittee agrees to no~ the office of the Underwater Archaeology Unit, P.O. Box 38, Kure Beach, North Carolina 28449, phone 910-458- 9042, at least 48 hours prior to imtiating field activities. ' The Permittee shall submit a monthly report detaiHng project activities and listing all artifacts recovered and thelI status. Monthfy report are due by the 10th day of the following month. All logs and timbers recovered under the conditions of this permit shall become property of the Permittee. The period of this permit shall be one year. The permit may be renewed yearfy, subject to any changes in the permit the Department deems appropriate, providing the Pennittee has satlsfactorily met ill the terms and conditions of this pennit. B. c. D. E. ~ 7- ,- ~ ~~?~ TI\\ "".' '.-. ,,"I~ I" , ' .. . . JI .' ~ I . \ l 0' J ----. -- .J.....;...._ ~ -J ~ I: i 1-< i' I , ' I ' i 1/: ~ ~ '. '~7 ! ! / -'-/ NOV131996~ DIVISIO;,j OF COASTA,L MAr~AGEMENT \( cv..x 1..- I~- "r h ~"VZ- APPLICATION FOR PERMIT Exploration, Recovery and Salvage of Submerged Cultural Resources State of North Carolina Department of Cultural Resources I. AppHcantbUo~tion A. Name: Chamberlin, Thomas Vance B. Address: 307 S. 3rd Sl Wilmington, NC 28401 (910) 251-9105 (\-t ) C. Institutional or other affiliation: ~\ ~ - () 1\' t w} II. Location ofProposcd Project A. County: New Hanover, Pender, Duplin B. City, town, community or landmark: Wilmington, Albcrtston C. Creek, river, sound, bay or ocean beach in or near which project is located: Northeast Cape Fear River. . III. Description of Proposed Project A. Provide a statement of the purpose or objectives of the project: The objective of this project will be to recover submerged logs that are of sufficient quality to be milled into hunber. The project will be in two stages: 1. Map the N.E. Cape Fear River from north of the shipping lane (railroad bridge) to as far north as the concentration of logs or river depth will permit economic recovery. 2. Once the concentration and location of logs has been established, . the river project will be divided into sections. Each section will be reviewed by the Underwater Archeology Unit a.~ to location of shipwrecb or other archeological artifacts that are not to be disturbed, Once this criterion has been establishe~ pcnni.~sion to proceed in a specific section will be given. ?O I TiZ:, ((; ~ Ii \\lIilll n' :\\ ,~,-y~" \1 \\\- Jj .1\3 NOV 1 3 1996. v OIVISIO,\} OF T ~OASTAL MAI~AGEMEN B. Provide a description of the exact nature and scope of the proposed project, include the methods, techniques, and equipment to be used: The survey will be done using an Echoscope 1600 by Ornnitech or Kline System 2000 by Kline Associates or other similar sonar system. These systems provide a 3D target picture. The target can be positioned, zoomed, and scaled to length, area, and volume. The sonar unit, in conjunction with GPS, will give exact locations to be salvaged. The salvage equipment will consist of a crane of approximately 10 ton capacity mounted on a barge of approximately 60 feet. The crane will be fitted with a hydraulic or mechanical grapple. Using the sonar picture, the grapple can be guided to specific logs for salvage. The logs will be loaded onto the barge, and taken to an appropriate sight to be off-loaded. The logs will then be tr4r1Sported to a sight to be manufactured into lumber. I, C. Provide the schedule for the proposed project including beginning and completion dates of all phases: The survey will be started in April and take approximately one month. The salvage operation will begin when sufficient logs have been identified to warrant salvaging. The entire project could take up to three years. IV. Project personnel A. Project Director: SMIE B. Archaeologist: Nt A C. Approximate number ofpcople to be involved in the proposed project: Ten V. Disposition of Artifacts A. Will the proposed project result in the removaL displacement, or destroction of submerged cultural resources? YES B. Is the objective of the proposed project the salvage of submerged cultural resources for commercial purposes? YES If yes, provide the name and location of the facility where the salvaged materials will be stored until final disposition as set forth in the required salvage contract: , The pwpose is to manufacture the logs into bunbel'. Whether an independent sawmill operator will be contracted or the machinery will be purchased will be determined. The location of this operation will be deternrined by the above decision, and the off-loading site for the barge. The best off-loading sites will be detcnnincd during the preliminary survey according to log concentration. C. Is the objective of the project the recovery of material for archaeological research purposes'? NO. D. Does the applicant wish to obtain possession of the artifacts on a loan basis from the Department of Cultural resources? NO. . VI. In addition to the complete application form the following items must be provided: A. A 1 :24,000 or larger scale map clearly depicting the location of the proposed project B. A resume for the project director: Thomas Vance Chamberlin 1993 to present OMlor - T Vance Chamberlin Woodworking. Custom furniture, millwork, lumber. 1619 1/2 Castle Hayne Rd. ~. --V' /.-ol'~ -~I ~n - TT \7, -:-~17J': l( , ' ;:.J ,1 ~. : ',;,';! , ", /1 I I . ~ ~ ~- ~ '.. -!..:r_~ I -- ' I ,> - , \ . \.. ~J NOIJ 1 3 1996 L DIVIS;O,\; OF COASTAL MAI~AGEMEt