HomeMy WebLinkAboutNCC191811_ESC Approval Submitted_20190916Energy, Min era I
and Land Resources
ENVIRONMENTAL QUALITY
April 15, 2019
LETTER OF APPROVAL
City of Charlotte
Attention. Monifa Woodside
600 East 4th Street
Charlotte, NC 28202
RE: Project Name: CMPD South Division Station
Acres Approved: 5.1
Project ID: MECKL-2019-058
County: Mecklenburg, City: Charlotte
Address: Providence Road
River Basin: Catawba
Stream Classification: Other
Submitted By: City of Charlotte
Date Received by LQS: March 22, 2019
Plan Type: New
Dear Ms. Woodside:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
S. DANNY SMITH
Interim Director
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable
and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site.
This plan approval shall expire three (3) years following the date of approval, if no land -disturbing activity has
been undertaken, as is required by Title 15A NCAC 4B .0129.
As of March 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (NOl) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.govINCGO1. Please direct questions about
the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov. After
you submit a complete and correct NOI Form, a COC will be emailed to you within three business days.
Initially, DEMLR will not charge a fee for coverage under the NCGOI permit. However, on or after May 1,
2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office in
Raleigh.
State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources
Mooresville Regional Office 610 East Center Ave Ste 301 1 Mooresville, NC 28115
704 663 1699 T
Letter of Approval
City of Charlotte
April 15, 2019
Page 2 of 2
Title 15A NCAC 4B .0118(a) and the NCGO 1 permit require that the following documentation be kept on file at
the job site:
The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, the erosion and
sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality
laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -
disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
ames Moore
Assistant Regional Engineer
Land Quality Section
THE
Enclosures: Certificate of Approval
NCGO1 Fact Sheet
em: Jason.Dolan@timmons.com